Attachment J-17 (Schedule Model Review).docx

DOCX document 23 KB Posted

Attached to
AMENDMENT A0012 - USS RUSSELL (DDG 59) & USS SOMERSET (LPD 25) FY21 Selected Restricted Availabilities (SRAs)
Solicitation number
N00024-21-R-4456
Issued by

View the file

Other files

File Type Posted
N00024-21-R-4456_A0012_CONFORMED.pdf PDF
N00024-21-R-4456_A0012.pdf PDF
N00024-21-R-4456_A0011.pdf PDF
N00024-21-R-4456_A0011_ CONFORMED.pdf PDF
N00024-21-R-4456-A0010 Conformed.pdf PDF
N00024-21-R-4456-A0010.pdf PDF
N00024-20-R-4456_A0009.pdf PDF
N00024-20-R-4456_A0009_CONFORMED.pdf PDF
N00024-21-R-4456_A0008 CONFORMED.pdf PDF
TPPC-DDG59-SWRMC21-CN01 NSI Index_Rev1.pdf PDF
N00024-21-R-4456_A0008.pdf PDF
N00024-20-R-4456_CONFORMED THROUGH A0007.pdf PDF
N00024-20-R-4456_A0007.pdf PDF
Attachment J-4_Rev1 (Pricing Workbook).xlsx XLSX spreadsheet
N00024-21-C-4456_A0006_CONFORMED.pdf PDF
N00024-21-C-4456_A0006.pdf PDF
N00024-21-R-4456_A0005.pdf PDF
N00024-21-R-4456_A0005_Conformed.pdf PDF
N00024-21-R-4456_A0004.pdf PDF
N00024-21-R-4456_A0004_CONFORMED.pdf PDF
CDRLs Rev1.zip ZIP file
N0002421R4456_A0003.pdf PDF
Attachment J-18 (GFM List REV1).xlsx XLSX spreadsheet
Attachment J-8 GFM List (REV1).xlsx XLSX spreadsheet
N0002421R4456_A0003_CONFORMED.pdf PDF
N00024-21-R-4456_A0002.pdf PDF
N00024-21-R-4456_A0002_CONFORMED.pdf PDF
N00024-21-R-4456_A0001_CONFORMED.pdf PDF
N00024-21-R-4456_A0001.pdf PDF
Attachment S-5 (Eligibility Criteria Data Sheet).docx DOCX document
Attachment S-15 (Eligibility Criteria Data Sheet).docx DOCX document
N00024-21-R-4456 (USS SOMERSET_USS RUSSELL).pdf PDF
Attachment J-15 (QASP).pdf PDF
Attachment J-8 (GFM List).xlsx XLSX spreadsheet
CDRLs.zip ZIP file
Attachment S-3 (PPI Form).xlsx XLSX spreadsheet
Attachment J-18 (GFM List).xlsx XLSX spreadsheet
Attachment J-5 (QASP).pdf PDF
Attachment S-7 (Proposal Assessment).xlsx XLSX spreadsheet
Attachment S-17 (Proposal Assessment).xlsx XLSX spreadsheet
Attachment J-7 (Schedule Model Review).docx DOCX document
Attachment S-13 (PPI Form).xlsx XLSX spreadsheet
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-17 Schedule Model Review USS SOMERSET Purpose: At A-30 the Lead Maintenance Activity (LMA) shall lead a Schedule Model Review of the Integrated Production Schedule (IPS) with all parties to validate integration requirements. The Schedule Model Review is intended to be a detailed review of all work items to ensure adequate integration into the master schedule and to de-conflict any overlapping activities. The anticipated duration of this meeting is 5-7 days. Hours for Day 1 is 0800-1600 and for Day 2 and following is 0800-1130.

1. Required Attendees:

a. LMA management team

b. Government Project Management Team (NSA)

c. Turnkey Subcontractors

d. Alteration Installation Team (AIT) On Site Installation Coordinators (OSIC)

e. Intermediate Maintenance Facility (IMF) Ship’s Superintendent, if applicable

f. Ship’s Force (one representative from each department, Ship’s Maintenance Officer)

2. Agenda:

Day 1 Work Package Execution Review (WPER) (Government Facilitated)

a. Early Start Candidates (LMA)

b. WAF/Tag Out coordination (LMA)

c. Pier Laydown Plan (LMA)

d. First 100 Hour Plan (NSA)

e. Communications Plan (NSA)

f. Process Control Procedures (PCP) (LMA)

g. Access Cuts (LMA)

h. Fire Prevention and Fire Drill (8010) requirements (NSA)

i. Memorandum of Agreement (MOA) – AIT’s only (NSA)

Day 2 - 7

j. LMA to Present the IPS for review. The IPS shall include (but not limited to) all work associated with the LMA, subcontractors, AITs, Ship’s Force, and Intermediate Maintenance Activity (IMA).

3. Deliverables:

a. Updated IPS with all maintenance activities fully integrated. (LMA)

b. Early start candidates submitted and approved by the NSA. (LMA)

c. WAF/Tag Out coordination plan established. (LMA)

d. First 100 Hour Plan established. (NSA)

e. Set schedule for all required meetings. (NSA)

f. Pier Laydown Plan submitted for approval by NSA. (LMA)

g. List of Process Control Procedures with projected due dates. (LMA)

h. List of access cuts (if required). (LMA)

i. Fire drill execution date set. (NSA)

j. Detailed review of critical path and top three controlling path items. (LMA)