About this file

This document contains instructions and templates for submitting Specification Change Recommendations (SCRs) to the Department of the Navy for the T-ARC(X) Cable Ship Replacement program. Interested offerors should use the provided SCR Master List and SCR Form templates to identify needed changes to the requirements and specifications for the T-ARC(X) and submit them to the Navy for consideration. The SCR Form requires offerors to provide identifying information for the recommended change, a description of the change and rationale, impacts and costs, views on the current and proposed language, and any dependent SCRs. If approved, major SCRs would require significant design changes while minor SCRs could be incorporated with minimal impact. The Navy will evaluate SCR submissions on an ongoing basis during the development of the T-ARC(X) technical specifications.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00024-20-R-2211

ATTACHMENT J-4

ATTACHMENT J-4

T-ARC(X) SPECIFICATION CHANGE RECOMMENDATION (SCR) FORM INSTRUCTIONS

SCR Master List (List of all SCRs submitted to date. Submit an updated version with each SCR.)

1. SCR Number (Contractor Name Initials - #. Must be sequential such that the number will reflect the total number of SCRs submitted by the Contractor as of that SCR submittal)

2. Title (Short title for Change Recommendation)

3. Date of SCR Submittal

4. Company Name

5. Affected Section & Paragraph

6. Change Level “Major” – When the SCR would require significant changes to the ship design being developed if approved at a later stage of the Contractor’s design maturation “Minor” – When the SCR can be worked into the Contractor’s ship design being developed without significant change if approved at a later stage of the design maturation

7. SCR Technical Point of Contact (POC) First and Last name Office Phone Email Address

SCR Form (Complete for each CR.)

1. SCR Number (Contractor Name Initials - #)

2. Title (Short title for Change Recommendation)

3. Date of SCR Submittal

4. Company Name

5. Affected Section & Paragraph

6. Change Level (Major or Minor)

7. DECRIPTION: shall contain the summary narrative description of the recommended SPEC change including rationale and anticipated acquisition and/or lifecycle cost savings.

8. PROS & CONS: summary of pros and cons of the recommendation.

9. IS/WAS views of the SPEC language change

10. SWBS AFFECTED: Ship Work Breakdown Sequence (SWBS) area – list all SWBS areas impacted in 3 digit SWBS format with a narrative explanation of impact to each SWBS area impacted

11. DEPENDENT SCR#: If the SCR is dependent on one or more other SCRs (i.e. both/all must be approved to effect the Contractor’s intent), the other SCR(s) shall be identified in this block with an explanation of the dependency.

T-ARC(X) SPECIFICATION CHANGE RECOMMENDATION FORM (SCR)

Master List

SCR #
Title
Date

Submitted

Company
Affected Section & Paragraph
Change Level
Technical

POC

Company initial - #
title
YYYYMMDD
Name
Major or Minor
Name

Phone Email

T-ARC(X) SPECIFICATION CHANGE RECOMMENDATION FORM (SCR)

Summary Sheet

SCR #
Title
Date
Company
(Company Initials - #)
(Enter Title)
(YYYY/MM/DD)
(Name)

Affected Section & Paragraph

Description:
Level of Change: Major or Minor
Pros:
Cons:
Is:
Was:
SWBS Affected:
Dependent SCR#

DISTRIBUTION STATEMENT A: Approved for public release. Distribution unlimited.