Task Order 0001 - EW System Development.pdf
PDF 81 KB Posted
- Attached to
- Engineering and Technical Support for Research and Development Efforts within the Tactical Electronic Warfare Division Federal contract opportunity
- Solicitation number
- N00173-13-R-RV01
About this file
Task Order 0001 - EW System Development.pdf
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00173-13-R-RV01
Task Order 0001
STATEMENT OF WORK
TASK ORDER 0001
ELECTRONIC WARFARE SYSTEM DEVELOPMENT
DATED 05/17/2013
1.0 INTRODUCTION
1.1 The purpose of this task is to design, develop, integrate, test prototype and provide 12 limited-production EW systems for use aboard Navy platforms and R&D testing environments.
1.2 Proposals shall demonstrate, at a minimum, the Offeror’s Technical Approach, Requirements
Process, System Design, Modeling and Simulation Approach, Software & Interface Design, Program
Timeline & Delivery Schedule, Technical Personnel Required, Testing and Quality Assurance
Procedures, Configuration Management Processes, and Delivery & Acceptance Process. Submissions shall comply with proposal requirements as outlined in section L.
2.0 SCOPE OF TASK ORDER
2.1 The system must have the ability to provide both a generic EA countermeasure against a broad spectrum of threats as well as a highly special EA countermeasure against an individual threat using advanced DRFM technologies.
2.2 Systems must have the ability to operate in an autonomous mode to detect, classify, and respond to the signal environment. The system shall have the ability to be cued from an external source to generate a response. The system shall employ coherent and not-coherent response techniques. The system shall interface with an external graphical user interface (GUI) through Ethernet connectivity.
2.3 The contractor shall propose response techniques. The contract shall accept established techniques as government furnished information (GFI) for implementation into the system. [For proposal purposes, assume that GFI is limited to 25 techniques.]
2.4 To support this effort the contractor shall conduct studies and analysis and help derivation of system level technical performance requirements. The contractor shall support modeling and simulation
(M&S) of the system performance, and shall design, integrate, and test the various electronic subsystems.
The contractor shall be responsible for any qualification testing required to meet Navy Mil-Spec requirements. The contractor shall develop and deliver a complete documentation package on the unit in sufficient detail that will allow the Navy to compete the production of additional systems should it desire to do so following the conclusion of this tasking. The documentation package must consist of all design drawings, interface documents, software and firmware source and object code as well as documentation, test and acceptance plans, and sparing and repair plans. All documentation generated, source code, analysis & simulation results, and demonstration test data shall have unlimited Government data rights.
2.5 The Contractor shall propose an EW system design which meets the minimum requirements as outlined in Table 1. Proposals may utilize the following assumptions in preparing proposals:
Systems may be hard mounted to the installation platform
Systems have fixed antenna orientation.
Systems may utilize a cold plate capable of continuously sinking heat up to 2kW.
External GUI may be hosted on a commercial laptop computer (mobile workstation grade eg:
DELL PRECISION Series)
Table 1 defines requirements for the EW prototype systems within this Task Order. Entries in the Goal
(T/O) column indicate whether the requirement is a Threshold (T), Objective (O) or both (T/O).
Table 1: EW System Requirements
Category Req't # Description Goal
(T/O)
SWaP SRD-001 System shall not exceed 3 cubic feet and no single dimension shall exceed
30 inches.
T/O
SWaP SRD-002 System shall not exceed 150 pounds T/O
SWaP SRD-0003 System shall operate from 28V DC T/O
SWaP SRD-0004 System shall not require more than 2kW of prime power T/O
Operational SRD-0005 System shall have an operational frequency range of 32-37GHz T
Operational SRD-0006 System shall have an operational frequency range of 30-40GHz O
Operational SRD-0007 System shall have an instantaneous receive angular coverage of not less than 45 degrees in azimuth and 22 degrees in elevation T
Operational SRD-0008 System shall have a minimum transmit beam of not less than 10 degrees in azimuth and 22 degrees in elevation T
Operational SRD-0009 System shall be able to steer its transmit beam over a 45 degree azimuth T
Operational SRD-0010 System shall have a minimum ERP (@ saturation) of 35dBW T
Operational SRD-0011 System shall have a minimum ERP (@ saturation) of 40dBW O
Environmental SRD-0012 System shall meet NAVY MIL standards for shock and vibration compliance T
Environmental SRD-0013 System shall meet NAVY MIL standards for EMI/EMC compliance T
Interface SRD-0014 System shall accept external control through Ethernet connectivity T
3.0 PLACE OF PERFORMANCE
3.1 Primary place of performance is the contractor’s facility. Presentations, technical interchange meetings, and support activities may require TDY to remote locations. Performance of this task may also require travel to system test execution sites.
4.0 ORDER TYPE
This task order is issued on the basis marked below:
Firm Fixed Price Level of Effort
Cost Plus Fixed Fee Term
X Cost Plus Fixed Fee Completion
5.0 DELIVERABLES
Initial Prototype System
11 Prototypes Systems
6.0 DELIVERY SCHEDULE
Delivery Date
Initial Prototype System 15 months from award of task order
11 Prototypes Systems 24 months from award of task order