CDRL_A001_5_6_26.pdf

PDF 511 KB Posted

Attached to
FILTER PROCUREMENT INSTALLATION
Solicitation number
N0016426Q0119
Issued by

About this file

This is a Contract Data Requirements List (CDRL) on DD Form 1423 for an Airborne Expendable Countermeasures (AECM) contract. The form specifies one data deliverable requirement: an Acceptance Test Report (ATR) with Data Item Number A001, referenced from Statement of Work paragraph 3.4.1 and Data Acquisition Document DI-QCIC-81891. The requiring office is NSWC Crane Code WXR.

The ATR must be submitted as a one-time deliverable within 14 days after completion of testing for Buildings 365 and 366 baghouses, following repairs and operational testing activities. The report shall be delivered in electronic format (Microsoft Word or Adobe PDF) to the designated recipient, Marty Terry, at marty.s.terry2.civ@us.navy.mil. The deliverable requires two copies—one draft and one final—and carries Distribution Statement A marking for approved public release with unlimited distribution. The form was prepared by Gregory Kerns and approved by Casandra O'Neall on May 4, 2026. Contract line item number, contractor identification, contract/PR number, price group, and estimated total price are marked as TBD (to be determined).

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREVIOUS EDITION MAY BE USED.

DD FORM 1423, FEB 2024 Page 1 of 2

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO.

TBD

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER X QCIC

D. SYSTEM/ITEM

Airborne Expendable Countermeasures (AECM)

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

ACCEPTANCE TEST REPORT (ATR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-QCIC-81891 NOT 2

5. CONTRACT REFERENCE

SOW PARA: 3.4.1

6. REQUIRING OFFICE

NSWC CRANE CODE WXR

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

ONETIME

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

BLK 9: DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC

RELEASE, DISTRIBUTION UNLIMITED.

BLK 10: Upon completion of the baghouse repairs and operational testing, the Contractor shall prepare and submit a comprehensive Acceptance Test Report.

BLK 12: A copy of the ATR shall be provided within 14 days after completion of the testing of the Bldg.

365 and Bldg. 366 baghouses.

BLK 14: DATA DELIVERABLE SHALL BE SUBMITTED IN ELECTRONIC MEDIA, MICROSOFT

WORD OR ADOBE PDF FORMAT TO THE FOLLOWING EMAIL ADDRESSEE(S):

RTA: Marty Terry , EMAIL: marty.s.terry2.civ@us.navy.mil

RTA 0 2 1

15.TOTAL 1 1

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Gregory Kerns

H. SIGNATURE I. APPROVED BY

Casandra O'Neall

J. SIGNED ON 20260504

KERNS.GREGORY.

ELLIS.1611843077

Digitally signed by

KERNS.GREGORY.ELLIS.161184307

Date: 2026.05.04 11:26:00 -04'00'

O'NEALL.CASANDR

A.ELISE.1501878576

Digitally signed by

O'NEALL.CASANDRA.ELISE.150187

Date: 2026.05.04 11:34:39 -04'00'

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoDM 5010.12 for detailed instructions.)

DD FORM 1423, FEB 2024 Page 2 of 2

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Name of preparer of CDRL.

Item H. Date CDRL was prepared and signature of preparer of CDRL.

Item I. Name of CDRL approval authority.

Item J. Date CDRL was approved and signature of CDRL approval authority.

Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.

Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.

File details come from the government source that posted it. Updated .