Solicitation_13-R-RV01.pdf
PDF 925 KB Posted
- Attached to
- Engineering and Technical Support for Research and Development Efforts within the Tactical Electronic Warfare Division Federal contract opportunity
- Solicitation number
- N00173-13-R-RV01
About this file
Solicitation N00173-13-R-RV01
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I – THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Solicitation No. N00173-13-R-RV01 Page 2 of 97
The Contractor shall provide engineering and technical services in accordance with Section C – Statement of Work. The minimum guarantee of $50,000.00 for each contract for the maximum contract term will be satisfied with the award of the initial task order. The total maximum cumulative value for all contracts is $47,000,000.00.
B–1 PART I – SUPPLIES/SERVICES AND COSTS
ITEM NO SUPPLIES/SERVICES ESTIMATED COST FIXED FEE
Noun:
Tactical Electronic Warfare Engineering and Support (Non-
Severable)
PSC: AC64
Contract Type: Cost Plus Fixed Fee
Inspection: N00173
Acceptance: N00173
FOB: Destination
Ordering Period: 09/01/2013 through 8/30/2016
Limitations of Liability: To be defined in each TO
Descriptive Data:
The Contractor shall furnish all labor, material, equipment, travel, facilities, and items reasonably required to accomplish task orders issued pursuant to the requirements contained in the Statement of Work entitled “Tactical Electronic Warfare Engineering and Support”, and
IAW Section G clause “G-8, Ordering Procedures.”
ESTIMATED COST PLUS FIXED FEE
Not Separately Priced
Noun: Hardware Deliverables
PSC AC63
Contract Type: Cost Plus Fixed Fee
Inspection: N00173
Acceptance: N00173
FOB: Destination
The Contractor shall deliver all hardware as required by individual task orders. The price of this CLIN is included in CLIN 0001.
ESTIMATED COST PLUS FIXED FEE Not Separately Priced
Solicitation No. N00173-13-R-RV01 Page 3 of 97
Noun: Software Deliverables
Contract Type: Cost Plus Fixed Fee
Inspection: N00173
Acceptance: N00173
The Contractor shall deliver all software as required by individual task orders. The price of this
CLIN is included in CLIN 0001.
Noun: Data and Reports
DD1423 is Exhibit A
Contract Type: Cost Plus Fixed Fee
Inspection: N00173
Acceptance: N00173
The Contractor shall furnish all data as required by the Contract Data Requirements List
(CDRL), DD Form 1423, which is hereby incorporated as Exhibit A. Applicable data will be indicated on each task order issued hereunder. The price of this CLIN is included in CLINs
0001.
Solicitation No. N00173-13-R-RV01 Page 4 of 97
Noun: Tactical Electronic Warfare Engineering and Support (Severable)
PSC: AC64
Contract Type: Cost Plus Fixed Fee
Inspection: N00173
Acceptance: N00173
FOB: Destination
Ordering Period: 09/01/2013 through 8/30/2016
The Contractor shall furnish all labor, material, equipment, travel, facilities, and items reasonably required to accomplish task orders issued pursuant to the requirements contained in the Statement of Work entitled “Tactical Electronic Warfare Engineering and Support”, and
IAW Section G clause “G-8, Ordering Procedures.”
ESTIMATED COST PLUS FIXED FEE
Noun: Hardware Deliverables
Contract Type: Cost Plus Fixed Fee
Inspection: N00173
Acceptance: N00173
The Contractor shall deliver all hardware as required by individual task orders. The price of this CLIN is included in CLIN 0001.
Solicitation No. N00173-13-R-RV01 Page 5 of 97
Noun: Software Deliverables
Contract Type: Cost Plus Fixed Fee
Inspection: N00173
Acceptance: N00173
The Contractor shall deliver all software as required by individual task orders. The price of this
CLIN is included in CLIN 0001.
DD1423 is Exhibit B
Contract Type: Cost Plus Fixed Fee
Inspection: N00173
Acceptance: N00173
(CDRL), DD Form 1423, which is hereby incorporated as Exhibit A. Applicable data will be indicated on each task order issued hereunder. The price of this CLIN is included in CLINs
0001.
Solicitation No. N00173-13-R-RV01 Page 6 of 97
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
Direct
Productive
Person
Hours
(DPPH)
Noun: Tactical Electronic Warfare Engineering and Support
Contract Type: Firm-Fixed Price Level of Effort
Inspection: N00173
Acceptance: N00173
FOB: Destination
Ordering Period 09/01/2013 through 8/30/2016
The Contractor shall furnish all labor, equipment, and facilities reasonably required to accomplish task orders issued pursuant to the requirements contained in the Statement of Work entitled
“Tactical Electronic Warfare Engineering and Support”, and IAW Section G clause “G-8, Ordering Procedures.”
TOTAL AMOUNT
LOT
Materials for Tactical Electronic Warfare Engineering and
Support
PSC AC63
Contract Type: Cost
Inspection: N00173
Acceptance: N00173
FOB: Destination
The Contractor shall furnish all materials reasonably required to accomplish task orders issued against CLIN 1001.
Solicitation No. N00173-13-R-RV01 Page 7 of 97
ODCs (excluding materials) for Tactical Electronic Warfare
Engineering and Support
PSC AC63
Contract Type: Cost
Inspection: N00173
Acceptance: N00173
FOB: Destination
The Contractor shall furnish all travel, and other direct costs (excluding materials) reasonably required to accomplish task orders issued against CLIN 1001.
