TARC RFP FINAL 17 Jul 2020.pdf

PDF 1 MB Posted

Attached to
Navy Cable Ship Replacement T-ARC(X) Federal contract opportunity
Solicitation number
N00024-20-R-2211
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This request for proposal solicits proposals for Phase I of the Navy Cable Ship Replacement T-ARC(X) program. Interested parties should respond with their proposals by 2:00 PM EST on August 18, 2020. The Navy seeks industry studies to identify cost-effective design solutions for the replacement cable ship. Offerors must have the capability to construct the vessels. Studies will analyze cable stowage and handling, sea plow and ROV systems, a moonpool design, and objective trade studies. Deliverables include design reports, drawings, analyses, cost estimates and a schedule. The contractor will receive payments upon government acceptance of deliverables according to a schedule of payable events. Engineering and industrial services may also be ordered to support the program.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local time

X

A X B X C X D

EX

X

G F 71 - 78

79 - 93 X H 94 - 99 roxie.thomas@navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

D0-A3 1 99

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00024 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

ROXIE P. THOMAS (202) 781-5331

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 4

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

5 - 23

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

25 - 26

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 28 - 37 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 38 - 43 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

44 - 69

PART II - CONTRACT CLAUSES

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2020

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

N0002420NR53116

5. DATE ISSUED

17 Jul 2020

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0002420R2211

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

CLIN

Number

Each

T-ARC(X) Industry Studies

FFP

See Note A FOB: Destination

PURCHASE REQUEST NUMBER: N0002420NR53116

PSC CD: 1925

NET AMT

Data for CLIN 0001

FFP

Data for CLIN 0001 and if Exercised CLIN 0003 (See Note A and E) FOB: Destination

Special Studies (PIO)

FFP

Analyses and reviews in support of T-ARC(X) (See notes B, C and D) FOB: Destination

NOTES

SECTION B

SECTION B – NOTES

NOTE A: The total price of all SLINs under CLIN 0001 shall not exceed $4,000,000. Based on available funding the Government is limited to $4,000,000 per contract to fund the CLIN 0001 Navy Cable Ship T-ARC (X).

Therefore, in accordance with the requirements of Section M of this RFP, the price an Offeror proposes for CLIN 0001 shall not exceed $4,000,000.

NOTE B: Option Items, to which the option clause in Section I applies and which is to be supplied only if and to the extent said option is exercised. The Government is not obligated to order any or all of these items. Exercise of one option will not obligate the Government to the exercise of other options.

NOTE C: Approximately 2,000 man-hours of labor will be needed for CLIN 0003. This is an estimate and does not indicate that the Government will necessarily order this amount or any at all. In the table below, enter the applicable hourly labor rate for each Government fiscal year, which will apply to any work ordered under this item.

CLIN 0003 Special Studies & Documentation Fiscal Year

Fully Burdened Rate Supervisory ($ per Hour)

Fully Burdened Rate Sr. Engineer ($ per Hour)

Fully Burdened Rate Engineer ($ per Hour)

2021 TBD TBD TBD

2022 TBD TBD TBD

NOTE D: Provisional amounts are subject to adjustment under the clause of this contract entitled “PROVISIONED ITEMS ORDER (PIO)” for supplies or other requirements ordered pursuant to said clause. The amounts shown are for planning purposes only. Amount in actual orders, if any orders are issued, will be individually priced. All orders hereunder are to be firm-fixed price.

NOTE E: Item 0002 is Not Separately Priced (NSP) and is included in the cost of CLIN 0001 and if Exercised

CLIN 0003.

