N00024-21-R-4485_A0006.pdf

PDF 441 KB Posted

Attached to
Amendment A0012 - USS MUSTIN (DDG 89) FY22 Depot Modernization Period (DMP)
Solicitation number
N00024-21-R-4485
Issued by

About this file

This document summarizes a federal solicitation for depot modernization services for the USS MUSTIN. The Naval Sea Systems Command is seeking proposals for the USS MUSTIN (DDG 89) FY22 Depot Modernization Period, requiring maintenance, modernization, and repair services. Interested offerors should monitor the SAM.gov website for release of solicitation N00024-21-R-4485 and any amendments. The availability includes a combination of maintenance, modernization, and repair work and will require a contractor with substantial facilities and human resources. The period of performance is from May 2022 to November 2023. Proposals are due in March 2022 and award will be made on or around the same date. The document provides instructions for offerors to request relevant technical attachments.

View the file

Other files

File Type Posted
N00024-21-R-4485_CONFORMED THROUGH A0012.pdf PDF
N00024-21-R-4485_A0012.pdf PDF
N00024-21-R-4485_A0011.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0011.pdf PDF
Attachment J-8 (GFM List) (Rev 3).xlsx XLSX spreadsheet
N00024-21-R-4485_A0010.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0010.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0009.pdf PDF
N00024-21-R-4485_A0009.pdf PDF
Attachment J-8 (GFM) List) (Rev 2).xlsx XLSX spreadsheet
N00024-21-R-4485_A0008.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0008.pdf PDF
Attachment J-8 (GFM List) (Rev 1).xlsx XLSX spreadsheet
N00024-21-R-4485_A0007.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0007.pdf PDF
Attachment S-9 (Past Performance Questionnaire) (Rev1).docx DOCX document
N00024-21-R-4485_CONFORMED THROUGH A0006.pdf PDF
N00024-21-R-4485_A0005.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0005.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0004.pdf PDF
N00024-21-R-4485_A0004.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0003.pdf PDF
N00024-21-R-4485_A0003.pdf PDF
N00024-21-R-4485_CONFORMED THROUGH A0002.pdf PDF
N00024-21-R-4485_A0002.pdf PDF
N00024-21-R-4485 CONFORMED THROUGH A0001.pdf PDF
N00024-21-R-4485_A0001.pdf PDF
Attachment S-4 (Manpower Performance Data Sheet).xlsx XLSX spreadsheet
Attachment S-2 (Past Performance Questionnaire).docx DOCX document
CDRL A017 Encl (1) Monthly Manning Report Template.xlsx XLSX spreadsheet
Attachment J-7 (Schedule Model Review).docx DOCX document
Attachment J-8 (GFM List).xlsx XLSX spreadsheet
Attachment J-10 (Open and Inspect Milestone Reports Due).xlsx XLSX spreadsheet
N00024-21-R-4485_MUSTIN FY22 DMP.pdf PDF
Attachment S-8 (Pier and Drydock Graphical Representation Template).xlsx XLSX spreadsheet
CDRL Exhibit C.pdf PDF
Attachment S-3 (Pre-Proposal Information Form) - 9Jun21.xlsx XLSX spreadsheet
CDRL Exhibit B.pdf PDF
Attachment S-9 (Past Performance CPARS References).docx DOCX document
CDRL Exhibit A.pdf PDF
Attachment S-5 (Eligibility Criteria Data Sheet).docx DOCX document
CDRL A016 Enc (1) End of Avail Report Template.xlsx XLSX spreadsheet
Attachment J-5 (Quality Assurance Surveillance Plan).docx DOCX document
Attachment S-7 (Proposal Assessment).xlsx XLSX spreadsheet
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002421FR62091

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to: (1) provide responses to Bidder Questions #45-68; (2) update Section J to incorporate Attachment S-9 (Rev 1); (3) update Section L.V.B.3; and (4) update Section M.III.D.

1. CONTRACT ID CODE PAGE OF PAGES

1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Sep-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002421R4485

X 9B. DATED (SEE ITEM 11)

23-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Sep-2021

CODE

NAVAL SEA SYSTEMS COMMAND

1333 ISAAC HULL AVENUE SE

WASHINGTON NAVY YARD DC 20376

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002421R4485

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

DOCUMENTS/EXHIBITS/ATTACHMENTS

The following document(s), exhibit(s), and other attachment(s) form a part of this solicitation:

No. Document Attachment S-1 RESERVED Attachment S-2 RESERVED Attachment S-3 Pre-Proposal Information (PPI) Form Attachment S-4 Manpower Plan to Actual Data Sheet Attachment S-5 Eligibility Criteria Data Sheet Attachment S-6 RESERVED Attachment S-7 Proposal Assessment Attachment S-8 Pier and Dry-dock Graphical Representation Template Attachment S-9 Past Performance Questionnaire (PPQ) (Rev 1 – A0006)

The following document(s), exhibit(s), and other attachment(s) also form a part of this solicitation and will form a part of the contract resulting from this solicitation:

Attachment J-1 Specification Package TPPC-DDG89-SWRMC21-CN01 Attachment J-2 Work Item Plans, Drawings and Other References Attachment J-3 Execution Milestones and Key Event Dates Attachment J-4 Pricing Workbook (Rev 1 – A0001) Attachment J-5 Quality Assurance Surveillance Plan Attachment J-6 Subcontracting Plan (to be incorporated upon award) Attachment J-7 Schedule Model Review Attachment J-8 Government Furnished Material (GFM) List Attachment J-9 Compartment Closeout List (NSI 009-81) Attachment J-10 Open & Inspect List

Exhibit A Contract Data Requirements List (CDRL) (DD Form 1423) A001-A003, A005-A009, A011, A014, A016- A017) (Does not include A004, A0010, A012-A0013, or A015) Exhibit B Contract Data Requirements List (CDRL) (DD Form 1423) B001-B009 Exhibit C Contract Data Requirements List (CDRL) (DD Form 1423) C001-C002

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

INSTRUCTIONS TO OFFERORS

I. INTRODUCTION

A. This solicitation is a Request for Proposals (RFP) that will result in the award of a single Firm-Fixed-Price contract to complete the USS MUSTIN (DDG 89) FY22 DMP.

B. The Government intends to award a single Fixed-Price contract to the Offeror whose proposal represents the Best Value to the Government, utilizing trade off source selection procedures in accordance with FAR 15.101-1 and Section M of this solicitation.

C. ALL INQUIRIES shall be made in writing and directed to Warren Beckman, Contracting Officer, and Jaclyn Evans, Contract Specialist, at warren.m.beckman.civ@us.navy.mil, and jaclyn.v.evans.civ@us.navy.mil, respectively. To ensure the Government is able to adequately address and respond to Offeror pre-proposal information (PPI) via amendment, it is requested questions be submitted no later than 13 September 2021 at 3:00 pm, local time, Washington DC. The Government reserves the right to not answer any requests received after this date and time. Furthermore, Offerors should note that the proposal due date will not be extended solely on the basis of requests received after this date and time. Solicitation questions should reference the solicitation and/or specification page and paragraph number and be submitted on the Pre-Proposal Information (PPI) form (Attachment S-3) provided with this solicitation.

D. Estimated Award Date: The Government anticipates making an award in March 2022.

E. Potential Prime Offeror’s Negative Response: The Government requests a negative response from any potential Prime Offeror who, after reviewing this solicitation, does not intend on submitting a proposal.

Negative response are to be delivered to the Contracting Officer and Contract Specialist listed above NLT seven (7) business dates after solicitation release.

II. INSTRUCTIONS FOR THE SUBMISSION OF OFFERS

A. Proposal Due Date:

1. All copies of proposals (Volumes I & II) shall be received by the Government at the address below no later than 22 October 2021 at 10:00 am, local time, Washington DC. Due to COVID-19 restrictions, only electronic submittal of proposals via DoD SAFE will be permitted. Offerors shall notify the Contracting Officer and Contract Specialist requesting a pick-up request no later than three

(3) business days prior to the proposal deadline. Late proposals WILL NOT be considered. Partial proposals or attachments WILL NOT be considered. Offerors are advised to consult FAR 15.208 related to timely receipt of proposals.

a) Offerors must provide a proposal valid for at least 140 calendar days from the proposal due date.

(Complete block 12 of the Standard Form (SF-33).

B. Directions for Electronic Submission of Proposals:

1. Due to ongoing restrictions resulting from the global COVID-19 pandemic, hand delivery of proposals is not possible at this time to the Washington Navy Yard. Offerors are instructed to submit proposals electronically via the DoD SAFE application located at https://safe.apps.mil.

2. Offerors wishing to submit a proposal in response to this notification shall notify the Contracting Officer and Contract Specialist noted as points of contact (POCs) on this solicitation no later than three

(3) business days prior to the proposal deadline of this solicitation and no earlier than 14 calendar days prior to the proposal deadline. The Offeror shall provide its name and e-mail as contact information so the Government can generate a pick-up request from the DoD SAFE application to be sent to the Offeror, which is valid for 14 calendar days. Upon notification from the Offeror, either the Contract mailto:warren.m.beckman.civ@us.navy.mil mailto:jaclyn.v.evans.civ@us.navy.mil https://safe.apps.mil/

Officer or Contract Specialist will send a DoD SAFE pick-up request. The Offeror shall submit its proposal, and provide email confirmation of tis submission to all POCs identified in paragraph I(C) above.

3. Offerors shall address their package with the RFP number and Offeror’s company name. Offerors shall click the “Confirm Delivery” button within the DoD SAFE app in order to receive a confirmation of pick up by the Government. The DoD SAFE system records the time that files are submitted for transmission. The Offeror is responsible for ensuring that it drops off its proposals and generates a drop-off time prior to the proposal submission date and time. In the event of a dispute of proposal time submission, the pick-up e-mail with the system-generated drop off time within the body of the e-mail shall serve as the official time that the proposal was submitted to the Government. Late proposal submissions will be handled in accordance with FAR 52.215-1.

4. Proposals must be submitted as one .zip file per ship/proposal, formatted so that each Volume 1 Price

Volume and each Volume 2 Technical Volume are submitted in separate file folders clearly marked.

Each Volume shall be formatted with separate files submitted for each Factor.

5. All files uploaded must be scanned to ensure that there are no computer viruses within the file. The files shall be in a format that is compatible with and capable of being opened in the most current Microsoft Office Suite or Adobe Acrobat. The proposal shall have separate files. All spreadsheets shall be in Microsoft Excel format such that each mathematical equation is obvious and traceable. No fields or documents shall be password protected. If files are compressed, the necessary decompression program must be included.

6. Proposal volumes shall be structured as follows:

Proposal Volume Title

USS MUSTIN MUS-1 USS MUSTIN Price Volume MUS-2 USS MUSTIN Technical Volume

III. GENERAL INFORMATION

A. Ship Checks:

1. The USS MUSTIN (DDG 89) will not be available for ship check prior to the proposal submission due date. Potential Offerors may inspect sister ship, USS PINCKNEY (DDG 91) in San Diego, CA from 01 September 2021 to 12 September 2021.

2. To schedule a ship check, Offerors shall email a "Request for Ship Check" to Warren Beckman, Contracting Officer, and Jaclyn Evans, Contract Specialist, at warren.m.beckman.civ@us.navy.mil and jaclyn.v.evans.civ@us.navy.mil, respectively. Due to the ship location, additional information will be provided upon request.

3. Participants will be subject to security, safety, and other applicable regulations established by Southwest Regional Maintenance Center (SWRMC) and ship’s Commanding Officers. Contractors conducting SWRMC related work efforts must visit SWRMC security website for latest forms and instructions at:

a) http://www.navsea.navy.mil/Home/RMC/swrmc/Visitor-Information/

b) https://www.cnic.navy.mil/regions/cnrsm/installations/navbase_san_diego/om/force_prote ction/pass_and_decal.html

B. Specifications and Associated Reference Documentation:

1. Upon request, the Government will provide the Specification Package Work Items and Work Item

References.

mailto:warren.m.beckman.civ@us.navy.mil mailto:jaclyn.v.evans.civ@us.navy.mil http://www.navsea.navy.mil/Home/RMC/swrmc/Visitor-Information/ https://www.cnic.navy.mil/regions/cnrsm/installations/navbase_san_diego/om/force_protection/pass_and_decal.html https://www.cnic.navy.mil/regions/cnrsm/installations/navbase_san_diego/om/force_protection/pass_and_decal.html

2. Offerors may request solicitation attachments by submitting a request to:

a) Warren Beckman, Contracting Officer at warren.m.beckman.civ@us.navy.mil, and

b) Jaclyn Evans, Contract Specialist at jaclyn.v.evans.civ@us.navy.mil

3. Additional work item references not already in the possession of the Offerors, commercially available, listed under 52.211-2, are available through the following websites:

a) https://jedmics.net/

b) https://mfom.sscno.nmci.navy.mil/MFOM/DoDStatement.aspx

c) https://nsedr.nnsy.navy.mil//

C. Alteration of Solicitation

1. Offerors shall respond to the solicitation as posted. Offerors who alter the solicitation (except for completing appropriate “fill-in” blocks and certifications) may be considered non-responsive and thus ineligible for award.

D. Proposal Information

1. Offerors shall not presume the Government has knowledge outside of information provided in the proposal. Additionally, Offerors are advised conclusory statements regarding an Offeror’s experience such as: “the Offeror understands”, “the Offeror has a long history of outstanding support”, “standard procedures shall be used”, “well known techniques shall be employed”, or any paraphrasing of the solicitation, shall be considered inadequate to demonstrate experience, knowledge of, or compliance with solicitation requirements. Offerors shall provide specific and concise information to validate all assertions.

E. Amendments

1. The Government may revise the solicitation at any time by means of an Amendment. It is an Offeror’s responsibility to ensure it is accessing the Beta.sam.gov website to view potential amendments and procurement notifications for this solicitation.

F. Teaming Arrangements

1. Proposals must be submitted by one (1) Prime Contractor. An Offeror may be listed as a subcontractor in multiple proposals but may only submit one (1) proposal as a Prime Contractor with a unique Commercial and Government Entity (CAGE) code and Taxpayer Identification Number. To be evaluated as a Joint Venture (JV), Offerors must provide a notarized agreement (with the price proposal) delineating roles and responsibilities for all proposed work.

G. One-bid Situation

1. If the Government receives only one bid for solicitation N00024-21-R-4485, the Government reserves the right to require certified cost or pricing data in accordance with DFARS 252.215-7008. As identified by the Contracting Officer, additional cost or pricing data will be required in order to determine whether proposed pricing is fair and reasonable or to comply with the statutory requirements of certified cost or pricing data in accordance with 10 USC 2306(a) and FAR 15.403-4. The Offeror agrees to provide any additional data requested within 30 days of notification.

IV. PROPOSAL FORMAT

A. To facilitate efficiency and consistency in proposal evaluation the following is mandatory. PROPOSALS

WHICH DO NOT FOLLOW THIS DIRECTION MAY BE REJECTED AS NON-RESPONSIVE

AND THUS INELIGIBLE FOR AWARD. NON-RESPONSIVE PROPOSALS WILL NOT BE

EVALUATED.

B. Electronic Proposals: Electronic Proposals: All proposals shall be submitted via DoD SAFE as outlined above. Pages shall be formatted to 8.5 x 11 inch paper with one inch margins. The text used shall be Times mailto:warren.m.beckman.civ@us.navy.mil mailto:jaclyn.v.evans.civ@us.navy.mil https://jedmics.net/ https://mfom.sscno.nmci.navy.mil/MFOM/DoDStatement.aspx https://nsedr.nnsy.navy.mil/

New Roman with a minimum of 12 point font. Any revisions to Offerors’ proposals (if required) shall be submitted in two (2) forms: (1) a final clean revised document; and (2) a redlined document outlining the Offeror’s changes. The Contracting Officer reserves the right to provide any additional instructions regarding revisions to Offerors’ proposals via letter. Offerors shall use the attachments provided with this solicitation for their proposal content as specified in Section V where required.

C. Page Limits:

1. Volume I (MUS-1): No page limitation with the exception of the cover letter which shall not exceed three (3) pages.

2. Volume II (MUS-2)

a) Factor 1 (Technical Eligibility): No page limitation

b) Factor 2 (Resource Capacity & Schedule):

(1) Emphasis Area A (Manpower): No page limitation, with the exception of the narrative which shall not exceed 20 pages

(2) Emphasis Area B (Physical Resource Capacity): No page limitation, with the exception of the narrative which shall not exceed 10 pages

(3) Emphasis Area C (Production Schedule): No page limitation

V. PROPOSAL CONTENT

A. VOLUME I: Factor 1: Price

1. Price Proposal: The price proposal shall not contain non-price factor information. The price proposal shall be comprised of the following documentation:

a) Cover Letter,

b) Signed SF 33 with all amendments acknowledged,

c) Small Business Subcontracting plan per FAR Part 19 (large businesses only),

d) Any Joint Venture / teaming agreements (if applicable),

e) Completed Attachment J-4 and Solicitation Section B carrying forward information from Attachment

J-4, as applicable, containing:

(1) Work Item Pricing for all Base and Option Items,

(2) Daily Extension Rates,

(3) Inter-port Differential (IPD),

(4) Fully Burdened Ship Repair Labor & Material Burden Rate, New Work & Growth Reservation,

(5) Dock Differential (if applicable).

f) Completed Execution Milestones and Key Event Dates (Attachment J-3).

g) Completed Proposal Assessment (Attachment S-7).

2. Cover Letter: The cover letter, which shall not exceed three (3) pages, shall meet all the requirements of the “first page of the proposal” outlined in FAR 52.215-1(c)(2)(i-v). In addition to those requirements, the Offeror shall include the following in the cover letter:

a) Identification of all enclosures included with the proposal,

b) CAGE and Data Universal Numbering System (DUNS) numbers for the Prime contractor,

c) Notice of any alterations to the solicitation (except for completing appropriate “fill-in” blocks and certifications).

d) Name, address, and telephone number of each proposed first-tier subcontractor with a proposed subcontract estimated at $10 million or more.

e) For any work item (WI) with a total dollar value of zero dollars proposed in the Pricing Workbook

(Attachment J-4) provide an explanation as to why. In addition, if applicable:

(1) For any WI with a total value of zero labor hours proposed (prime and subcontractor combined)

(although material is proposed), provide an explanation as to why.

(2) For any WI with a total dollar value of zero material proposed (prime and subcontractor combined) (although labor is proposed), provide an explanation as to why.

3. Standard Form 33 (SF-33): As part of the price proposal package, the Offeror shall submit the completed

SF 33 with blocks 12 through 18 completed, as well as all sections with applicable “fill-ins” filled in and shall acknowledge all amendments. The representative who signs this form must be authorized to contractually bind the company providing the offer. Section B CLIN pricing must also be completed for ALL APPLICABLE CLINs. The Offeror shall complete and provide all Representations, Certifications, and Other Statements included in Section K of the solicitation. Submission of a signed offer to the Government constitutes agreement and acceptance of the terms and conditions of the solicitation in a FFP contracting environment.

4. Small Business Subcontracting Plan (SBSP):

a) An Offeror shall submit a SBSP outlining its strategy for maintaining compliance with FAR 52.219-9 for the duration of the availability, which includes:

i. A subcontracting goal of 25 percent of an Offeror’s total contracting dollars utilizing small disadvantaged businesses, women-owned small businesses, veteran-owned small businesses, service-disabled veteran-owned small businesses, and HUB-Zone small businesses. Note, the 25 percent goal is inclusive of the congressionally mandated five percent (5%) goal for small disadvantaged business concerns.

ii. Offerors must provide rationale for any proposed plan which does not meet the following thresholds (as applied to total contract dollars):

(1) 25 percent of prime contracts for small businesses

(2) Five percent of prime and subcontracts for women-owned small businesses

(3) Five percent of prime contracts and subcontracts for small disadvantaged businesses

(4) Three percent of prime contracts and subcontracts for HUBZone small businesses

(5) Three percent of prime and subcontracts for service-disabled veteran-owned small businesses

iii. In addition, Offerors must provide explanation for any SBSP which fails to address all requirements outlined in FAR 52.219-9.

iv. A SBSP is NOT REQUIRED from a small business concern.

5. Completed Solicitation Section B and Pricing Workbook (Attachment J-4):

a) Offerors must propose on all contract line items (CLINs) including all base and option CLINs, complete Section B “NOTE B: SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED),” complete Section B “NOTE D: SCHEDULE OF DAILY

RATES FOR PIERSIDE AND DRY-DOCKING (FULLY BURDENED) FOR PURPOSES

OF A COMPENSABLE EXTENSION TO THE DRY-DOCKING OR DELIVERY DATE,”

and complete all tabs of Pricing Workbook (Attachment J-4) to be considered responsive.

b) The contractor must submit prices using the Pricing Workbook (Attachment J-4) for all Tabs, including: Work Item Pricing, Daily Extension Rates, Fully Burdened Ship Repair Labor Rate & Material Burden Rates and Total Evaluated Pricing in Microsoft Excel in the format provided in this solicitation. The breakdown of CLIN prices, corresponding to the work item pricing, must add up to the total of each CLIN. If there is a discrepancy between Section B and Attachment J-4, the Section B CLIN price shall govern. The Pricing Workbook (Attachment J-4) Fully Burdened Ship Repair Labor Rate and Material Burden Rate must match the rates provided in the Section B “NOTE B: SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED).” If there is a discrepancy between the two, the Section B Fully Burdened Ship Repair Labor Rate and Material Burden Rate shall govern.

c) Offerors are to insert pricing in all yellow shaded fields in the pricing workbook (Attachment J- 4).

6. Inter-port Differential (IPD)

a) The IPD applicable to the USS MUSTIN (DDG 89) FY22 DMP must be included in all offers and is calculated using foreseeable costs for fuel, towing and pilot charges, and travel to the contractor’s facility by applicable Government personnel. The following chart provides the values to be included in all Offerors’ price proposals to determine the Offeror’s total evaluated price.

Location* Differential

San Diego, CA $249,093 Seattle, WA $2,348,007

Portland, OR $3,377,778

b) Offeror’s whose location is not listed in the above Government provided port differential tables shall submit a bidder’s question requesting a Government provided port differential be calculated for the Offeror’s proposed location for the USS MUSTIN (DDG 89) FY22 DMP.

7. Dock Differential

a) Offerors that will rely on the Government to supply rent-free use of the Naval Base San

Diego Graving Dock for performance of the USS MUSTIN (DDG 89) FY22 DMP shall include within the offeror’s price proposal the Dock Differential value listed in the chart below.

When proposed, the Government will use the Dock Differential value for evaluation purposes only in determining the offeror’s total evaluated price.

Location Dock Differential

San Diego Naval Base Graving Dock $4,237,139

B. VOLUME II

Non-Price Proposal: The non-price proposal shall be comprised of three factors, as follows:

1. Non-Price Factor 1 – Technical Eligibility:

Offerors must provide the following to demonstrate eligibility for Award (There is no page limit associated with this Factor):

a) Provide a completed Eligibility Criteria Data Sheet (Attachment S-5) that identifies the specific pier and drydock intended to be used for the proposed availability and indicates that the pier and drydock meet the minimum characteristics identified in Attachment S-5. Offerors proposing to utilize the Naval Base San Diego Graving Dock shall state so under the “Dock Name/Identification” portion of Attachment S-5, and do not need to complete the remaining drydock details as requested in Attachment S-5.

b) Provide a signed letter identifying and confirming ownership of a pier available to berth the vessel from the ‘Availability Start’ through ‘Contract Complete’ milestones and a drydock capable of docking the vessel from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3). The representative who signs the letter must be authorized to contractually bind the company. If the offeror is utilizing a subcontractor for physical resources (pier or drydock), a letter signed by the subcontractor identifying and confirming committed access to the proposed pier from the ‘Availability Start’ through ‘Contract Complete’ milestone and/or a drydock capable of docking the vessel from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3) is required. The subcontractor representative who signs the letter must be authorized to contractually bind the company. If the offeror is utilizing the San Diego Naval Station Graving Dock, state so in the offeror’s signed letter. The proposed pier and drydock facilities, whether owned by the offeror or subcontractor, must be accessible by the USS MUSTIN without any modification to the vessel.

c) In accordance with the most current version of MIL-STD-1625, provide a current drydock certification applicable to the drydock proposed for the Availability. Certifications shall demonstrate the drydock will remain certified from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3). If the proposed drydock is currently uncertified, or if the certificate will expire prior to the ‘Undock Vessel’ milestone date, the offeror shall provide a detailed plan and schedule to certify or re-certify the drydock in order to remain certified through the period between the ‘Dock Vessel’ and ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3). Certification or recertification plans shall include timeline to complete the requirements of MIL-STD-1625 including the below items. Offeror’s plan shall provide a plan of action and milestones (including specific dates or timeframes) to commence and complete the following actions:

i. Contractor Navy Audit request.

ii. Contractor preparation of facility spaces to be inspected. Contractor shall describe when they expect these facilities to be available to complete necessary inspections and any risks to their availability.

iii. Navy examination of the facility, facility certification report, maintenance program documentation, and operational records.

iv. Navy observation of a docking or undocking operation, whenever possible. In the case of a floating dry dock, this operation shall include a submergence test to the maximum dock draft.

v. Navy evaluation of the control inspection, operating, and maintenance procedures.

vi. Navy preparation of exit brief and formalized in a written report.

vii. Contractor actions to resolve any identified deficiencies. Contractor shall explain the time allotted to deficiency resolution and any associated risks.

viii. Navy examination of actions to resolve deficiencies.

2. Non-Price Factor 2 –Resource Capacity & Schedule:

Offerors must address three Emphasis Areas to demonstrate their ability to provide (a) manpower resources, (b) physical resource capacity, and (c) an executable schedule to complete the solicited requirements:

a) Emphasis Area A – Manpower: To assess the Offeror’s ability to provide efficient manpower to successfully complete the solicited availability, the Government requires the Offeror to provide specified workload data that contains historical workload performance and forecasted workload estimates.

(1) Manpower Performance Data Sheet (Attachment S-4): Provide a completed Manpower

Performance Data Sheet, (Attachment S-4) in Microsoft Excel in the format provided in this solicitation. Include all projects, defined as Navy or Non-Navy Ship Repair and New Construction Projects, for which the Offeror is the prime or a major subcontractor (performing 30% or more of a CNO availability or comparable portion of a Non-Navy project) which were active (on-going or completed) or planned (awarded or proposed) (including the proposal for this solicitation) during the first month identified in Attachment S-4 and the Contract Complete Date of this solicitation.

The Attachment S-4 must capture all work performed by the Offeror within the shipyard and at the local Naval Station, if the Offeror’s shipyard is within the homeport fleet concentration area. The Offeror may estimate performance information for subcontractors based on prime contractor budgets and the prime contractor’s actual outlays to subcontractors. Enter remaining growth work options in the distinguished column/row, using the phasing assumptions provided in Section B Note F.

The “Definitions” tab within Attachment S-4 defines the following terms: Contract / Actual / Forecast Start and Completion Date, Project Status, Time-now, Cumulative Earned Value, Time-phased Earned Value, Full Time Equivalents (FTE), Budget at Complete (BAC), Estimate at Complete (EAC), Budgeted Cost of Work Scheduled (BCWS), Budgeted Cost of Work Performed (BCWP), Budget to Complete (BTC), Actual Cost of Work Performed (ACWP), Estimate to Complete (ETC), Cost Performance Index (CPI), To-Complete Cost Performance Index (TCPI), Schedule Performance Index (SPI), Remaining Growth Options, New Work, Prime Contractor Labor, Overtime Labor, Subcontractor Labor, and Temporary Labor.

a) For each project, provide the Earned Value (hours) data on a time phased, month-by-month basis (month-ending) over each project’s duration, from the Actual / Forecast Start Dates to the Actual / Forecast Completion Dates.

b) For each project, verify the cumulative hour values calculated within the S-4 in the “Cumulative EV” tab align with internal earned value information. If the cumulative calculation does not align with the internal earned value information, then enter the value manually and “Insert Comment” to the manually adjusted cell that describes the discrepancy.

Provide the additional project related information requested in the “Cumulative EV” tab (all cells that are green).

c) Provide a list of holiday dates in the “Holiday Calendar” tab. If the monthly reporting dates associated with the monthly earned value data are not aligned to the calendar month, then provide the appropriate values for the “Month Start” and “Month End” in the “Monthly EV” tab (rows 3 and 4). This date information is necessary to convert the monthly hours data into monthly FTE as described in Attachment S-4.

(2) Manpower Charts: Provide manpower charts reflecting the data in Attachment S-4. The manpower charts must represent each project’s ACWP and ETC within the Actual / Forecast Start Date and Actual / Forecast Completion Date for each project provided in Attachment S-4. The manpower charts must show separate stacked areas for each project in the chart. The manpower charts must meet all format requirements stated in “Manpower Charts Format” tab within Attachment S-4. The “Manpower Charts Format” tab within Attachment S-4 includes an example manpower chart formatted to requirements. Provide the following manpower charts:

a) Manpower chart showing the total FTE resources required for all projects completed, on-going, awarded, the solicited availability and the Offeror’s remaining outstanding proposals, as provided in Attachment S-4.

b) Manpower chart showing the total FTE resources required for all projects completed, on-going, awarded, the solicited availability and the Offeror’s executable award scenario from the Offeror’s remaining outstanding proposals accounting for all un-mitigatable resource conflicts, as provided in Attachment S-4. This manpower chart is not required if it produces the same chart required in (2) a) above.

(3) Manpower Narrative: Provide a narrative to characterize the workload information from the manpower charts required in Section L, paragraph V.B.2a.2.a-b, by describing and quantifying the: historical yard-wide FTE levels, forecasted yard-wide FTE levels, and the composition of historical/forecasted FTE values for: prime straight, prime overtime, subcontracted, and temporary labor. The narrative must explain how and when the Offeror plans to adjust or maintain the current workforce to achieve the proposed forecasted FTE levels and whether the adjustment occurs via additional hiring, use of subcontractors, use of temporary labor, or overtime. Provide supporting data and historical evidence to the maximum extent possible. The narrative should not exceed 20 pages. Address the following possibilities:

a) Any existing constraints between outstanding proposals that would prohibit the Offeror from executing one or more outstanding proposals.

b) Should the Offeror propose to hire additional personnel for the solicited availability, the narrative must quantify the proposed number of hires and describe the plan to hire and manage the additional personnel from Time-now through Contract Completion Date.

c) Should the Offeror propose overtime for the solicited availability, the narrative must include: the historical overtime rate, the forecasted overtime rate, and the plan to manage and provide the overtime from Time-now through Contract Completion Date.

d) Should the Offeror propose temporary labor for the solicited availability, the narrative must include: the historical temporary labor FTE, the forecasted temporary labor FTE, and the plan to manage and provide the temporary labor from Time-now through Contract Completion Date.

e) Should the Offeror propose subcontracted resources for the solicited availability, the Offeror must explain which requirements the prime contractor will complete and which work the subcontractor will complete, including the work item, trade, and duration of each subcontracted requirement. The Government considers the use of subcontractors in excess of 45% of production labor to increase the risk of unsuccessful contract performance. The Offeror must include in its narrative a plan to manage the subcontractor manning levels included from Time-now through Contract Completion Date.

f) The Offeror must explain any atypical circumstances that caused or contributed to poor historical earned value performance. The Offeror must address how its proposed approach for the evaluated project reflects resiliency to atypical causes of risk (e.g.

government furnished material delays or foreseeable trade labor demand).

b) Emphasis Area B – Physical Resource Capacity:

(1) Complete Attachment S-8 Pier and Dry Dock Graphical Representation Template to demonstrate the Offeror has the pier and dry dock available to complete the requirements of the proposed availability. The Attachment S-8 must show (a) the piers and dry docks expected to be in working capacity by month from proposal submission through the Contract Completion Date in Attachment J-3 and (b) the awarded and outstanding projects and work using those resources by month. The Attachment S-8 must include:

a) The piers and dry-docks required to complete work the Offeror currently has under contract based on current contract schedules.

b) The piers and dry-docks required to complete all outstanding proposals, including this proposal, per proposed schedules.

c) The piers and dry-docks required to complete any other anticipated requirements, including but not limited to Non-Navy work, pier and dry-dock upgrades, maintenance or dredging.

(2) Provide a narrative not to exceed 10 pages to support the Attachment S-8 and address:

a) If the Offeror proposes a subcontracted pier or dry dock, explain the resource requirements that the prime contractor will provide and the pier and dry dock that the subcontractor will provide.

b) The Offeror's plan to resolve pier and dry dock resource conflicts as a result of proposed and awarded projects. Piers and dry docks must not be committed to multiple ships during the same time period without explanation.

c) If the Offeror proposes an interval of less than seven days between the unberthing or undocking date of another requirement and the proposed berthing or docking date of this availability or a proposed docking date within the first seven days of this availability, then detail the necessary steps to accomplish this effort.

c) Emphasis Area C - Production Schedule:

(1) Develop a Production Schedule in accordance with the following requirements:

a) Include Key Events, Milestones, tests

b) Schedule each Work Item to the Work Activity level, listing the planned start and planned completion dates, and durations for each Work Activity.

c) Assign each Work Activity with the appropriate predecessor and successor relationships within the contractor’s scheduling software that establish the logic relationship between schedule Work Activities. Each activity must have at least one predecessor and one successor, with the exception of the Key Event Start Availability (which may have no predecessors) and the Key Event Complete Availability (which may have no successors).

Each Event and Activity may have more than one predecessor and more than one successor. The preferred relationships between linked predecessor and successor activities is Finish-to-Start. The use of scheduling Lags and Leads should be minimized.

d) Assign appropriate predecessor relationships to each Key Event and Milestone(s) to ensure there is an accurate logical progression through all work activities leading to their assigned Key Event and Milestone(s), ensure milestones are linked to the Key Events they support, and ensure the Production Schedule supports accurate prediction of Key Event and Milestone(s) attainment.

e) Assign appropriate predecessor and successor relationships between the Work Activities conducted on the same component, or in the same location but under differing Work Items, to ensure all related Work Activities across all Work Items are interdependently linked together.

f) Schedule production work and preliminary inspections generating reports required by Attachment J-10 that could result in a change in work to be accomplished or additional material to be procured to support reporting no later than the first 20 percent of the availability duration.

(2) Provide an export of the Production Schedule data elements in a sortable/filterable spreadsheet format compatible with Microsoft Excel. Include the following minimum data elements for each Work Activity in the schedule, as appropriate:

a) Work Item Number (as appropriate): 4-E specification Work Item number

b) Work Activity Identifier: Numerical designator identifying the Work Activity within the

Work Breakdown Structure (WBS)

c) Title: Descriptive title of Work Item and Work Activity

d) Key Event: Key Event applicable to the Work Activity

e) Milestone (as appropriate): Milestone applicable to the Work Activity

f) System (as appropriate): System(s) affected

g) Component (as appropriate): Component Unit (For example: tank, valve, motor, pump)

h) Location: Work location/compartment number

i) Executing Activity: ID specific organization: Prime KTR, Sub-KTR

j) Baseline Start: The date identified in the Production Schedule when the contractor plans to start the Work Activity

k) Baseline Finish: The date identified in the Production Schedule when the contractor plans to finish the Work Activity

l) Early Start: Software determined date. The earliest point in time that a Work Activity may start based on the Production Schedule network logic and any other schedule constraints. Early start dates may change as the availability progresses.

m) Early Finish: Software determined date. The earliest point in time that a Work Activity may complete based on the Production Schedule network logic and any other schedule constraints. Early start dates may change as the availability progresses.

n) Late Start: Software determined date. The latest point in time that a Work Activity may begin without delaying the applicable Milestone or Key Event based on the Production Schedule network logic.

o) Late Finish: Software determined date. The latest point in time that a Work Activity may be completed without delaying the applicable Milestone or Key Event based on the Production Schedule network logic.

p) Duration: The total number of work periods required to complete a Work Activity.

q) Calendar Identification: Number of scheduled workdays per week

r) Total Float: The total number of workdays that the Contractor can delay a Work Activity without affecting the project finish date.

s) Predecessor: An Activity or Event that immediately precedes one or more Activities or

Events with a direct tie in the Total Project Network.

t) Successor: An Activity or Event that immediately follows one or more Activities or

Events with a direct tie in the Total Project Network.

u) Constraints: Constraints used as applicable to Work Item or Work Activity. This may be provided within the predecessor or successor field.

(3) Provide the Proposed Production Schedule in the Native Software file

(4) Provide the Proposed Production Schedule in a time-oriented Gantt chart format that shows all work item activities, milestones and key events within the Production Schedule.

(5) Provide the Proposed Production Schedule in a time-oriented Gantt chart format that shows only Critical Path and Controlling Work Items at the Work Activity level and assigned Key Events and/or Milestones.

a) Critical Path: That sequence of Work Activities which forms the work and test chain of the longest duration, and directly affects the completion of the availability. Factors that influence when a Work Activity is on the Critical Path include: time duration required for the Work Activity, space limitations, manpower available, and the predecessor/successor relationships between Work Activities. The Critical Path is determined by automated schedule analysis and will include any sequential set of Work Activities forming the longest chain of events extending throughout the schedule and which has the least Total Float.

b) Controlling Work Items: Those Work Items which include activities that are on the critical path of the Production Schedule, which, by virtue of scope, material requirements, complexity, or other considerations, have the significant potential for impact on the scheduled project Key Events or completion of the availability.

(6) The Offeror shall provide a narrative to explain their Production Schedule. The narrative shall address the following:

a) Describe critical float paths and mention the work items that the Offeror estimates as the most critical and pose the most risk.

b) Demonstrate how the Offeror has scheduled the performance of all work items included in the Availability work package (including both Base and Option items) so as to permit the contract scope increases described in Section B, Note F (all growth work identified in this solicitation) without causing delay or disruption to the work required by the aforementioned work items, to any other Government contract, or to any other work in progress for the Government.

3. Non-Price Factor 3 – Past Performance:

In the Past Performance Volume, the Offeror shall demonstrate through submission of its Attachment S-9 (Past Performance Questionnaire) its performance on efforts of similar size, scope, and complexity that the Offeror will be able to perform the requirements outlined in this solicitation. The Offeror may provide up to five (5) recent and relevant contracts depicting its past performance and qualifications. The Offeror should submit contract information for recent (within five years of the proposal submission date) and relevant (Government ship repair) contracts.

Where the Offeror does not have recent and relevant past performance information, the Offeror shall affirmatively state that it does not have recent and relevant past performance information for the Government to consider.

NOTE: The Government reserves the right to use the contract information provided in the Offeror’s proposal to obtain data from other sources, such as the Contractor Performance Assessment Reporting System (CPARS) database, and from the points of contact identified by the Offeror in its proposal.

The Offeror is responsible for ensuring their customers complete the Past Performance Questionnaires and return them before the closing date of this solicitation.

E-mail to: Warren Beckman, Contracting Officer, warren.m.beckman.civ@us.navy.mil and mailto:warren.m.beckman.civ@us.navy.mil

Jaclyn Evans, Contract Specialist, jaclyn.v.evans.civ@us.navy.mil

Any questionnaire received after the proposal due date/time may be considered as late and may not be considered in the Offeror’s past performance evaluation. The Government, at its discretion, will determine whether or not questionnaires received after the proposal due date will be considered.

SECTION M - EVALUATION FACTORS FOR AWARD

EVALUATION FACTORS FOR AWARD

I. GENERAL

A. The Government intends to award a Fixed-Price contract for the completion of the USS MUSTIN (DDG

89) FY22 DMP to the Offeror whose proposal represents the Best Value to the Government.

B. Offerors are advised that the Government intends to make award on the basis of initial proposals without conducting discussions with Offerors, but reserves the right to conduct discussions if determined by the Contracting Officer to be necessary (see paragraph (f)(4) of FAR 52.215-1). Therefore, each initial offer should contain the Offeror’s best terms from a price and technical standpoint.

C. Offerors are advised that the Government will not evaluate any proposal information not contained within the body of the proposal.

II. BASIS OF AWARD

A. The Government will select the best overall offer, based upon an assessment of Volume I, Factor 1 and Volume II, Factors 1-3. A contract shall be awarded to the Offeror who is deemed responsible in accordance with FAR 9.104, whose proposal conforms to the RFP’s requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Section L of this solicitation) and represents the best value to the Government utilizing trade-off source selection procedures, in accordance with FAR 15.101-1 and the evaluation criteria.

1. As part of its responsibility determination in accordance with FAR 9.104, the Government will evaluate whether the Offeror holds a current MSRA or MSRA equivalency. In accordance with FAR

9.103 (b), in the absence of information clearly indicating a prospective Offeror is responsible, the contracting officer will make a determination of non-responsibility.

B. The best value basis for award will be based on the following evaluation factors:

1. Price Factor

a) Factor 1: Price

2. Non-Price Factors

a) Factor 1: Technical Eligibility

b) Factor 2: Resource Capacity & Schedule

a. Emphasis Area A: Manpower

b. Emphasis Area B: Physical Resource Capacity

c. Emphasis Area C: Production Schedule

c) Factor 3: Past Performance mailto:jaclyn.v.evans.civ@us.navy.mil

C. Ratings will be applied to Non-Price Factors as follows:

a) Non-Price Factors 1 and 3 in terms of acceptable or unacceptable

b) An overall adjectival rating from section IV below for Non-Price Factor 2.

D. The Government will first evaluate Non-Price Factor 1, Technical Eligibility, for acceptability. If an Offeror is found to be unacceptable for Factor 1 or Factor 3, then the Government reserves the right not to conduct additional evaluation. Non-Price Factor 2 is considered significantly more important than the Price Factor. The Government will not assign adjectival ratings to Factor 2 emphasis areas. The importance of price as an evaluation factor will increase as the difference in Non-Price Factor 2 among competing proposals decreases. This may result in an award to a higher rated, higher priced Offeror, where the decision is consistent with the evaluation factors, and the Source Selection Authority (SSA) reasonably determines that the benefits associated with award to the higher price Offeror outweigh the difference in price. The SSA will base the source selection decision on an assessment of proposals against all source selection criteria in the solicitation.

III. EVALUATION FACTOR DESCRIPTIONS

A. Cost/Price Factor 1 - Price

1. The Government will assess price proposals in accordance with FAR 15.404 to determine reasonableness of proposed pricing based on the information contained in the Pricing Workbook (Attachment J-4). The Government will not conduct a price realism analysis on any aspect of an Offeror’s price proposal.

Although award will be made based on an Offeror’s total price, a price proposal that is found unreasonable and/or unbalanced may be rejected. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated.

2. Total evaluated price for the availability shall be calculated by adding:

a) The price of all Base and Option contract line item numbers (CLIN) (this amount shall match the total price of all work items),

b) Contractor’s Fully burdened Ship Repair Labor Rate & Material Burden Rates as applied to all Growth Reservation CLINS (Base and Option) and New Work,

c) The price of the Extension Day Rates as listed in Attachment J-4,

d) As applicable, the value of the inter-port differential (as identified in Section…

This is the start of the file's text. The full file is on GovTribe.