Final_RFP_ATT11_Ship_Availability_Schedule.pptx

PPTX presentation 442 KB Posted

Attached to
PMW 750 C4I Testing, Integration, and Installation Follow-on
Solicitation number
N00039-17-R-0043
Issued by

About this file

This document contains an attachment providing a ship availability schedule for various naval vessels under solicitation N00039-17-R-0043 for C4I testing, integration, and installation follow-on services. The schedule outlines equipment delivery dates, space turnovers, builder trials, crew move aboard dates, obligation work limiting dates, and planned delivery dates for aircraft carriers CVN 80 and CVN 81, as well as CVN 74, CVN 75, LHA 8 and LHA 9 through fiscal years 2019 to 2030. It also defines key terms related to the schedule such as equipment required in-yard dates, initial post-delivery availability, post-delivery availability, early start work for refueling complex overhauls, and shipbuilder design and construction contract award dates. The related federal contract opportunity notice indicates the solicitation was for C4I testing, integration, and installation follow-on services with a total award amount of $601,513,730 to multiple awardees under the Department of the Navy Information Warfare Systems Command as of June 26, 2019.

View the file

Other files

File Type Posted
ATT12_Past_Performance_Questionnaire_Survey.docx DOCX document
AMEND1_FINAL_RFP_ATT13_Small_Business_Participation_Data.doc DOC document
Final_RFP_ATT2.2_WD_15.4341_Rev.-10_Norfolk&NewportNews_VA.pdf PDF
ATT9_Hull_POR_Summary.xlsx XLSX spreadsheet
Final_RFP_ATT2.3_WD_15-5147_Rev.-6_Pascagoula_MS.pdf PDF
Final_RFP_ATT10_PEO_C4I_POR_&_Non-POR_Systems.pdf PDF
AMEND1_FINAL_RFP_ATT14_Prime_Contractor_&_Sub_Cost_Spreadsheets.xlsx XLSX spreadsheet
Final_RFP_ATT2.1_WD_15-4427_Rev.-9_Charleston_SC.pdf PDF
N0003917R0043_AMEND_01.docx DOCX document
Final_RFP_Exhibit_A-CTII_FO_CDRLs.pdf PDF
AMEND1_FINAL_RFP_ATT4_Labor_Table_Sanitized.xlsx XLSX spreadsheet
AMEND1_FINAL_RFP_ATT6_Rlvnt_Experience_Form.docx DOCX document
Final_RFP_ATT12_Past_Performance_Questionnaire_Survey.pdf PDF
Final_RFP_ATT7_Gate_Review_Matrix.pdf PDF
Final_RFP_QA_N00039-17-R-0043.pdf PDF
AMEND1_FINAL_RFP_ATT1_PWS.doc DOC document
FinalRFPAttachment15.pdf PDF
Final_RFP_ATT9_Hull_POR_Summary.pdf PDF
ATT15_LaborCategories.docx DOCX document
ATT7_Gate_Review_Matrix.xlsx XLSX spreadsheet
ATT4_Labor_Table_Sanitized.xlsx XLSX spreadsheet
Final_RFP_ATT5_QASP.pdf PDF
N0003917R0043_AMEND_01_CONFORMED.docx DOCX document
Final_RFP_ATT8_Rlvnt_PEO_C4I_POR_and_Systems.pdf PDF
AMEND1_FINAL_RFP_ATT3_DD254.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 11 – SHIP AVAILABILTY SCHEDULE

Ship Availability Schedule For illustration purposes only. Schedule does not reflect all work intended on the contract. Availability periods may change.

N00039-17-R-0043 For all ships: Task Order 1 includes Phases I, II, III. Task Order 2 includes Phases IV and V.

Attachment 11

CVN

CVN

CVN

CVN

LHA

LHA

FY19

CMA

Q1FY27

Shipbuilder DD&C contract Awarded

Q1FY19

FY20

FY21

FY22

FY23

FY24

FY25

FY26

FY29

FY27

FY28

Equipment RIYD Aug ‘24 Delivery Sep ‘27

OWLD

Aug ‘28

PSA

OWLD

Aug ‘25

CMA/

Delivery Jan ‘24

Shipbuilder DD&C contract Awarded

Q2FY22

Equipment RIYD May ‘21

Space Turn-over Nov ‘23

BT

Aug ‘23

CMA/

Delivery Jan ‘29

Equipment RIYD May ‘26

Space Turn-over Nov ‘28

BT

Aug ‘28

PDA

Apr ‘24

IPDA

Feb ‘29

CMA

Q3FY30

Shipbuilder DD&C contract Awarded

Q1FY24

Equipment RIYD Feb ‘28

PDA

Apr ‘29

IPDA

Mar ‘24

Delivery Jan ‘25

JITD

Q2FY22

OWLD

Feb ‘26

RCOH Start Jan ‘21

OWLD

Jan ‘29

Delivery Dec ‘27

JITD

Q4FY24

Shipbuilder DD&C contract Awarded

Q3FY22

RCOH Start Mar ‘24

ESW

Oct ‘23 Contract Award Exercise Option

ATTACHMENT 11 – SHIP AVAILABILTY SCHEDULE

Definitions N00039-17-R-0043 Attachment 11 Definitions Builder Trials (BT): Evaluation trials and inspections conducted underway by the builder to assure the builder and the Navy that the ship is, or will be, ready for Acceptance Trials.

Crew Move Aboard (CMA): Date when SHIPS FORCE Personnel transition onboard to work on the ship. It is critical they can conduct day-to-day operations, so certain C4I systems must be operational to support them.

Delivery: Date when the ship is delivered (or re-delivered in case of RCOH) to the Navy. This milestone is preceded by Builders Trials (BT) and Acceptance Trials (AT).

Early Start Work (ESW): Also referred to as “Smart Start”. The beginning of a period assigned prior to the start of a Refueling Complex Overhaul (RCOH) availability where removal and space preparation work can begin.

Equipment Required In-Yard Date (RIYD): Date when all equipment must be delivered to ship. For CVN A & B, these dates are specified in the DD&C contract so the shipbuilder can install for equipment on board.

Initial Post-Delivery Availability (IPDA): A period inserted ahead of the Post-Delivery Availability (PDA) when it is determined the planned PDA period may be insufficient to conduct trials and tests.

Just in Time Delivery (JITD): Planned date when GFE is to be delivered to the shipyard.

Obligation Work Limiting Date (OWLD): Date when all SCN-funded work must be complete on the ship.

Post Shakedown Availability (PSA): For CVN A & B, this availability fixes all Trial Card issues. It is also the window where the CANES LAN Drops are completed (roughly 2,500 Drops).

Post-Delivery Availability (PDA): A variable-duration period assigned by the TYCOM for the conduct of selected trials and tests peculiar to the anti-air warfare, strike warfare, amphibious warfare, anti-surface warfare and antisubmarine warfare (ASW) systems.

Shipbuilder DD&C contract Awarded: Planned date when NAVSEA (PMS 312, 377, or 379) will award the shipbuilding contract for the construction of the ship.

image1.png image2.png

File details come from the government source that posted it. Updated .