This document contains questions and responses regarding an amendment to a solicitation for production, engineering, and other services in support of Battle Force Tactical Training and Advanced Training Domain scope. The Naval Sea Systems Command is seeking these services through a total small business set-aside. Key details include clarification that CDRLs B010 and C001 are required deliverables, quantities are not listed for items on Table C-1 but can be requested, a duplicate requirement was removed in Section C.3.5.2, a reference error in Exhibit B was corrected, the proposal delivery deadline was amended to 12:00PM on September 15th, 2022, and that pricing is required for all CLINs except optional CLINs X005 and X006. The incumbent contractor must price first article units in Attachment L-01.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question | Document Description | Page # | Section/ Paragraph | Question/Comment | Proposed Action/Change | Government Response |
| 1 | N00024-22-R-5107 | 41 | Section C.3.3.8 | CDRLs B010 and C001 are listed as a deliverable, but are not mention in the Statement of Work and B010 is not listed on Exhibits A/B/C provided. | Request clarification if CDRLs B010 and C001 will be required. | CDRLs B010 and C001 are referenced as deliverables. CDRL B010 and C001 are listed under Section C.3.1. The CDRL B010 attachment will be posted as part of Amendment 01. |
| 2 | N00024-22-R-5107 | 39 | Section C.3.3.5 | Table C-1 does not list the quantities of each item | Request clarification on the quantities required for each item on Table C-1 | Table C-1 within pg. 39 is simply a list of the specific drawings contained in Attachment J-03 T52A TDP package, as detailed in Section C.3.3.5, that pertain to the SCS production unit. Please send in a request for the Attachment J-03 T52A TDP package and the Goverment will send via FedEx. |
| 3 | N00024-22-R-5107 | 43 | Section C.3.5.2 | Requirements d. and g. are duplicates | Request correction of requirements | Correct, requirements are duplicates. The section g. duplicate is deleted and changed on Amendment 01. |
| 4 | N00024-22-R-5107 | 13 | Exhibit B | CDRL A006 Block 5 calls out C.3.4.1 which does not exist in the RFP. | Request clarification | Reference applies to C.3.4. The change within the Exhibit A, B, C will be changed on Amendment 01. |
| 5 | N00024-22-R-5107 | 1 | Section A | The time listed for the delivery deadline is 12:00AM local time on 15 September 2022. The 12-hour clock is a time convention in which the 24 hours of the day are divided into two periods: a.m. (from Latin ante meridiem, translating to "before midday") and p.m. (from Latin post meridiem, translating to "after midday"). By using 12:00 AM the delivery dead line would effectively be 14 September 2022. Further, does this mean someone will be available to accept delivery of the proposal on the night of the 14th? | Request the clarification of the delivery hour and date. | The RFP is amended to be 12:00PM local time on 15 September 2022. |
| 6 | N00024-22-R-5107 | DD 1423 | The DD 1423 lists all CDRLs under CLIN 0007 which is NSP. The RFP lists all CDRLs under FFP CLINs and CLINs 0004 and 0011 discusses performing work that would require CDRLs to be provided | Request the Government's clarification on which CDRLs are expected to be provide under FFP CLIN 0007 (not separately priced) and which CDRLs are to be provided under CLINs 0004 as Level of effort. | The acronym NSP means 'Not Seperately Priced'. Translated, it means that even though the Offeror is required to complete Boxes 17 & 18 on the CDRL itself (for tracking purposes), the costs of delivering the CDRL defined requirements will not be fixed to Box 17 & 18 but instead will be charged to LOE (Level Of Effort). | |
| 7 | N00024-22-R-5107 | Will the Government consider making this contract "D" type contract Vs a "C" contract? A "D" type contract benefits the government as well as the contractor for ease of reconciliation of the contract. Each Delivery Order (DO) works as a smaller contract and when the DO is completed it can be closed out rather than waiting for the 5 year contract to end to closeout and reconcile the contract as well. | Request the Government consider changing the contract type from a "C" contract to a "D" DO Contract. | No, the contract type will remain a "C" type contract. | ||
| 8 | N00024-22-R-5107 | 115 | Section L.2.5 | The proposal calls for CD/DVDs to be mailed | Can the proposal be submitted electronically via DoD Safe vice CD/DVDs mailed? | No, the proposal cannot be submitted electronically via DoD Safe. |
| 9 | N00024-22-R-5107 | 38 | Paragraph C.3.2, C.3.2.1 | First Article Units describes the requirements for First Article Units and pricing for same is included in Attachment L-01 Cost and Price Sheet. Removing this requirement for the incumbent contractor would result in schedule acceleration and cost savings. | Is the incumbent contractor required to produce and price the FAU units? | All CLINs including Option CLINs shall include pricing, except CLINs X005 and X006. |