Attachment J-10 (Open and Inspect Milestone Reports Due).xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- N00024-21-R-4485
About this file
This document includes a solicitation for the USS MUSTIN (DDG 89) FY22 Depot Modernization Period (DMP) and an associated list of 124 work items to be completed. The Naval Sea Systems Command seeks a contractor to execute maintenance, modernization, and repair for the USS MUSTIN from May 2022 to November 2023 at a West Coast location. The solicitation is issued via SAM.gov and interested parties must comply with that process. The work includes a variety of tasks across ship systems including hull inspection and repair, machinery maintenance, electrical upgrades, and weapons systems preservation. Offerors must request various attachments containing additional scope details and pricing information from the points of contact listed. The Government will make a single award by March 2022. This represents a significant ship maintenance availability requiring extensive facilities and personnel capable of coordinating complex, integrated work across all areas of the vessel.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prioritized List
| USS MUSTIN (DDG 89) FY22 DMP AVAIL - J-10 Milestone Reports Due | ||||
| No. | Work Item | Title | Para. | Milestone |
| 1 | 110-11-001 | Underwater Hull; inspect and repair | 3.3.1,3.4.1 | Dry Dock Reports |
| 2 | 113-11-001 | Bilge Drain Well; repair and preserve | 3.2.1.1, 3.5.1.1 | 20% O&I Inspect |
| 3 | 120-11-006 | Windlass Machinery Room Structural Repair; accomplish | 3.1.1 | Dry Dock Reports |
| 4 | 122-20-001 | Generator Room; repair | 3.1.2.1, 3.3.1, 3.4.4 | 20% O&I Inspect |
| 5 | 122-21-001 | Auxiliary Machinery Room Number One Transverse Bulkhead; inspect and repair | 3.3.1 | 20% O&I Inspect |
| 6 | 123-10-001 | Tank and Void Cleaning and Pumping; accomplish | 3.1.3 | 20% O&I Inspect |
| 7 | 123-11-001 | Compensated Fuel Tank Group One; repair | 3.1.1.1 | Dry Dock Reports |
| 8 | 123-11-002 | Compensated Fuel Tank Group 2; repair | 3.1.1.1 | Dry Dock Reports |
| 9 | 123-11-003 | Compensated Fuel Tank Group 3; repair | 3.1.1.1 | Dry Dock Reports |
| 10 | 123-11-004 | Compensated Fuel Tank Group 4; repair | 3.1.1.1 | Dry Dock Reports |
| 11 | 123-11-005 | Compensated Fuel Tank Group 5; repair | 3.1.1.1 | Dry Dock Reports |
| 12 | 123-11-006 | Compensated Fuel Tank Group 6; repair | 3.1.1.1 | Dry Dock Reports |
| 13 | 123-11-007 | Fuel Oil Service and Gravity Head Tank; repair | 3.2.1 | 20% O&I Inspect |
| 14 | 123-12-002 | JP-5 Tank; repair | 3.1.1.1 | 20% O&I Inspect |
| 15 | 123-14-001 | Potable Water Tank; repair | 3.1.1 | Dry Dock Reports |
| 16 | 123-15-001 | Lube Oil Tank; repair | 3.2.1 | 20% O&I Inspect |
| 17 | 123-17-001 | Contaminated Oil Tank; preserve (touch up) | 3.1.1 | 20% O&I Inspect |
| 18 | 123-17-002 | Contaminated Oil Tank; repair | 3.1.1 | 20% O&I Inspect |
| 19 | 123-19-001 | Waste Water Tank; repair | 3.1.1.1 | 20% O&I Inspect |
| 20 | 123-21-003 | Accessible Void Base Metal Weld Builup; accomplish | 3.1.1.1 | Dry Dock Reports |
| 21 | 123-22-001 | Chain Locker and Chain Locker Sump; repair | 3.1.1 | Dry Dock Reports |
| 22 | 130-11-001 | Aircraft Securing Fitting; replace | 3.1.2 | 20% O&I Inspect |
| 23 | 161-11-001 | Strut; inspect and repair | 3.1.1 | Dry Dock Reports |
| 24 | 163-11-001 | Sea Chest; inspect and repair | 3.2.2.1 | Dry Dock Reports |
| 25 | 163-11-002 | Waster Sleeve; replace | 3.4.7 | Dry Dock Reports |
| 26 | 165-11-001 | Sonar Dome Rubber Window (SDRW); inspect and repair | 3.2.2,3.3.1,3.6.1,3.7.1 | Dry Dock Reports |
| 27 | 167-11-002 | Bolted Equipment Removal Plate (BERP) Repair; accomplish | 3.1.1.1, 3.5.2 | 20% O&I Inspect |
| 28 | 167-11-003 | Lower Sonar Dome Access Scuttle; repair | 3.1.1, 3.2.1.4, 3.2.2.1 | Dry Dock Reports |
| 29 | 234-10-001 | Gas Turbine Module (GTM) 1A, 1B, 2A and 2B Flexible Hose Assembly; replace (OPTION ITEM) | 3.1.4.1 | 20% O&I Inspect |
| 30 | 241-10-001 | Lube Oil Pump Flexible Hose Assembly; replace | 3.1.4.1 | 20% O&I Inspect |
| 31 | 241-11-001 | Main Reduction Gear (MRG) Number One Flexible Hose Assembly; replace | 3.3.4.1 | 20% O&I Inspect |
| 32 | 241-12-001 | Main Reduction Gear (MRG) Number 2 Flexible Hose Assembly; replace | 3.3.4.1 | 20% O&I Inspect |
| 33 | 243-11-001 | Starboard Stern Tube Shaft Seal; overhaul | 3.2.2.3 | Dry Dock Reports |
| 34 | 243-11-002 | Starboard Waterborne Propulsion Shafting; inspect and repair | 3.1.1, 3.2.5.1, 3.4.1.1 | Dry Dock Reports |
| 35 | 243-11-003 | Starboard Waterborne Propulsion Shafting; install | 3.1.1, 3.2.7, 3.4.1.1 | Dry Dock Reports |
| 36 | 243-12-001 | Port Stern Tube Shaft Seal; overhaul | 3.2.2.3, 3.3.2 | Dry Dock Reports |
| 37 | 243-12-002 | Port Waterborne Propulsion Shafting; inspect and repair | 3.1.1, 3.2.5.1, 3.4.1.1 | Dry Dock Reports |
| 38 | 243-12-003 | Port Waterborne Propulsion Shafting; install | 3.1.1, 3.2.5.1, 3.4.1.1 | Dry Dock Reports |
| 39 | 244-11-003 | Starboard Outboard Propulsion Shafting Bearing Clearance Measurement; accomplish | 3.1.3.1 | Dry Dock Reports |
| 40 | 244-12-003 | Port Outboard Propulsion Shafting, Bearing Clearance Measurement; accomplish | 3.1.3.1 | Dry Dock Reports |
| 41 | 245-11-001 | Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Starboard; repair | 3.3.2.4, 3.3.4.1,3.4.2.4,3.4.4.1 | Dry Dock Reports |
| 42 | 245-11-002 | Number One Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box MER One; replace | 3.3.1 | Dry Dock Reports |
| 43 | 245-11-003 | Propellers and Propulsors Shaft Flexible Hose Assembly; replace | 3.1.4.1 | Dry Dock Reports |
| 44 | 245-11-004 | Number One Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplish | 3.2.2.1 | Dry Dock Reports |
| 45 | 245-12-001 | Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Port; repair | 3.3.2.4,3.3.4.1,3.4.2.4,3.4.4.1 | Dry Dock Reports |
| 46 | 245-12-002 | Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box MER 2; replace | 3.3.1 | Dry Dock Reports |
