This document is a Technical Data Package Status List that provides a detailed list of the technical drawings, documents, and data required for the procurement and conversion of two existing Offshore Supply Vessels (OSVs) into a Training Support Vessel, referred to as the "P-TSV", under a Firm Fixed Price (FFP) contract.
The list includes 64 technical data items across categories such as hull, machinery, electrical, piping, and technical manuals. It indicates whether each item already exists and is readily available, the format of the item (e.g., hardcopy, ACAD, PDF), and any relevant remarks. The related federal contract opportunity is a pre-solicitation announcement for the P-TSV procurement, which will include the delivery, technical data package, installation of a deck crane, JP-5 fuel system, C5I mission spaces, and accommodations spaces expansion. The overall objective is to provide industry with information to assist in understanding the current technical requirements and to gain feedback. The government will use this pre-solicitation process, but no solicitation or proposal submission is currently being requested.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DRAFT J-2 DRLs 26MAR2024.docx | DOCX document | |
| DRAFT J-6 P-TSV Maintenance SOWv1.docx | DOCX document | |
| DRAFT J-10 Preservation Instructions v1.docx | DOCX document | |
| DRAFT J-1 P-TSV Specification 3_28_24.docx | DOCX document | |
| Industry Questionnaire.xlsx | XLSX spreadsheet | |
| N0002424R2227_Draft RFP_1APR2024_SAM Posting.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Data Item | ||
| No. | Title | Item already exists and is readily available |
(Y, N, N/A)
| (If N/A, explain why in Remarks) | Format of Item | |
| (hardcopy, ACAD, PDF, MS Word, MS Excel, other) | Remarks | |
| DI-019-01 | HULL LINES AND BODY PLAN | |
| DI-019-02 | MIDSHIP AND TYPICAL SECTIONS DRAWING | |
| DI-019-03 | SCANTLING PLANS, DECKS, AND PROFILES | |
| DI-019-04 | SHELL EXPANSION DRAWING | |
| DI-019-05 | MAIN ENGINES, GENERATORS, AND MISCELLANEOUS FOUNDATIONS | |
| DI-019-06 | PROPELLER, SHAFT, AND RUDDER OR Z-DRIVE ARRANGEMENT AND REMOVAL DRAWING | |
| DI-019-07 | PROPELLER DRAWING | |
| DI-019-08 | MAIN CONTROL CONSOLE AND SHIP CONTROL CONSOLE ARRANGEMENTS | |
| DI-019-09 | INPUT/OUTPUT SIGNAL LIST | |
| DI-019-10 | TOPSIDE ARRANGEMENT DRAWING | |
| DI-019-11 | RUNNING, ANCHOR, AND SEARCHLIGHTS PLAN | |
| DI-019-12 | ANCHOR HANDLING AND STOWAGE | |
| DI-019-13 | ANCHOR AND MOORING DRAWING | |
| DI-019-14 | STEERING GEAR ARRANGEMENT AND DETAILS | |
| DI-019-15 | RUDDER AND RUDDER STOCK ARRANGEMENT AND DETAILS | |
| DI-019-16 | BOW THRUSTER ARRANGEMENT AND DETAILS | |
| DI-019-17 | COMPARTMENT ARRANGEMENT AND OUTFITTING DRAWINGS | |
| DI-019-18 | DOOR, WINDOW, AND HATCH SCHEDULE | |
| DI-019-19 | FLOOR GRATING ARRANGEMENT AND DETAILS | |
| DI-019-20 | RAILINGS, STAIRS, AND LADDERS ARRANGEMENT AND DETAILS | |
| DI-019-21 | MACHINERY CENTRALIZED CONTROL SYSTEM DESCRIPTION OF OPERATIONS | |
| DI-019-22 | TELEPHONE DIRECTORY | |
| DI-019-23 | LIST OF LUBRICANTS | |
| DI-019-24 | KEY TAG INDEX | |
| DI-019-25 | INSULATION SCHEDULE | |
| DI-019-26 | FIRE CONTROL AND SAFETY PLAN | |
| DI-019-27 | PERIODIC SAFETY TEST PROCEDURES | |
| DI-019-28 | TRIM AND STABILITY BOOKLET | |
| DI-019-29 | BOOKLET OF TANK CAPACITY AND SOUNDING TABLES | |
| DI-019-30 | NOT USED | |
| DI-019-31 | SHIP DRAWING INDEX | |
| DI-019-32 | GENERAL ARRANGEMENT OF DECKS | |
| DI-019-33 | INBOARD AND OUTBOARD PROFILES | |
| DI-019-34 | MACHINERY ARRANGEMENT PLANS | |
| DI-019-35 | ELECTRICAL DISTRIBUTION SYSTEM ONE-LINE DIAGRAM | |
| DI-019-36 | MAIN AND EMERGENCY SWITCHBOARD ONE-LINE DIAGRAM | |
| DI-019-37 | INTERIOR COMMUNICATION SYSTEM BLOCK WIRING DIAGRAMS | |
| DI-019-38 | RADIO COMMUNICATIONS BLOCK DIAGRAM | |
| DI-019-39 | ELECTRICAL CABLEWAYS AND PENETRATIONS | |
| DI-019-40 | NAVIGATION AND COMMUNICATIONS SYSTEM BLOCK DIAGRAM | |
| DI-019-41 | MACHINERY ALARM AND MONITORING BLOCK DIAGRAM | |
| DI-019-42 | MACHINERY VENTILATION DIAGRAM AND DETAILS | |
| DI-019-43 | HVAC DIAGRAMMATIC PLAN AND EQUIPMENT LIST | |
| DI-019-44 | HVAC CALCULATIONS | |
| DI-019-45 | PIPING SYSTEMS DIAGRAMS | |
| a. Fresh and Potable Water Service | ||
| b. Seawater Firemain System including Sprinkling, Cooling and Flushing | ||
| c. Bilge and Ballast | ||
| d. Lube Oil Service, Fill, Transfer, and Purification | ||
| e. Fuel Oil Service, Fill, Transfer, and Purification | ||
| f. Cargo Oil Fill and Transfer | ||
| g. Compressed Air and Control Air | ||
| h. Sanitary Drain | ||
| i. Central Seawater Cooling System | ||
| j. Auxiliary Seawater Cooling System | ||
| k. Chilled Water System | ||
| l. Freshwater Cooling System | ||
| m. Bilge and Oily Waste Transfer System | ||
| n. R.O./Distilling System | ||
| o. Maine Engine Cooling Water | ||
| p. Starting Air System | ||
| q. Hydraulic System | ||
| r. Sewage and Gray Water Systems | ||
| s. Vents, Sounding Tubes and Overflows | ||
| t. Main Engine and Generator Exhaust Piping | ||
| DI-019-46 | TECHNICAL MANUAL INDEX | |
| DI-019-47 | OEM TECHNICAL MANUALS | |
| a. Machinery plant | ||
| b. Machinery controls system | ||
| c. Dynamic positioning system | ||
| d. Navigation and control systems | ||
| e. Deck crane | ||
| f. Fixed Fire-fighting System | ||
| DI-019-48 | APPLICABLE MARPOL 73/75 PROCEDURES, ARRANGEMENTS AND MANAGEMENT MANUALS |
Sheet2
| Techinical Data Package Status List | ||
| This list shall be completed for te existing drawings, documents, and data for the vessel in its current state. The intent of this list is to provide information on which items currently exist and which items will ultimately need to be developed. It will be assumed that if an item is identified as not existing that it will need to be developed. | ||
| Data Item | ||
| No. | Title | Item already exists and is readily available |
(Y, N, N/A)
| (If N/A, explain why in Remarks) | Format of Item | |
| (hardcopy, ACAD, PDF, MS Word, MS Excel, other) | Remarks | |
| DI-012-01 | HULL LINES AND BODY PLAN | |
| DI-012-02 | MIDSHIP AND TYPICAL SECTIONS DRAWING | |
| DI-012-03 | SCANTLING PLANS, DECKS, AND PROFILES | |
| DI-012-04 | SHELL EXPANSION DRAWING | |
| DI-012-05 | MAIN ENGINES, GENERATORS, AND MISCELLANEOUS FOUNDATIONS | |
| DI-012-06 | PROPELLER, SHAFT, AND RUDDER OR Z-DRIVE ARRANGEMENT AND REMOVAL DRAWING | |
| DI-012-07 | PROPELLER DRAWING | |
| DI-012-08 | MAIN CONTROL CONSOLE AND SHIP CONTROL CONSOLE ARRANGEMENTS | |
| DI-012-09 | INPUT/OUTPUT SIGNAL LIST | |
| DI-012-10 | TOPSIDE ARRANGEMENT DRAWING | |
| DI-012-11 | RUNNING, ANCHOR, AND SEARCHLIGHTS PLAN | |
| DI-012-12 | ANCHOR HANDLING AND STOWAGE | |
| DI-012-13 | MOORING AND TOWING ARRANGEMENT | |
| DI-012-14 | STEERING GEAR ARRANGEMENT AND DETAILS | |
| DI-012-15 | RUDDER AND RUDDER STOCK ARRANGEMENT AND DETAILS | |
| DI-012-16 | THRUSTER ARRANGEMENT AND DETAILS | |
| DI-012-17 | COMPARTMENT ARRANGEMENT AND OUTFITTING DRAWINGS | |
| DI-012-18 | DOOR, WINDOW, AND HATCH SCHEDULE | |
| DI-012-19 | FLOOR GRATING ARRANGEMENT AND DETAILS | |
| DI-012-20 | RAILINGS, STAIRS, AND LADDERS ARRANGEMENT AND DETAILS | |
| DI-012-21 | MACHINERY CENTRALIZED CONTROL SYSTEM DESCRIPTION OF OPERATIONS | |
| DI-012-22 | TELEPHONE DIRECTORY | |
| DI-012-23 | LIST OF LUBRICANTS | |
| DI-012-24 | KEY TAG INDEX | |
| DI-012-25 | INSULATION SCHEDULE | |
| DI-012-26 | DAMAGE CONTROL DISPLAY PLANS | |
| DI-012-27 | PERIODIC SAFETY TEST PROCEDURES | |
| DI-012-28 | TRIM AND STABILITY BOOKLET | |
| DI-012-29 | BOOKLET OF TANK CAPACITY AND SOUNDING TABLES | |
| DI-012-30 | SHIP DRAWING INDEX | |
| DI-012-31 | GENERAL ARRANGEMENT OF DECKS | |
| DI-012-32 | INBOARD AND OUTBOARD PROFILES | |
| DI-012-33 | MACHINERY ARRANGEMENT PLANS | |
| DI-012-34 | ELECTRICAL DISTRIBUTION SYSTEM ONE-LINE DIAGRAM | |
| DI-012-35 | MAIN AND EMERGENCY SWITCHBOARD ONE-LINE DIAGRAM | |
| DI-012-36 | INTERIOR COMMUNICATION SYSTEM BLOCK WIRING DIAGRAMS | |
| DI-012-37 | RADIO COMMUNICATIONS BLOCK DIAGRAM | |
| DI-012-38 | ELECTRICAL CABLEWAYS AND PENETRATIONS | |
| DI-012-39 | NAVIGATION AND COMMUNICATIONS SYSTEM BLOCK DIAGRAM | |
| DI-012-40 | MACHINERY ALARM AND MONITORING BLOCK DIAGRAM | |
| DI-012-41 | MACHINERY VENTILATION DIAGRAM AND DETAILS | |
| DI-012-42 | HVAC DIAGRAMMATIC PLAN AND EQUIPMENT LIST | |
| DI-012-43 | HVAC CALCULATIONS | |
| DI-012-44 | PIPING SYSTEMS DIAGRAMS | |
| a. Fresh and Potable Water Service | ||
| b. Seawater Firemain System including Sprinkling, Cooling and Flushing | ||
| c. Bilge and Ballast | ||
| d. Lube Oil Service, Fill, Transfer, and Purification | ||
| e. Fuel Oil Service, Fill, Transfer, and Purification | ||
| f. JP-5 Fill and Transfer | ||
| g. Compressed Air and Control Air | ||
| h. Sanitary Drain | ||
| i. Central Seawater Cooling System | ||
| j. Auxiliary Seawater Cooling System | ||
| k. Chilled Water System | ||
| l. Freshwater Cooling System | ||
| m. Bilge and Oily Waste Transfer System | ||
| n. Fresh Water Generation System | ||
| o. Main Engine Cooling Water | ||
| p. Starting Air System | ||
| q. Hydraulic System | ||
| r. Sewage and Gray Water Systems | ||
| s. Vents, Sounding Tubes and Overflows | ||
| t. Main Engine and Generator Exhaust Piping | ||
| DI-012-45 | TECHNICAL MANUAL INDEX | |
| DI-012-46 | OEM TECHNICAL MANUALS | |
| a. Machinery plant | ||
| b. Machinery controls system | ||
| c. Dynamic positioning system | ||
| d. Navigation and control systems | ||
| e. Deck crane | ||
| f. Fixed Fire-fighting System | ||
| DI-012-47 | APPLICABLE MARPOL 73/75 PROCEDURES, ARRANGEMENTS AND MANAGEMENT MANUALS | |
| DI-012-48 | MISSION SPACES ARRANGEMENT | |
| DI-012-49 | NETWORKS SYSTEM BLOCK DIAGRAM | |
| DI-012-50 | CCTV SYSTEM BLOCK DIAGRAM | |
| DI-012-51 | LIGHTING SYSTEM ONE-LINE DIAGRAM | |
| DI-012-52 | OEM COMMERCIAL WARRENTY SHEETS AND REGISTRATION FORMS | |
| DI-012-53 | FIRE STRUCTURAL PROTECTION DRAWING | |
| DI-012-54 | SEAKEEPING PERFROMANCE REPORT | |
| DI-012-55 | ELECTRICAL POWER LOAD ANALYSIS | |
| DI-012-56 | ELECTRIAL POWER SYSTEM DIAGRAM | |
| DI-012-57 | NAVIGATION LIGHTS DRAWING | |
| DI-012-58 | ALARM SYSTEM DRAWING | |
| DI-012-59 | FIRE CONTROL AND SAFETY PLAN | |
| DI-012-60 | PAINT SCHEDULE | |
| DI-012-61 | DOCKING PLAN | |
| DI-012-62 | DECK FITTINGS AND CARGO SECURING ARRANGEMENT DRAWING | |
| DI-012-63 | MAST ARRANGEMENT AND DETAILS DRAWING | |
| DI-012-64 | 24VDC SYSTEM DIAGRAM |
File details come from the government source that posted it. Updated .