L-3_Cost Proposal Format_MA PSM_10.27.22.xlsx

XLSX spreadsheet 271 KB Posted

Attached to
Mid-Atlantic (MA) Aircraft Carrier Nuclear (CVN) Private Sector Maintenance (PSM), Repair and Modernization Efforts
Solicitation number
N0002422R4100
Issued by

About this file

This is a combined synopsis/solicitation from the Naval Sea Systems Command seeking proposals for maintenance, repair and modernization efforts on CVN 68 and CVN 78 Class Aircraft Carriers home-ported in the Hampton Roads, Virginia area. Services required include emergent work, continuous maintenance availabilities, pre-refueling complex overhaul availabilities, Ships Terminal Offload Program availabilities, and CNO scheduled availabilities such as Carrier Incremental Availabilities, Planned Incremental Availabilities, and Docking Planned Incremental Availabilities. The solicitation provides details on the products and services required to support maintenance and repair efforts for aircraft carriers visiting the Hampton Roads area, with the Naval Sea Systems Command listed as the contracting agency.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Labor Hour_Phasing

Labor Hours - Workload Phasing by Contractual YearCLINs 0013 and 0025 are for the payment purposes of Award Fee and Small Business Fee and have no hours assigned
CLINTask DescriptionYR1YR2YR3YR4YR5YR6YR7TOTALs
0001IAPA19,52014,76915,74516,79417,906- 0- 084,733.00
0002Repairs & Alts337,838255,622272,502290,670309,912- 0- 01,466,544.00
0003Emergent Repair33,78425,56227,25029,06730,991- 0- 0146,654.43
0004CDRLs- 0- 0- 0- 0- 0- 0- 0
0005PIA Planning18,83624,71721,0617,546- 0- 0- 072,160.00
CVN 773,46011,06414,0987,546- 0- 0- 036,168.00
CVN 7815,37613,6536,963- 0- 0- 0- 035,992.00
0006PIA Execution- 097,503355,071489,640257,105- 0- 01,199,320.00
CVN 77- 0- 067,340277,923257,105- 0- 0602,368.00
CVN 78- 097,503287,731211,717- 0- 0- 0596,952.00
0007DPIA Planning46,36015,064- 011,707107,869- 0- 0181,000.00
CVN 6946,36015,064- 0- 0- 0- 0- 061,424.00
CVN 78- 0- 0- 011,70737,021- 0- 048,728.00
CVN 77- 0- 0- 0- 070,848- 0- 070,848.00
0008DPIA Execution161,637599,675522,737- 0- 0- 0- 01,284,048.00
CVN 69161,637599,675522,737- 0- 0- 0- 01,284,048.00
CVN 78- 0- 0- 0- 0- 0- 0- 0- 0
CVN 77- 0- 0- 0- 0- 0- 0- 0- 0
0009CIA Planning2,7604,4411,5912102,022- 0- 011,024.00
CVN 691,3701,358- 0- 0- 0- 0- 02,728.00
CVN 781,3901,946- 0- 0- 0- 0- 03,336.00
CVN 77- 01,1371,591- 0- 0- 0- 02,728.00
CVN 78- 0- 0- 02102,022- 0- 02,232.00
CVN 77- 0- 0- 0- 0- 0- 0- 0- 0
0010CIA Execution49,287101,10864,52627,40761,632- 0- 0303,960.00
CVN 6931,32343,853- 0- 0- 0- 0- 075,176.00
CVN 7817,96345,50928,504- 0- 0- 0- 091,976.00
CVN 77- 011,74736,02227,407- 0- 0- 075,176.00
CVN 78- 0- 0- 0- 061,632- 0- 061,632.00
CVN 77- 0- 0- 0- 0- 0- 0- 0- 0
0011STOP Planning- 03,67514,43613,009- 0- 0- 031,120.00
CVN 68- 03,3337,8174,410- 0- 0- 015,560.00
CVN 69- 03416,6208,599- 0- 0- 015,560.00
0012STOP Execution- 0- 088,709346,650311,440- 0- 0746,800.00
CVN 68- 0- 079,997187,582105,821- 0- 0373,400.00
CVN 69- 0- 08,713159,068205,619- 0- 0373,400.00
Option CLINs Below
0014IAPA- 0- 0- 0- 0- 019,08832,64951,737.00
0015Repairs & Alts- 0- 0- 0- 0- 0330,374565,071895,444.00
0016Emergent Repair- 0- 0- 0- 0- 033,03756,50789,544.39
0017PIA Planning- 0- 0- 0- 0- 0- 0- 0- 0
CVN 77- 0- 0- 0- 0- 0- 0- 0- 0
CVN 78- 0- 0- 0- 0- 0- 0- 0- 0
0018PIA Execution- 0- 0- 0- 0- 0- 0- 0- 0
CVN 77- 0- 0- 0- 0- 0- 0- 0- 0
CVN 78- 0- 0- 0- 0- 0- 0- 0- 0
0019DPIA Planning- 0- 0- 0- 0- 0- 0- 0- 0
CVN 69- 0- 0- 0- 0- 0- 0- 0- 0
CVN 78- 0- 0- 0- 0- 0- 0- 0- 0
CVN 77- 0- 0- 0- 0- 0- 0- 0- 0
0020DPIA Execution- 0- 0- 0- 0- 0528,3961,543,1882,071,584.00
CVN 69- 0- 0- 0- 0- 0- 0- 0- 0
CVN 78- 0- 0- 0- 0- 0466,833365,911832,744.00
CVN 77- 0- 0- 0- 0- 061,5631,177,2771,238,840.00
0021CIA Planning- 0- 0- 0- 0- 01,1371,5912,728.00
CVN 69- 0- 0- 0- 0- 0- 0- 0- 0
CVN 78- 0- 0- 0- 0- 0- 0- 0- 0
CVN 77- 0- 0- 0- 0- 0- 0- 0- 0
CVN 78- 0- 0- 0- 0- 0- 0- 0- 0
CVN 77- 0- 0- 0- 0- 01,1371,5912,728.00
0022CIA Execution- 0- 0- 0- 0- 031,32343,85375,176.00
CVN 69- 0- 0- 0- 0- 0- 0- 0- 0
CVN 78- 0- 0- 0- 0- 0- 0- 0- 0
CVN 77- 0- 0- 0- 0- 0- 0- 0- 0
CVN 78- 0- 0- 0- 0- 0- 0- 0- 0
CVN 77- 0- 0- 0- 0- 031,32343,85375,176.00
0023STOP Planning- 0- 0- 0- 0- 0- 0- 0- 0
CVN 68- 0- 0- 0- 0- 0- 0- 0- 0
CVN 69- 0- 0- 0- 0- 0- 0- 0- 0
0024STOP Execution- 0- 0- 0- 0- 0- 0- 0- 0
CVN 68- 0- 0- 0- 0- 0- 0- 0- 0
CVN 69- 0- 0- 0- 0- 0- 0- 0- 0
Totals670,0211,142,1361,383,6281,232,7001,098,878943,3552,242,8588,713,576.81

The hours above are provided to be used as a basis of estimate to develop the total cost for each respective CLIN Labor tab.

Please note that the hour estimates above are diviided into the respective contract years (1-7)

Total Proposed Mid-Atlantic Private Sector Maintenance N00024-22-R-4100: Cost Proposal Submission "Overview"

CLINDescriptionDirect CostIndirect Cost
(Note 1)Indirect Cost
(Note 1)Indirect Cost
(Note 1)Indirect Cost
(Note 1)Indirect Cost
(Note 1)Indirect Cost
(Note 1)Fixed Fee
(Note 1)Total
0001Labor$ 2,021,802$ 21,308$ 2,043,110
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0001 Totals$ 2,021,802$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 21,308$ 2,043,110
0002Labor$ 2,021,802$ 21,308$ 2,043,110
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0002 Totals$ 2,021,802$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 21,308$ 2,043,110
0003Labor$ 2,021,802$ 21,308$ 2,043,110
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0003 Totals$ 2,021,802$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 21,308$ 2,043,110
0005Labor$ 2,021,802$ 21,308$ 2,043,110
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0005 Totals$ 2,021,802$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 21,308$ 2,043,110
0006Labor$ 2,021,802$ 21,308$ 2,043,110
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0006 Totals$ 2,021,802$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 21,308$ 2,043,110
0007Labor$ 2,021,802$ 21,308$ 2,043,110
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0007 Totals$ 2,021,802$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 21,308$ 2,043,110
0008Labor$ 2,021,802$ 21,308$ 2,043,110
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0008 Totals$ 2,021,802$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 21,308$ 2,043,110
0009Labor$ 2,021,802$ 21,308$ 2,043,110
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0009 Totals$ 2,021,802$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 21,308$ 2,043,110
0010Labor$ 2,021,802$ 21,308$ 2,043,110
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0010 Totals$ 2,021,802$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 21,308$ 2,043,110
0011Labor$ 2,021,802$ 21,308$ 2,043,110
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0011 Totals$ 2,021,802$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 21,308$ 2,043,110
0012Labor$ 2,021,802$ 21,308$ 2,043,110
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0012 Totals$ 2,021,802$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 21,308$ 2,043,110
0014Labor$ 1,416$ 85$ 1,501
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0014 Totals$ 1,416$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 85$ 1,501
0015Labor$ 1,416$ 85$ 1,501
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0012 Totals$ 1,416$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 85$ 1,501
0016Labor$ 1,416$ 85$ 1,501
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0016 Totals$ 1,416$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 85$ 1,501
0017Labor$ 1,416$ 85$ 1,501
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0017 Totals$ 1,416$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 85$ 1,501
0018Labor$ 1,416$ 85$ 1,501
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0018 Totals$ 1,416$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 85$ 1,501
0019Labor$ 1,416$ 85$ 1,501
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0019 Totals$ 1,416$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 85$ 1,501
0020Labor$ 1,416$ 85$ 1,501
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0020 Totals$ 1,416$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 85$ 1,501
0021Labor$ 1,416$ 85$ 1,501
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0021 Totals$ 1,416$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 85$ 1,501
0022Labor$ 1,416$ 85$ 1,501
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0022 Totals$ 1,416$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 85$ 1,501
0023Labor$ 1,416$ 85$ 1,501
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0023 Totals$ 1,416$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 85$ 1,501
0024Labor$ 1,416$ 85$ 1,501
Material$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0
CLIN 0024 Totals$ 1,416$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 85$ 1,501
Grand Total$ 22,255,393$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 235,324$ 22,490,717
Note 1Offerors will need to link the associated indirect cost factors to each CLIN tab for labor and the ODC tab for associated materials and travel expenses. Should Offerors need additional indirect columns, they will need to be added by the Offeror. The Offeror should update the associated title with the respective indirect rate to indicate the indirect rate type.

Direct Labor and Fee categories have already been linked for the Offeror to each associated tab. (Please note values present in the overview tab are directly tied to the sample entry provided by the Government for instructional purposes only. Once the Offeror removes the sample data from each CLIN tab, the associated cost for the sample will automatically be removed from the overview tab.

ODCs Mid-Atlantic Private Sector Maintenance N00024-22-R-4100: Cost Proposal Submission "ODCs for Completion"

CLINODC TYPEYearDirect CostTotal
Direct CostIndirect

Rate (Note 1) Indirect Cost (Note 1) Indirect Rate (Note 1) Indirect Cost (Note 1) Indirect Rate (Note 1) Indirect Cost

(Note 1)Total
Direct + IndirectFee %
(Note 2)Fee
(Note 2)Grand Total

(Direct+Indirect+Fee) (Note 3) Total NTE Price (not inclusive of Material fee) (Note 3)

PrimeTotal Subcontractors
0001MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 880,899*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 880,899
0002MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 15,246,329*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 15,246,329
0003MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 1,524,633*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 1,524,633
0005MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 731,596*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 731,593
0006MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 12,771,027*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 12,771,027
0007MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 1,950,125*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 1,950,125
0008MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 13,061,139*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 13,061,139
0009MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 113,169*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 113,169
0010MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 3,159,748*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 3,159,748
0011MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 653,346*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 326,673
0012MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 16,171,312*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 8,085,656
0014
(Option)MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 605,767*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 605,767
0015
(Option)MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 10,484,421*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 10,484,421
0016
(Option)MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 1,048,442*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 1,048,442
0017
(Option)MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0018
(Option)MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0019
(Option)MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0020
(Option)MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 24,491,566*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 24,491,566
0021
(Option)MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 31,729*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 31,729
0022
(Option)MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 874,352*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 874,352
0023
(Option)MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
0024
(Option)MATERIAL1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0*not inclusive of fee
TRAVEL1$ - 0$ - 00%$ - 0$ - 0
2$ - 0$ - 00%$ - 0$ - 0
3$ - 0$ - 00%$ - 0$ - 0
4$ - 0$ - 00%$ - 0$ - 0
5$ - 0$ - 00%$ - 0$ - 0
6$ - 0$ - 00%$ - 0$ - 0
7$ - 0$ - 00%$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Grand TotalsMATERIAL1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL MATERIAL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 103,799,600Total Material (not inclusive of fee)
TRAVEL1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL TRAVEL$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 95,387,268Total Travel
Note 1:
Columns E - JOfferors shall update Cells E2 through J2 (titles) to indicate the type of indirect rate for the respective column.

Offerors shall update columns E, G and I to indicate the rate (%) associated with the indirect rate category by linking to the associated "indirect rate" tab.

Offerors shall update columns F, H and J to add a formula to show how each indirect cost was derived (based on).

Offerors shall link the associated total indirect cost factors to the "Total Proposed" tab for each respective CLIN. If required, the offeror shall add additional indirect rate columns.

Note 2:
Columns K - LFee should not be applied to Travel or Facilities Capital Cost of Money (FCCM); for Material, Offerors shall apply no more than 6% fee.
Note 3:
Column M - NOfferors have been provided with values in Column Q. Offerors shall separate out the cost for each CLIN (Material & Travel) by direct cost/ indirect cost/ and fee; and ensure that proposed values do not exceed the value in Column Q for Travel. For Material, vendors shall add fee to the material lines to determine the final proposed cost. For each respective CLIN, vendors shall spread the Column Q value amongst years 1 through 7, as they see fit.

CLIN 0001_LABOR

Name of Project:MID ATLANTIC PRIVATE SECTOR MAINTENANCE (MA PSM)
SOLICITATION NO.N00024-22-R-4100
ATTACHMENT L-3L-3
Document Template7/5/22
CLIN Cost ProposalCLIN 0001 IAPA
Prime / Offeror:
Direct Labor (DL) (Note 1)
Labor CategoryName (Last, First)Year 1Year 2Year 3Year 4Year 5Total (Note 3)
MM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YR
HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursExtended $
Sample: ENG, Level IISmith, John20$58.08$1,162100$60.12$6,012100$62.08$6,20880$63.99$5,12050$66.02$3,301350$21,802
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
Total Direct Labor20$1,162100$6,012100$6,20880$5,12050$3,301350$21,802
Subcontracts/Interorganizational Transfer (Note 2)
BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $HoursExtended $
Sample: Acme AnvilsSubcontractor500$4,000.00$2,000,000ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0500$2,000,000
ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0- 0$0
ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0- 0$0
Total Subcontract Costs500$2,000,0000$00$00$00$0500$2,000,000
Indirect Costs (Note 3)
BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $Extended $
Sample: Labor and Material Overhead90.20%$090.20%$090.20%$090.20%$090.20%$0$0
Sample: Cost of Money (CoM)0.05400%$00.05400%$00.05400%$00.05400%$00.05%$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
Total Indirect Costs$0$0$0$0$0$0.00

Total Estimated Costs $2,001,162 $6,012 $6,208 $5,120 $3,301 $2,021,802

Fee / Profit on Prime Labor (Note 4)$1,1626.00%$70$6,0126.00%$361$6,2086.00%$372$5,1206.00%$307$3,3016.00%$198$1,308$21,308.09
Fee / Profit on Subcontractor Labor (Note 4)$2,000,0001.00%$20,000$01.00%$0$01.00%$0$01.00%$0$01.00%$0$20,000

Total Labor Price $2,021,231 $6,372 $6,580 $5,427 $3,499 850 $2,043,110

Instructions: A sample is included in all tabs to demonstrate how to properly complete this worksheet (noted in blue font).

Delete all sample entries when completing the worksheets to avoid erroneous cost enteries in your final submission.

Offerors have been provided the Government prescribed escalation rates on the "escalation" tab.

Note 1: Indicate whether the Offeror's Contractor's accounting system is based on a calendar year or fiscal year. Indicate the months during the period of performance that these rates apply.

Note 2: The Offeror/Contractor shall link to associated tab for the details. Indicate when submission is from a prime, subcontractor or consultant.

Note 3: The Offeror/Contractor shall include all indirect costs applied and identified in the Labor & Indirect Rates tab and shall specify and enumerate the basis in which those rates apply. This may include, but is not limited to Fringe Benefits, Labor Overhead, Material Handling, General and Administrative, and Facilities Cost of Money. The offeror shall link each total indirect cost element to the "Total Proposed" tab for the associated CLIN.

Note 4: Profit or fee is not allowed on Government entities or FCCM.

&"Arial,Bold"&12&A

CLIN 0002_LABOR

Name of Project:MID ATLANTIC PRIVATE SECTOR MAINTENANCE (MA PSM)
SOLICITATION NO.N00024-22-R-4100
ATTACHMENT L-3L-3
Document Template7/5/22
CLIN Cost ProposalCLIN 0002 Repairs and Alterations
Prime / Offeror:
Direct Labor (DL) (Note 1)
Labor CategoryName (Last, First)Year 1Year 2Year 3Year 4Year 5Total (Note 3)
MM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YR
HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursExtended $
Sample: ENG, Level IISmith, John20$58.08$1,162100$60.12$6,012100$62.08$6,20880$63.99$5,12050$66.02$3,301350$21,802
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
Total Direct Labor20$1,162100$6,012100$6,20880$5,12050$3,301350$21,802
Subcontracts/Interorganizational Transfer (Note 2)
BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $HoursExtended $
Sample: Acme AnvilsSubcontractor500$4,000.00$2,000,000ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0500$2,000,000
ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0- 0$0
ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0- 0$0
Total Subcontract Costs500$2,000,0000$00$00$00$0500$2,000,000
Indirect Costs (Note 3)
BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $Extended $
Sample: Labor and Material Overhead90.20%$090.20%$090.20%$090.20%$090.20%$0$0
Sample: Cost of Money (CoM)0.05400%$00.05400%$00.05400%$00.05400%$00.05%$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
Total Indirect Costs$0$0$0$0$0$0.00

Total Estimated Costs $2,001,162 $6,012 $6,208 $5,120 $3,301 $2,021,802

Fee / Profit on Prime Labor (Note 4)$1,1626.00%$70$6,0126.00%$361$6,2086.00%$372$5,1206.00%$307$3,3016.00%$198$1,308$21,308.09
Fee / Profit on Subcontractor Labor (Note 4)$2,000,0001.00%$20,000$01.00%$0$01.00%$0$01.00%$0$01.00%$0$20,000

Total Labor Price $2,021,231 $6,372 $6,580 $5,427 $3,499 850 $2,043,110

Instructions: A sample is included in all tabs to demonstrate how to properly complete this worksheet (noted in blue font).

Delete all sample entries when completing the worksheets to avoid erroneous cost enteries in your final submission.

Offerors have been provided the Government prescribed escalation rates on the "escalation" tab.

Note 1: Indicate whether the Offeror's Contractor's accounting system is based on a calendar year or fiscal year. Indicate the months during the period of performance that these rates apply.

Note 2: The Offeror/Contractor shall link to associated tab for the details. Indicate when submission is from a prime, subcontractor or consultant.

Note 3: The Offeror/Contractor shall include all indirect costs applied and identified in the Labor & Indirect Rates tab and shall specify and enumerate the basis in which those rates apply. This may include, but is not limited to Fringe Benefits, Labor Overhead, Material Handling, General and Administrative, and Facilities Cost of Money. The offeror shall link each total indirect cost element to the "Total Proposed" tab for the associated CLIN.

Note 4: Profit or fee is not allowed on Government entities or FCCM.

CLIN 0002 - LABOR

CLIN 0003_LABOR

Name of Project:MID ATLANTIC PRIVATE SECTOR MAINTENANCE (MA PSM)
SOLICITATION NO.N00024-22-R-4100
ATTACHMENT L-3L-3
Document Template7/5/22
CLIN Cost ProposalCLIN 0003 Emergent Repairs
Prime / Offeror:
Direct Labor (DL) (Note 1)
Labor CategoryName (Last, First)Year 1Year 2Year 3Year 4Year 5Total (Note 3)
MM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YR
HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursExtended $
Sample: ENG, Level IISmith, John20$58.08$1,162100$60.12$6,012100$62.08$6,20880$63.99$5,12050$66.02$3,301350$21,802
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
Total Direct Labor20$1,162100$6,012100$6,20880$5,12050$3,301350$21,802
Subcontracts/Interorganizational Transfer (Note 2)
BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $HoursExtended $
Sample: Acme AnvilsSubcontractor500$4,000.00$2,000,000ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0500$2,000,000
ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0- 0$0
ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0- 0$0
Total Subcontract Costs500$2,000,0000$00$00$00$0500$2,000,000
Indirect Costs (Note 3)
BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $Extended $
Sample: Labor and Material Overhead90.20%$090.20%$090.20%$090.20%$090.20%$0$0
Sample: Cost of Money (CoM)0.05400%$00.05400%$00.05400%$00.05400%$00.05%$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
Total Indirect Costs$0$0$0$0$0$0.00

Total Estimated Costs $2,001,162 $6,012 $6,208 $5,120 $3,301 $2,021,802

Fee / Profit on Prime Labor (Note 4)$1,1626.00%$70$6,0126.00%$361$6,2086.00%$372$5,1206.00%$307$3,3016.00%$198$1,308$21,308.09
Fee / Profit on Subcontractor Labor (Note 4)$2,000,0001.00%$20,000$01.00%$0$01.00%$0$01.00%$0$01.00%$0$20,000

Total Labor Price $2,021,231 $6,372 $6,580 $5,427 $3,499 850 $2,043,110

Instructions: A sample is included in all tabs to demonstrate how to properly complete this worksheet (noted in blue font).

Delete all sample entries when completing the worksheets to avoid erroneous cost enteries in your final submission.

Offerors have been provided the Government prescribed escalation rates on the "escalation" tab.

Note 1: Indicate whether the Offeror's Contractor's accounting system is based on a calendar year or fiscal year. Indicate the months during the period of performance that these rates apply.

Note 2: The Offeror/Contractor shall link to associated tab for the details. Indicate when submission is from a prime, subcontractor or consultant.

Note 3: The Offeror/Contractor shall include all indirect costs applied and identified in the Labor & Indirect Rates tab and shall specify and enumerate the basis in which those rates apply. This may include, but is not limited to Fringe Benefits, Labor Overhead, Material Handling, General and Administrative, and Facilities Cost of Money. The offeror shall link each total indirect cost element to the "Total Proposed" tab for the associated CLIN.

Note 4: Profit or fee is not allowed on Government entities or FCCM.

CLIN 0003_LABOR

CLIN 0005_LABOR

Name of Project:MID ATLANTIC PRIVATE SECTOR MAINTENANCE (MA PSM)
SOLICITATION NO.N00024-22-R-4100
ATTACHMENT L-3L-3
Document Template7/5/22
CLIN Cost ProposalCLIN 0005 PIA Planning
Prime / Offeror:
Direct Labor (DL) (Note 1)
Labor CategoryName (Last, First)Year 1Year 2Year 3Year 4Year 5Total (Note 3)
MM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YR
HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursExtended $
Sample: ENG, Level IISmith, John20$58.08$1,162100$60.12$6,012100$62.08$6,20880$63.99$5,12050$66.02$3,301350$21,802
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
Total Direct Labor20$1,162100$6,012100$6,20880$5,12050$3,301350$21,802
Subcontracts/Interorganizational Transfer (Note 2)
BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $HoursExtended $
Sample: Acme AnvilsSubcontractor500$4,000.00$2,000,000ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0500$2,000,000
ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0- 0$0
ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0- 0$0
Total Subcontract Costs500$2,000,0000$00$00$00$0500$2,000,000
Indirect Costs (Note 3)
BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $Extended $
Sample: Labor and Material Overhead90.20%$090.20%$090.20%$090.20%$090.20%$0$0
Sample: Cost of Money (CoM)0.05400%$00.05400%$00.05400%$00.05400%$00.05%$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
Total Indirect Costs$0$0$0$0$0$0.00

Total Estimated Costs $2,001,162 $6,012 $6,208 $5,120 $3,301 $2,021,802

Fee / Profit on Prime Labor (Note 4)$1,1626.00%$70$6,0126.00%$361$6,2086.00%$372$5,1206.00%$307$3,3016.00%$198$1,308$21,308.09
Fee / Profit on Subcontractor Labor (Note 4)$2,000,0001.00%$20,000$01.00%$0$01.00%$0$01.00%$0$01.00%$0$20,000

Total Labor Price $2,021,231 $6,372 $6,580 $5,427 $3,499 850 $2,043,110

Instructions: A sample is included in all tabs to demonstrate how to properly complete this worksheet (noted in blue font).

Delete all sample entries when completing the worksheets to avoid erroneous cost enteries in your final submission.

Offerors have been provided the Government prescribed escalation rates on the "escalation" tab.

Note 1: Indicate whether the Offeror's Contractor's accounting system is based on a calendar year or fiscal year. Indicate the months during the period of performance that these rates apply.

Note 2: The Offeror/Contractor shall link to associated tab for the details. Indicate when submission is from a prime, subcontractor or consultant.

Note 3: The Offeror/Contractor shall include all indirect costs applied and identified in the Labor & Indirect Rates tab and shall specify and enumerate the basis in which those rates apply. This may include, but is not limited to Fringe Benefits, Labor Overhead, Material Handling, General and Administrative, and Facilities Cost of Money. The offeror shall link each total indirect cost element to the "Total Proposed" tab for the associated CLIN.

Note 4: Profit or fee is not allowed on Government entities or FCCM.

CLIN 0006_LABOR

CLIN 0006_LABOR

Name of Project:MID ATLANTIC PRIVATE SECTOR MAINTENANCE (MA PSM)
SOLICITATION NO.N00024-22-R-4100
ATTACHMENT L-3L-3
Document Template7/5/22
CLIN Cost ProposalCLIN 0006 PIA Execution
Prime / Offeror:
Direct Labor (DL) (Note 1)
Labor CategoryName (Last, First)Year 1Year 2Year 3Year 4Year 5Total (Note 3)
MM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YR
HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursExtended $
Sample: ENG, Level IISmith, John20$58.08$1,162100$60.12$6,012100$62.08$6,20880$63.99$5,12050$66.02$3,301350$21,802
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
Total Direct Labor20$1,162100$6,012100$6,20880$5,12050$3,301350$21,802
Subcontracts/Interorganizational Transfer (Note 2)
BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $HoursExtended $
Sample: Acme AnvilsSubcontractor500$4,000.00$2,000,000ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0500$2,000,000
ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0- 0$0
ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0- 0$0
Total Subcontract Costs500$2,000,0000$00$00$00$0500$2,000,000
Indirect Costs (Note 3)
BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $Extended $
Sample: Labor and Material Overhead90.20%$090.20%$090.20%$090.20%$090.20%$0$0
Sample: Cost of Money (CoM)0.05400%$00.05400%$00.05400%$00.05400%$00.05%$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
Total Indirect Costs$0$0$0$0$0$0.00

Total Estimated Costs $2,001,162 $6,012 $6,208 $5,120 $3,301 $2,021,802

Fee / Profit on Prime Labor (Note 4)$1,1626.00%$70$6,0126.00%$361$6,2086.00%$372$5,1206.00%$307$3,3016.00%$198$1,308$21,308.09
Fee / Profit on Subcontractor Labor (Note 4)$2,000,0001.00%$20,000$01.00%$0$01.00%$0$01.00%$0$01.00%$0$20,000

Total Labor Price $2,021,231 $6,372 $6,580 $5,427 $3,499 850 $2,043,110

Instructions: A sample is included in all tabs to demonstrate how to properly complete this worksheet (noted in blue font).

Delete all sample entries when completing the worksheets to avoid erroneous cost enteries in your final submission.

Offerors have been provided the Government prescribed escalation rates on the "escalation" tab.

Note 1: Indicate whether the Offeror's Contractor's accounting system is based on a calendar year or fiscal year. Indicate the months during the period of performance that these rates apply.

Note 2: The Offeror/Contractor shall link to associated tab for the details. Indicate when submission is from a prime, subcontractor or consultant.

Note 3: The Offeror/Contractor shall include all indirect costs applied and identified in the Labor & Indirect Rates tab and shall specify and enumerate the basis in which those rates apply. This may include, but is not limited to Fringe Benefits, Labor Overhead, Material Handling, General and Administrative, and Facilities Cost of Money. The offeror shall link each total indirect cost element to the "Total Proposed" tab for the associated CLIN.

Note 4: Profit or fee is not allowed on Government entities or FCCM.

CLIN 0007_LABOR

CLIN 0007_LABOR

Name of Project:MID ATLANTIC PRIVATE SECTOR MAINTENANCE (MA PSM)
SOLICITATION NO.N00024-22-R-4100
ATTACHMENT L-3L-3
Document Template7/5/22
CLIN Cost ProposalCLIN 0007 DPIA Planning
Prime / Offeror:
Direct Labor (DL) (Note 1)
Labor CategoryName (Last, First)Year 1Year 2Year 3Year 4Year 5Total (Note 3)
MM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YR
HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursRateExtended $HoursExtended $
Sample: ENG, Level IISmith, John20$58.08$1,162100$60.12$6,012100$62.08$6,20880$63.99$5,12050$66.02$3,301350$21,802
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
$0$0$0$0$00$0
Total Direct Labor20$1,162100$6,012100$6,20880$5,12050$3,301350$21,802
Subcontracts/Interorganizational Transfer (Note 2)
BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $HoursExtended $
Sample: Acme AnvilsSubcontractor500$4,000.00$2,000,000ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0500$2,000,000
ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0- 0$0
ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0ERROR:#DIV/0!$0- 0$0
Total Subcontract Costs500$2,000,0000$00$00$00$0500$2,000,000
Indirect Costs (Note 3)
BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $BaseRateExtended $Extended $
Sample: Labor and Material Overhead90.20%$090.20%$090.20%$090.20%$090.20%$0$0
Sample: Cost of Money (CoM)0.05400%$00.05400%$00.05400%$00.05400%$00.05%$0$0
$0$0$0$0$0$0
$0$0$0$0$0$0
Total Indirect Costs$0$0$0$0$0$0.00

Total Estimated Costs $2,001,162 $6,012 $6,208 $5,120 $3,301 $2,021,802

Fee / Profit on Prime Labor (Note 4)$1,1626.00%$70$6,0126.00%$361$6,2086.00%$372$5,1206.00%$307$3,3016.00%$198$1,308$21,308.09
Fee / Profit on Subcontractor Labor (Note 4)$2,000,0001.00%$20,000$01.00%$0$01.00%$0$01.00%$0$01.00%$0$20,000

Total Labor Price $2,021,231 $6,372 $6,580 $5,427 $3,499 850 $2,043,110

Instructions: A sample is included in all tabs to demonstrate how to properly complete this worksheet (noted in blue font).

Delete all sample entries when completing the worksheets to avoid erroneous cost enteries in your final submission.

Offerors have been provided the Government prescribed escalation rates on the "escalation" tab.

Note 1: Indicate whether the Offeror's Contractor's accounting system is based on a calendar year or fiscal year. Indicate the months during the period of performance that these rates apply.

Note 2: The Offeror/Contractor shall link to associated tab for the details. Indicate when submission is from a prime, subcontractor or consultant.

Note 3: The Offeror/Contractor shall include all indirect costs applied and identified in the Labor & Indirect Rates tab and shall specify and enumerate the basis in which those rates apply. This may include, but is not limited to Fringe Benefits, Labor Overhead, Material Handling, General and Administrative, and Facilities Cost of Money. The offeror shall link each total indirect cost element to the "Total Proposed" tab for the associated CLIN.

Note 4: Profit or fee is not allowed on Government entities or FCCM.

CLIN 0008_LABOR

CLIN 0008_LABOR

Name of Project:MID ATLANTIC PRIVATE SECTOR MAINTENANCE (MA PSM)
SOLICITATION NO.N00024-22-R-4100
ATTACHMENT L-3L-3
Document Template7/5/22
CLIN Cost ProposalCLIN 0008 DPIA Execution
Prime / Offeror:
Direct Labor (DL) (Note 1)
Labor CategoryName (Last, First)Year 1Year 2Year 3Year 4Year 5Total (Note 3)
MM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YRMM/YR to MM/YR

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .