Task Order 0002 - Engineering Support for PASS.pdf

PDF 14 KB Posted

Attached to
Engineering and Technical Support for Research and Development Efforts within the Tactical Electronic Warfare Division Federal contract opportunity
Solicitation number
N00173-13-R-RV01
Issued by
Department of the Navy Secretary of the Navy Office of Naval Research

About this file

Task Order 0002 - Engineering Support for PASS.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Engineering and Technical Support for Research and Development Efforts within the Tactical Electronic Warfare Division, newest first.
File Type Posted
Amendment_0004_N00173-13-R-RV01.pdf PDF
N00173-13-R-RV01_Amendment_0003.pdf PDF
Attachment 7 - Fixed Price Labor Rate Schedule —
Attachment 9 - Direct Labor Ceiling Rate Form.xlsx XLSX spreadsheet
Questions and Answers N00173-13-R-RV01.pdf PDF
SECTION SF 30.pdf PDF
Attachment 2 - DD254 Revision 1.pdf PDF
Attachment 1 - Personnel Qualifications.pdf PDF
Amendment_0001.pdf PDF
Exhibit A - DD 1423.pdf PDF
Attachment 2 - DD254.pdf PDF
Solicitation_13-R-RV01.pdf PDF
Exhibit C - DD 1423.pdf PDF
Attachment 3 - Requirements for On-Site Contractors.pdf PDF
Attachment 11 - Task Order Cost_Price Spreadsheet.xlsx XLSX spreadsheet
Attachment 1 - Personnel Qualifications.pdf PDF
Attachment 9 - Direct Labor Ceiling Rate Form.xlsx XLSX spreadsheet
Attachment 7 - Fixed Price Labor Rate Schedule.xlsx XLSX spreadsheet
Attachment 10 - Task Order Staffing Plan.xlsx XLSX spreadsheet
Attachment 8 - Indirect Ceiling Rate Form.docx DOCX document
Attachment L-2 - Previous Contracting Efforts.doc DOC document
Task Order 0001 - EW System Development.pdf PDF
Attachment L-1 - Past Performance Questionnaire.doc DOC document
Exhibit B - DD 1423.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00173-13-R-RV01

Task Order 0002

STATEMENT OF WORK

TASK ORDER 0002

ENGINEERING SUPPORT FOR PASS

DATED 06/03/2013

1.0 INTRODUCTION

NRL Code 5720 has developed a prototype ESM system for experimentation of the Passive Autonomous

Surveillance System (PASS) project. This system leverages technology components developed within the branch to provide advanced ESM capabilities, precision angle of arrival, and geolocation information.

The resulting information is passed to sensor integration software, currently referred to as Rough Widow

(RW).

2.0 TASK DESCRIPTION

Algorithm Development:

The contractor shall develop signal processing algorithms to estimate monopulse angle of arrival (AOA) estimates for received radar signals using differential phase and amplitude. The contractor shall develop specialized Matlab models and simulation tools for thorough testing and evaluation. The contractor shall conceive, test, and transition algorithms from the modeling stage to real time operational ES prototype systems. The contractor shall produce write-ups and presentations to document all developments and performance assessments. NRL expects 1-2 algorithm developments per year.

Software Engineering:

The contractor shall develop software for prototype ESM systems. The software shall perform signal processing functions such as calculating AOA or other pulse processing functions. The contractor shall be responsible for supporting the system testing, evaluation, and debugging cycles. The contractor may be required to consult with engineers, management, and field engineers to develop software that produces a working, productive ES system. The software must interact with ESM system hardware, other ESM subsystems (FPGAs, GUI displays, etc), and networked systems aboard the target platform (e.g. sensor fusion software, navigation sensors, etc.) Systems integration is expected to occur 1-2 times annually, with a primary focus on airborne prototype integration.

Field Tech work:

The contractor shall support the design and operation of Prototype ESM systems. This includes installation, test and evaluation, troubleshooting, and operating prototype ES systems aboard NRL P3 aircraft. The contractor shall be flight qualified on the NRL P3 aircraft. OPNAVINST 3710.7U defines the qualifications required to fill the role of project specialist.

Project Specialist: An individual embarked in a government aircraft not equipped with ejection seats and/or personal oxygen systems (excluding emergency oxygen systems) for the purpose of operating aircraft systems, operating specially designed equipment, or observing aircraft or crew performance when required in connection with assigned duties or contractual responsibilities. Project specialists are not responsible for normal aircrew duties.

To be properly qualified to fly aboard NRL aircraft, you will need two things:

1 A current Class II FAA up-chit and

2 Documentation of successfully completing the NP4 survival swim and physiology training course.

The contractor shall provide real time feedback on the operational aspects of the system during test execution, and post test analysis on system performance, capabilities, and suggested improvements. The contractor personnel assigned to this task shall be able to deploy with the aircraft and system Based on prior experience, airbone field tech TDY is anticipated to include one (1) month CONUS travel, originating from NAS PAX River, MD and up to two (2) months consecutive OCONUS travel.

The contractor shall support technical and operational personnel associated with USN or USCG ships to install, test, evaluate, troubleshoot, and operate prototype ES systems aboard ships. The contractor shall participate in at-sea deployments and tests to operate and evaluate the ESM systems. The Contractor shall provide real time feedback on the operational aspects of the system during test execution, and post test analysis on the system performance, capabilities, and suggested improvements. Based on prior experience, shipboard field tech TDY is anticipated to include up to two (2) months consecutive

OCONUS travel.

The contractor personnel assigned to this task shall be able to deploy to sea with the equipment (both

CONUS and OCONUS and single deployments may last up to 3 months at a time).

3.0 PLACE OF PERFORMANCE

The primary place of performance is NRL Washington, DC. Flight integration shall occur at NAS

Patuxent River, MD. Field test execution requires both CONUS and OCONUS deployment as determined by testing scenarios and field exercises.

4.0 LEVEL OF EFFORT

The estimated level of effort for this task order is as follows:

LABOR CATEGORY HOURS

Senior Microwave/RF Design Engineer (Key)

Microwave/RF Design Engineer

Microwave Technician

Senior Analog/Digital Design Engineer (Key)

Analog/Digital Design Engineer

Assembly Technician

Senior Software Engineer I (Key)

Senior Software Engineer II 480

Associate Software Engineer

DSP Design Engineer (hardware and software) 160

Senior Aero/Mechanical Engineer (Key)

Mechanical Design Engineer

Technical Program Specialist I

Senior Scientist I (Key)

Senior Scientist II

Senior Engineer

Senior Systems Engineer

Senior Electrical Design Engineer

Associate Senior Scientist

Electrical Engineer

Technical Program Specialist II

Field Test Engineer 960

Electrical Engineering Technician

Graphic Designer/Draftsman

TOTAL 1,600

5.0 ORDER TYPE

This task order is issued on the basis marked below:

Order Type

X Firm-Fixed-Price Level-of-Effort

Cost-Plus-Fixed-Fee-Term

Cost-Plus-Fixed-Fee-Completion

6.0 PERIOD OF PERFORMANCE

The term of this task order is twelve (12) months from date of award.

File details come from the government source that posted it. Updated .