N00024-21-R-4485_A0012.pdf
PDF 808 KB Posted
- Solicitation number
- N00024-21-R-4485
About this file
This is a solicitation amendment for the USS MUSTIN (DDG 89) FY22 Depot Modernization Period (DMP). The Naval Sea Systems Command seeks a contractor to execute maintenance, modernization, and repair for this availability from May 2022 to November 2023 at a West Coast location. Interested parties must request access to pricing workbooks and technical attachments by specific dates in March 2022. The Government will make a single award by March 2022. This availability requires a contractor with substantial facilities including a capable pier for DDG-class ships, as well as personnel capable of coordinating and integrating multiple areas of ship maintenance and repair work. The set-aside does not apply as the requirement exceeds small business capabilities.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002421FR62091
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to make the follow ing administrative updates to Section B: (1) include CLINs 0053-0079, w hich w ere incorporated in Attachment J-4 (Rev 2) via Amendment A0009; (2) update Notes A and E to align w ith the values reflected in Attachment J-4
(Rev 2) issued via Amendment A0009; and (3) update Section J to incorporate Attachment J-4 (Rev 3) w hich corrects formula errors w ithin the 'WI Pricing' tab.
1. CONTRACT ID CODE PAGE OF PAGES
1 69
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Oct-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002421R4485
X 9B. DATED (SEE ITEM 11)
23-Aug-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Oct-2021
CODE
NAVAL SEA SYSTEMS COMMAND
1333 ISAAC HULL AVENUE
WASHINGTON NAVY YARD DC 20376
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0002421R4485
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS
MUSTIN (DDG 89) DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
Attachments J-1 and J-2.See Notes A, B, D, E, F, and G
To:
prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
Attachments J-1 and J-2.See Notes A, B, D, E, F
CLIN 0002
prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0003
prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0004
The CLIN description has changed from RESERVED to CDRLs.
RESERVED
MUSTIN (DDG 89) DURING FY22 DMP (Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the USS MUSTIN
(DDG 89) FY22 DMP as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract. See Notes A, B, D, E and F
CLIN 0005
prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0006
Personnel Berthing Barge Support; provide (OPTION ITEM)PREPARE FOR AND
ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89)
DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
Attachments J-1 and J-2.See Notes A - G.
Personnel Berthing Barge Support; provide (OPTION ITEM)PREPARE FOR AND
DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
Attachments J-1 and J-2.See Notes A - F.
CLIN 0007
prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0008
OrdAlt 80817, Air Cooled Solid State Frequency (ACSSFC) Insulated Gate Bipolar Transistor
(IGBT) Inverter Module and 28 Volts DC Power Supply, Alteration Installation Team (AIT)
Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR
AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
Notes A - G.
OrdAlt 80817, Air Cooled Solid State Frequency (ACSSFC) Insulated Gate Bipolar Transistor
(IGBT) Inverter Module and 28 Volts DC Power Supply, Alteration Installation Team (AIT)
Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR
AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
Notes A - F.
CLIN 0009
OrdAlt 74588, FCS KAS Installation, Alteration Installation Team (AIT) Support Service;
provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
OrdAlt 74588, FCS KAS Installation, Alteration Installation Team (AIT) Support Service;
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0010
ShipAlt DDG51-95946K, C2P Tech Refresh, Alteration Installation Team (AIT) Support
Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-95946K, C2P Tech Refresh, Alteration Installation Team (AIT) Support
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0011
Standardized Pierside Maintenance and Repair (SPMR), Alteration Installation Team (AIT)
Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR
AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
Standardized Pierside Maintenance and Repair (SPMR), Alteration Installation Team (AIT)
AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0012
Fuel Assistance for Fuel Barge; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH
REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
Fuel Assistance for Fuel Barge; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
CLIN 0013
Defuel Ship; accomplish (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
Defuel Ship; accomplish (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0014
ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish
(OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT MODERNIZATION PERIOD
(DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS
Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A - G.
ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish
(OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT MODERNIZATION PERIOD
(DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS
Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A - F.
CLIN 0015
ShipAlt DDG51-91580K, AN/SQQ-89A(V)15 Tech Refresh; accomplish (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS MUSTIN (DDG 89) DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, ShipAlt DDG51-91580K, AN/SQQ-89A(V)15 Tech Refresh; accomplish (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS MUSTIN (DDG 89) DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0016
ShipAlt DDG51-80156K, AN/SLQ-32 (V)6 Surface Electronic Warfare Improvement Program
(SEWIP) Block 2 Upgrade; accomplish (OPTION ITEM)PREPARE FOR AND ACCOMPLISH
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-80156K, AN/SLQ-32 (V)6 Surface Electronic Warfare Improvement Program
(SEWIP) Block 2 Upgrade; accomplish (OPTION ITEM)PREPARE FOR AND ACCOMPLISH
REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0017
ShipAlt 79362K and OrdAlt 79362K, AWS Seawater Flowmeter, Alteration Installation Team
(AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH
REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt 79362K and OrdAlt 79362K, AWS Seawater Flowmeter, Alteration Installation Team
REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
CLIN 0018
Engineering Change 90119, Navy Cash Equipment Refresh, Alteration Installation Team (AIT)
AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
Engineering Change 90119, Navy Cash Equipment Refresh, Alteration Installation Team (AIT)
AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0019
ShipAlt DDG-51-96436K, Temporary 30MM Gun Weapon System (GWS), Alteration
Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND
ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89)
DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item
ShipAlt DDG-51-96436K, Temporary 30MM Gun Weapon System (GWS), Alteration
Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND
ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89)
DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
Attachments J-1 and J-2.See Notes A - F
CLIN 0020
ShipAlt DDG-51-75360K, CBSP Tier 3, Alteration Installation Team (AIT) Support Service;
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG-51-75360K, CBSP Tier 3, Alteration Installation Team (AIT) Support Service;
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0021
ShipAlt DDG51-84694K, PEOC4I DMR IW and MUOS Upgrade, Alteration Installation Team
REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-84694K, PEOC4I DMR IW and MUOS Upgrade, Alteration Installation Team
REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0022
ShipAlt DDG51-86033K, MOS Modification, Alteration Installation Team (AIT) Support
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-86033K, MOS Modification, Alteration Installation Team (AIT) Support
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0023
ShipAlt DDG51-91580K and 86222K, SQQ-89/NGF Install, Alteration Installation Team (AIT)
AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-91580K and 86222K, SQQ-89/NGF Install, Alteration Installation Team (AIT)
AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0024
ShipAlt DDG51-87785K, AS-4775 Link 16 Antenna, Alteration Installation Team (AIT)
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-87785K, AS-4775 Link 16 Antenna, Alteration Installation Team (AIT)
AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0025
ShipAlt DDG51-91027K, GPNTS(V)4, Alteration Installation Team (AIT) Support Service;
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-91027K, GPNTS(V)4, Alteration Installation Team (AIT) Support Service;
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
CLIN 0026
ShipAlt DDG51-93987K, SSEE INC AIU Modification, Alteration Installation Team (AIT)
AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-93987K, SSEE INC AIU Modification, Alteration Installation Team (AIT)
AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0027
ShipAlt DDG51-88635K, CIWS Block 1B Overhaul, Alteration Installation Team (AIT) Support
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
ShipAlt DDG51-88635K, CIWS Block 1B Overhaul, Alteration Installation Team (AIT) Support
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0028
ShipAlt DDG51-83335K, Phase III OPA System Improvement, Alteration Installation Team
REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-83335K, Phase III OPA System Improvement, Alteration Installation Team
REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0029
ShipAlt DDG51-94294K, Canes HW2 Tech Refresh, Alteration Installation Team (AIT) Support
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-94294K, Canes HW2 Tech Refresh, Alteration Installation Team (AIT) Support
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0030
ShipAlt DDG51-85030K, PEOC41 GBS RBM, Alteration Installation Team (AIT) Support
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-85030K, PEOC41 GBS RBM, Alteration Installation Team (AIT) Support
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0031
ShipAlt DDG51-84646K, SSEE Mod SA 555, Alteration Installation Team (AIT) Support
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-84646K, SSEE Mod SA 555, Alteration Installation Team (AIT) Support
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0032
ShipAlt DDG51-95861K, AN/USQ T-52A(V)1 Training Interface Unit, Alteration Installation
Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH
REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-95861K, AN/USQ T-52A(V)1 Training Interface Unit, Alteration Installation
Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH
REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0033
ShipAlt DDG51-94692K, N/SPS-73(V)18 Surface Scan Radar, Alteration Installation Team
REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-94692K, N/SPS-73(V)18 Surface Scan Radar, Alteration Installation Team work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0034
ShipAlt DDG51-94979K, DDG HM&E Condition System Rack, Alteration Installation Team
REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-94979K, DDG HM&E Condition System Rack, Alteration Installation Team
REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0035
ShipAlt DDG51-85077K, AN/SPQ-9B Production Tech Refresh With PDD On Surface Ship, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR
AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89)
DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item
ShipAlt DDG51-85077K, AN/SPQ-9B Production Tech Refresh With PDD On Surface Ship, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR
AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89)
DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0036
ShipAlt DDG51-90149K, ADNS AN/USQ-144K(V)2 With SP4, Alteration Installation Team
REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-90149K, ADNS AN/USQ-144K(V)2 With SP4, Alteration Installation Team
REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
CLIN 0037
Temporary Duty Section Berthing Off-Ship; provide (OPTION ITEM)PREPARE FOR AND
DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item
Temporary Duty Section Berthing Off-Ship; provide (OPTION ITEM)PREPARE FOR AND
DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0038
OrdAlt 80831, Guided Missile Director AS-3444/SPG-62, Passive Countermeasure System
(PCMS) Installation; accomplishPREPARE FOR AND ACCOMPLISH REPAIR AND
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
OrdAlt 80831, Guided Missile Director AS-3444/SPG-62, Passive Countermeasure System
(PCMS) Installation; accomplishPREPARE FOR AND ACCOMPLISH REPAIR AND
ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT
MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The
Contractor shall prepare for and accomplish repair and alterations during the Depot
Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0039
Growth Reservation Associated with CLIN 0001. See attachment J-4. See Notes A - G
Growth Reservation Associated with CLIN 0001. See attachment J-4. See Notes A, B, D, E, F
CLIN 0040
CLIN 0041
CLIN 0042
The CLIN description has changed from Growth Reservation - CLIN 0002 to Growth
Reservation - CLIN 0001.
Growth Reservation Associated with CLIN 0002. See attachment J-4. See Notes A - G
CLIN 0043
The CLIN description has changed from Growth Reservation - CLIN 0003 to Growth
Reservation - CLIN 0002.
Growth Reservation Associated with CLIN 0003. See attachment J-4. See Notes A - G
Growth Reservation Associated with CLIN 0002. See attachment J-4. See Notes A, B, D, E, F
CLIN 0044
The CLIN description has changed from Growth Reservation - CLIN 0005 to Growth
Reservation - CLIN 0003.
Growth Reservation Associated with CLIN 0005. See attachment J-4. See Notes A - G
Growth Reservation Associated with CLIN 0003. See attachment J-4. See Notes A, B, D, E, F
CLIN 0045
The CLIN description has changed from Growth Reservation - CLIN 0007 to Growth
Reservation - CLIN 0003.
Growth Reservation Associated with CLIN 0007. See attachment J-4. See Notes A - G
Growth Reservation Associated with CLIN 0003. See attachment J-4. See Notes A, B, D, E, F
The option status has changed from Option to No Status.
CLIN 0046
The CLIN description has changed from Growth Reservation - CLIN 0012 to Growth
Reservation - CLIN 0005.
Growth Reservation Associated with CLIN 0012. See attachment J-4. See Notes A - G
Growth Reservation Associated with CLIN 0005. See attachment J-4. See Notes A, B, D, E, F
The option status has changed from Option to No Status.
CLIN 0047
The CLIN description has changed from Growth Reservation - CLIN 0013 to Growth
Reservation - CLIN 0006.
Growth Reservation Associated with CLIN 0013. See attachment J-4. See Notes A - G
Growth Reservation Associated with CLIN 0006. See attachment J-4. See Notes A - F
CLIN 0048
The CLIN description has changed from Growth Reservation - CLIN 0014 to Growth
Reservation - CLIN 0007.
Growth Reservation Associated with CLIN 0014. See attachment J-4. See Notes A - G
Growth Reservation Associated with CLIN 0007. See attachment J-4. See Notes A - F
CLIN 0049
The CLIN description has changed from Growth Reservation - CLIN 0015 to Growth
Reservation - CLIN 0008.
Growth Reservation Associated with CLIN 0015. See attachment J-4. See Notes A - G
Growth Reservation Associated with CLIN 0008. See attachment J-4. See Notes A - F
CLIN 0050
The CLIN description has changed from Growth Reservation - CLIN 0016 to Growth
Reservation - CLIN 0009.
Growth Reservation Associated with CLIN 0016. See attachment J-4. See Notes A - G
Growth Reservation Associated with CLIN 0009. See attachment J-4. See Notes A - F
CLIN 0051
The CLIN description has changed from Growth Reservation - CLIN 0037 to Growth
Reservation - CLIN 0010.
Growth Reservation Associated with CLIN 0037. See attachment J-4. See Notes A - G
Growth Reservation Associated with CLIN 0010. See attachment J-4. See Notes A - F
CLIN 0052
The CLIN description has changed from Growth Reservation - CLIN 0038 to Growth
Reservation - CLIN 0011.
Growth Reservation Associated with CLIN 0038. See attachment J-4. See Notes A - G
Growth Reservation Associated with CLIN 0011. See attachment J-4. See Notes A - F
CLIN 0053 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
1 Lot
OPTION Growth Reservation - CLIN 0012
FFP
Growth Reservation Associated with CLIN 0012. See attachment J-4.
See Notes A - F
FOB: Destination
PSC CD: J999
NET AMT
CLIN 0054 is added as follows:
OPTION Growth Reservation - CLIN 0013
Growth Reservation Associated with CLIN 0013. See attachment J-4.
CLIN 0055 is added as follows:
OPTION Growth Reservation - CLIN 0014
Growth Reservation Associated with CLIN 0014. See attachment J-4.
CLIN 0056 is added as follows:
OPTION Growth Reservation - CLIN 0015
Growth Reservation Associated with CLIN 0015. See attachment J-4.
CLIN 0057 is added as follows:
OPTION Growth Reservation - CLIN 0016
Growth Reservation Associated with CLIN 0016. See attachment J-4.
CLIN 0058 is added as follows:
OPTION Growth Reservation - CLIN 0017
Growth Reservation Associated with CLIN 0017. See attachment J-4.
CLIN 0059 is added as follows:
OPTION Growth Reservation - CLIN 0018
Growth Reservation Associated with CLIN 0018. See attachment J-4.
CLIN 0060 is added as follows:
OPTION Growth Reservation - CLIN 0019
Growth Reservation Associated with CLIN 0019. See attachment J-4.
CLIN 0061 is added as follows:
OPTION Growth Reservation - CLIN 0020
Growth Reservation Associated with CLIN 0020. See attachment J-4.
CLIN 0062 is added as follows:
OPTION Growth Reservation - CLIN 0021
Growth Reservation Associated with CLIN 0021. See attachment J-4.
CLIN 0063 is added as follows:
OPTION Growth Reservation - CLIN 0022
Growth Reservation Associated with CLIN 0022. See attachment J-4.
CLIN 0064 is added as follows:
OPTION Growth Reservation - CLIN 0023
Growth Reservation Associated with CLIN 0023. See attachment J-4.
CLIN 0065 is added as follows:
OPTION Growth Reservation - CLIN 0024
Growth Reservation Associated with CLIN 0024. See attachment J-4.
CLIN 0066 is added as follows:
OPTION Growth Reservation - CLIN 0025
Growth Reservation Associated with CLIN 0025. See attachment J-4.
CLIN 0067 is added as follows:
OPTION Growth Reservation - CLIN 0026
Growth Reservation Associated with CLIN 0026. See attachment J-4.
CLIN 0068 is added as follows:
OPTION Growth Reservation - CLIN 0027
Growth Reservation Associated with CLIN 0027. See attachment J-4.
CLIN 0069 is added as follows:
OPTION Growth Reservation - CLIN 0028
Growth Reservation Associated with CLIN 0028. See attachment J-4.
CLIN 0070 is added as follows:
OPTION Growth Reservation - CLIN 0029
Growth Reservation Associated with CLIN 0029. See attachment J-4.
CLIN 0071 is added as follows:
OPTION Growth Reservation - CLIN 0030
Growth Reservation Associated with CLIN 0030. See attachment J-4.
CLIN 0072 is added as follows:
OPTION Growth Reservation - CLIN 0031
Growth Reservation Associated with CLIN 0031. See attachment J-4.
CLIN 0073 is added as follows:
OPTION Growth Reservation - CLIN 0032
Growth Reservation Associated with CLIN 0032. See attachment J-4.
CLIN 0074 is added as follows:
OPTION Growth Reservation - CLIN 0033
Growth Reservation Associated with CLIN 0033. See attachment J-4.
CLIN 0075 is added as follows:
OPTION Growth Reservation - CLIN 0034
Growth Reservation Associated with CLIN 0034. See attachment J-4.
CLIN 0076 is added as follows:
OPTION Growth Reservation - CLIN 0035
Growth Reservation Associated with CLIN 0035. See attachment J-4.
CLIN 0077 is added as follows:
OPTION Growth Reservation - CLIN 0036
Growth Reservation Associated with CLIN 0036. See attachment J-4.
CLIN 0078 is added as follows:
OPTION Growth Reservation - CLIN 0037
Growth Reservation Associated with CLIN 0037. See attachment J-4.
CLIN 0079 is added as follows:
OPTION Growth Reservation - CLIN 0038
Growth Reservation Associated with CLIN 0038. See attachment J-4.
The following have been modified:
NOTE A: LEVEL OF EFFORT TO COMPLETION –SHIP REPAIR
1. The Contractor agrees to provide the Level of Effort to Completion (LOE to Completion) in the performance of growth CLINs in the execution of the USS MUSTIN FY22 DMP:
a. 77,657 direct labor hours (labor hours) and $5,630,133 ($TBD fully burdened) materials to complete expected, within scope growth work on the USS MUSTIN FY22 DMP work package under CLINS 0039 – 0079.
2. The total LOE to Completion for the performance of the above growth CLINs shall be comprised of labor hours and the associated material required to support the expected, within scope growth. The mix of labor hours and material may be adjusted. Adjustments to the labor hour and material mix will be documented via weekly
Technical Direction Letter (TDL) and subsequently unilaterally adjusted via contract modification. The
Government reserves the right to reconcile the weekly TDLs via unilateral modification at the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .