Attachment 8 - Indirect Ceiling Rate Form.docx

DOCX document 23 KB Posted

Attached to
Engineering and Technical Support for Research and Development Efforts within the Tactical Electronic Warfare Division Federal contract opportunity
Solicitation number
N00173-13-R-RV01
Issued by
Department of the Navy Secretary of the Navy Office of Naval Research

About this file

Attachment 8 - Indirect Ceiling Rate Form.docx

View the file

Other files for this federal contract opportunity

Other files attached to Engineering and Technical Support for Research and Development Efforts within the Tactical Electronic Warfare Division, newest first.
File Type Posted
Amendment_0004_N00173-13-R-RV01.pdf PDF
N00173-13-R-RV01_Amendment_0003.pdf PDF
Attachment 7 - Fixed Price Labor Rate Schedule —
Attachment 9 - Direct Labor Ceiling Rate Form.xlsx XLSX spreadsheet
Questions and Answers N00173-13-R-RV01.pdf PDF
SECTION SF 30.pdf PDF
Attachment 2 - DD254 Revision 1.pdf PDF
Attachment 1 - Personnel Qualifications.pdf PDF
Amendment_0001.pdf PDF
Exhibit C - DD 1423.pdf PDF
Task Order 0002 - Engineering Support for PASS.pdf PDF
Exhibit A - DD 1423.pdf PDF
Attachment 2 - DD254.pdf PDF
Solicitation_13-R-RV01.pdf PDF
Attachment 3 - Requirements for On-Site Contractors.pdf PDF
Attachment 11 - Task Order Cost_Price Spreadsheet.xlsx XLSX spreadsheet
Attachment 1 - Personnel Qualifications.pdf PDF
Attachment 9 - Direct Labor Ceiling Rate Form.xlsx XLSX spreadsheet
Attachment 7 - Fixed Price Labor Rate Schedule.xlsx XLSX spreadsheet
Attachment 10 - Task Order Staffing Plan.xlsx XLSX spreadsheet
Attachment L-2 - Previous Contracting Efforts.doc DOC document
Task Order 0001 - EW System Development.pdf PDF
Attachment L-1 - Past Performance Questionnaire.doc DOC document
Exhibit B - DD 1423.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation N00173-13-R-RV01 Attachment 8

INDIRECT CEILING RATE FORM

Cost Center (if applicable) ________________

The indirect ceiling rates shown below will be the maximum allowable rates that can be proposed or billed under individual task orders issued during the respective ordering periods under this contract. These are not bid rates. Indirect rates proposed for individual task orders may be less and should be in accordance with the offeror’s disclosed estimating system practices and, if applicable, forward pricing rate agreements. Additionally, should actual rates experienced during the performance of the contract be lower than the ceiling rates shown, actual rates will be billed. The multiplier is the factor that will be applied to direct costs to calculate fully burdened costs. Information on this form shall be submitted for the Prime and proposed cost-reimbursable subcontractor (if applicable). If multiple cost centers will be used in the performance of this contract, this form shall be submitted for each cost center.

FY 2013 INDIRECT CEILING RATES

Cost Element
Fringe
Contractor Facility Overhead
Gov’t Facility Overhead
G&A
FCCOM

Direct Labor (Contractor Facility)

Provide in Chart below

Direct Labor (Gov’t Facility)

OCONUS Hardship

Materials

Travel

Fixed Price Subcontracts

Cost Reimbursable Subcontractors

Other (list)

FCCOM POOL
COST BASIS
RATE

The listed indirect rate categories should be adjusted to reflect accounting system.

If maximum indirect rates proposed for FY 2014 through FY 2017 vary significantly from the proposed base year indirect rates, explain and support the basis of these maximum indirect rates.

FY 2014 INDIRECT CEILING RATES

Cost Element
Fringe
Contractor Facility Overhead
Gov’t Facility Overhead
G&A
FCCOM

Direct Labor (Contractor Facility)

Provide in

Direct Labor (Gov’t Facility)

OCONUS Hardship

Materials

Travel

Fixed Price Subcontracts

Cost Reimbursable Subcontractors

Other (list)

FCCOM POOL
COST BASIS
RATE

If maximum indirect rates proposed for FY 2014 through FY 2017 vary significantly from the proposed base year indirect rates, explain and support the basis of these maximum indirect rates. )

FY 2015 INDIRECT CEILING RATES

Cost Element
Fringe
Contractor Facility Overhead
Gov’t Facility Overhead
G&A
FCCOM

Direct Labor (Contractor Facility)

Provide in

Direct Labor (Gov’t Facility)

OCONUS Hardship

Materials

Travel

Fixed Price Subcontracts

Cost Reimbursable Subcontractors

Other (list)

FCCOM POOL
COST BASIS
RATE

FIELD

HOME

G&A

OWNED EQUIPMENT

If maximum indirect rates proposed for FY 2014 through FY 2017 vary significantly from the proposed base year indirect rates, explain and support the basis of these maximum indirect rates.

FY 2016 INDIRECT CEILING RATES

Cost Element
Fringe
Contractor Facility Overhead
Gov’t Facility Overhead
G&A
FCCOM

Direct Labor (Contractor Facility)

Provide in

Direct Labor (Gov’t Facility)

OCONUS Hardship

Materials

Travel

Fixed Price Subcontracts

Cost Reimbursable Subcontractors

Other (list)

FCCOM POOL
COST BASIS
RATE

FIELD

HOME

G&A

OWNED EQUIPMENT

If maximum indirect rates proposed for FY 2014 through FY 2017 vary significantly from the proposed base year indirect rates, explain and support the basis of these maximum indirect rates.

FY 2017 INDIRECT CEILING RATES

Cost Element
Fringe
Contractor Facility Overhead
Gov’t Facility Overhead
G&A
FCCOM

Direct Labor (Contractor Facility)

Provide in

Direct Labor (Gov’t Facility)

OCONUS Hardship

Materials

Travel

Fixed Price Subcontracts

Cost Reimbursable Subcontractors

Other (list)

FCCOM POOL
COST BASIS
RATE

FIELD

HOME

G&A

OWNED EQUIPMENT

If maximum indirect rates proposed for FY 2014 through FY 2017 vary significantly from the proposed base year indirect rates, explain and support the basis of these maximum indirect rates.

SOURCE SELECTION SENSITIVE INFORMATION – DISCLOSURE LIMITATIONS AS OUTLINED IN FAR 2.101 & 3.104 APPLY

File details come from the government source that posted it. Updated .