BREMERTON CDRL 005-008 Rev1.pdf
PDF 161 KB Posted
- Solicitation number
- N00024-21-R-4202
About this file
This Contract Data Requirements List (CDRL) outlines four required inspection reports for the operation and maintenance of inactive vessels in Bremerton and San Diego. The Navy seeks quarterly cathodic protection reports, monthly dehumidification reports, semi-annual integrity reports for Mobile Offshore Bases assets and annual reports for all others. Annual preservation inspection reports are also required for Category B and C vessels. The reports must be submitted within five days of inspection completion and input into the contractor's Inspection and Safety Management System, with the exception of dehumidification reports which the Navy will accept directly if its system is unavailable. Proposed prices for preparation and submission of the reports are to be included.
View the file
Other files
Show 40 more
Latest 50 of 95 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423, AUG 96
CONTRACT DATA REQUIREMENTS LIST
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page ____ of ____ Pages
| A_CONTRACT_LINE_ITEM_NO: |
| B_EXHIBIT: |
| TDP: Off |
| TIM: Off |
| OTHER: |
| D_SYSTEMITEM: |
| E_CONTRACTPR_NO: |
| FCONTRACTOR: |
| 1_DATA_ITEM_NO1: A005 |
| 2_TITLE_OF_DATA_ITEM1: Cathodic Protection Reports |
| 3_SUBTITLE1: |
| 4_AUTHORITY1: |
| 5_CONTRACT_REFERENCE1: C.5.2.5.2.2 / Attachment J-10 |
| 6_REQUIRING_OFFICE1: |
| 7_DD_250_REQ1: |
| 8_APP_CODE1: |
| 9_dist1: |
| 10_FREQUENCY1: quarterly/semi-ann/ann |
| 11_AS_OF_DATE1: see blk 16 |
| 12_DATE_OF_FIRST_SUB1: see blk 16 |
| 13_DATE_OF_SUBSEQUENT_SUB1: see blk 16 |
| addr1_1: COR |
| draft1_1: |
| reg1_1: 1 |
| repro1_1: |
| addr1_2: |
| draft1_2: |
| reg1_2: |
| repro1_2: |
| addr1_3: |
| draft1_3: |
| reg1_3: |
| repro1_3: |
| 15_TOTALReg1: 1 |
| 15_TOTALRepro1: 0 |
| 16_REMARKS1: Shall be prepared and input into the ISMS inspection program within 5 workdays of completion of inspection. |
| 17_PRICE_GROUP1: |
| 18_totalprice1: |
| 1_DATA_ITEM_NO2: A006 |
| 2_TITLE_OF_DATA_ITEM2: Dehumidification Inspection Reports |
| 3_SUBTITLE2: |
| 4_AUTHORITY2: |
| 5_CONTRACT_REFERENCE2: C.5.2.5.2.3 / Attachment J-11 |
| 6_REQUIRING_OFFICE2: |
| 7_DD_250_REQ2: |
| 8_APP_CODE2: |
| 9_dist2: |
| 10_FREQUENCY2: monthly/quarterly/ann |
| 11_AS_OF_DATE2: see blk 16 |
| 12_DATE_OF_FIRST_SUB2: see blk 16 |
| 13_DATE_OF_SUBSEQUENT_SUB2: see blk 16 |
| draft2_1: |
| addr2_1: COR |
| addr2_2: |
| reg2_1: 1 |
| repro2_1: |
| addr2_3: |
| draft2_3: |
| reg2_3: |
| repro2_3: |
| 15_TOTALReg2: 1 |
| 15_TOTALRepro2: 0 |
| 16_REMARKS2: Shall be prepared and input into the ISMS inspection program within 5 workdays of completion of inspection. Should government program not be available, Contractor will be responsible for providing report. |
| 17_PRICE_GROUP2: |
| 18_totalprice2: |
| 1_DATA_ITEM_NO3: A007 |
| 2_TITLE_OF_DATA_ITEM3: Integrity Inspection Reports |
| 3_SUBTITLE3: |
| 4_AUTHORITY3: |
| 5_CONTRACT_REFERENCE3: C.5.2.5.2.5 / Attachment J-13 |
| 6_REQUIRING_OFFICE3: |
| 7_DD_250_REQ3: |
| 8_APP_CODE3: |
| 9_dist3: |
| 10_FREQUENCY3: semi-annual/annual |
| 11_AS_OF_DATE3: as required |
| 12_DATE_OF_FIRST_SUB3: as required |
| 13_DATE_OF_SUBSEQUENT_SUB3: as required |
| 16_REMARKS3: Shall be prepared and entered into the ISMS inspection program within 5 workdays of completion of inspection. Semi-annual for MOB B assets and annually for all others. |
| addr3_1: COR |
| addr3_2: |
| addr3_3: |
| draft3_1: |
| reg3_1: 1 |
| repro3_1: |
| draft3_2: |
| reg3_2: |
| repro3_2: |
| draft3_3: |
| reg3_3: |
| repro3_3: |
| 15_TOTALReg3: 1 |
| 15_TOTALRepro3: 0 |
| 15_total_Draft3: 0 |
| 15_total_Draft2: 0 |
| 15_total_Draft1: 0 |
| 17_PRICE_GROUP3: |
| 18_totalprice3: |
| 1_DATA_ITEM_NO4: A008 |
| 2_TITLE_OF_DATA_ITEM4: Preservation Inspection Report |
| 3_SUBTITLE4: |
| 4_AUTHORITY4: |
| 5_CONTRACT_REFERENCE4: C.5.2.5.2.7 / Attachment J-3 |
| 6_REQUIRING_OFFICE4: |
| 7_DD_250_REQ4: |
| 8_APP_CODE4: |
| 9_dist4: |
| 10_FREQUENCY4: annually |
| 11_AS_OF_DATE4: as required |
| 13_DATE_OF_SUBSEQUENT_SUB4: as required |
| 12_DATE_OF_FIRST_SUB4: as required |
| 16_REMARKS4: Shall be prepared and submitted annually for all Category "B" and "C" vessels. |
| addr4_1: COR |
| draft4_1: |
| reg4_1: 1 |
| repro4_1: |
| addr4_2: |
| draft4_2: |
| reg4_2: |
| repro4_2: |
| addr4_3: |
| draft4_3: |
| reg4_3: |
| repro4_3: |
| 15_total_Draft4: 0 |
| 15_TOTALReg4: 1 |
| 15_TOTALRepro4: 0 |
| 17_PRICE_GROUP4: |
| 18_totalprice4: |
| G_PREPARED_BY: |
| H_DATE: |
| J_DATE: |
| Page: 1 |
| Reset: |
| I_APPROVED_BY: |
| pages: 1 |
| draft2_2: |
| repro2_2: |
| reg2_2: |
File details come from the government source that posted it. Updated .