BREMERTON ATTACHMENT J-17 Fire Extinguisher Log.docx

DOCX document 233 KB Posted

Attached to
Operation and Maintenance of Bremerton Inactive Vessels and San Diego Detachment
Solicitation number
N00024-21-R-4202
Issued by

About this file

This document contains inspection guidelines and forms for fire extinguishers on naval vessels berthed in Bremerton. The guidelines provide periodic inspection procedures for CO2 fire extinguishers, including checks for cylinders, hoses, fittings, valves and locks. Inspection managers are to use the forms to record inspection dates, discrepancies found, and dates of corrections.

A related federal contract opportunity is also provided. Solicitation N00024-21-R-4202 from the Naval Sea Systems Command seeks proposals for operation and maintenance of inactive vessels in Bremerton and a detachment in San Diego. Offers must be received by June 16, 2022. The solicitation requires maintenance and upkeep of fire safety equipment on inactive naval ships.

View the file

Other files

File Type Posted
Attachment J2 Cost Element Summary Spreadsheets Rev 2.xlsx XLSX spreadsheet
BREMERTON CDRL 033-036 Rev1.pdf PDF
Attachment J-1 Pre-Proposal Information Form Rev 4.xlsx XLSX spreadsheet
BREMERTON CDRL 017-020 Rev1.pdf PDF
BREMERTON CDRL 049-052 Rev1.pdf PDF
BREMERTON CDRL 009-012 Rev1.pdf PDF
BREMERTON CDRL 041-044 Rev1.pdf PDF
BREMERTON CDRL 001-004 Rev1.pdf PDF
BREMERTON CDRL 013-016 Rev1.pdf PDF
BREMERTON CDRL 045-048 Rev1.pdf PDF
Bremerton Solicitation Rev 4.pdf PDF
BREMERTON CDRL 025-028 Rev1.pdf PDF
BREMERTON CDRL 037-040 Rev1.pdf PDF
BREMERTON CDRL 021-024 Rev1.pdf PDF
BREMERTON CDRL 005-008 Rev1.pdf PDF
BREMERTON CDRL 053-055 Rev1.pdf PDF
BREMERTON CDRL 029-032 Rev1.pdf PDF
Amendment 003.pdf PDF
BREMERTON ATTACHMENT J-2 Cost Element Summary Spreadsheets Rev 2.xlsx XLSX spreadsheet
BREMERTON ATTACHMENT J-1 Pre-Proposal Information Form Rev 2.xlsx XLSX spreadsheet
BREMERTON ATTACHMENT J-9 Government Furnished Vehicles.xlsx XLSX spreadsheet
BREMERTON ATTACHMENT J-20 - Quality Assurance Surveillance Plan.pdf PDF
BREMERTON ATTACHMENT J-2 Cost Element Summary Spreadsheets.xlsx XLSX spreadsheet
BREMERTON CDRL 021-024.pdf PDF
BREMERTON ATTACHMENT J-7 Janitorial Task and Frequency Chart.xlsx XLSX spreadsheet
BREMERTON CDRL 017-020.pdf PDF
BREMERTON CDRL 001-004.pdf PDF
BREMERTON CDRL 033-036.pdf PDF
BREMERTON ATTACHMENT J-14 Integrity Inspection.docx DOCX document
BREMERTON ATTACHMENT J-11 Cathodic Protection.docx DOCX document
BREMERTON CDRL 013-016.pdf PDF
BREMERTON CDRL 025-028.pdf PDF
BREMERTON ATTACHMENT J-10 TOOLS MATERIAL.xls XLS spreadsheet
BREMERTON ATTACHMENT J-3 List of assigned Vessels.xls XLS spreadsheet
BREMERTON CDRL 037-040.pdf PDF
BREMERTON CDRL 005-008.pdf PDF
BREMERTON ATTACHMENT J-4 Tank Soundings Template.xls XLS spreadsheet
BREMERTON ATTACHMENT J-6 History Folder Index.docx DOCX document
BREMERTON CDRL 009-012.pdf PDF
BREMERTON ATTACHMENT J-21 DD254 (BREMERTON).pdf PDF
BREMERTON ATTACHMENT J-8 GFE FROM ERP.xls XLS spreadsheet
BREMERTON ATTACHMENT J-13 Fire and Flood.docx DOCX document
BREMERTON CDRL 029-032.pdf PDF
BREMERTON ATTACHMENT J-1 Pre-Proposal Information Form.xlsx XLSX spreadsheet
BREMERTON CDRL 045-048.pdf PDF
BREMERTON CDRL 053-055.pdf PDF
BREMERTON ATTACHMENT J-22 INACTSHIPMAINTO BREMERTON Organizational Chart_.pdf PDF
BREMERTON ATTACHMENT J-16 Security Report.doc DOC document
BREMERTON ATTACHMENT J-19 PCB Inventory.doc DOC document
BREMERTON ATTACHMENT J-5 Repair Request Work Order (RRWO)(sample).docx DOCX document
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Periodicity:

Spec Code:

Berthed At:

Quarter:

NSTM 50 INSPECTION GUIDELINES

CO1

Insp Date:

TDL

Remarks N/A

NO

YES

Description Item CO2 cylinders are in place on board?

Check latest hydrostatic test data stamped on cylinder dome. Inspection card in place and up to date.

Hose and horn are free of deterioration and fittings are tight?

CO2 band and clamp assembly in satisfactory condition?

The extinguisher valve, handle, locking pin and D-ring are free of damage and corrosion?

Locking pin cannot be removed without breaking anti-pilferage seal? DO NOT BREAK SEAL CO2 Bottles (visual) FWD Draft:

AFT Draft:

List:

Comments:

Inspector Inspector Inspection Manager

Attachment 17 NSTM 50 INSPECTION GUIDELINES - Discrepancy Listing Spec Code:

Line Item # Location Discrepancy Discovery Dt Correction Dt

Periodicity:

Berthed At:

Quarter:

NSTM 50 INSPECTION GUIDELINES

CO2

Insp Date:

TDL

Remarks N/A

NO

YES

Description Item CO2 cylinders are in place on board?

Locking pin cannot be removed without breaking anti-pilferage seal? DO NOT BREAK SEAL CO2 cylinders are of proper weight?

CO2 Bottles (Weigh) FWD Draft:

AFT Draft:

List:

Comments:

Inspector Inspector Inspection Manager

NSTM 50 INSPECTION GUIDELINES - Discrepancy Listing

Line Item # Location Discrepancy Discovery Dt Correction Dt

File details come from the government source that posted it. Updated .