INDEX
SHIP: USS RUSSELL (DDG 59) TPPC-DDG59-SWRMC21-CN01
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-21 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE CHANGE DATE CHANGE
009-01 General Criteria; accomplish 10/01/2019 Original
009-02 Environmental Compliance Report for Material Usage; accomplish 10/01/2019 Original
009-03 Toxic and Hazardous Substance; control 10/01/2019 Original
009-04 Quality Management System; provide 10/01/2019 Original
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
08/31/2018 Original
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping;
accomplish
07/24/2019 Original
009-08 Shipboard Fire Protection and Fire Prevention; accomplish 10/01/2019 Original
009-10 Asbestos-Containing Material (ACM); control 10/01/2019 Original
009-18 Mine Warfare Ships Magnetic Material; control 04/30/2018 Original
009-19 Provisioning Technical Documentation (PTD); provide 10/01/2018 Original
009-20 Government Property; control 10/01/2017 Original
009-21 Logistics and Technical Data; provide 10/01/2018 Original
009-23 Interference; remove and install 10/01/2018 Original
009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness;
accomplish
10/01/2019 Original
009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2018 Original
009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish
10/01/2018 Original
009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide
10/01/2019 Original
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;
provide and manage
10/01/2019 Original
009-61 Shipboard Use of Fluorocarbons; control 07/18/2014 Original
009-67 Integrated Total Ship Testing; manage 04/30/2018 Original
009-69 Heavy Weather/Mooring Plan; provide 04/30/2018 Original
009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and
Housekeeping for Unmanned Vessels; accomplish
10/01/2019 Original
009-72 Physical Security at a Private Contractor Facility; accomplish 10/01/2019 Original
009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair
10/01/2018 Original
009-74 Occupational, Safety and Health Plan; accomplish 10/01/2019 Original
009-80 Ship Facilities; maintain 11/18/2016 Original
009-81 Compartment Closeout; accomplish 10/01/2019 Original
009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018 Original
009-84 Threaded Fastener Requirements; accomplish 10/01/2018 Original
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution
Prevention Act (PPA) Information; provide
03/06/2018 Original
009-99 Ship Departure Report; provide 07/18/2014 Original
009-100 Ship's Stability; maintain 03/06/2018 Original
ITEM_NO. TITLE CHANGE DATE CHANGE
009-101 Ship Transit and Berthing; accomplish 03/26/2018 Original
009-106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2017 Original
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 10/01/2017 Original
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 11/18/2016 Original
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in
Duration; provide and manage
04/30/2018 Original
009-117 Combat Systems, Light-Off Suport; provide 10/01/2019 Original
009-118 CG Deck Loading; accomplish 07/18/2014 Original
009-120 Fact Finding and Critique of Unplanned Event; manage 03/06/2018 Original
009-122 Temporary Padeye; install and remove 10/01/2018 Original
CHANGE DATETITLEITEM NO.
CATEGORY II. FY-21 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER
CHANGE
009-05 Temporary Access; accomplish 10/01/2018 Original
009-09 Process Control Procedure (PCP); provide and accomplish
10/01/2019 Original
009-12 Weld, Fabricate, and Inspect; accomplish 10/01/2019 Original
009-13 Meter, Gauge, Switch, and Thermometer; repair 04/09/2019 Original
009-16 Electronic Equipment; repair 10/01/2018 Original
009-25 Structural Boundary Test; accomplish 10/01/2019 Original
009-26 Deck Covering; accomplish 10/01/2018 Original
009-32 Cleaning and Painting Requirements; accomplish 04/09/2019 Original
009-36 Controller; repair 08/31/2018 Original
009-57 Reduction Gear Security; accomplish 11/18/2016 Original
009-63 Lubricating Oil and Hydraulic Fluid; analyze 04/30/2018 Original
009-65 Polychlorinated Biphenyls (PCBs); control 03/26/2018 Original
009-71 Piping System; test 10/01/2019 Original
009-76 Waveguide and Rigid Coaxial Lay-Up; accomplish 10/01/2018 Original
009-77 Cofferdam Installation; accomplish 10/01/2019 Original
009-78 Passive Countermeasures System (PCMS) Material;
repair
10/01/2018 Original
009-87 Chemical disinfection Procedures; accomplish 10/01/2017 Original
009-88 Collection, Holding and Transfer (CHT) and Motor
Gasoline (MOGAS) Tanks, Spaces, and Piping, including Sewage or MOGAS-Contaminated Tanks, Spaces, and Piping; certify
11/18/2016 Original
009-89 Contractor Furnished Anode Purchase and
Inspection; accomplish
03/06/2018 Original
009-92 Resilient Mount; install 04/30/2018 Original
009-103 Weight and Moment Change Data; provide 04/30/2018 Original
009-123 Fiber Optic Component;inspect, install, repair, remove, and test
10/01/2018 Original
ITEM NO. TITLE
Accountability of Manhour and Material Reservation; accomplish042-11-001
Work Package Execution Review (WPER); accomplish042-11-002
Conditions Found Report (CFR); provide and manage042-11-003
Fire Drill Service; provide077-11-001
Waterway Bar; repair110-21-001
Drain Well; repair113-11-001
Engine Room Number One Structural Repair; accomplish120-11-001
Auxiliary Machinery Room Number One Structural Repair; accomplish120-11-002
Auxiliary Machinery Room Number 2 Structural Repair; accomplish120-11-004
Air Condition Machinery And Pump Room Structural Repair; accomplish120-11-006
Underwater Log Trunk; repair120-11-010
Crew Living Space Number 2; repair120-11-011
Vacuum Collection Holding Tank (VCHT) Room Structural Repair;
accomplish
120-11-012
Washroom, Watercloset and Shower Bulkhead; repair120-11-015
Vacuum Collection Holding Trunk Room Number 2 Tank Top; repair120-11-016
Transverse Watertight Bulkhead Frame 300; repair122-20-001
Tank and Void Cleaning and Pumping; accomplish123-10-001
Fuel Oil Gravity Head Tank; repair123-11-001
Fuel Oil Gravity Head Tank; preserve123-11-002
Forward Bank Compensated Fuel Tank; repair123-11-003
Mid Bank Compensated Fuel Tank; repair123-11-006
Fuel Oil Tank Equalizing Pipe; replace123-11-008
Potable Water Tank; repair123-14-001
Potable Water Tank; preserve123-14-002
Lube Oil Storage Tank; clean and coat123-15-001
Contaminated Oil Tank; repair123-17-001
Vacuum, Collection, Holding and Transfer (VCHT) Tank; repair123-19-001
Vacuum Collection, Holding and Transfer (VCHT) Tank; preserve123-19-002
Accessible Void and Tank; repair123-21-001
Accessible Void/Tank; preserve123-21-002
Aircraft Securing Fitting; replace130-11-001
Main Deck Structural Flange Plate; repair131-11-001
03 Level Array Sloping Bulkhead; repair150-11-001
Director Equipment Room Deck; repair150-11-002
Bulkhead Stuffing Tube; remove150-11-003
04 Level Deck and Platform; repair150-11-004
Fan Room Pressure Zone Number 4 Stiffener; repair150-11-005
Fan Room PZ Number 3; repair150-11-006
Fan Room Bulkhead; repair150-11-007
03 Level Deck and Bulkhead; repair150-11-008
02 Level Waterway Bar; repair150-11-009
Waterway Bar and Scupper Structure; repair150-11-010
DDG51 Class AER 76227D, Sonar Dome Relief Valve Flange
Modification; accomplish
165-80-001
ShipAlt DDG51-83678D, Sonar Dome Air Flow Meter Replacement;
accomplish
165-80-002
Exterior Watertight Hatch; replace167-11-001
Bolted Equipment Removal Plate (BERP) Repair and Replace;
accomplish
167-11-002
Ammo Strikedown Hatch; repair167-11-003
Watertight Scuttle; replace167-11-004
Watertight Scuttle; replace167-11-005
Pallet Truck Stowage/Battery Door; repair168-12-001
ShipAlt DDG51-87737K, Removal of Unused MCS Cable; accomplish202-90-001
DDG51 Class AER 66068, Main Reduction Gear (MRG) Case Security
Lock; accomplish
241-80-001
Gas Turbine Intake Trunk Clean Side; repair251-00-001
Air Intake and Exhaust Louver; preserve (touch up)251-31-001
Number One Gas Turbine (GTRB) Intake; repair251-32-001
Number 3 Gas Turbine Generator (GTG) Intake Repair and Preservation;
accomplish
251-32-002
Number 2 Gas Turbine Intake; repair251-32-003
Gas Turbine Module 2A Base Enclosure; repair251-32-004
Gas Turbine Module 2B Base Enclosure; repair251-32-005
Number One Gas Turbine Generator (GTG) Intake Preservation;
accomplish
251-32-006
Seawater Cooling System; clean and inspect256-11-001
Number One Gas Turbine Mixing Room, Uptake, Boundary Layer
Infra-Red Suppression System (BLISS) Cap; partial repair and preserve
259-10-001
Number 2 Gas Turbine Mixing Room Uptake; partial repair and preserve259-10-002
Number 2 Ships Service Gas Turbine Generator (SSGTG) Exhaust
Trunk; repair
259-10-003
Gas Turbine (GTRB) Exhaust Duct Collector; repair259-11-001
Lube Oil Fill and Transfer Piping; replace262-11-001
Number 2 Main Reduction Gear (MRG) Lube Oil Cooler; clean and inspect
262-12-001
Lube Oil Purifier Heater Number One; clean and inspect264-31-001
Number 2 Lube Oil Purifier Heater; clean and inspect264-31-002
Number One Ship Service Gas Turbine Generator (SSGTG) Resilient
Mount; install
311-31-001
Number 2 Ship Service Gas Turbine Generator (SSGTG) Resilient
Mount; install
311-32-001
Number 3 Ship Service Gas Turbine Generator (SSGTG) Resilient
Mount; install
311-33-001
DDG51 Class AER 66085, Repair Generator Cabling Chafing
Modification; accomplish
311-80-001
Multi-Cable Transit; repair321-11-001
DDG51 Class AER 76101D, Replace Dossert Lug Connector;
accomplish
324-80-001
ShipAlt DDG51-84530K, Aegis Weapon System (AWS) Peripherals
Upgrade; accomplish (OPTION ITEM)
411-90-001
DDG51 Class AER 66070D, Integrated Voice Communication System
(IVCS) Printer Replacement; accomplish
432-80-001
Tank Level Indication (TLI) Stuffing Tube; replace437-21-001
ShipAlt DDG51-77333K AWS CKT 3TV COTS Upgrade; accomplish
(OPTION ITEM)
439-90-001
ShipAlt DDG-51-83940K AWS Video Distribution System Upgrade;
accomplish (OPTION ITEM)
439-90-002
ShipAlt DDG51-74283K and OrdAlt 74283, Ballistic Missile Defense
(BMD) 4.0 ORTS Display Upgrade; accomplish (OPTION ITEM)
450-90-001
ShipAlt DDG51-79322K, Ballistic Missile Defense (BMD) DDG 4.0.1 Ship
Impact; accomplish (OPTION ITEM)
456-90-001
ShipAlt DDG51-92104K, AN/SQQ-89A(V)15 With TI-18 Hardware;
accomplish (OPTION ITEM)
463-90-001
ShipAlt DDG51-80156K, AN/SLQ-32(V)6 Surface Electronic Warfare
Improvement Program (SEWIP) Block 2 Upgrade and ShipAlt
DDG51-81382K, AN/SLQ-32(V)6 Data Adaptation Processor (DAP)
Hardware; accomplish (OPTION ITEM)
472-90-001
OrdAlt 80831, Guided Missile Director AS-3444/SPG-62, Passive
Countermeasure System (PCMS) Installation; accomplish (OPTION
ITEM)
482-00-001
ShipAlt DDG51-81961K and DDG51-85114K, Tactical Tomahawk
Weapons Control System (TTWCS) V5.4.0.2 and TC2S 5.0.1 Upgrade;
accomplish (OPTION ITEM)
482-90-001
ShipAlt DDG51-86574K, USW-DSS AN/UYQ-100(V)3 Infrastructure
Hardware; accomplish (OPTION ITEM)
495-90-001
Engine Room Insulation and Lagging; replace508-11-001
Lagging and Insulation, Inside Machinery Space; replace508-11-002
Lagging and Insulation, Outside Machinery Space; replace508-12-001
Ventilation Cleaning; accomplish512-11-001
Ventilation Plenum Assembly; repair512-11-002
Laundry Exhaust Pipe and Deck; repair512-11-003
Ventilation Plenum; repair512-11-004
02 Level Ventilation; repair and preserve512-11-005
Exhaust Ventilation Assembly; repair512-11-006
Intake Ventilation; replace512-11-007
Cooling Coil Drain Pan; install512-11-008
ShipAlt DDG51-81435K, Install Remote Fire Toggle Switch; accomplish512-90-001
ShipAlt DDG51-74012K, VLS Magazine Ventilation Upgrade; accomplish
(OPTION ITEM)
512-90-002
Chilled Water Thermal Well; replace514-11-001
Air Conditioning Plant Resilient Mount; replace514-20-001
Air Conditioning (AC) Plant Condenser; mechanically clean514-20-002
Air Conditioning Plant Condenser Water Control Valve (CWCV); replace514-20-003
Plumbing Vent Piping; replace528-11-001
ShipAlt DDG51-87881K Main Drainage System Piping and Valve
Modification; accomplish (partial)
529-90-001
DDG51 Class AER DDG51-66069D, Reverse Osmosis Hose and Valve
Material Upgrade; accomplish
531-80-001
Fuel Oil Piping Hanger; replace541-11-001
Bleed Air Piping; install551-11-001
Anti-Icing Piping; install551-11-002
High Pressure Air Compressor (HPAC) Class C Air End Overhaul including Cooler and Sub-Assembly; accomplish
551-51-001
High Pressure Air Compressor (HPAC) Class C Air End Overhaul including Cooler and Sub-Assembly; accomplish
551-52-001
HALON System Flow Test; accomplish555-11-002
Slewing Arm Davit (SLAD); repair583-11-001
Vacuum Collection, Holding and Transfer (VCHT) System Hydroblast;
accomplish
593-11-001
Number 1A Vacuum, Collection, Holding and Transfer (VCHT) Ejector
Pump and Motor; install (OPTION ITEM)
593-11-002
Number 1B Vacuum, Collection, Holding and Transfer (VCHT) Ejector
Pump and Motor; install (OPTION ITEM)
593-11-003
Number 2A Vacuum, Collection, Holding and Transfer (VCHT) Ejector
Pump and Motor; install (OPTION ITEM)
593-11-004
Number 2B Vacuum, Collection, Holding and Transfer (VCHT) Ejector
Pump and Motor; install (OPTION ITEM)
593-11-005
Trash Disposal Room; repair and preserve593-11-006
Nomex Deck Panel; replace622-12-001
Balanced Joiner Door; remove, store and install624-11-001
Bosn Storeroom Number 2/Hazmat; preserve631-11-003
Chemical Warfare Defense Equipment Storeroom Number 2; preserve631-11-004
Escape Trunk; preserve631-11-005
Battle Dressing Station and Storeroom; preserve631-11-007
Auxiliary Machinery Room Number One Bilge; preserve631-11-008
Auxiliary Machinery Room Number 2 Bilge; preserve631-11-009
Aqueous Film Forming Foam (AFFF) Station Deck; preserve631-11-010
Deck Gear Locker; preserve631-11-011
Engine Room Number One; preserve631-12-001
Engine Room Number One Bilge; preserve631-12-002
Engine Room Number 2; preserve631-12-003
Air Conditioning Machinery and Pump Room; preserve631-12-004
Steering Gear Room; preserve631-12-005
Collective Protection System (CPS) Zone 2 Fan Room Deck; preserve631-13-001
Windlass Machinery Room Deck; preserve631-13-002
01 Level Weather Deck and Superstructure; preserve631-21-001
Harpoon Blast Shield Pad Assembly; repair634-11-001
Castleway Passage Nonskid; replace634-11-002
06 Level Nonskid; install634-11-003
Porcelain Tile Deck Covering System; install634-11-004
Wear Resistant Deck Tile; install634-11-005
Forecastle Nonskid; replace634-21-001
Flight Deck Nonskid (Flight I); install634-21-002
Hull Insulation; repair635-11-001
Crew Berthing Hamper Modification; accomplish643-11-001
Sanitary Space Habitability Project (HENL) Installation; accomplish643-11-002
Berthing Space Habitability Project (BENL) Installation; accomplish643-11-003
ShipAlt DDG51-86820K, Women At Sea Berthing Annex Number 4, 5 and
6; accomplish
643-90-001
ShipAlt DDG51-86823K, Women At Sea Berthing Number 5 Crew Living
Space Modification; accomplish
643-90-002
ShipAlt DDG-51-86822K, Women At Sea Berthing Number 4 Crew Living
Space Modification; accomplish
643-90-003
Galley Equipment; replace651-11-001
Scullery Dishwasher; replace651-11-002
ShipAlt DDG51-87970K, Install Oven Restraint; accomplish651-90-001
Vertical Launch System (VLS) Valve Repair and Flush; accomplish721-31-001
Vertical Launch System (VLS), MK 41 Launcher Top and Uptake Hatch;
replace and preserve
721-31-002
Antenna Photograph; provide837-11-001
Combat Systems Discrepancy Correction; accomplish844-31-001
Technical Representative; provide (OPTION ITEM)860-70-001
Local Area Network (LAN) Support Service; provide863-50-001
Availability Program Management Multi-Cable Transit (MCT) Cableway
Integrator; provide
897-11-001
OrdAlt 70227, Cradle Operating Cylinder Standardized Pierside
Maintenance and Repair (SPMR), Alteration Installation Team (AIT)
Support Service; provide (OPTION ITEM)
980-00-001
OrdAlt 20353, Electric Control Valve on Cooler and Demineralizer (C/D)
Water Cooler, Alteration Installation Team (AIT) Support Service; provide
(OPTION ITEM)
980-00-002
OrdAlt DDG51-74588K, MK 99 FCS Kill Assessment System, Alteration
Installation Team (AIT) Support Service; provide (OPTION ITEM)
980-00-003
OrdAlt 89524K OJ-663 CRO Monitor Upgrade, Alteration Installation
Team (AIT) Support Service; provide (OPTION ITEM)
980-00-004
Naval Air Warfare Center, Aviation Facilities Assist Visit Discrepancy;
correct
980-10-001
Light-Off Discrepancy Correction Assistance; provide980-11-001
Ship's Force Office And Training Facility; provide980-11-002
ShipAlt DDG51-96034K, BFTN AN/USQ-195A(V)1, Alteration Installation
Team (AIT) Support Service; provide (OPTION ITEM)
980-90-001
ShipAlt DDG51-94294K, Canes HW2 Tech Refresh, Alteration
Installation Team (AIT) Support Service; provide (OPTION ITEM)
980-90-002
ShipAlt DDG51-95946K, C2P Tech Refresh, Alteration Installation Team
(AIT) Support Service; provide (OPTION ITEM)
980-90-006
MachAlt 96411, ShipAlt 96412, MachAlt 95151, and MachAlt 86639, C2
IBNS Tech Refresh with C3 IEM, C2 IBNS Tech Refresh with C3, IBNS
Physical Throttle, DDGM Back Fit IBNS Hardware and Windows 7 OS
Upgrade, Alteration Installation Team (AIT) Support Service; provide
(OPTION ITEM)
980-90-007
ShipAlts 84530K, 79322K, 74283K, OrdAlts 74283K, 79300K, 74380K, 79024K, and 76644K, AWS: SPRS, BMD 4.1, BMD 4.0 Program ORTS, BMD 4.0.3 ORTS Display Upgrade, BMD 4.0 Equipment, BMD 4.0.3 SPY
In Service Signal Processor, BMD SPY Coherent Combiner, AN/UYK 43
I/O Enhancement, Alteration Installation Team (AIT) Support Service;
provide (OPTION ITEM)
980-90-008
ShipAlt DDG51-84694K, DMR IW and MUOS Upgrade, Alteration
Installation Team (AIT) Support Service; provide (OPTION ITEM)
980-90-009
ShipAlt DDG51-91027K, GPNTS(V)4, Alteration Installation Team (AIT)
Support Service; provide (OPTION ITEM)
980-90-010
Engineering Change 90119, Navy Cash Tech Refresh Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION
ITEM)
980-90-013
ShipAlt DDG51-95858K, BFTT AEGIS T46E Hardware Upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION
ITEM)
980-90-015
ShipAlt 92104K and 86644K, AN/SQQ-89A (TI-18/17) and USW: DSS
SQQ-89 Cable, Alteration Installation Team (AIT) Support Service;
provide (OPTION ITEM)
980-90-016
ShipAlt DDG51-86033K, Multifunctional Information Distribution System
On Ship (MOS MOD) Modification, Alteration Installation Team (AIT)
Support Service; provide (OPTION ITEM)
980-90-018
ShipAlt DDG51-00151.02K, Upgrade A/C Plants from R-114 to HFC-236, Alteration Installation Team (AIT) Support Service; provide (OPTION
ITEM)
980-90-019
Machinery Space Production Completion and Requirement for Light-Off
Assessment (LOA) (Non-Complex); accomplish
982-31-001
Dock Trial, Fast Cruise, and Sea Trial; accomplish982-31-002
Preliminary Light Off Assessment (LOA) Inspection Discrepancy
Correction Assistance; provide
982-32-001
Dock Trial, Sea Trial Discrepancy Correction; accomplish982-41-001
Temporary Mast and Roller Staging for Ship's Force Use; provide991-11-001
Ship's Force Parking; provide992-11-001
Demineralized Water; provide992-11-002
Personnel Berthing Barge Support; provide992-11-003
Temporary Flammable Liquid Hazardous Waste and Hazardous Material
Storage for Ship's Force Use at Contractor's Facility; provide
992-11-004
Temporary Refrigerated and Freezer Storage Facility, 7,000 Cubic Feet
Total; provide
992-11-005
Pierside Small Boat Storage; provide (OPTION ITEM)992-11-006
Transport Control Protocol/Internet Protocol Based T-1 Type Computer
Network (T-1 Line) Support Service; provide
992-11-008
Temporary Air Conditioning; provide992-11-009
Fuel Assistance for Fuel Barge; provide (OPTION ITEM)992-11-010
Support Service for Ship's Force Security; provide992-11-011
Temporary Service; provide992-11-012
Oil Spillage and Floating Sandblasting Debris Boom; install992-11-013
Regional Maintenance Center (RMC) Office Space; provide992-11-014
Defuel Ship; accomplish (OPTION ITEM)992-21-001
Bilge Cleaning and Pumping; accomplish992-31-001
Integrated Logistic Overhaul (ILO) Support Service; provide993-11-001
Ship's Force Warehouse Storage Space; provide993-11-002
AN/SPY-1 Antenna Array Face Resurface Support Service; provide993-21-001
Rigging, Crane and Transportation Service; provide993-21-002
Temporary Main Reduction Gear (MRG) Dehumidifier System; provide993-31-001
Temporary Deck Covering; install993-31-002
AN/SPY-1D Antenna Protective Cover; install993-31-003
Pressurized Waveguide and Transmission Line Dry Air Lay-Up;
accomplish
993-31-004
Hazardous Waste Produced on Naval Vessels; control998-41-001