DD1423 is Exhibit C
Contract Type: Firm-Fixed Price Level of Effort
Inspection: N00173
Acceptance: N00173
(CDRL), DD Form 1423, which is hereby incorporated as Exhibit B Applicable data will be indicated on each task order issued hereunder. The price of this CLIN is included in CLIN
Solicitation No. N00173-13-R-RV01 Page 8 of 97
B–2 FIRM-FIXED-PRICE, LEVE OF EFFORT (FFPLOE) TERM TASK ORDERS
In the performance of CLIN 1001 of this contract, the contractor shall provide the following level of effort within the time period as set forth in the applicable task order:
DIRECT PRODUCTIVE PERSON HOURS (DPPH)*
LEVEL OF EFFORT COMPOSITE RATE PER HOUR TOTAL
[To be completed in each FFPLOE task order]
DPPH are defined as prime contractor, subcontractor, and consultant actual direct labor hours exclusive of vacation, holiday, sick leave, and other absences.
In accordance with FAR 16.207-2, entitlement to full payment is based on the determination by the Government that the required level of effort and reports have been provided and are acceptable.
B–3 MATERIAL PURCHASES
Material purchases for CLIN 1002 must be itemized and reported monthly to the COR. Any individual item with a unit price greater than $5,000.00 requires advanced approval by the Contracting Officer’s Representative (COR).Any individual item with a unit price greater than $25,000 must be approved by the Procuring Contracting Officer (PCO) prior to purchase.
B–4 TRAVEL COSTS
(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its reasonable actual travel costs in accordance with FAR 31.205-46. The costs to be reimbursed shall be those costs accepted by the cognizant DCAA office.
(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.
(c) Relocation costs and travel costs incidental to relocation are allowable to the extent provided for in FAR 31.204-35;
however, contracting officer approval shall be required prior to incurring relocation expenses and travel costs incidental to relocation.
(d) The Contractor shall not be reimbursed for the following daily local travel costs:
(i) Travel at U.S. military installations where Government transportation is available;
(ii) Travel performed for personal convenience/errands, including commuting to and from work; and
(iii) Travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's or employee's convenience.
SECTION C
DESCRIPTION/SPECIFICATIONS/PERFORMANCE WORK STATEMENT
Solicitation No. N00173-13-R-RV01 Page 9 of 97
C–1 STATEMENT OF WORK
C– 1.1. INTRODUCTION
This Statement of Work (SOW) describes the engineering and technical support services to be provided to the Naval
Research Laboratory’s (NRL) Tactical Electronic Warfare Division (TEWD), which is located in Washington, D.C.
C– 1.2. BACKGROUND
This SOW describes a variety of taskings which incorporate the three major subdivisions of EW: Electronic Attack (EA), Electronic Warfare Support (ES), and Electronic Protection (EP). TEWD is tasked with performing research on Electronic
Warfare (EW) systems and the application of technologies to support the development and fielding of EW systems. Areas of specific interest include a broad spectrum of scientific research, engineering development, computer simulation, and direct technical liaison with US intelligence and armed services EW experts. TEWD is seeking Contractor technical support in a variety of disciplines and related applications. Services conducted under this SOW will concentrate on system research and development (R&D); RF engineering and fabrication; aeronautical engineering and unmanned vehicle development; mixed signal circuit design; digital signal processing; EA technique development; software development
(real-time DSP, real-time displays, and GUIs); mechanical engineering; information technology deployment and maintenance support; as well as fabrication, assembly, integration and testing of prototype EW systems and associated components; general design; modeling and simulation of EW concepts; development support (e.g., schematics, design documentation, and user and operator manuals); field test, exercise, system installation, and training support; and program management support. The required services include a number of interrelated tasks that vary in both their technical dimensions and deliverable product.
C– 1.3. SCOPE
The Contractor shall provide the person-hours of scientific, technical, and engineering support services and materials to perform the tasks described within this SOW. These tasks include systems engineering (hardware and software), systems analysis (hardware and software), and data collection and analysis. The uniqueness of data availability, availability of necessary processing equipment, and security requirements dictate that the Contractor must perform a major portion of the tasks on-site at NRL. The Contractor shall support tasking up to the SCI classification level. The Contractor shall provide research and engineering services in support of six basic task areas:
Task 1 RF Engineering
Task 2 Mixed-signal circuit design (Analog/Digital)
Task 3 Digital Signal Processing (DSP) and Software Development
Task 4 Mechanical and Aeronautical Engineering
Task 5 System/Subsystem Technical Development and Support
Task 6 Graphics and Drafting Services
C– 1.4. SOW TASKS
1.4.1 Task 1 RF Engineering:
The Contractor shall provide Radio Frequency (RF) engineering and technical support for design, development, and repair of unique components and subsystems supporting R&D projects and prototype system developments. RF frequencies of interest for this task may range from 100 MHz up through 100 GHz. Contractor services provided under this task may include the design, analysis and fabrication of antennas, filters, amplifiers, oscillators, frequency conversion components and various types of millimeter wave, microwave and RF receivers. The Contractor shall provide 3-D and 2-D electromagnetic modeling and simulation capabilities suitable for the development of antennas, antenna arrays as well a variety of common RF components. Additionally, the Contractor shall provide receiver design and analysis services, leading to the development of new receiver architectures. Based on a given set of requirements, the Contractor shall design, build, and integrate the RF hardware required to fulfill the requirements. This involves a variety of tasks, Solicitation No. N00173-13-R-RV01 Page 10 of 97 including system architectural design; hardware development; layout, fabrication, procurement, assembly, and testing;
system level integration; testing; and documentation.
1.4.2 Task 2 Mixed Signal Circuit Design (Analog/Digital):
The Contractor shall provide Mixed Signal Circuit Design engineering and technical support for the design, development and repair of unique components and subsystems supporting R&D projects and prototype system developments. The primary objective for this task will be the development of circuits containing both analog and digital circuitry including
Digital RF Memory (DRFM) technologies. An example of the type of work to be anticipated under this task is the development of a circuit board containing analog signal conditioning components, analog-to-digital conversion (ADC) components and digital signal processing components. ADC sample rates are expected to be in excess of 2.0 GSPS.
Extreme attention to detail concerning the control of signal isolation and crosstalk will be required to optimize circuit performance. Noise mitigation in the analog sections will be critical. The Contractor shall provide hardware design and debug services, including embedded processor design, to support electronic warfare processing applications. Based on a given set of requirements, the Contractor shall design, build, and integrate the digital, analog, and RF hardware and software required to fulfill the requirements. This involves a variety of tasks, including system architectural design;
hardware and software development; printed wiring board (PWB) design, layout, fabrication, procurement, assembly, and testing; system level integration; and testing. Detailed digital designs must use ADCs and must include the supporting analog and RF circuitry required to perform signal reception, amplification, conditioning, filtering, as well as digital circuitry to perform digital signal processing.
1.4.3 Task 3 Digital Signal Processing (DSP) and Software Development:
DSP is concerned with the practical aspects of representing information-bearing signals in digital form and with using computers or special purpose digital hardware to extract that information or to transform the signals in useful ways.
Orders issued against this task area may involve work in one or more of the following area(s):
1.4.3.1 DSP Hardware – The Contractor shall integrate high-speed ADC boards with state-of-the-art processor boards.
Data from these boards must then be transformed into useful data using a variety of data analysis algorithms. This data will be used by the software application to implement signal detection, characterization and analysis algorithms. The
Contractor shall implement high-throughput data transfers across numerous bus technologies including RACEway, PCI, Compact-PCI, PCI-Express, PXI, VME, VXI and other serial or optical devices.
1.4.3.2 DSP Software Development – The Contractor shall develop software using the target high-bandwidth processing hardware and the requisite developmental systems. The Contractor shall implement established DSP techniques such as
FFTs, convolution, digital filters, number system conversions, vector algebra, trigonometry, and other algorithms specific to Electronic Warfare. The Contractor shall optimize DSP algorithms using real-time DSP and FPGA technologies.
1.4.3.3 EW Systems Software Development – The current and projected emitter environment requires emphasis on advanced EW support systems that can simultaneously detect and process a large number of emitters. The Contractor shall develop software capable of analyzing and processing large amounts of emitter data collected by these EW systems.
Custom software must also be developed for integration and test purposes as well as advanced algorithm development for automatic analysis techniques and real-time process control. Additionally, software must be developed to integrate GUIs required to display all data collected and analyzed by the system with operator control via this interface.
1.4.3.4 Electronic Attack Techniques Development – The Contractor shall develop a coherent EA techniques generator based on DRFM technology. This techniques generator must have flexibility of waveform input and output characteristics such that it will support the development of EA techniques against a range of modern threat radars. The victim radars use advanced modes of operation including Frequency Modulation (FM) and phase coded pulse compression, pulse to pulse frequency and Pulse Repetition Interval (PRI) agility, Doppler processing, Inverse Synthetic Aperture Radar (ISAR) and
Synthetic Aperture Radar (SAR). The Contractor shall design the coherent EA techniques generator such that it can be used in the TEWD/development based technique generators to support the EA function with coherent EA techniques. The
Solicitation No. N00173-13-R-RV01 Page 11 of 97
Contractor shall use the techniques generator to develop effective EA techniques against the simulated threats in demonstration scenarios and provide the controls, both hardware and software, to generate an effective technique to engage EA of those threats with either a laboratory or field site based test bed. The Contractor shall use the techniques generator to develop EA techniques against other advanced radar threats. The Contractor shall support this EA technique development with threat information, as background and reference, at up to the SCI classification level.
1.4.3.5 Analysis Software Development – The Contractor shall design, develop, and manage software systems used to collect, distribute, analyze, record and display emitter data. Requirements for the software being developed are based upon on-going R&D projects. Additional requirements are constantly being added because of newly developed algorithms and evolving emitter sources. The Contractor shall implement near real-time digital signal processing and display the results on a graphical user interface (GUI).
This task also includes the development of a variety of established as well as developmental digital signal processing algorithms. The Contractor shall rapidly prototype and develop algorithms to provide various processing and control functions as part of the software development task. Initial algorithm development may be accomplished using test code developed on a desktop workstation or on any of several commercially available mathematical packages such as the
MathWorks product, MATLAB. The Contractor shall integrate third party mathematics packages as required by the application. The Contractor shall perform all tasks from initial algorithm development through prototyping and final implementation.
1.4.3.6 Software Testing – The Contractor shall conduct software testing at both a system and subsystem level to verify requirements. The Contractor shall document the testing to show the requirement, the module(s) that satisfies the requirement, and the test engineer conducting the test.
Field testing is required of all prototype digital electronic support systems. The field tests often lead to the development of new requirements and adjustments to algorithms. The Contractor shall travel to offsite locations with the NRL developers to perform field testing and modification, if required. The Contractor shall place the results of the field testing under configuration control and present any errors occurring during field testing to the software development team for resolution.
The Contractor shall develop automated tests that can be used to test a delivered baseline of the system. These automated tests must be stored with the software baseline and must be capable of being modified if necessary.
1.4.4 Task 4 Mechanical and Aeronautical Engineering:
The Contractor shall provide mechanical and aeronautical engineering and technical support for design, development, fabrication, and repair of systems, unique components and subsystems supporting R&D projects and prototype system developments. The mechanical assemblies developed include, but are not limited to, airframes, electronic component and antenna system support structures and enclosures. The assemblies must be developed for laboratory, land based, shipboard, and airborne environments. Examples of the types of assemblies to be designed under this task are; unmanned vehicle systems and subsystems; assemblies of RF components and antenna support and positioning assemblies. The
Contractor shall provide extensive mechanical design and CAD capability. CAD programs such as AutoCad, SolidWorks and Pro-Engineer shall be utilized. The Contractor shall perform thermal, time-motion and shock tolerance analysis for the proposed designs. The Contractor shall produce a mechanical design documentation set to include estimated mechanical assembly performance where relevant and sufficiently detailed mechanical design data so as to specify assembly fabrication.
1.4.5 Task 5 System/Subsystem Technical Development and Support:
The Contractor shall provide engineering and technical services to design, develop, integrate, and test prototype and limited-production systems and subsystems. These systems and subsystems include but are not limited to the following:
unmanned vehicles; structural components; mechanical and electro-mechanical devices; RF, electronic and avionics components; software elements; ground support equipment; and other devices supporting TEWD activities. The
Solicitation No. N00173-13-R-RV01 Page 12 of 97
Contractor shall conduct studies and analysis in support of new EW concepts and applications being developed and shall support derivation of system level technical performance requirements. The Contractor shall design, procure, test, and integrate electronic and avionics systems for data acquisition, processing, and analysis; command and telemetry functions;
low-noise signal conditioning and sensor interfaces; power conversion; and temperature control. The Contractor shall also conduct studies and analysis in support of existing EW capability and shall support the derivation of system capability effectiveness assessments for various EW Mission Scenarios. The Contractor shall provide technical analysis and subject matter expertise in support of Naval EW systems and concepts of employment (CONEMP). The Contractor shall prepare technical materials including reports and briefings that document the work that was done and the results that were obtained. The Contractor shall provide program management support including administrative, technical, and financial management functions in support of this tasking. The Contractor shall require access to intelligence data at up to the SCI classification level.
1.4.5.1 Systems Analysis – The Contractor shall provide engineering/ analyst technical services plus subject matter experts in the resolution of technical issues regarding requirements, software development, integration, and testing of multiple Contractor components, subsystems, and systems. Participate in technical meetings and support Integrated
Product Teams (IPT) used by the Government to technically manage programs. The Government will designate those
IPTs to be supported. Provide technical support in defining requirements and writing software to integrate, coordinate and communicate with combat systems and other EW systems including any new EW development effort. Coordinate with
Contractor and Government personnel in reviewing technical documentation during the design of computer software, firmware and hardware. The Contractor shall develop CONEMPs and analyze alternative system methodologies.
1.4.5.2 Design – The Contractor shall provide technical and engineering support for NRL facilities and experiments. The
Contractor shall design, fabricate or acquire, and deliver to NRL incidental hardware required for the support of research within the scope of tasks issued within task area. The Contractor shall modify, repair or maintain existing equipment in support of on-going research efforts; and document performance of systems or subsystems. The Contractor shall provide experiment support, design, fabrication, maintenance, and repair of system or subsystems.
1.4.5.3 Fabrication and Assembly – The Contractor shall provide for the fabrication and assembly of hardware for prototype systems and subsystems, including the fabrication of unique piece parts, printed wiring boards, fixtures, and mechanical assemblies for use during assembly, integration, and test. The Contractor shall provide specialized material, hardware, and components (e.g., raw materials, electrical, electronic, and electro-mechanical parts, machined parts, weldments, racks and structures, test equipment, and special processes) in support of tasks issued within this area. The
Contractor shall interface with vendors for the production and delivery of hardware, components and equipment. The
Contractor shall maintain piece part inventories and will track and monitor the assembly process on selected efforts.
1.4.5.4 Integration and Test – The Contractor shall provide engineering services to test and integrate systems and subsystems with target platforms. The Contractor shall provide support to NRL engineering staff to establish requirements for environmental test of specific systems and subsystems to include mechanical and electrical experimental and functional testing, along with corrective actions where necessary. The Contractor shall develop test plans and procedures for the integration and test of systems and subsystems into an operational platform at NRL or other NRL-designated facilities. The Contractor shall design, fabricate, assemble, test, calibrate, and maintain specialized laboratory equipment, instrumentation, GFE, and facilities to support the integration and test activity. The Contractor shall perform system level environmental and functional testing, and implement corrective actions resulting from testing. The Contractor shall provide all support necessary for scientists and engineers performing special system calibrations and analyzing the resultant test data sets.
1.4.5.5 Support of On-Site and Field Experiments – The Contractor shall provide all support necessary to successfully execute experiments of prototypes developed under this task at both on-site and for field experiments at off-site locations in support tasks issued in this area. The Contractor, in support of the requirements herein, shall conduct site surveys, provide operator training, install and operate equipment, perform equipment maintenance, perform system diagnostics, acquire raw data, process the data, as well as analyze and archive collected data. Upon completion of this analysis, the
Contractor shall provide the data acquired, including all disks, tapes, films, etc., and submit a written reports of the results.
Solicitation No. N00173-13-R-RV01 Page 13 of 97
Tasking support shall require travel to sites and activities world-wide; working aboard military aircraft, boats, submarines, and at military installations. Equipment handling/installation requires heavy lifting (in excess of 50 lbs.). The Contractor shall train civilian and military personnel in the operation and maintenance of NRL EW systems.
1.4.5.6 Operational Maintenance and Repair Support for EW Systems – The Contractor shall provide support to maintain, repair, and upgrade existing EW systems. The Contractor shall provide all necessary facilities, services, test equipment and parts to test, repair or upgrade Government Furnished Property within the scope of this SOW and as specified by each task order. The Contractor shall fabricate and repair highly integrated radio frequency components, hybrid integrated component assemblies, and monolithic microwave integrated circuit (MMIC) modules. The Contractor shall utilize a Class 10,000 clean room with workspaces/workbenches suitable for Class 1,000 or better processing to accomplish high fidelity fabrication and repair. The Contractor shall provide technical and engineering support to maintain the EW techniques and libraries. The Contractor shall evaluate intelligence information, evaluate current EW techniques, and modify techniques in accordance with current and future system capabilities as intelligence is updated.
The Contractor shall provide technical support to operate and maintain the NRL Technique Evaluation anechoic chamber, the Technique Generation Units, various missile and radar simulators, and DRFM subsystems. The Contractor shall provide engineering support to collect and analyze EW and simulator data, incorporate the data into SIMDIS, and document technique effectiveness in the laboratory, field tests and at-sea tests. The Contractor shall investigate software upgrades designed to enhance overall system performance and implement improvements as directed.
1.4.5.7 Technical Program Management Support – The Contractor shall provide direct technical and management support on Future Naval Capabilities (FNC), Discovery and Invention (D&I), and Innovative Naval Prototype (INP) projects. The Contractor shall provide support and guidance to NRL Program Principal Investigators regarding proposal preparations. This support includes compliance with ONR management requirements, preparation of various NRL Project reports, Business Plans, Briefings, Program Reviews and interactions with OPNAV and the various Naval Systems
Commands as required. The Contractor shall support the threat aspects of EW, and the cyber security aspects of communications up to the SCI classification level.
1.4.6 Task 6 Graphics and Drafting Services:
The Contractor shall provide for the creation of illustrations, drawings, and other graphic material required by various programs, studies, proposals, or technical presentations. The Contractor shall provide artistic capabilities and the computer resources to render illustrations, drawings, schematics, block diagrams, flow charts, and text files. The
Contractor will scan and edit mechanical and electrical drawings produced using designated computer aided design
(CAD) systems. The Contractor shall leverage existing drawings and illustrations from previous NRL developments and shall administer files on a variety of fileservers. The Contractor shall coordinate graphic requirements associated with program review cycles. The Contractor shall possess requisite hardware, software and peripheral devices necessary to fulfill task requirements for all work efforts performed off-site from the NRL.
Solicitation No. N00173-13-R-RV01 Page 14 of 97
C– 1.5. APPENDIX A - LIST OF TERMS AND ACRONYMS
IPT Integrated Product Team
ISAR Inverse Synthetic Aperture Radar
ISR Interrupt Service Routine
LAN Local Area Network
M/COS Mercury Computer Operating System
MHz Mega Hertz
NICEnet NRL Integrated Communications Environment Network
NRL Naval Research Laboratory
ONR Office of Naval Research
OPNAV Operational Navy
PCI Peripheral Component Interconnect
PPC Power PC (Personal Computer)
PRI Pulse Repetition Interval
PW Pulse Width
PWB Printed Wiring Board
PXI PCI eXtensions for Instrumentation
RF Radio Frequency
RT Real Time
RTOS Real-Time Operating System
SAL Scientific Algorithms Library
SAR Synthetic Aperture Radar
SCI Sensitive Compartmentalized Information
SOW Statement of Work
TCP/IP Transaction Control Protocol/Internet Protocol
TEWD Tactical Electronic Warfare Division
UDP User Datagram Protocol
VHDL VHSIC High level Design Language
VHSIC Very High Speed Integrated Circuit
VME VersaModule Eurocard
VPX VITA 46 (successor to VME architecture)
WAN Wide Area Network
C–2 DELIVERY/TASK ORDERS
The specific work to be carried out shall be further described in orders issued under this contract.
C–3 ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA)
The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Naval Research Laboratory via a secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil .
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year
(FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.
https://doncmra.nmci.navy.mil/ https://doncmra.nmci.navy.mil/
SECTION D
PACKAGING AND MARKING
Solicitation No. N00173-13-R-RV01 Page 15 of 97
D–1 UNCLASSIFIED PACKAGING AND MARKING
All unclassified data shall be preserved, packaged, packed and marked and must conform to normal commercial packing standards to assure safe delivery at destination.
D–2 CLASSIFIED PACKAGING AND MARKING
Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security
Program Operating Manual (NISPOM), DOD 5220.22-M dated February 28, 2006 and the DD 254 - Contract Security
Classification Specification.
SECTION E
INSPECTION AND ACCEPTANCE
Solicitation No. N00173-13-R-RV01 Page 16 of 97
E–1 INSPECTION AND ACCEPTANCE CLAUSES INCORPORATED BY REFERENCE
FAR CLAUSE TITLE
52.246-4 Inspection of Services – Fixed-Price (AUG 1996)
52.246-8 Inspection of Research and Development Cost Reimbursement (MAY 2001)
DFARS CLAUSE TITLE
252.246-7000 Material Inspection and Receiving Report (MAR 2008)
E–2 INSPECTION AND ACCEPTANCE
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0101 Destination Government Destination Government
0102 Destination Government Destination Government
0103 Destination Government Destination Government
0104 Destination Government Destination Government
1001 Destination Government Destination Government
1002 Destination Government Destination Government
1003 Destination Government Destination Government
1004 Destination Government Destination Government
Items 0001 through 0003, Items 0101 through 0103, and Items 1001 through 1003: Acceptance shall be made by the task order Contracting Officer Representative (COR) or an authorized representative of the Government upon receipt of a copy of the authorization for services and the original certification of performance.
Item 0004, 0104, and Item 1004: Inspection and acceptance of all data shall be specified in on the attached Contract Data
Requirements List(s), DD Form 1423.
Constructive acceptance, in accordance with FAR 32.904, shall be deemed to have occurred on the 15 day after the final delivery.
SECTION F
DELIVERIES OR PERFORMANCE
Solicitation No. N00173-13-R-RV01 Page 17 of 97
F–1 DELIVERIES OR PERFORMANCE CLAUSES INCORPORATED BY REFERENCE
FAR CLAUSE TITLE
52.242-15 Stop-Work Order (AUG 1989) - Alternate I (APR 1984)
52.247-34 F.O.B. Destination (NOV 1991)
F–2 DELIVERIES OR PERFORMANCE
(a) The effective period of this contract during which delivery orders/task orders may be issued is as follows:
CLIN Ordering Period
0001 09/01/2013 through 8/30/2016
0002 09/01/2013 through 8/30/2016
0003 09/01/2013 through 8/30/2016
0004 09/01/2013 through 8/30/2016
0101 09/01/2013 through 8/30/2016
0102 09/01/2013 through 8/30/2016
0103 09/01/2013 through 8/30/2016
0104 09/01/2013 through 8/30/2016
1001 09/01/2013 through 8/30/2016
1002 09/01/2013 through 8/30/2016
1003 09/01/2013 through 8/30/2016
1004 09/01/2013 through 8/30/2016
(b) Each delivery/task order shall specify its period of performance
(c) All deliverables under each order shall be shipped FOB Destination. The place of delivery will be defined in each task order.
Receiving Officer
Naval Research Laboratory
Contract Number:
ATTN:
CODE:
LOCATION:
(d) Each task order shall specify its place of performance.
F–3 DELIVERABLES
Each task order shall establish any additional required deliverables and a schedule for submission. Deliverables shall be provided to the Contracting Officer’s Representative (COR) appointed under separate letter upon award, or as specified in the individual task order(s).
SECTION G
CONTRACT ADMINISTRATION DATA
Solicitation No. N00173-13-R-RV01 Page 18 of 97
G–1 CONTRACT ADMINISTRATION
In order to expedite administration of this contract, the following delineation of duties is provided including the names and contact information for each individual or office specified. Contact the individual/position designated as having responsibility for any questions, clarifications or information regarding the functions assigned herein.
a. The Contract Administration Office (CAO) designated in Block 20A on the Standard Form 26 is responsible for all matters specified in FAR 42.302(a) and DFARS 242.302(a), except in those areas otherwise designated herein.
The ACO shall direct procuring agency inquiries as follows:
Contract Specialist – Reese Van Wyen, Code 3220, (202) 404-2398, reese.vanwyen@nrl.navy.mil
Contracting Officer – [To Be Completed at Award]
Security Matters – Contracting Officer for Security, Code 1226, (202) 767-2240, DSN 297-2240, security-group@nrl.navy.mil.
Safety Matters – Head Safety Branch, Code 3540, (202) 767-2232, safety@nrl.navy.mil.
Patent Matters – Associate Counsel (Intellectual Property), Code 1008.2, (202) 404-1552, DSN 297-1552, patents@nrl.navy.mil.
Release of Data – Public Affairs Officer, Code 1030, (202) 767-2541, DSN 297-2541, publicaffairs@nrl.navy.mil.
b. Contract administration functions withheld, additional contract administration functions assigned, or special instructions are set forth below:
None
c. Inquiries regarding payment should be referred to DFAS at http://www.dod.mil/dfas/Contractorpay/myinvoice.html
G–2 CONTRACTING OFFICER’S REPRESENATIVE (COR)
[To Be Completed at Award] is hereby designated as the Contracting Officer's Representative (COR). Unless terminated sooner, this appointment is effective for the period of performance of this contract including any options, if exercised.
COR authority may not be re-delegated. No change in COR assignment shall be made without written notice by the
Contracting Officer, who will modify the contract to reflect the change of COR assignment. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the Contractor via contract modification.
a. The responsibilities and limitations of the COR are as follows:
The COR is responsible for:
1. Providing technical direction and guidance as necessary with respect to the performance of work under this contract. Technical direction and guidance may be used to provide technical advice/recommendations/clarifications on the statement of work/specifications. It MAY NOT be used to tell the
Contractor how to perform the work.
2. Submitting interim and final Contractor Performance Assessment Reports (CPARS) at www.cpars.csd.disa.mil/cparsmain.htm.
3. Quality assurance of services performed or deliveries made mailto:reese.vanwyen@nrl.navy.mil mailto:security-group@nrl.navy.mil mailto:security-group@nrl.navy.mil mailto:safety@nrl.navy.mil mailto:patents@nrl.navy.mil mailto:publicaffairs@nrl.navy.mil http://www.dod.mil/dfas/contractorpay/myinvoice.html http://www.cpars.csd.disa.mil/cparsmain.htm
Solicitation No. N00173-13-R-RV01 Page 19 of 97
4. Inspection and acceptance of services or deliverables
5. Ensuring that Government Furnished Property, to include any Contractor use of on-site equipment and/or IT resources is adequately monitored and accounted for.
6. Security requirements on Government installation, such as the request and retrieval of personnel security badges and vehicle passes.
7. Monitoring Contractor's performance and promptly report problems and recommendations for corrective action to the PCO
8. Annually, furnish a written report on performance of the Contractor to the PCO. And, if deemed necessary, attending a follow-up meeting to discuss.
9. Attend post award conference, if conducted.
10. Ensuring a copy of all Government technical correspondence, to include Technical Direction
Memorandums/Guidance, is forwarded to the PCO for placement in the contract file.
11. Monitoring of funds expended
12. Ensuring that the Contractor does not exceed the defined statement of work set forth in the contract.
b. Limitations: The COR is not authorized to take any action, either directly or indirectly, that could result in a change in the cost/price, quantity, quality, place of performance, delivery schedule, or any other terms or conditions of the contract.
If, as a result of technical discussions, it is desirable to alter contract obligations or the statement of work/specifications, a modification must be issued in writing and signed by the Contracting Officer in order to effect such changes. No such changes shall be made without the express written prior authorization/direction of the Contracting Officer.
G–3 TASK ORDER CONTRACTING OFFICER’S REPRESENATIVE (COR)
[To Be Completed in Each Task Order] is hereby designated as the task order Contracting Officer's Representative
(COR). Unless terminated sooner, this appointment is effective for the period of performance of the task order including any options, if exercised. Task order COR authority may not be re-delegated. No change in task order COR assignment shall be made without written notice by the Contracting Officer, who will modify the task order to reflect the change of task order COR assignment.
a. The responsibilities and limitations of the task order COR are as follows:
The task order COR is responsible for:
1. Providing technical direction and guidance as necessary with respect to the performance of work under this contract. Technical direction and guidance may be used to provide technical advice/recommendations/clarifications on the statement of work/specifications. It MAY NOT be used to tell the
Contractor how to perform the work.
2. Quality assurance of services performed or deliveries made
3. Inspection and acceptance of services or deliverables
4. Ensuring that Government Furnished Property, to include any Contractor use of on-site equipment and/or IT resources is adequately monitored and accounted for.
5. Monitoring Contractor's performance and promptly report problems and recommendations for corrective action to the PCO
Solicitation No. N00173-13-R-RV01 Page 20 of 97
6. Annually, furnish a written report on performance of the Contractor to the PCO. And, if deemed necessary, attending a follow-up meeting to discuss.
7. Attend post award conference, if conducted.
8. Ensuring a copy of all Government technical correspondence, to include Technical Direction
Memorandums/Guidance, is forwarded to the PCO for placement in the task order.
9. Monitoring of funds expended
10. Ensuring that the Contractor does not exceed the defined statement of work set forth in the task order.
b. Limitations: The task order COR is not authorized to take any action, either directly or indirectly, that could result in a change in the cost/price, quantity, quality, place of performance, delivery schedule, or any other terms or conditions of the task order. If, as a result of technical discussions, it is desirable to alter task order obligations or the statement of work/specifications, a modification must be issued in writing and signed by the Contracting Officer in order to effect such changes. No such changes shall be made without the express written prior authorization/direction of the Contracting
Officer.
G–4 GOVERNMENT FURNISHED PROPERTY
The Government will provide item(s) of Government property to the Contractor for use in the performance of this contract. The following Government property will be furnished to the Contractor on a rent-free basis for use in performing the contract:
Facilities: The Government will provide on-site workspaces for the Contractor staff to provide the support outlined in the
SOW to include desk space, telephones, computers, and other items necessary to maintain an office environment.
Utilities: The Government will provide utilities for the on-site facility/facilities in which the Contractor is required to work. Utilities will be available for the Contractor’s use in performance of tasks outlined in this SOW. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under the conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning equipment.
All Government furnished property shall be used and maintained by the Contractor in accordance with provisions of the
“Government Property” clause included in this contract.
Any/all Government property provided to the Contractor shall be for use in the performance of this contract only. This property shall be used and maintained by the Contractor in accordance with provisions of the “Government Property” clause. Upon completion of the contract, all property acquired/used/provided shall be returned to the Government. Any/all
GFP provided to the Contractor shall be returned to the Government upon completion of the order or termination of the order/contract.
G–5 ONR 5252.242-9718 - TECHNICAL DIRECTION (FEB 02)
a. Performance of the work hereunder is subject to the technical direction of the Program Officer/COR designated in this contract, or his duly authorized representative. For the purposes of this clause, technical direction includes the following:
1. Direction to the Contractor which shifts work emphasis between work areas or tasks, requires pursuit of certain lines of inquiry, fills in details or otherwise serves to accomplish the objectives described in the statement of work;
2. Guidelines to the Contractor which assist in the interpretation of drawings, specifications or technical portions of work description.
Solicitation No. N00173-13-R-RV01 Page 21 of 97
b. Technical direction must be within the general scope of work stated in the contract. Technical direction may not be used to:
1. Assign additional work under the contract,
2. Direct a change as defined in the contract clause entitled "Changes";
3. Increase or decrease the estimated contract cost, the fixed fee, or the time required for contract performance; or
4. Change any of the terms, conditions or specifications of the contract.
c. The only individual authorized to in any way amend or modify any of the terms of this contract shall be the
Contracting Officer. When, in the opinion of the Contractor, any technical direction calls for effort outside the scope of the contract or inconsistent with this special clause, the Contractor shall notify the Contracting Officer in writing within ten working days after its receipt. The Contractor shall not proceed with the work affected by the technical direction until the Contractor is notified by the Contracting Officer that the technical direction is within the scope of the contract.
d. Nothing in the foregoing paragraphs may be construed to excuse the Contractor from performing that portion of work statement, which is not affected by the disputed technical direction.
G–6 SUBCONTRACTORS/CONSULTANTS
a. Advance notification or requests for consent pursuant to the contract clause entitled "Subcontracts" (FAR 52.244-2) shall be directed to the cognizant administrative contracting officer (ACO).
b. (Paragraph (j) of FAR 52.244-2 is filled in as follows. The following subcontractor/consultants have been identified in the Contractor’s proposal as necessary for performance of this contract and were evaluated during negotiations:
Subcontractor/Consultant Name Estimated Total Cost
[To Be Completed By Offeror]
G–7 ACCOUNTING AND APPROPRIATION DATA
Each task order will contain the accounting and appropriation data for payment under this contract.
G–8 TASK ORDER ISSUANCE PROCEDURES
If this contract contains multiple awardees, the issuance procedures stated herein are applicable.
G–8.1 General
(a) When the Government requires work under the contract, the Government will initiate the Request for Proposal (RFP) process. The RFP will normally be transmitted electronically by e-mail, but may be placed via mail, telephone, or other electronic means.
(b) Task Orders (TO) will be awarded on DD Form 1155 (Order for Supplies or Services). The TO will normally be transmitted electronically by e-mail, but may be placed via mail, telephone, or other electronic means.
(c) The Government will not be obligated to reimburse the Contractor for work performed, items delivered, or any costs
Solicitation No. N00173-13-R-RV01 Page 22 of 97 incurred, nor shall the Contractor be obligated to perform, deliver, or otherwise incur costs, except as authorized by duly executed TOs.
(d) Each TO shall include as a minimum:
(i) Contract/ TO number
(ii) Award date
(iii) Award amount
(iv) Contract item number and description of the specified work required.
(v) Delivery or performance schedule
(vi) Place of performance
(vii) Any packaging, packing, and shipping instructions
(viii) Accounting and appropriation data
(ix) Method of payment and payment office
(x) Any other pertinent information (such as applicable Service Contract Act wage determination)
(e) Modifications to TOs will be issued on Standard Form (SF) 30.
(f) In accordance with FAR 16.505(a)(9)(i), no protest under Subpart 33.1 is authorized in connection with the issuance or proposed issuance of an order under a TO contract except for a protest on the grounds that the order increases the scope, period, or maximum value of the contract, or a protest of an order valued in excess of $10 million.
G–8.2 Time Frames for Ordering
(a) The draft work description will be submitted to all Contractors, notifying them of an upcoming requirement and will detail the expected lead time. Contractors will be able to query the Government on the upcoming requirement based on the draft work description. Any questions and Government responses will be forwarded to all Contractors to ensure fair opportunity.
(b) Once the complete procurement package has been received by the PCO, the RFP will be issued to all Contractors.
(c) Proposals shall be submitted within 10 to 30 days from issuance of the RFP, depending on the estimated dollar value of the requirements.
G–8.3 Multiple Award Ordering Selection Criteria
(a) The Contracting Officer will issue a Letter of Intent for a Task to be performed to Contract Awardees, which includes the Statement of Work (SOW), the period of performance and the proposal due date.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .