N00024-21-R-4485_A0012.pdf

PDF 808 KB Posted

Attached to
Amendment A0012 - USS MUSTIN (DDG 89) FY22 Depot Modernization Period (DMP)
Solicitation number
N00024-21-R-4485
Issued by

About this file

This is a solicitation amendment for the USS MUSTIN (DDG 89) FY22 Depot Modernization Period (DMP). The Naval Sea Systems Command seeks a contractor to execute maintenance, modernization, and repair for this availability from May 2022 to November 2023 at a West Coast location. Interested parties must request access to pricing workbooks and technical attachments by specific dates in March 2022. The Government will make a single award by March 2022. This availability requires a contractor with substantial facilities including a capable pier for DDG-class ships, as well as personnel capable of coordinating and integrating multiple areas of ship maintenance and repair work. The set-aside does not apply as the requirement exceeds small business capabilities.

View the file

Other files

File Type Posted
N00024-21-R-4485_CONFORMED THROUGH A0012.pdf PDF
N00024-21-R-4485_A0011.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0011.pdf PDF
Attachment J-8 (GFM List) (Rev 3).xlsx XLSX spreadsheet
N00024-21-R-4485_A0010.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0010.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0009.pdf PDF
N00024-21-R-4485_A0009.pdf PDF
Attachment J-8 (GFM) List) (Rev 2).xlsx XLSX spreadsheet
N00024-21-R-4485_A0008.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0008.pdf PDF
Attachment J-8 (GFM List) (Rev 1).xlsx XLSX spreadsheet
N00024-21-R-4485_A0007.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0007.pdf PDF
Attachment S-9 (Past Performance Questionnaire) (Rev1).docx DOCX document
N00024-21-R-4485_CONFORMED THROUGH A0006.pdf PDF
N00024-21-R-4485_A0006.pdf PDF
N00024-21-R-4485_A0005.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0005.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0004.pdf PDF
N00024-21-R-4485_A0004.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0003.pdf PDF
N00024-21-R-4485_A0003.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0002.pdf PDF
N00024-21-R-4485_A0002.pdf PDF
N00024-21-R-4485 CONFORMED THROUGH A0001.pdf PDF
N00024-21-R-4485_A0001.pdf PDF
Attachment S-4 (Manpower Performance Data Sheet).xlsx XLSX spreadsheet
Attachment S-2 (Past Performance Questionnaire).docx DOCX document
CDRL A017 Encl (1) Monthly Manning Report Template.xlsx XLSX spreadsheet
Attachment J-7 (Schedule Model Review).docx DOCX document
Attachment J-8 (GFM List).xlsx XLSX spreadsheet
Attachment J-10 (Open and Inspect Milestone Reports Due).xlsx XLSX spreadsheet
N00024-21-R-4485_MUSTIN FY22 DMP.pdf PDF
Attachment S-8 (Pier and Drydock Graphical Representation Template).xlsx XLSX spreadsheet
CDRL Exhibit C.pdf PDF
Attachment S-3 (Pre-Proposal Information Form) - 9Jun21.xlsx XLSX spreadsheet
CDRL Exhibit B.pdf PDF
Attachment S-9 (Past Performance CPARS References).docx DOCX document
CDRL Exhibit A.pdf PDF
Attachment S-5 (Eligibility Criteria Data Sheet).docx DOCX document
CDRL A016 Enc (1) End of Avail Report Template.xlsx XLSX spreadsheet
Attachment J-5 (Quality Assurance Surveillance Plan).docx DOCX document
Attachment S-7 (Proposal Assessment).xlsx XLSX spreadsheet
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002421FR62091

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to make the follow ing administrative updates to Section B: (1) include CLINs 0053-0079, w hich w ere incorporated in Attachment J-4 (Rev 2) via Amendment A0009; (2) update Notes A and E to align w ith the values reflected in Attachment J-4

(Rev 2) issued via Amendment A0009; and (3) update Section J to incorporate Attachment J-4 (Rev 3) w hich corrects formula errors w ithin the 'WI Pricing' tab.

1. CONTRACT ID CODE PAGE OF PAGES

1 69

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Oct-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002421R4485

X 9B. DATED (SEE ITEM 11)

23-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Oct-2021

CODE

NAVAL SEA SYSTEMS COMMAND

1333 ISAAC HULL AVENUE

WASHINGTON NAVY YARD DC 20376

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002421R4485

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS

MUSTIN (DDG 89) DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

Attachments J-1 and J-2.See Notes A, B, D, E, F, and G

To:

prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

Attachments J-1 and J-2.See Notes A, B, D, E, F

CLIN 0002

prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0003

prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0004

The CLIN description has changed from RESERVED to CDRLs.

RESERVED

MUSTIN (DDG 89) DURING FY22 DMP (Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the USS MUSTIN

(DDG 89) FY22 DMP as specified in the statement of work provided herein and in accordance with the requirements stated in the Work Item Specifications and Work Item Plans, Drawings and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract. See Notes A, B, D, E and F

CLIN 0005

prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0006

Personnel Berthing Barge Support; provide (OPTION ITEM)PREPARE FOR AND

ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89)

DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

Attachments J-1 and J-2.See Notes A - G.

Personnel Berthing Barge Support; provide (OPTION ITEM)PREPARE FOR AND

DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

Attachments J-1 and J-2.See Notes A - F.

CLIN 0007

prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0008

OrdAlt 80817, Air Cooled Solid State Frequency (ACSSFC) Insulated Gate Bipolar Transistor

(IGBT) Inverter Module and 28 Volts DC Power Supply, Alteration Installation Team (AIT)

Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR

AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

Notes A - G.

OrdAlt 80817, Air Cooled Solid State Frequency (ACSSFC) Insulated Gate Bipolar Transistor

(IGBT) Inverter Module and 28 Volts DC Power Supply, Alteration Installation Team (AIT)

Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR

AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

Notes A - F.

CLIN 0009

OrdAlt 74588, FCS KAS Installation, Alteration Installation Team (AIT) Support Service;

provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

OrdAlt 74588, FCS KAS Installation, Alteration Installation Team (AIT) Support Service;

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0010

ShipAlt DDG51-95946K, C2P Tech Refresh, Alteration Installation Team (AIT) Support

Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-95946K, C2P Tech Refresh, Alteration Installation Team (AIT) Support

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0011

Standardized Pierside Maintenance and Repair (SPMR), Alteration Installation Team (AIT)

Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR

AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

Standardized Pierside Maintenance and Repair (SPMR), Alteration Installation Team (AIT)

AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0012

Fuel Assistance for Fuel Barge; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH

REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

Fuel Assistance for Fuel Barge; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

CLIN 0013

Defuel Ship; accomplish (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

Defuel Ship; accomplish (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0014

ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish

(OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT MODERNIZATION PERIOD

(DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS

Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A - G.

ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish

(OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT MODERNIZATION PERIOD

(DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS

Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A - F.

CLIN 0015

ShipAlt DDG51-91580K, AN/SQQ-89A(V)15 Tech Refresh; accomplish (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS MUSTIN (DDG 89) DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, ShipAlt DDG51-91580K, AN/SQQ-89A(V)15 Tech Refresh; accomplish (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS MUSTIN (DDG 89) DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0016

ShipAlt DDG51-80156K, AN/SLQ-32 (V)6 Surface Electronic Warfare Improvement Program

(SEWIP) Block 2 Upgrade; accomplish (OPTION ITEM)PREPARE FOR AND ACCOMPLISH

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-80156K, AN/SLQ-32 (V)6 Surface Electronic Warfare Improvement Program

(SEWIP) Block 2 Upgrade; accomplish (OPTION ITEM)PREPARE FOR AND ACCOMPLISH

REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0017

ShipAlt 79362K and OrdAlt 79362K, AWS Seawater Flowmeter, Alteration Installation Team

(AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH

REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt 79362K and OrdAlt 79362K, AWS Seawater Flowmeter, Alteration Installation Team

REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

CLIN 0018

Engineering Change 90119, Navy Cash Equipment Refresh, Alteration Installation Team (AIT)

AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

Engineering Change 90119, Navy Cash Equipment Refresh, Alteration Installation Team (AIT)

AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0019

ShipAlt DDG-51-96436K, Temporary 30MM Gun Weapon System (GWS), Alteration

Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND

ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89)

DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item

ShipAlt DDG-51-96436K, Temporary 30MM Gun Weapon System (GWS), Alteration

Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND

ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89)

DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

Attachments J-1 and J-2.See Notes A - F

CLIN 0020

ShipAlt DDG-51-75360K, CBSP Tier 3, Alteration Installation Team (AIT) Support Service;

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG-51-75360K, CBSP Tier 3, Alteration Installation Team (AIT) Support Service;

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0021

ShipAlt DDG51-84694K, PEOC4I DMR IW and MUOS Upgrade, Alteration Installation Team

REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-84694K, PEOC4I DMR IW and MUOS Upgrade, Alteration Installation Team

REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0022

ShipAlt DDG51-86033K, MOS Modification, Alteration Installation Team (AIT) Support

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-86033K, MOS Modification, Alteration Installation Team (AIT) Support

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0023

ShipAlt DDG51-91580K and 86222K, SQQ-89/NGF Install, Alteration Installation Team (AIT)

AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-91580K and 86222K, SQQ-89/NGF Install, Alteration Installation Team (AIT)

AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0024

ShipAlt DDG51-87785K, AS-4775 Link 16 Antenna, Alteration Installation Team (AIT)

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-87785K, AS-4775 Link 16 Antenna, Alteration Installation Team (AIT)

AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0025

ShipAlt DDG51-91027K, GPNTS(V)4, Alteration Installation Team (AIT) Support Service;

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-91027K, GPNTS(V)4, Alteration Installation Team (AIT) Support Service;

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

CLIN 0026

ShipAlt DDG51-93987K, SSEE INC AIU Modification, Alteration Installation Team (AIT)

AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-93987K, SSEE INC AIU Modification, Alteration Installation Team (AIT)

AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0027

ShipAlt DDG51-88635K, CIWS Block 1B Overhaul, Alteration Installation Team (AIT) Support

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

ShipAlt DDG51-88635K, CIWS Block 1B Overhaul, Alteration Installation Team (AIT) Support

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0028

ShipAlt DDG51-83335K, Phase III OPA System Improvement, Alteration Installation Team

REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-83335K, Phase III OPA System Improvement, Alteration Installation Team

REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0029

ShipAlt DDG51-94294K, Canes HW2 Tech Refresh, Alteration Installation Team (AIT) Support

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-94294K, Canes HW2 Tech Refresh, Alteration Installation Team (AIT) Support

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0030

ShipAlt DDG51-85030K, PEOC41 GBS RBM, Alteration Installation Team (AIT) Support

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-85030K, PEOC41 GBS RBM, Alteration Installation Team (AIT) Support

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0031

ShipAlt DDG51-84646K, SSEE Mod SA 555, Alteration Installation Team (AIT) Support

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-84646K, SSEE Mod SA 555, Alteration Installation Team (AIT) Support

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0032

ShipAlt DDG51-95861K, AN/USQ T-52A(V)1 Training Interface Unit, Alteration Installation

Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH

REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-95861K, AN/USQ T-52A(V)1 Training Interface Unit, Alteration Installation

Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH

REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0033

ShipAlt DDG51-94692K, N/SPS-73(V)18 Surface Scan Radar, Alteration Installation Team

REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-94692K, N/SPS-73(V)18 Surface Scan Radar, Alteration Installation Team work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0034

ShipAlt DDG51-94979K, DDG HM&E Condition System Rack, Alteration Installation Team

REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-94979K, DDG HM&E Condition System Rack, Alteration Installation Team

REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0035

ShipAlt DDG51-85077K, AN/SPQ-9B Production Tech Refresh With PDD On Surface Ship, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR

AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89)

DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item

ShipAlt DDG51-85077K, AN/SPQ-9B Production Tech Refresh With PDD On Surface Ship, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR

AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89)

DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0036

ShipAlt DDG51-90149K, ADNS AN/USQ-144K(V)2 With SP4, Alteration Installation Team

REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-90149K, ADNS AN/USQ-144K(V)2 With SP4, Alteration Installation Team

REPAIR AND ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

CLIN 0037

Temporary Duty Section Berthing Off-Ship; provide (OPTION ITEM)PREPARE FOR AND

DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item

Temporary Duty Section Berthing Off-Ship; provide (OPTION ITEM)PREPARE FOR AND

DURING FY22 DEPOT MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0038

OrdAlt 80831, Guided Missile Director AS-3444/SPG-62, Passive Countermeasure System

(PCMS) Installation; accomplishPREPARE FOR AND ACCOMPLISH REPAIR AND

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

OrdAlt 80831, Guided Missile Director AS-3444/SPG-62, Passive Countermeasure System

(PCMS) Installation; accomplishPREPARE FOR AND ACCOMPLISH REPAIR AND

ALTERATIONS ONBOARD USS MUSTIN (DDG 89) DURING FY22 DEPOT

MODERNIZATION PERIOD (DMP)(Non-prorated WIs – See attachment J-4 for list)The

Contractor shall prepare for and accomplish repair and alterations during the Depot

Modernization Period (DMP) onboard USS Mustin (DDG 89) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0039

Growth Reservation Associated with CLIN 0001. See attachment J-4. See Notes A - G

Growth Reservation Associated with CLIN 0001. See attachment J-4. See Notes A, B, D, E, F

CLIN 0040

CLIN 0041

CLIN 0042

The CLIN description has changed from Growth Reservation - CLIN 0002 to Growth

Reservation - CLIN 0001.