| 47 | 245-12-004 | Number 2 Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplish | 3.2.2.1 | Dry Dock Reports |
| 48 | 251-30-001 | Number One Gas Turbine Module (GTM) Clean Air Intake; repair and preserve | 3.2.1, 3.5.1, 3.6.1 | 20% O&I Inspect |
| 49 | 251-30-002 | Number 2 Gas Turbine Module (GTM) Clean Air Intake; repair | 3.2.1, 3.5.1, 3.6.1 | 20% O&I Inspect |
| 50 | 251-30-003 | Number One Ship Service Gas Turbine Generator (SSGTG) Clean Air Intake; inspect and clean | 3.3.1 | 20% O&I Inspect |
| 51 | 251-30-004 | Number 3 Ship Service Gas Turbine Generator (SSGTG) Clean Air Intake; preserve | 3.2.1, 3.4.1 | 20% O&I Inspect |
| 52 | 251-31-001 | Air Intake and Exhaust Louver; clean and preserve | 3.3.1.1 | 20% O&I Inspect |
| 53 | 251-32-001 | Propulsion Gas Turbine (GTRB) Intake Number 2 and Ships Service Gas Turbine Generator (SSGTG) Intake Number 2 and 3; repair and preserve | 3.2.1, 3.3.1, 3.4.2.1, 3.5.1.1 | 20% O&I Inspect |
| 54 | 251-32-002 | Propulsion Gas Turbine (GTRB) Intake Number One and Ships Service Gas Turbine Generator (SSGTG) Intake Number One; repair and preserve | 3.2.1, 3.3.1, 3.4.2.1, 3.5.1.1 | 20% O&I Inspect |
| 55 | 256-70-001 | Centralized Seawater Cooling Pump; overhaul | 3.3.1, 3.5.5.1 | 20% O&I Inspect |
| 56 | 259-10-001 | Number 2 Gas Turbine Mixing Room, Uptake and Boundary Layer Infra-Red Suppression System (BLISS); repair and preserve | 3.3.3 | 20% O&I Inspect |
| 57 | 259-10-002 | Number One Gas Turbine Mixing Room, Uptake and Boundary Layer Infra-Red Suppression System (BLISS); repair and preserve | 3.2.1, 3.4.2 | 20% O&I Inspect |
| 58 | 259-10-004 | Ship Service Gas Turbine (GTRB) Exhaust Trunk Deck; preserve | 3.2.1 | 20% O&I Inspect |
| 59 | 259-11-001 | Gas Turbine (GTRB) Exhaust Duct Collector; repair | 3.3.2 | 20% O&I Inspect |
| 60 | 261-11-001 | Fuel Service Pump Flexible Hose Assembly; replace (OPTION ITEM) | 3.1.4.1 | 20% O&I Inspect |
| 61 | 261-12-002 | 2A Fuel Service Filter Separator; replace | 3.2.3.1 | 20% O&I Inspect |
| 62 | 261-21-001 | 1B Fuel Oil Service Pump; overhaul (OPTION ITEM) | 3.5.2.1 | 20% O&I Inspect |
| 63 | 261-22-001 | 2A Fuel Oil Service Pump; repair (OPTION ITEM) | 3.5.2.1 | 20% O&I Inspect |
| 64 | 262-11-001 | Main Reduction Gear (MRG) Lube Oil Cooler; clean and inspect | 3.2.3.1 | 20% O&I Inspect |
| 65 | 264-31-001 | Lube Oil Purifier Heater Number One; clean and inspect | 3.4.5 | 20% O&I Inspect |
| 66 | 264-31-002 | Lube Oil Purifier Heater Number 2; clean and inspect | 3.4.5 | 20% O&I Inspect |
| 67 | 311-30-001 | Ship Service Gas Turbine Generator Flexible Hose Assembly; replace (OPTION ITEM) | 3.1.4.1 | 20% O&I Inspect |
| 68 | 311-31-001 | Ship Service Gas Turbine Generator (SSGTG) Number One Lube Oil Cooler; chemically clean and inspect | 3.2.2, 3.3.3.1 | 20% O&I Inspect |
| 69 | 311-32-001 | Ship Service Gas Turbine Generator (SSGTG) Number 2 Lube Oil Cooler; chemically clean and inspect | 3.2.2, 3.3.3.2 | 20% O&I Inspect |
| 70 | 311-33-001 | Ship Service Gas Turbine Generator (SSGTG) Number 3 Lube Oil Cooler; chemically clean and inspect | 3.2.2, 3.3.3.2 | 20% O&I Inspect |
| 71 | 411-90-001 | ShipAlt DDG51-89925K, AWS: ACB16/TI16 CIC Display Upgrade; accomplish | 3.3.1 | 20% O&I Inspect |
| 72 | 411-90-002 | ShipAlt DDG51-89804K, AWS: ACB16/TI16 OA Computing Plant; accomplish | 3.2.1 | 20% O&I Inspect |
| 73 | 438-90-001 | ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish (OPTION ITEM) | 3.1.1 | 20% O&I Inspect |
| 74 | 438-90-002 | (Drawings Ordered) ShipAlt DDG51-71604K, DDG Mod MCS/DCS Upgrades, Single Central Control Station (CCS) Watchstander; accomplish | 3.3.2 | 20% O&I Inspect |
| 75 | 438-90-003 | ShipAlt DDG51-71726K, DDG Mod Full IBS Upgrade, Single Bridge Watchstander; accomplish | 3.3.1 | 20% O&I Inspect |
| 76 | 442-10-001 | TR-232B/WQC-2A and TR-233B/WQC-2A Transducer Cabling; install | 3.2.4.1, 3.3.1 | Dry Dock Reports |
| 77 | 442-11-001 | TR-233B/WQC-2A Transducer; replace | 3.1.4 | Dry Dock Reports |
| 78 | 456-90-001 | ShipAlt DDG51-89769K, AWS: ACB16/TI16 KAS WDRC Upgrade; accomplish | 3.2.1 | 20% O&I Inspect |
| 79 | 456-90-002 | ShipAlt DDG51-91754K, AWS: ACB16/TI16 MMSP-R Upgrade; accomplish | 3.1.1 | 20% O&I Inspect |
| 80 | 462-08-001 | DT-513/BQA-8 Hydrophone and Cable Assembly; replace | 3.1.2.3, 3.1.3.3, 3.3.1, 3.4.2 | Dry Dock Reports |
| 81 | 463-89-001 | AN/SQQ-89 Sonar Transducer and Stave Cable Connectorized; replace | 3.1.3, 3.2.1 | Dry Dock Reports |
| 82 | 468-90-001 | ShipAlt DDG51-91580K, AN/SQQ-89A(V)15 Tech Refresh; accomplish (OPTION ITEM) | 3.1.1 | 20% O&I Inspect |
| 83 | 512-11-005 | MORPAC Valve Overhaul; accomplish | 3.1.2 | Dry Dock Reports |
| 84 | 514-20-001 | Air Conditioning Plant Condenser Water Control Valve (CWCV); replace | 3.1.1 | 20% O&I Inspect |
| 85 | 514-20-002 | Air Conditioning Plant Variable Geometry Diffuser (VGD); replace | 3.2.1, 3.4.1.1 | 20% O&I Inspect |
| 86 | 514-21-001 | Air Conditioning (AC) Plant Condenser; mechanically clean | 3.3.5.1 | 20% O&I Inspect |
| 87 | 514-21-002 | Air Conditioner Chill Water Pump; overhaul | 3.7.1.2 | 20% O&I Inspect |
| 88 | 520-11-001 | Sea Valve; repair and replace | 3.2.1.1 | Dry Dock Reports |
| 89 | 521-11-001 | Firemain Valve; replace | 3.2.1 | Dry Dock Reports |
| 90 | 521-21-001 | Fire Pump Number 5; overhaul | 3.4.3.1, 3.5.3.2 | Dry Dock Reports |
| 91 | 521-21-002 | Fire Pump Number 2; overhaul | 3.4.3.1, 3.5.3.2 | Dry Dock Reports |
| 92 | 541-21-001 | Fuel Oil Transfer Pump and Motor; repair (OPTION ITEM; Out of Homeport ONLY) | 3.4.2.2 | 20% O&I Inspect |
| 93 | 541-22-001 | Fuel Oil Purifier Class B Overhaul; accomplish | 3.5.1.1 | 20% O&I Inspect |
| 94 | 551-53-001 | Number One Low Pressure Air Compressor (LPAC) Class B Overhaul; accomplish | 3.3.2, 3.4.1.1 | 20% O&I Inspect |
| 95 | 551-53-002 | Number 2 Low Pressure Air Compressor (LPAC) Class B Overhaul; accomplish | 3.3.2, 3.4.1 | 20% O&I Inspect |
| 96 | 551-53-003 | Number 3 Low Pressure Air Compressor (LPAC) Class B Overhaul; accomplish | 3.3.2, 3.4.1.1 | 20% O&I Inspect |
| 97 | 551-61-001 | Masker Air Cooler; chemical clean | 3.5 | 20% O&I Inspect |
| 98 | 562-10-001 | Rudder Bearing Seal and Rudderstock Seal; repair | 3.3.3.1 | Dry Dock Reports |
| 99 | 562-11-001 | Starboard Rudder; inspect and repair | 3.2.2.1 | Dry Dock Reports |
| 100 | 562-11-002 | Rudder Stock Bearing; install | 3.4.1.1 | Dry Dock Reports |
| 101 | 562-11-003 | Port Rudder; inspect and repair | 3.2.2.1 | Dry Dock Reports |
| 102 | 568-10-001 | Steering System Flexible Hose Assembly; replace (OPTION ITEM) | 3.1.5.1 | Dry Dock Reports |
| 103 | 571-11-001 | Sliding Padeye, Tilting; overhaul and preserve | 3.4.3.1 | 20% O&I Inspect |
| 104 | 581-11-001 | Port and Centerline Anchor Hawse and Chain Pipe; repair | 3.2.1, 3.3.1 | Dry Dock Reports |
| 105 | 581-11-002 | Anchor and Anchor Chain; inspect and preserve | 3.1.3.2, 3.3.11 | Dry Dock Reports |
| 106 | 588-21-002 | Helicopter Hangar Door; repair | 3.2.1.1, 3.3.3.1 | 20% O&I Inspect |
| 107 | 593-11-004 | Vacuum, Collection, Holding and Transfer (VCHT) System Flexible Hose Assembly; replace (OPTION ITEM) | 3.2.5.1 | 20% O&I Inspect |
| 108 | 593-21-001 | Oily Waste Transfer Pump Flexible Hose Assembly; replace (OPTION ITEM) | 3.1.4.1 | 20% O&I Inspect |
| 109 | 624-11-001 | Balanced Joiner Door; remove, store and install | 3.1.2 | 20% O&I Inspect |
| 110 | 631-11-001 | Bilge; preserve | 3.5.2.1 | 20% O&I Inspect |
| 111 | 631-11-008 | Fan Room Deck; preserve | 3.1.1, 3.2.1.1 | 20% O&I Inspect |
| 112 | 631-12-001 | Engine Room Number One Deck; preserve | 3.1.1, 3.3.1 | 20% O&I Inspect |
| 113 | 631-12-003 | Ships Service Gas Turbine Generator (SSGTG) Exhaust Trunk; preserve | 3.2.1, 3.3.1 | 20% O&I Inspect |
| 114 | 631-13-001 | Collective Protection System (CPS) Zone One Fan Room; repair and preserve | 3.4.1 | 20% O&I Inspect |
| 115 | 631-13-002 | Collective Protection System (CPS) Zone 2 Fan Room; repair and preserve | 3.4.1 | 20% O&I Inspect |
| 116 | 631-13-003 | Collective Protection System (CPS) Zone 3 Fan Room; repair and preserve | 3.4.1 | 20% O&I Inspect |
| 117 | 631-31-002 | Underwater Hull Preservation with Paint Company Original Equipment Manufacturers' (OEM) Technical Representative; accomplish | 3.1.1 | Dry Dock Reports |
| 118 | 633-11-001 | Transducer Compartment Zinc Anode; install | 3.3.3, 3.4.4 | Dry Dock Reports |
| 119 | 633-21-001 | Impressed Current Cathodic Protection (ICCP) System; inspect and repair | 3.2.1, 3.4.3, 3.5.3 | Dry Dock Reports |
| 120 | 634-21-001 | Flight Deck Nonskid; replace | 3.1.1, 3.3.1, 3.4.1, 3.10.1.1 | 20% O&I Inspect |
| 121 | 636-11-001 | Sonar Dome Hull Damping System; repair | 3.1.1, 3.3.1.1 | Dry Dock Reports |
| 122 | 651-90-001 | ShipAlt DDG51-71605, DDG Modifications to Galley; accomplish | 3.2.1 | 20% O&I Inspect |
| 123 | 721-31-001 | Vertical Launch System (VLS), MK 41 Launcher Top and Uptake Hatch; preserve | 3.2.1 | 20% O&I Inspect |
| 124 | 721-31-002 | Vertical Launch System (VLS), MK 41 Launcher Uptake and Cell Hatch; remove and replace | 3.3.4.2 | 20% O&I Inspect |