LCS SEC Attachment J-9 Provisioning Requirements Introduction.pdf

PDF 235 KB Posted

Attached to
Littoral Combat Ships Rolling Admissions to SEC WEST MAC IDIQ RFP PPI Responses Update 02
Solicitation number
N00024-21-R-4443
Issued by

About this file

This document outlines requirements for a Navy solicitation seeking proposals for maintenance, repair and modernization work on Littoral Combat Ships. Offerors are requested to submit proposals for indefinite delivery/indefinite quantity multiple award contracts to perform selected restricted availabilities, drydocking selected restricted availabilities, continuous maintenance availabilities, and emergent maintenance for LCS vessels in the continental United States and outside the continental United States. Proposal submission instructions are provided, including directions for requesting restricted attachments. Evaluation of proposals and award of tier one MAC IDIQ contracts is anticipated to occur in July 2021.

View the file

Other files

File Type Posted
LCS SEC WEST II Rolling Admissions PPI Responses 9-12.pdf PDF
LCS SEC WEST II Rolling Admissions PPI Responses 1-8.pdf PDF
N00024-21-R-4443 RFP.pdf PDF
LCS SEC Attachment J-2 MILSTRAP DHA_BHJ Desk Gude for Demand Only Transaction Reporting 12 May 2016.pdf PDF
LCS SEC Attachment J-4 LCSRON Compartment Cleaning Instruction (COMLCSRONONEINST 4790.8).pdf PDF
LCS SEC Attachment J-7 PMS Reporting Template.xlsx XLSX spreadsheet
LCS SEC Attachment J-15 PMS 505 Instructions for Seaframe Mission Critical Systems dtd 3 Dec 2014.pdf PDF
LCS SEC Attachment J-1 Desk Guide for Ships 3-M Parts Usage Reporting 25 May 2016.pdf PDF
LCS SEC Attachment S-3 Technical Capabilities Data Sheet.docx DOCX document
LCS SEC Attachment J-12A_Compartment_Cleaning_Schedule_LCS1_Variant.xls XLS spreadsheet
LCS SEC Attachment J-16 Labor_and_Material_Burden_Ceiling_Rates_Price_Sheet.xlsx XLSX spreadsheet
LCS SEC Attachment J-11 Logistics Mgnt Info Wkshts.pdf PDF
SEC West CDRL A014 Financial Data Requirements with CWBS.xlsx XLSX spreadsheet
LCS SEC Attachment J-10 Provisioning Statement of Work.pdf PDF
LCS SEC West Rolling Admissions CDRL Package 23 Sep 2019.pdf PDF
LCS SEC Attachment S-2 Past Performance Questionaire.docx DOCX document
LCS SEC Attachment J-14 DD254.pdf PDF
LCS SEC Attachment J-8 Standard Work Template (SWT) Facility Maintenance.pdf PDF
LCS SEC Attachment S-1 Bidders Questions Form.docx DOCX document
LCS SEC Attachment J-12B_Compartment_Cleaning_Schedule_LCS2_Variant.xlsx XLSX spreadsheet
LCS SEC Attachment J-5 Tag-Out User Manual S0400-AD-URM-010 TUM.pdf PDF
LCS SEC Attachment J-6 Work Authorization Form (WAF).pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00024-21-R-4443Attachment J-9

PROVISIONING REQUIREMENTS INTRODUCTION

This section provides requirements/specifications for Contractor’s use in submitting Provisioning Data

Products and participating in the provisioning process with the Government.

1. Prime Provisioning Activity. The Prime Provisioning Activity (PPA) is the NAVSEA Engineering

Activity designated as the Technical Support Activity (TSA). The PPA/TSA will be the Government

Activity that is listed on the Contract Data Requirements List (CDRL) for delivery of the LMI Data

Products for DID DI-SESS-81758A. The PPA may be re-negotiated at the PGC. The PPA (Address and

Zip Code):

Commander

NSWC Carderock Division (Code 94512)

Building 4

Philadelphia, PA 19112-5083

2. Correspondence. Address all correspondence, Provisioning Data Products, Engineering Data for

Provisioning (EDFP) documentation, etc., pertaining to spare/repair parts provisioning and related data items to the PPA.

3. Conferences. The requirements for provisioning related conferences will be determine at the PGC or by the PPA. The PGC is / is not required.

4. Sample Article. A sample article of the component/end item is required / is not required at the provisioning conference. A sample article of the component/end item will be viewed / disassembled at the provisioning conference.

5. Incremental Submission. Incremental submission concentrates provisioning efforts on portions of the system which are considered design stable. By authorizing incremental submission, the Provisioning Data

Products for the stable aspects of the system can be processed while waiting for the remainder of the system to mature. Incremental submission of Provisioning Data Products is / is not authorized.

This will be determined at the PGC.

6. Special Tools and Test Equipment. STTE will / will not be included in the Provisioning Data

Products.

7. Vendors/Subcontractors. When the prime contractor buys end articles or a portion thereof from a vendor/subcontractor, the prime contractor shall impose this specification upon its vendors/subcontractors.

The inclusion of the requirement for such data on contractor’s subcontracts/purchase orders to its vendor/subcontractors does not relieve the prime contractor of its obligation to insure timely delivery of the required Provisioning Data Products and EDFP.

8. Ordering of Spare/Repair Parts. The Government will use provisioned Item Order (PIO) if the

Government elects to procure spares/repair parts from the prime contractor. The Government reserves the right to place additional orders for spare/repair parts during the life of the contract. PIOs will be placed directly with vendors if it is determined that such purchase will reduce acquisition costs without compromising the integrity of the system in which the parts are to be used.

9. Delivery of Spare/Repair Parts. Spare/repair parts shall be delivered in accordance with the delivery schedule provided in the PIO unless specified otherwise. The delivery schedule provided to the contractor in the PIO will become the definite/firm schedule unless the contractor takes exception and provides an alternative delivery schedule with which the government agrees within 60 calendar days from receipt of the

PIO.

N00024-21-R-4443 Attachment J-9

10. Interim Support Items. The requirement for Interim Support Items is a contract option that the

Government may exercise at any time during the life of contract. The Interim Supply Support (ISS) process will be discussed at the PGC.

11. Interim Release. Interim release should be employed when there are spares required that take longer to manufacture than the time available in the normal provisioning process. By requiring the use of interim release, the contractor shall prepare a listing of items which fall into this category. These items comprise the Long Lead Time Items List (LLTIL). Interim Release is /is not required.

12. Provisioning Performance Schedule. The Provisioning Performance Schedule (PPS) is used to consolidate all provisioning-related requirements of the contract into a time-sequenced format. If required, the contractor shall complete the PPS and submit it as part of their offer. The schedule shall be finalized at the PGC. The Provisioning Performance Schedule is / is not required.