Growth Reservation Associated with CLIN 0002. See attachment J-4. See Notes A - G

CLIN 0043

The CLIN description has changed from Growth Reservation - CLIN 0003 to Growth

Reservation - CLIN 0002.

Growth Reservation Associated with CLIN 0003. See attachment J-4. See Notes A - G

Growth Reservation Associated with CLIN 0002. See attachment J-4. See Notes A, B, D, E, F

CLIN 0044

The CLIN description has changed from Growth Reservation - CLIN 0005 to Growth

Reservation - CLIN 0003.

Growth Reservation Associated with CLIN 0005. See attachment J-4. See Notes A - G

Growth Reservation Associated with CLIN 0003. See attachment J-4. See Notes A, B, D, E, F

CLIN 0045

The CLIN description has changed from Growth Reservation - CLIN 0007 to Growth

Reservation - CLIN 0003.

Growth Reservation Associated with CLIN 0007. See attachment J-4. See Notes A - G

Growth Reservation Associated with CLIN 0003. See attachment J-4. See Notes A, B, D, E, F

The option status has changed from Option to No Status.

CLIN 0046

The CLIN description has changed from Growth Reservation - CLIN 0012 to Growth

Reservation - CLIN 0005.

Growth Reservation Associated with CLIN 0012. See attachment J-4. See Notes A - G

Growth Reservation Associated with CLIN 0005. See attachment J-4. See Notes A, B, D, E, F

The option status has changed from Option to No Status.

CLIN 0047

The CLIN description has changed from Growth Reservation - CLIN 0013 to Growth

Reservation - CLIN 0006.

Growth Reservation Associated with CLIN 0013. See attachment J-4. See Notes A - G

Growth Reservation Associated with CLIN 0006. See attachment J-4. See Notes A - F

CLIN 0048

The CLIN description has changed from Growth Reservation - CLIN 0014 to Growth

Reservation - CLIN 0007.

Growth Reservation Associated with CLIN 0014. See attachment J-4. See Notes A - G

Growth Reservation Associated with CLIN 0007. See attachment J-4. See Notes A - F

CLIN 0049

The CLIN description has changed from Growth Reservation - CLIN 0015 to Growth

Reservation - CLIN 0008.

Growth Reservation Associated with CLIN 0015. See attachment J-4. See Notes A - G

Growth Reservation Associated with CLIN 0008. See attachment J-4. See Notes A - F

CLIN 0050

The CLIN description has changed from Growth Reservation - CLIN 0016 to Growth

Reservation - CLIN 0009.

Growth Reservation Associated with CLIN 0016. See attachment J-4. See Notes A - G

Growth Reservation Associated with CLIN 0009. See attachment J-4. See Notes A - F

CLIN 0051

The CLIN description has changed from Growth Reservation - CLIN 0037 to Growth

Reservation - CLIN 0010.

Growth Reservation Associated with CLIN 0037. See attachment J-4. See Notes A - G

Growth Reservation Associated with CLIN 0010. See attachment J-4. See Notes A - F

CLIN 0052

The CLIN description has changed from Growth Reservation - CLIN 0038 to Growth

Reservation - CLIN 0011.

Growth Reservation Associated with CLIN 0038. See attachment J-4. See Notes A - G

Growth Reservation Associated with CLIN 0011. See attachment J-4. See Notes A - F

CLIN 0053 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

CLIN

Number

1 Lot

OPTION Growth Reservation - CLIN 0012

FFP

Growth Reservation Associated with CLIN 0012. See attachment J-4.

See Notes A - F

FOB: Destination

PSC CD: J999

NET AMT

CLIN 0054 is added as follows:

OPTION Growth Reservation - CLIN 0013

Growth Reservation Associated with CLIN 0013. See attachment J-4.

CLIN 0055 is added as follows:

OPTION Growth Reservation - CLIN 0014

Growth Reservation Associated with CLIN 0014. See attachment J-4.

CLIN 0056 is added as follows:

OPTION Growth Reservation - CLIN 0015

Growth Reservation Associated with CLIN 0015. See attachment J-4.

CLIN 0057 is added as follows:

OPTION Growth Reservation - CLIN 0016

Growth Reservation Associated with CLIN 0016. See attachment J-4.

CLIN 0058 is added as follows:

OPTION Growth Reservation - CLIN 0017

Growth Reservation Associated with CLIN 0017. See attachment J-4.

CLIN 0059 is added as follows:

OPTION Growth Reservation - CLIN 0018

Growth Reservation Associated with CLIN 0018. See attachment J-4.

CLIN 0060 is added as follows:

OPTION Growth Reservation - CLIN 0019

Growth Reservation Associated with CLIN 0019. See attachment J-4.

CLIN 0061 is added as follows:

OPTION Growth Reservation - CLIN 0020

Growth Reservation Associated with CLIN 0020. See attachment J-4.

CLIN 0062 is added as follows:

OPTION Growth Reservation - CLIN 0021

Growth Reservation Associated with CLIN 0021. See attachment J-4.

CLIN 0063 is added as follows:

OPTION Growth Reservation - CLIN 0022

Growth Reservation Associated with CLIN 0022. See attachment J-4.

CLIN 0064 is added as follows:

OPTION Growth Reservation - CLIN 0023

Growth Reservation Associated with CLIN 0023. See attachment J-4.

CLIN 0065 is added as follows:

OPTION Growth Reservation - CLIN 0024

Growth Reservation Associated with CLIN 0024. See attachment J-4.

CLIN 0066 is added as follows:

OPTION Growth Reservation - CLIN 0025

Growth Reservation Associated with CLIN 0025. See attachment J-4.

CLIN 0067 is added as follows:

OPTION Growth Reservation - CLIN 0026

Growth Reservation Associated with CLIN 0026. See attachment J-4.

CLIN 0068 is added as follows:

OPTION Growth Reservation - CLIN 0027

Growth Reservation Associated with CLIN 0027. See attachment J-4.

CLIN 0069 is added as follows:

OPTION Growth Reservation - CLIN 0028

Growth Reservation Associated with CLIN 0028. See attachment J-4.

CLIN 0070 is added as follows:

OPTION Growth Reservation - CLIN 0029

Growth Reservation Associated with CLIN 0029. See attachment J-4.

CLIN 0071 is added as follows:

OPTION Growth Reservation - CLIN 0030

Growth Reservation Associated with CLIN 0030. See attachment J-4.

CLIN 0072 is added as follows:

OPTION Growth Reservation - CLIN 0031

Growth Reservation Associated with CLIN 0031. See attachment J-4.

CLIN 0073 is added as follows:

OPTION Growth Reservation - CLIN 0032

Growth Reservation Associated with CLIN 0032. See attachment J-4.

CLIN 0074 is added as follows:

OPTION Growth Reservation - CLIN 0033

Growth Reservation Associated with CLIN 0033. See attachment J-4.

CLIN 0075 is added as follows:

OPTION Growth Reservation - CLIN 0034

Growth Reservation Associated with CLIN 0034. See attachment J-4.

CLIN 0076 is added as follows:

OPTION Growth Reservation - CLIN 0035

Growth Reservation Associated with CLIN 0035. See attachment J-4.

CLIN 0077 is added as follows:

OPTION Growth Reservation - CLIN 0036

Growth Reservation Associated with CLIN 0036. See attachment J-4.

CLIN 0078 is added as follows:

OPTION Growth Reservation - CLIN 0037

Growth Reservation Associated with CLIN 0037. See attachment J-4.

CLIN 0079 is added as follows:

OPTION Growth Reservation - CLIN 0038

Growth Reservation Associated with CLIN 0038. See attachment J-4.

The following have been modified:

NOTE A: LEVEL OF EFFORT TO COMPLETION –SHIP REPAIR

1. The Contractor agrees to provide the Level of Effort to Completion (LOE to Completion) in the performance of growth CLINs in the execution of the USS MUSTIN FY22 DMP:

a. 77,657 direct labor hours (labor hours) and $5,630,133 ($TBD fully burdened) materials to complete expected, within scope growth work on the USS MUSTIN FY22 DMP work package under CLINS 0039 – 0079.

2. The total LOE to Completion for the performance of the above growth CLINs shall be comprised of labor hours and the associated material required to support the expected, within scope growth. The mix of labor hours and material may be adjusted. Adjustments to the labor hour and material mix will be documented via weekly

Technical Direction Letter (TDL) and subsequently unilaterally adjusted via contract modification. The

Government reserves the right to reconcile the weekly TDLs via unilateral modification at the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .