LCS SEC Attachment J-8 Standard Work Template (SWT) Facility Maintenance.pdf

PDF 7 KB Posted

Attached to
Littoral Combat Ships Rolling Admissions to SEC WEST MAC IDIQ RFP PPI Responses Update 02
Solicitation number
N00024-21-R-4443
Issued by

About this file

This document contains a facilities maintenance work specification template for use on Littoral Combat Ships. The template outlines requirements for housekeeping, industrial cleaning, inspection of preservation coatings and structural integrity, and removal and installation of various types and amounts of bulkhead plating, lagging, and piping throughout ship spaces as designated by the SUPERVISOR. It refers to standard work items and other reference documents for guidance on authorized chemical cleaning products, compartment cleaning plans, and preservation and corrosion control. No government furnished material is provided.

The related federal contract opportunity is a solicitation from the Naval Sea Systems Command for a multiple award contract indefinite delivery, indefinite quantity contract to expand the pool of shipyards able to perform maintenance, repair, and modernization of Littoral Combat Ships on the west coast. The scope of work includes selected restricted availabilities, drydocking selected restricted availabilities, continuous maintenance availabilities, unscheduled maintenance, and emergent maintenance in the continental US and outside the continental US. Interested offerors must monitor the beta.SAM.gov website for amendments and access restricted attachments by the deadlines provided. The Navy anticipates awards will be made in July 2021.

View the file

Other files

File Type Posted
LCS SEC WEST II Rolling Admissions PPI Responses 9-12.pdf PDF
LCS SEC WEST II Rolling Admissions PPI Responses 1-8.pdf PDF
N00024-21-R-4443 RFP.pdf PDF
LCS SEC Attachment J-2 MILSTRAP DHA_BHJ Desk Gude for Demand Only Transaction Reporting 12 May 2016.pdf PDF
LCS SEC Attachment J-4 LCSRON Compartment Cleaning Instruction (COMLCSRONONEINST 4790.8).pdf PDF
LCS SEC Attachment J-7 PMS Reporting Template.xlsx XLSX spreadsheet
LCS SEC Attachment J-15 PMS 505 Instructions for Seaframe Mission Critical Systems dtd 3 Dec 2014.pdf PDF
LCS SEC Attachment J-1 Desk Guide for Ships 3-M Parts Usage Reporting 25 May 2016.pdf PDF
LCS SEC Attachment S-3 Technical Capabilities Data Sheet.docx DOCX document
LCS SEC Attachment J-12A_Compartment_Cleaning_Schedule_LCS1_Variant.xls XLS spreadsheet
LCS SEC Attachment J-16 Labor_and_Material_Burden_Ceiling_Rates_Price_Sheet.xlsx XLSX spreadsheet
LCS SEC Attachment J-11 Logistics Mgnt Info Wkshts.pdf PDF
SEC West CDRL A014 Financial Data Requirements with CWBS.xlsx XLSX spreadsheet
LCS SEC Attachment J-10 Provisioning Statement of Work.pdf PDF
LCS SEC West Rolling Admissions CDRL Package 23 Sep 2019.pdf PDF
LCS SEC Attachment S-2 Past Performance Questionaire.docx DOCX document
LCS SEC Attachment J-14 DD254.pdf PDF
LCS SEC Attachment J-9 Provisioning Requirements Introduction.pdf PDF
LCS SEC Attachment S-1 Bidders Questions Form.docx DOCX document
LCS SEC Attachment J-12B_Compartment_Cleaning_Schedule_LCS2_Variant.xlsx XLSX spreadsheet
LCS SEC Attachment J-5 Tag-Out User Manual S0400-AD-URM-010 TUM.pdf PDF
LCS SEC Attachment J-6 Work Authorization Form (WAF).pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Facilities Maintenance Work Specification Template

Ship: LCS CLASS ITEM NO.897-11-002

COAR: N/A PCN: None

CWT FILE NO: CMP: N/A

REVISED: 20150623 PLANNER: N/A

1. SCOPE:

1.1. Title: Littoral Combat Ship Facilities Maintenance (FM) and Corrosion

Control; accomplish

1.2. Location of Work

1.2.1. Throughout the Ship

1.3. Identification

1.3.1. Not Applicable

1.4 (Security as required)

2. REFERENCES

2.1. Standard Items

2.2. NAVSEA S6480-A4-CAT-010: Authorized Chemical Cleaning Products and

Dispensing Systems Catalog

2.3 COMLCSRONONEINST 4790.8 Littoral Combat Ship Compartment

Cleaning Plan

3. REQUIREMENTS:

3.1. Accomplish Housekeeping and Industrial Cleaning in locations as designated by the SUPERVISOR in accordance with 2.2 and 2.3.

3.1.1.Submit one legible copy, in approved transferrable media, of an FM

Surveillance Log to be used as a means of planning, tracking, and coordinating the accomplishment of contractor work no later than 7 days prior to the start of work.

3.1.2.The FM Surveillance Log shall be revised daily to include additions, deletions, modifications, progress, and completions.

3.1.2.1.Submit one legible copy, in approved transferrable media, of the revised FM Surveillance Log when requested by the SUPERVISOR.

3.1.3.Accomplish a visual inspection of each space to be cleaned for existing preservation coating, areas of corrosion or deterioration, and missing/damaged/deteriorated lagging.

3.1.3.1.Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.1.2 to the

SUPERVISOR.

3.2. Accomplish the requirements of 009-32 of 2.1 (specific table) for XX square footage as designated by the SUPERVISOR.

3.3.Remove existing and install new a total of XX square feet of bulkhead plating, XX linear feet of 8 inch firemain lagging, XX linear feet of 6 inch chill water or firemain lagging, XX linear feet of 4 inch chill water or firemain lagging, and XX linear feet of one inch or 2 inch chill water or firemain lagging as designated by the SUPERVISOR

3.3.1. Accomplish the requirements of 009-11 of 2.1.

4.NOTES: None.

5.GOVERNMENT FURNISHED MATERIAL (GFM)

5.1. None.

File details come from the government source that posted it. Updated .