Final_RFP_ATT12_Past_Performance_Questionnaire_Survey.pdf

PDF 43 KB Posted

Attached to
PMW 750 C4I Testing, Integration, and Installation Follow-on
Solicitation number
N00039-17-R-0043
Issued by

About this file

This document includes a past performance questionnaire and survey related to a Navy contract for logistics, integration, engineering, procurement, fabrication, assembly, test, inspection, zone integration, and installation of integrated C4I capabilities aboard new construction aircraft carriers and large deck amphibious ships. The incumbent contractors are requested to complete the survey evaluating the past performance of [Contractor Name] on Contract No. [Contract No.]. The survey addresses quality, schedule, cost control, management, and utilization of small businesses. Responses are due within five working days to edwin.davenport@navy.mil. A separate document provides details of Solicitation Number N00039-17-R-0043 for PMW 750 C4I Testing, Integration, and Installation Follow-on services with a total award amount of $601,513,730 to multiple vendors on June 26, 2019 by the Department of the Navy Information Warfare Systems Command.

View the file

Other files

File Type Posted
ATT12_Past_Performance_Questionnaire_Survey.docx DOCX document
AMEND1_FINAL_RFP_ATT13_Small_Business_Participation_Data.doc DOC document
Final_RFP_ATT2.2_WD_15.4341_Rev.-10_Norfolk&NewportNews_VA.pdf PDF
ATT9_Hull_POR_Summary.xlsx XLSX spreadsheet
Final_RFP_ATT2.3_WD_15-5147_Rev.-6_Pascagoula_MS.pdf PDF
Final_RFP_ATT10_PEO_C4I_POR_&_Non-POR_Systems.pdf PDF
AMEND1_FINAL_RFP_ATT14_Prime_Contractor_&_Sub_Cost_Spreadsheets.xlsx XLSX spreadsheet
Final_RFP_ATT2.1_WD_15-4427_Rev.-9_Charleston_SC.pdf PDF
N0003917R0043_AMEND_01.docx DOCX document
Final_RFP_Exhibit_A-CTII_FO_CDRLs.pdf PDF
AMEND1_FINAL_RFP_ATT4_Labor_Table_Sanitized.xlsx XLSX spreadsheet
AMEND1_FINAL_RFP_ATT6_Rlvnt_Experience_Form.docx DOCX document
Final_RFP_ATT7_Gate_Review_Matrix.pdf PDF
Final_RFP_QA_N00039-17-R-0043.pdf PDF
AMEND1_FINAL_RFP_ATT1_PWS.doc DOC document
FinalRFPAttachment15.pdf PDF
Final_RFP_ATT9_Hull_POR_Summary.pdf PDF
ATT15_LaborCategories.docx DOCX document
ATT7_Gate_Review_Matrix.xlsx XLSX spreadsheet
Final_RFP_ATT11_Ship_Availability_Schedule.pptx PPTX presentation
ATT4_Labor_Table_Sanitized.xlsx XLSX spreadsheet
Final_RFP_ATT5_QASP.pdf PDF
N0003917R0043_AMEND_01_CONFORMED.docx DOCX document
Final_RFP_ATT8_Rlvnt_PEO_C4I_POR_and_Systems.pdf PDF
AMEND1_FINAL_RFP_ATT3_DD254.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Competition Sensitive – For Official Use Only

N00039-17-R-0043 Attachment 12

ATTACHMENT 12 – PAST PERFORMANCE QUESTIONNAIRE/SURVEY

Space and Naval Warfare Systems Command ED DAVENPORT, CODE 2.1XX

SPAWAR CONTRACTS

4301 PACIFIC HIGHWAY

SAN DIEGO, CA 92110-3127

FAX TO:

AGENCY:

PHONE:

EMAIL:

REQUEST FOR PAST PERFORMANCE EVALUATION

This office is currently in the process of awarding a competitive contract for logistics, integration, engineering, procurement, fabrication, assembly, test, inspection, zone integration, and installation of integrated C4I capabilities aboard new construction (NEWCON) aircraft carrier and large deck amphibious ships, to include Refueling and Complex Overhaul (RCOH) ships. [CONTRACTOR NAME] has provided your name and organization as a reference regarding [CONTRACTOR’S NAME] record of past performance under Contract No. [CONTRACT NO.]. Specifically, we are looking for past performance information regarding the following areas:

a.) Quality of Product or Service - Conformance to contract requirements, specifications and standards of good workmanship, accuracy of reports, appropriateness of personnel, and technical excellence;

b.) Schedule - Timeliness of performance, met interim milestones, reliable, responsive to technical and contractual direction, completed on time, including wrap-up and contract administration, no liquidated damages assessed;

c.) Cost Control - Within budget, current accurate and complete billings, actual cost/rates reflect closely to negotiated cost/rates, cost efficiency measures, adequate budgetary internal controls;

d.) Management - Effectiveness of management, to include effective management of subcontractors;

professionalism of correspondence and communications internally and externally; responsiveness to contract requirements; reasonable/cooperative behavior; prompt notification of urgent issues/problems; presentation of flexible, proactive, and effective Contractor-recommended solutions; and e.) Utilization of Small Business - Timeliness and accuracy of required subcontract reports; compliance with statutory and negotiated small business participation goals; effective small business/small disadvantaged business subcontracting program.

In order for our team to complete its evaluation, we request that you complete the attached survey form and email it, and any other pertinent information, within five (5) working days to edwin.davenport@navy.mil. Any relevant information you have would be vital in our assessment of the aforementioned contractor.

Best Regards, Ed Davenport Procuring Contracting Officer

SPAWAR 2.0

TEL: (619) 524-3558

mailto:edwin.davenport@navy.mil

CONTRACTOR PERFORMANCE EVALUATION SURVEY

CONTRACTOR NAME: CONTRACT NUMBER:

EVALUATION PERIOD: DELIVERY ORDER

NO.:

GOVERNMENT TECHNICAL REPRESENTATIVE:

Name (print) Code Phone

Please read the statements below, indicating your relative level of agreement in the box provided:

EXCEPTIONAL

VERY

GOOD

SATISFACTORY

MARGINAL

UNSATISFACTORY

a.) QUALITY OF PRODUCT OR SERVICE:

(1) The contractor provided a product or service that conformed to contract requirements, specifications, and standards of good workmanship

(2) The contractor submitted accurate reports.

(3) The contractor utilized personnel that were appropriate to the effort performed.

b.) SCHEDULE:

(1) The tasks required under this effort were performed in a timely manner and in accordance with the period of performance of the contract.

(2) The contractor was responsive to technical and/or contractual direction.

(3) The contractor furnished updated project schedules on a timely basis.

c.) COST CONTROL:

(1) The contractor performed the effort within the estimated cost/price.

(2) The contractor submitted accurate invoices on a timely basis.

(3) The contractor demonstrated cost efficiencies in performing the required effort.

(4) The actual costs/rates realized closely reflected the negotiated costs/rates.

NOTE: For statements indicating “Excellent” or “Not Satisfactory,” please provide a brief explanation on the NARRATIVE EXPLANATION page.

CONTRACTOR PERFORMANCE EVALUATION SURVEY (CONTINUED)

CONTRACTOR NAME: CONTRACT NUMBER:

EXCEPTIONAL

VERY

GOOD

SATISFACTORY

MARGINAL

UNSATISFACTORY

d.) MANAGEMENT:

(1) The contractor demonstrated effective management over the effort performed.

(2) The contractor maintained an open line of communication so that the COR and/or Technical Point of Contact were apprised of technical, cost, and schedule issues.

(3) The contractor presented information and correspondence in a clear, concise, and businesslike manner.

(4) The contractor promptly notified the Contracting Officer’s Representative, Technical Point of Contact, and/or Contracting Officer in a timely manner regarding urgent issues.

(5) The contractor cooperated with the Government in providing flexible, proactive, and effective recommended solutions to critical program issues.

(6) The contractor made timely award to, and demonstrated effective management of its subcontractors.

e.) UTILIZATION OF SMALL BUSINESS:

(1) The contractor completed and submitted required subcontract reports accurately and in a timely manner.

(2) The contractor met statutory and negotiated small business participation goals.

(3) The contractor demonstrated an effective small/small disadvantaged business subcontracting program.

NOTE: For statements indicating “Excellent” or “Not Satisfactory,” please provide a brief explanation on the NARRATIVE EXPLANATION page.

CONTRACTOR PERFORMANCE EVALUATION SURVEY (CONTINUED)

CONTRACTOR NAME: CONTRACT NUMBER:________________________

NARRATIVE EXPLANATION:

ATTACHMENT 12 – PAST PERFORMANCE QUESTIONNAIRE/SURVEY

File details come from the government source that posted it. Updated .