BREMERTON ATTACHMENT J-13 Fire and Flood.docx
DOCX document 649 KB Posted
- Solicitation number
- N00024-21-R-4202
About this file
This solicitation requests proposals for operation and maintenance of inactive vessels in Bremerton and a detachment in San Diego. Proposals are due by 5:00 PM on June 16, 2022. The solicitation was released by the Department of the Navy Naval Sea Systems Command. Offerors must provide all necessary services to operate and maintain the inactive vessels, including inspection and testing of fire and flood detection systems according to provided Navy standards. Inspections will cover circuit testing, alarm functionality, sensor placement and operation, and documentation of any discrepancies. The selected contractor will be responsible for maintenance and repair of all fire and flood protection equipment onboard the vessels.
View the file
Other files
Show 40 more
Latest 50 of 95 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Periodicity:
Spec Code:
Berthed At:
Quarter:
NSTM 50 INSPECTION GUIDELINES
FF1
Insp Date:
TDL
Remarks N/A
NO
YES
Description Item Check continuity of each heat, smoke and flood alarm circuit at the control panel. Record results below. Are all readings satisfactory?
Have all other discrepancies been reported? If not report them here.
F/F Continuity FWD Draft:
AFT Draft:
List:
Comments:
Inspector Inspector Inspection Manager Circuit Continuity Test Results SW No.
Cir Type K Ohm Test Location Sat Unsat SW No.
Cir Type K Ohm Test Location Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat Sat Unsat
Attachment 12 NSTM 50 INSPECTION GUIDELINES - Discrepancy Listing Spec Code:
Line Item # Location Discrepancy Discovery Dt Correction Dt
Berthed At:
Quarter:
NSTM 50 INSPECTION GUIDELINES
FF2
Insp Date:
TDL
Remarks N/A
NO
YES
Description Item Audible alarm and alarm light are activated by the test switch?
Is the power available light energized at all times except during continuity testing ?
Does test switch indicate proper vessel and alarm on remote monitoring computer; can alarm be silenced from remote monitoring computer?
Have all other discrepancies been reported? If not report them here.
Fire Panel FWD Draft:
AFT Draft:
List:
Comments:
Inspector Inspector Inspection Manager
Line Item # Location Discrepancy
Berthed At:
Quarter:
NSTM 50 INSPECTION GUIDELINES
FF3
Insp Date:
TDL
Remarks N/A
NO
YES
Description Item Activate all flooding sensors by tipping floats or shorting probes to check for proper operation.
Are sensor cutout switches numbered and chart present? Do cutouts isolate alarms circuit as indicated on chart?
All sensors operated mannually indicate proper vessel and location on remote monitoring systems.
Are Fire/Flood sensors correctly located in respect to electrical power and water tight sub-division of a ship?
Visual and audible alarms activate when the sensor is actuated.
Each fire wire heat sensor is activated.
Each smoke detector is activated using canned smoke to ensure its proper operation.
Have all other discrepancies been reported? If not report them here.
Flood Tip Float (MOB B) FWD Draft:
AFT Draft:
List:
Comments:
Inspector
Line Item # Location Discrepancy
Berthed At:
Quarter:
NSTM 50 INSPECTION GUIDELINES
FF4
Insp Date:
TDL
Remarks N/A
NO
YES
Description Item Visual and audible alarms activate when the sensor is actuated.
Activate all flooding sensors by tipping floats or shorting probes to check for proper operation.
Are sensor cutout switches numbered and chart present? Do cutouts isolate alarms circuit as indicated on chart?
All sensors operated mannually indicate proper vessel and location on remote monitoring systems.
Are Fire/Flood sensors correctly located in respect to electrical power and water tight sub-division of a ship?
Each heat sensor is activated using a hot air gun to ensure its proper operation. (exercise extreme caution to prevent damage to heat dectecting element due to overheating) Each smoke detector is activated using canned smoke to ensure its proper operation.
Have all other discrepancies been reported? If not report them here.
Flood Tip Float (Non MOB B) FWD Draft:
AFT Draft:
List:
Comments:
Inspector
Line Item # Location Discrepancy
File details come from the government source that posted it. Updated .