Section C - Descriptions and Specifications

STATEMENT OF WORK

PART 1 – GENERAL STATEMENT OF WORK

PART 2 – CONTRACT LINE ITEM NUMBER (CLIN) DESCRIPTIONS

PART 3 – STATEMENT OF WORK FOR INDUSTRY STUDIES AND DOCUMENTATION

PART 4 – STANDARD CLAUSES

C-1. PART 1: GENERAL STATEMENT OF WORK

C.1.1 - INTRODUCTION

The Navy Cable Ship T-ARC(X) Program is a replacement for the Navy’s only undersea cable installation and repair ship, USNS ZEUS (T-ARC 7). This ship’s primary mission is to transport, install, retrieve, and repair undersea cables and equipment, with additional missions of conducting acoustic, hydrographic and bathymetric surveys, towing projectors, and deploying and recovering UUVs and packages through the moonpool.

In accordance with the T-ARC(X) System Specification, Attachment J-1, the statement of work, the terms and conditions of the contract, and the other documents listed in Section J, the Contractor shall perform Industry Studies for the T-ARC(X) Cable Ship to perform capability and cost trade studies in key areas, investigate options to maximize affordability and producibility, and develop concept designs. Objectives are (1) to identify cost effective design solutions by leveraging commercial designs and shipbuilder experience and standards; and (2) inform System Specification and its development.

The Contractor shall select an existing design or develop a new design to use as a baseline, as described in Section C.3.4.1, to represent a ship meeting the requirements of the T-ARC(X) System Specification, Attachment J-1.

While the stated goal of the industry studies is to identify cost effective design solutions, the Contractor will make every effort to identify other areas of production, documentation, and testing to reduce the acquisition cost of the vessels. For the purpose of this effort, the Contractor is to assume a maximum T-ARC(X) construction cost (fiscal year 2023) of $340M, excluding non-recurring engineering and profit. This assumption is for guidance only, and is in no way an indication, assurance, or guarantee of current or future availability or amount of funding, if any.

The Contractor shall place emphasis on the use of commercially available, non-developmental and proven technologies. Component commonality with other Military Sealift Command ships is desirable.

Due to the nature of the scope of work for this effort, the Government requires that the successful Contractor have the demonstrated capability and facilities to construct the TARC vessels; therefore, the resultant contract for this solicitation will only be awarded to teams with a member that has production facilities capable of constructing a T-ARC(X).

The Contractor shall provide, and the Government will retain, rights in technical data developed under this contract per DFARS 252.227-2003. As such, future solicitations may contain some or all of the recommendations and conclusions made based on analyses and studies produced by the Contractor under this contract. Business sensitive data such as financial reporting and shipyard capability information may be marked as “proprietary”, where such proprietary marking is justified by the Contractor and approved by the Government. Any proprietary or sensitive business data provided by the Contractor via a deliverable must be marked appropriately and will not be shared with other industry participants. All commercial and non-commercial data delivered must be marked with the technical data rights appropriately asserted by the Contractor. Assertions must be made in accordance with DFAR 52.227- 7013 and 52.227-7017.

The metric system of measurement (International System of Units (SI)) shall be used for technical efforts and related documents, except where necessary to interface with existing English unit equipment or systems. Where existing technical documents are in English units for equipment or systems, conversion of the documentation to metric system need not be performed.

The Contractor’s obligation to perform this contract is in no way conditioned upon the Government providing any facilities, material, property, equipment, services, or information, except as may be otherwise expressly provided herein.

The Contractor shall prepare and deliver the data items required by the Data Requirements List (DRL), Attachment J-2. Note: Deliverables are listed in italics in the SOW.

C-2. PART 2: CONTRACT LINE ITEM NUMBER (CLIN) DESCRIPTIONS

C.2.1 - CLIN 0001 Industry Studies

The Contractor shall furnish all resources necessary to perform Industry Studies for T-ARC(X) in accordance with contract requirements. The effort shall be in accordance with the requirements of the Contract, including attachments, revisions and modifications thereto including the following:

a) The provisions of this Contract

b) T-ARC(X) System Specification, Attachment J-1

c) Other documents, exhibits, and attachments listed with the requirements of the Contract; and

d) All revisions and modifications thereto.

The Contractor shall provide the management effort necessary to ensure the on-schedule completion of Industry Studies.

C.2.2 - CLIN 0002 Data for CLIN 0001 (not separately priced)

The Contractor shall prepare and deliver the data items required by the Data Requirements List (DRL), Attachment J-2. The Contractor shall submit all required data in digital format in accordance with Attachment J-7, Integrated Digital Environment Site Access and Public Key Infrastructure/Information Assurance Awareness Attributes. This item is Not-Separately Priced (NSP).

C.2.3 - CLIN 0003 (If Exercised) T-ARC(X) Special Studies

The Contractor shall provide up to 2,000 man-hours to perform special studies, design, analyses, and reviews as Additional Government Requirements in support of the T-ARC(X) program. These Additional Government Requirements are over and above that specified in other contract line item numbers (CLINs). Orders for this effort shall be placed in accordance with the General Requirement in SECTION C of this contract entitled

“PROVISIONED ITEMS ORDER”.

C-3. PART 3: STATEMENT OF WORK FOR INDUSTRY STUDIES AND DOCUMENTATION

C.3.1 - SINGLE SYSTEMS VENDOR (SSV) AND CONSULTANTS

C.3.1.1 – PROPULSION SINGLE SYSTEMS VENDOR (SSV)

The Contractor shall select and obtain the services of the Propulsion Single System Vendor (SSV) no later than the second Design Review. Shipyards are prohibited from acting as the Propulsion SSV. The Propulsion SSV shall have a minimum of five (5) years corporate experience in the design and integration of marine propulsion plants and controls, including mechanical drive and integrated electric propulsion systems, passive/active filters for electric systems, and shall have experience as a supplier of electrical control system equipment for this type of application.

The Propulsion SSV shall be responsible for integrating into the overall design the following, where applicable:

1. Propulsion diesel engines

2. Reduction gear systems, as necessary (including couplings and clutches)

3. Propulsion shaft assemblies, bearings, seals, couplings, and shaft locks/brakes

4. Main propulsion motors, drives (including passive/active filters), propulsion motor controllers, AC/DC Electronic Power Conversion and interconnecting cabling

5. Propulsion thrusters (including azimuthing and podded systems) and associated support services (air, water, lubrication)

6. Thruster motors, drives, motor controllers and interconnecting cabling

7. Propulsors

8. Diesel generator sets, emergency generator sets, and controls

9. Switchboard (including main, emergency, and auxiliary), major load centers, transformers, motor generators, and isolation transformers

10. Machinery Centralized Control System (MCCS), including the Main Control Console (MCC) and Ship Control Console (SCC) controls, displays and mimics, including propulsion bridgewing consoles

11. Dynamic Positioning Systems (DPS)

12. Condition Based Monitoring (CBM) systems

C.3.1.2 – CABLE SYSTEM CONSULTANT(S)

The Contractor shall select and obtain the services of a Cable Systems Consultant(s) no later than the first Design Review. The Cable Systems Consultant(s) shall have a minimum of ten (10) years’ experience in cable ship operations at sea and/or in the design and installation of cable laying and repairing equipment and cable handling and stowage arrangements on cable ships. The CSC shall have experience in cable installation, cable repair, cable burial via plow, PLIB operations by ROV, cable loading and offloading, cable machinery function and arrangement, and a knowledge of cable ship layout and design, cable splicing/jointing, and cable mission planning.

The Contractor is prohibited from being the Cable System Consultant(s).

The Cable Systems Consultant(s) shall work closely with the Contractor and other subcontractors and vendors to support cable system design including cable handling equipment selection and layout, cable tank design, Cable Highway layout, cable pathway layout, cable loading configurations, Sea Plow and Sea Plow LARS selection and arrangement, and ROV and ROV LARS selection and arrangement.

C.3.1.3 – NOISE CONTROL CONSULTANT(S)

The Contractor shall select and obtain the services of a Noise Control Consultant no later than the second esign Review. The Contractor is prohibited from acting as the Noise Control Consultant. The Noise Control Consultant(s) shall have a minimum of five (5) years corporate experience in ship noise analysis and the development of the acoustic designs and treatments. The acoustic designs and treatments will address minimizing ship's noise, including airborne and structure-borne noise impacting habitability, vibration, and self-noise impacting the operation of sonar systems.

