N0016720R0019_Q andA _3Aug2020.pdf

PDF 122 KB Posted

Attached to
Ballast Water Treatment Systems Federal contract opportunity
Solicitation number
N0016720R0019
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document provides questions and answers regarding solicitation number N00167-20-R-0019 from the Department of the Navy Naval Sea Systems Command for the engineering design, manufacturing, delivery, testing and evaluation of one Compact and one Standard Ultraviolet Ballast Water Treatment System for Navy surface vessels. The maximum pressure requirement for the ballast water system is clarified as not exceeding 17 bar as specified in MIL-STD-777, though the BWTS design need only be functionally and physically compatible rather than required to meet the exact maximum pressure. Additionally, there is no specified place of performance requirement for contractors to provide manufacturing facilities and travel as required to perform tasks in the statement of work such as training and commissioning.

View the file

Other files for this federal contract opportunity

Other files attached to Ballast Water Treatment Systems, newest first.
File Type Posted
N0016720R0019 Amendment 0005.pdf PDF
Attachment 13 Q and A 20 08 18.pdf PDF
Attachment 12 Q and A 20 08 12.pdf PDF
N016720R0019 Amendment 0004.pdf PDF
N0016720R0019 Amendment 0003.pdf PDF
Attachment 11 Q and A 20 08 11.pdf PDF
Exhibit A CDRLS.pdf PDF
Attachment 1R1_MFR UV BWTS BDRD_2020-07-30.docx DOCX document
N0016720R0019 Amendment 0002.pdf PDF
Attachment 4R1_BWTSConformanceChecklist.xlsx XLSX spreadsheet
N0016720R0019 Amendment 0001.pdf PDF
Attachment 7_20-R-0019_Revised_Cost_Summary_Format.xls XLS spreadsheet
N0016720R0019 _QandA_15July2020.pdf PDF
DD Form 1423 - CDRL A003 Meeting report 2020-05-19.pdf PDF
Attachment 2 NAVSEAHazMatAvoidProcess.pdf PDF
DD Form 1423 - CDRL E003 Developmental TDP Manufacture 2020-05-19.pdf PDF
Attachment 1_MFR UV BWTS BDRD.docx DOCX document
Attachment 5_Past_Performance_Questionnaire.doc DOC document
DD Form 1423 - CDRL E004 Technical Manual 2020-05-19.pdf PDF
DD Form 1423 - CDRL E006 Product TDP Test 2020-05-19.pdf PDF
DD Form 1423 - CDRL A002 master schedule 2020-05-19.pdf PDF
DD Form 1423 - CDRL E005 Environmental Testing Analysis Report 2020-05-19.pdf PDF
Attachment 6_Previous_Contracting_Efforts.doc DOC document
Attachment 8_DirectLaborRateSubstantiationTable.xls XLS spreadsheet
Attachment 7_20-R-0019_Cost_Summary_Format.xls XLS spreadsheet
Attachment 3_Small Business Subcontracting Plan Coversheet.docx DOCX document
DD Form 1423 - CDRL T002 Test report 2020-05-19.pdf PDF
N0016720R0019.pdf PDF
DD Form 1423 - CDRL T001 Test procedures 2020-05-19.pdf PDF
DD Form 1423 - CDRL A005 GFE inventory report 2020-06-02 signed_bec.pdf PDF
DD Form 1423 - CDRL A004 RFV 2020-05-19.pdf PDF
DD Form 1423 - CDRL A001 monthly status report 2020-05-19.pdf PDF
DD Form 1423 - CDRL E001 Technical report 2020-05-19.pdf PDF
DD Form 1423 - CDRL E002 Developmental TDP Design 2020-05-19.pdf PDF
Attachment 4_BWTSConformanceChecklist.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00167-20-R-0019 Attachment 10 Questions and Answers

3 August 2020

QUESTION 16:

I am looking at the “Baseline Design Requirements Document” for the Ultraviolet Ballast Water System for Surface Vessels.

The only mention of the incoming ballast water system pressure comes from Table II, Shipboard Interfaces.

The first row, Ballast Water, indicates that the incoming water supplies maximum pressure is 17 Bar (250 PSIG).

I would like confirmation that the BWMS needs to be designed to handle 17 Bar maximum pressure. If not, please indicate what the maximum ballast water system pressure is.

ANSWER 16: As currently written, Section 3.7 of the Baseline Design Requirements Document states the Offeror’s ballast water treatment design shall be functionally and physically compatible with shipboard interfaces but does not set a requirement to meet the maximum ballast water system pressure. However, the maximum pressure of shipboard supplied ballast water can be controlled or adjusted to meet the pressure requirements of the BWTS but shall not exceed 17 bar as specified in MIL-STD-777. The Baseline Design Requirements Document and the Conformance Checklist have been modified to clarify this requirement.

QUESTION 17:

What is the “Place of Performance” on this posting?

ANSWER 17: This solicitation does not require any particular “Place of Performance.” The contractor is responsible for providing manufacturing facilities. The contractor will be required to travel to perform some parts of the SOW (e.g., training and commissioning), but travel is as yet unspecified;

see SOW Section 3.3. Section F, Deliveries or Performance provides the delivery information.

File details come from the government source that posted it. Updated .