About this file

Task Order 0001 - EW System Development.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Engineering and Technical Support for Research and Development Efforts within the Tactical Electronic Warfare Division, newest first.
File Type Posted
Amendment_0004_N00173-13-R-RV01.pdf PDF
N00173-13-R-RV01_Amendment_0003.pdf PDF
Questions and Answers N00173-13-R-RV01.pdf PDF
SECTION SF 30.pdf PDF
Attachment 2 - DD254 Revision 1.pdf PDF
Attachment 1 - Personnel Qualifications.pdf PDF
Attachment 7 - Fixed Price Labor Rate Schedule —
Attachment 9 - Direct Labor Ceiling Rate Form.xlsx XLSX spreadsheet
Amendment_0001.pdf PDF
Attachment 3 - Requirements for On-Site Contractors.pdf PDF
Attachment 11 - Task Order Cost_Price Spreadsheet.xlsx XLSX spreadsheet
Attachment 1 - Personnel Qualifications.pdf PDF
Attachment 9 - Direct Labor Ceiling Rate Form.xlsx XLSX spreadsheet
Attachment 7 - Fixed Price Labor Rate Schedule.xlsx XLSX spreadsheet
Exhibit A - DD 1423.pdf PDF
Attachment 2 - DD254.pdf PDF
Solicitation_13-R-RV01.pdf PDF
Attachment 10 - Task Order Staffing Plan.xlsx XLSX spreadsheet
Attachment 8 - Indirect Ceiling Rate Form.docx DOCX document
Attachment L-2 - Previous Contracting Efforts.doc DOC document
Attachment L-1 - Past Performance Questionnaire.doc DOC document
Exhibit B - DD 1423.pdf PDF
Exhibit C - DD 1423.pdf PDF
Task Order 0002 - Engineering Support for PASS.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00173-13-R-RV01

Task Order 0001

STATEMENT OF WORK

TASK ORDER 0001

ELECTRONIC WARFARE SYSTEM DEVELOPMENT

DATED 05/17/2013

1.0 INTRODUCTION

1.1 The purpose of this task is to design, develop, integrate, test prototype and provide 12 limited-production EW systems for use aboard Navy platforms and R&D testing environments.

1.2 Proposals shall demonstrate, at a minimum, the Offeror’s Technical Approach, Requirements

Process, System Design, Modeling and Simulation Approach, Software & Interface Design, Program

Timeline & Delivery Schedule, Technical Personnel Required, Testing and Quality Assurance

Procedures, Configuration Management Processes, and Delivery & Acceptance Process. Submissions shall comply with proposal requirements as outlined in section L.

2.0 SCOPE OF TASK ORDER

2.1 The system must have the ability to provide both a generic EA countermeasure against a broad spectrum of threats as well as a highly special EA countermeasure against an individual threat using advanced DRFM technologies.

2.2 Systems must have the ability to operate in an autonomous mode to detect, classify, and respond to the signal environment. The system shall have the ability to be cued from an external source to generate a response. The system shall employ coherent and not-coherent response techniques. The system shall interface with an external graphical user interface (GUI) through Ethernet connectivity.

2.3 The contractor shall propose response techniques. The contract shall accept established techniques as government furnished information (GFI) for implementation into the system. [For proposal purposes, assume that GFI is limited to 25 techniques.]

2.4 To support this effort the contractor shall conduct studies and analysis and help derivation of system level technical performance requirements. The contractor shall support modeling and simulation

(M&S) of the system performance, and shall design, integrate, and test the various electronic subsystems.

The contractor shall be responsible for any qualification testing required to meet Navy Mil-Spec requirements. The contractor shall develop and deliver a complete documentation package on the unit in sufficient detail that will allow the Navy to compete the production of additional systems should it desire to do so following the conclusion of this tasking. The documentation package must consist of all design drawings, interface documents, software and firmware source and object code as well as documentation, test and acceptance plans, and sparing and repair plans. All documentation generated, source code, analysis & simulation results, and demonstration test data shall have unlimited Government data rights.

2.5 The Contractor shall propose an EW system design which meets the minimum requirements as outlined in Table 1. Proposals may utilize the following assumptions in preparing proposals:

Systems may be hard mounted to the installation platform

Systems have fixed antenna orientation.

Systems may utilize a cold plate capable of continuously sinking heat up to 2kW.

External GUI may be hosted on a commercial laptop computer (mobile workstation grade eg:

DELL PRECISION Series)

Table 1 defines requirements for the EW prototype systems within this Task Order. Entries in the Goal

(T/O) column indicate whether the requirement is a Threshold (T), Objective (O) or both (T/O).

Table 1: EW System Requirements

Category Req't # Description Goal

(T/O)

SWaP SRD-001 System shall not exceed 3 cubic feet and no single dimension shall exceed

30 inches.

T/O

SWaP SRD-002 System shall not exceed 150 pounds T/O

SWaP SRD-0003 System shall operate from 28V DC T/O

SWaP SRD-0004 System shall not require more than 2kW of prime power T/O

Operational SRD-0005 System shall have an operational frequency range of 32-37GHz T

Operational SRD-0006 System shall have an operational frequency range of 30-40GHz O

Operational SRD-0007 System shall have an instantaneous receive angular coverage of not less than 45 degrees in azimuth and 22 degrees in elevation T

Operational SRD-0008 System shall have a minimum transmit beam of not less than 10 degrees in azimuth and 22 degrees in elevation T

Operational SRD-0009 System shall be able to steer its transmit beam over a 45 degree azimuth T

Operational SRD-0010 System shall have a minimum ERP (@ saturation) of 35dBW T

Operational SRD-0011 System shall have a minimum ERP (@ saturation) of 40dBW O

Environmental SRD-0012 System shall meet NAVY MIL standards for shock and vibration compliance T

Environmental SRD-0013 System shall meet NAVY MIL standards for EMI/EMC compliance T

Interface SRD-0014 System shall accept external control through Ethernet connectivity T

3.0 PLACE OF PERFORMANCE

3.1 Primary place of performance is the contractor’s facility. Presentations, technical interchange meetings, and support activities may require TDY to remote locations. Performance of this task may also require travel to system test execution sites.

4.0 ORDER TYPE

This task order is issued on the basis marked below:

Firm Fixed Price Level of Effort

Cost Plus Fixed Fee Term

X Cost Plus Fixed Fee Completion

5.0 DELIVERABLES

Initial Prototype System

11 Prototypes Systems

6.0 DELIVERY SCHEDULE

Delivery Date

Initial Prototype System 15 months from award of task order

11 Prototypes Systems 24 months from award of task order