The Contractor and their Noise Control Consultant shall establish and maintain an overall ship's noise control program. Where design detail is insufficient, empirical data and vendor-supplied information may be used to develop the noise control program and related analyses. The Contractor shall include this data in the affected reports.

C.3.2 - MEETINGS AND REVIEWS

C.3.2.1 – POST-AWARD CONFERENCE

The Contractor shall participate in a Post Award Conference (PAC) within 30 days after contract award (details will be provided by the Government at time of contract award). The purpose of the conference is to (1) review the contract and technical documents, (2) review the technical and schedule requirements including the schedule of Design Reviews, (3) discuss the roles and working relationships between the Contractor and the Government and (4) answer Contractor questions. Representatives from each firm on the Contractor’s team shall attend. The Contractor shall prepare Post Award Conference Agenda, Presentation, and Minutes (A001).

C.3.2.2 - DESIGN REVIEWS AND TECHNICAL EXCHANGE MEETINGS

The Contractor shall conduct Design Reviews (DRs) quarterly after the PAC through the end of Industry Studies.

The purpose of the DRs is for the Contractor to address adherence to contractual requirements, report study progress, anticipated problems and other related matters. If the Government places orders against Item 0003, the Government will determine if additional DRs are required and dates for those DRs. The Contractor shall prepare Design Review Agendas, Presentations, and Minutes (A002) of each DR and provide copies of all information presented. The Contractor’s design agent (if used), SSV, Noise Control Consultant, and Cable Systems Consultants shall attend all DRs. Each DR shall be held at the Contractor’s facility or, at the Government’s option may be held at a Government facility in Washington, D.C. or via Video-Teleconference.

The Contractor shall conduct one Technical Exchange Meeting between each Design Review, beginning after the PAC. The purpose of the Technical Exchange Meetings is for the Contractor to discuss current risk areas and design issues with the Government. Each Technical Exchange Meeting shall be held via Video-Teleconference. The Contractor shall prepare and provide Technical Exchange Meeting Minutes (A002) of each Technical Exchange Meeting.

C.3.2.3 - DESIGN MATURITY ASSESSMENT (DMA)

The Contractor shall conduct a Design Maturity Assessment (DMA) concurrently with the final DR to present the DMA portion of the Design Summary Report.

A summary of the design and review of the documentation shall be presented during the reviews.

The Contractor shall conduct the PAC and DRs per the schedule below.

Table 1: Industry Studies Conferences and Reviews Month1 1 2 3 4 5 6 7 8 9 10 11 12 Post Award Conference2 X Design Reviews X X X X Design Maturity Assessment X

Note 1: Months are measured from CLIN 0001 award and indicate latest date an event may be scheduled.

Note 2: This event shall be held only once following CLIN 0001 award.

C.3.3 - PROJECT MANAGEMENT AND SCHEDULING

The Contractor shall provide project management services necessary to ensure the on-schedule completion of all the work associated with this contract. A Management Plan (A003) and a Master Schedule (A004) shall be prepared and provided. The Contractor shall identify and maintain visibility of all problems and potential problems arising during contract performance.

C.3.4 - INDUSTRY STUDIES

The Contractor shall perform industry studies to develop design solutions for the T-ARC(X) Program as specified herein. The Government is interested in proposed systems and approaches that meet the mission requirements and offer cost effective design solutions. Modifying an existing baseline design or developing a new design are acceptable approaches.

The Contractor may be required to consult with regulatory bodies during contract performance. Regulatory bodies include but are not limited to ABS, USCG, IMO, and EPA. The Contractor shall provide copies of all outgoing and incoming Regulatory Body Communications and Correspondence (A005) between the Contractor and regulatory bodies.

C.3.4.1 - BASELINE DESIGN DESCRIPTION REPORT

The Contractor shall establish a baseline design that represents a ship meeting the requirements of the System Specification, Attachment J-1. The Contractor shall prepare a Baseline Design Description Report (A006).

C.3.4.1.1 - REGULATORY GAP ANALYSIS STUDY

The Contractor shall perform a Regulatory Gap Analysis Study Report (A007) to identify potential design changes needed in order to become ABS classed to the latest ABS MVR. Any other significant gaps with other regulatory body requirements shall also be addressed.

C.3.4.1.2 - EMERGENT REGULATIONS STUDY

The Contractor shall perform a study to evaluate options for complying with applicable emergent regulations. The Emergent Regulations Study Report (A008) shall address the design impacts, acquisition, and lifecycle cost of emergent regulations.

C.3.4.2 - DESIGN STUDIES

The Contractor shall perform the individual design studies listed in Sections C.3.4.2.1 through C.3.4.2.6. Within each study the Contractor shall propose a design solution to meet the requirements of the T-ARC(X) System Specification, Attachment J-1.

For each study, the Contractor shall prepare a Study Report that describes the proposed design solution and resulting impacts to the baseline design. The Contractor shall include a description of the study methodology and assumptions, and alternatives considered.

C.3.4.2.1 – CABLE STOWAGE AND HANDLING STUDY

The Contractor shall prepare a Cable Stowage and Handling Study Report (A009-01).

The following data shall be provided:

- Cable Stowage and Handling Drawing (A009-02)

- Cable Gear Stowage and Handling Drawing (A009-03)

C.3.4.2.2 – SEA PLOW SYSTEM STUDY

The Contractor shall prepare a Sea Plow System Study Report (A010-01) that provides the design solution to meet the System Specification requirement to launch and recover the Sea Plow over the stern through SS5.

- Sea Plow System Arrangement (A010-02)

C.3.4.2.3 – REMOTE OPERATED VEHICLE (ROV) SYSTEM STUDY

The Contractor shall prepare an ROV System Study Report (A011-01) that provides the design solution to meet the System Specification requirement to launch and recover the ROV through sea state 5.

The following data shall be provided:

- ROV System Arrangement (A011-02)

C.3.4.2.4 - MOONPOOL STUDY

The Contractor shall prepare a Moonpool Study Report (A012-01). The Contractor shall perform a study to develop a moonpool design solution capable of launching and recovering the UUV and launching the Package through SS3, per the System Specification.

The Contractor shall provide a seakeeping analysis of the moonpool.

The Contractor shall provide an analysis that predicts the amount of air venting that is required to stay within the pressure threshold as defined in Attachment J-1, System Specification.

- Moonpool Arrangement (A012-02)

- Moonpool LARS Arrangement (A012-03)

C.3.4.2.5 - INTEGRATION STUDY

The Contractor shall perform a study to assess the impacts and effects of the design solutions in Sections C.3.4.2.1- C.3.4.2.4. The Contractor shall analyze how the proposed design solutions are integrated and identify any compatibility issues or compounding impacts.

The Contractor shall discuss how the systems and arrangements required for additional missions (moonpool operations, acoustic, hydrographic and bathymetric surveys, and towing projectors) do not interfere with the ship’s primary cable installation and repair mission. Any integration issues related to interfaces between primary and additional missions shall be explained.

The Contractor shall prepare an Integration Study Report (A013) that documents the results of their analysis and the methodology and assumptions used.

C.3.4.2.6 - OBJECTIVE TRADE STUDIES

The Contractor shall perform trade studies on the following objectives:

C.3.4.2.6.1 – UNREFUELED RANGE OBJECTIVE TRADE STUDY

The Contractor shall perform a study to assess the design and cost impacts of a 17,500 nm unrefueled range at 15 knots in calm seas. The Contractor shall prepare an Unrefueled Range Objective Trade Study Report (A014-01).

C.3.4.2.6.2 – DRY MOONPOOL OBJECTIVE TRADE STUDY

The Contractor shall perform a study to assess the design and cost impacts of a dry moonpool and prepare a Dry Moonpool Objective Trade Study Report (A014-02).

C.3.4.2.6.3 – SEA STATE 5 MOONPOOL OBJECTIVE TRADE STUDY

The Contractor shall perform a study to assess the design and cost impacts of moonpool operations through Sea State 5 and prepare a Sea State 5 Moonpool Objective Trade Study Report (A014-03).

C.3.4.3 - AFFORDABILITY STUDIES

C.3.4.3.1 – SYSTEM SPECIFICATION REVIEW FOR ACQUISITION AND LIFEYCLE COSTS

The Contractor shall review Attachment J-1 T-ARC(X) System Specification to identify requirements, other than those listed in Attachment J-3 Key Requirements Verification Matrix, that are potential cost drivers and could significantly increase acquisition and/or lifecycle costs, and submit resulting Specification Change Recommendations (A015) (SCRs) using the form provided as Attachment J-4. The Contractor acknowledges and agrees that the government is under no obligation to approve or implement a SCR and that the Contractor design will need to be capable of being matured to adhere to the Specification provided under this contract.

C.3.4.3.2 - AFFORDABILITY STUDY

The Contractor shall review its design for approaches, methods, and trade-offs that will improve affordability and producibility of the ship during construction and during service life without impacting the requirements listed in Attachment J-3 Key Requirements Verification Matrix and prepare an Affordability Study Report (A016).

C.3.4.4 – SHIP DESIGN DEVELOPMENT

C.3.4.4.1 - GENERAL

The shipbuilder shall furnish the necessary resources to complete a Ship Design Development (SDD) Study Effort and prepare and provide deliverables in accordance with the SDD Studies Data Requirements List (DRL), Attachment J-2. The design effort shall meet the requirements of the T-ARC(X) System Specification Attachment J-1, and other requirements of this contract.

C.3.4.4.2 - DRAWINGS

The Contractor shall prepare the following drawings:

General Arrangement (A017-01) Hull Lines Drawing and Offsets Database (A017-02) Appendage Drawing (A017-03) Midship Section Drawing (*) (A017-04) Hull Deck, Platform and Longitudinal Bulkhead and Superstructure Scantling Drawings (*) (A017-05) Sonar System Arrangement (A017-06 Deck Systems Arrangement (A017-07)

The Contractor shall submit drawings marked with (*) to ABS for review (approval not needed during Industry Studies).

C.3.4.4.3 – AREA/VOLUME AND TANKAGE REPORT

The Contractor shall prepare an Area/Volume and Tankage Report (A018).

C.3.4.4.4 – HABITABILITY AND SPECIAL PURPOSE SPACES DESIGN REPORT

The Contractor shall prepare a Habitability and Special Purpose Spaces Design Report (A019) including sample space arrangements.

C.3.4.4.5 – WEIGHTS AND STABILITY

The Contractor shall prepare a Weight Control Plan (A020).

The Contractor shall prepare a three-digit SWBS Weight Estimate (A021).

The Contractor shall prepare an Intact and Damage Stability Report (A022). The Contractor shall submit the report to ABS for review (approval not needed during Industry Studies).

C.3.4.4.6 - HULL FORM AND HYDRODYNAMICS

The Contractor shall perform a speed and power analysis consisting of the powering characteristics of the hullform selected at the Full Load Departure condition. The Contractor shall prepare a Speed and Power Report (A023) to document the results of the analysis.

The Contractor shall perform a seakeeping performance analysis and prepare a Seakeeping Performance Report (A024) to document the results of the analysis.

The Contractor shall perform a maneuvering performance analysis and prepare a Maneuvering Performance Report (A025) to document the results of the analysis.

The Contractor shall perform a dynamic positioning system (DPS) Performance Analysis and prepare a Dynamic Positioning System Performance Report (A026) to document the results of the analysis.

The Contractor shall perform a Bubble Sweepdown Computational Fluid Dynamics (CFD) Analysis and prepare a Bubble Sweepdown Computational Fluid Dynamics Report (A027) to document the results of the analysis.

C.3.4.4.7 - MODEL TEST PROGRAM

The Contractor shall prepare a Model Test Plan (A028).

The Contractor shall conduct model tests in accordance with Appendix B of the T-ARC(X) System Specification (Attachment J-1), including construction of all hull and propeller models. The Contractor shall prepare a Model Test Report (A029) for each model test.

The Contractor shall prepare Model Test Data, Video and Photographs (A030) of the model(s) during model testing.

The Contractor shall maintain and warehouse all models and test articles used in testing through completion of industry studies. The Contractor shall provide thirty (30) days notification for each model test event such that the Government team can arrange for representative(s) to witness all tests.

C.3.4.4.8 – STRUCTURES REPORTS

The Contractor shall prepare structural drawings which shall be consistent with weight estimates and Regulatory Body requirements:

Hull Girder Longitudinal Strength Analysis Report (A031) Structural Design Criteria Report (A032)

The Contractor shall submit these reports to ABS for review (approval not needed during Industry Studies).

C.3.4.4.9 – MAIN MACHINERY STUDY

The Contractor/Propulsion SSV shall prepare a Main Machinery Study Report (A033-01). The design shall comply with current Buy American provisions, including subsection (a) of 10 U.S.C. 2534 regarding domestic source limitations on air circuit breakers, steering controls, pumps, propulsion and machinery control systems. Bow thruster selection shall consider moonpool location, sonar locations, noise requirements, and performance in higher sea states and speeds.

The following data shall be prepared:

Machinery Space Arrangement (A033-02) Major Equipment List (A033-03) Electric Power Load Analysis (A033-04) Electrical One-Line Block Diagram (A033-05) Endurance and Annual Fuel Consumption Calculations (A033-06)

C.3.4.4.10 - AUXILIARY SYSTEMS

The Contractor shall prepare an Auxiliary, Firefighting, and HVAC Systems Design Report (A034).

C.3.4.4.11 – ACOUSTIC, NOISE AND VIBRATION CONTROL

The Contractor and Noise Control Consultant shall provide a Noise Control Approach Report (A035).

C.3.4.4.12 - CORROSION PREVENTION AND CONTROL PLAN

The Contractor shall prepare a Corrosion Prevention and Control Plan (A036).

C.3.4.4.13 –DESIGN SUMMARY REPORT

The Contractor shall prepare a Design Summary Report (A037), including the DMA.

C.3.4.4.14 - COST ESTIMATES

The Contractor shall prepare procurement cost estimates using the results of their design. The Contractor shall prepare Cost Estimates (A038).

C.3.4.4.15 – NOTIONAL DETAIL DESIGN & CONSTRUCTION SCHEDULE

The Contractor shall prepare a Notional Detail Design and Construction Schedule (A039).

CLAUSES INCORPORATED BY FULL TEXT

C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)

The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.

(End of text)

C-202-H002 ADDITIONAL DEFINITIONS–ALTERNATE I (NAVSEA) (OCT 2018)

(a) Department - means the Department of the Navy.

(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.

(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(e) NAVSEA 08 - means the Deputy Commander, Nuclear Propulsion Directorate, Naval Sea Systems Command of the Department of the Navy.

(f) Lead Shipbuilder, Lead Yard or Lead Shipyard - mean (List contractor) in its capacity as Contractor under Contract No. (List Contract) for the construction of the (List first ship of the class).

(g) Follow Shipbuilder, Follow Yard or Follow Shipyard - mean a prime contractor performing a contract for the construction of follow ships of the (List ship class) Class.

(h) Lead Ship or First Ship of the Class - mean the (List first ship.)

(i) Follow Ship – means any ship of the (List class) Class other than the first ship.

(j) Design Agent - means (List contractor) in its capacity as Design Agent, not in its capacity as shipbuilding contractor.

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)

(OCT 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)

(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal Contractor to Fill In dated Contractor to Fill In in response to Solicitation No. N00024-20-R-2211

(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.

C-217-H001 PROVISIONED ITEMS ORDERS--BASIC (NAVSEA) (OCT 2018)

(a) General. The Contractor agrees that it will furnish the supplies or services ordered by the Government in accordance with the procedures specified herein. Orders will be placed by the Contracting Officer, Provisioning Activity or Administrative Contracting Officer as unilateral or bilateral modifications to this contract on SF 30, Amendment of Solicitation/Modification of Contract. Any amounts shown in Section B at time of award of the initial contract for each provisioned line item are estimated amounts only and are subject to upward or downward adjustment by the issuing activity. If no amounts are shown, funding will be obligated before or at time of order issuance. It is understood and agreed that the Government has no obligation under this contract to issue any orders hereunder.

(b) Priced Orders. For each proposed order, the Contractor agrees that it will submit such cost or pricing data as the Contracting Officer may require. Promptly thereafter, the Contractor and the Contracting Officer shall negotiate the price and delivery schedule for the proposed order. Upon execution and receipt of the priced order, the Contractor shall promptly commence the work specified in the order.

(c) Undefinitized Orders. Whenever the Contracting Officer determines that urgent demands or requirements prevent the issuance of a priced order, he/she may issue an unpriced order. Such order may be unilateral or bilateral and shall establish a limitation of Government liability, a maximum ceiling amount, and a schedule for definitization, as described in subparagraph (e)(2) below. Upon request the Contractor shall submit a maximum ceiling amount proposal before the undefinitized order is issued. The maximum ceiling amount is the maximum price at which the order may be definitized. The Contractor shall begin performing the undefinitized order upon receipt, except as provided in paragraph (d) below. The clause entitled "Contract Definitization" (DFARS 252.217- 7027) shall be included in any undefinitized order.

(d) Rejection of Unilateral Orders. The Contractor may reject any unilateral order if the Contractor determines that it cannot feasibly perform the order, or if the Contractor does not concur with the maximum ceiling amount.

However, each unilateral order shall be deemed to have been accepted by the Contractor unless within fifteen days of issuance of the order, the Contractor notifies the Contracting Officer in writing of its rejection of the order.

(e) Definitization of Undefinitized Orders. (1) The Contractor agrees that following the issuance of an undefinitized order, it will promptly begin negotiating with the Contracting Officer the price and terms of a definitive order that will include: (A) all clauses required by regulation on the date of the order; (B) all clauses required by law on the date of execution of the definitive order; and, (C) any other mutually agreeable clauses, terms and conditions. No later than sixty (60) days after the undefinitized order is issued, the Contractor agrees to submit a cost proposal with sufficient data to support the accuracy and derivation of its price; and, when required by FAR, cost or pricing data. If additional cost information is available prior to the conclusion of negotiations, the Contractor shall provide that information to the Contracting Officer. The price agreed upon shall be set forth in a bilateral modification to the order. In no event shall the price exceed the maximum ceiling amount specified in the undefinitized order.

(2) Each undefinitized order shall contain a schedule for definitization which shall include a target date for definitization and dates for submission of a qualifying proposal, beginning of negotiations and, if appropriate, submission of make-or-buy and subcontracting plans and cost or pricing data. Submission of a qualifying proposal in accordance with the definitization schedule is a material element of the order. The schedule shall provide for definitization of the order by the earlier of:

(i) a specified target date which is not more than 180 days after the issuance of the undefinitized order.

However, that target date may be extended by the Contracting Officer for up to 180 days after the Contractor submits a qualifying proposal as defined in DFARS 217.7401; or

(ii) the date on which the amount of funds expended by the Contractor under the undefinitized order exceed fifty percent (50%) of the order's maximum ceiling amount, except as provided in subparagraph (f)(3) below.

(3) If agreement on a definitive order is not reached within the time provided pursuant to subparagraph (e)(2) above, the Contracting Officer may, with the approval of the Head of the Contracting Activity, determine a reasonable price in accordance with Subpart 15.4 and Part 31 of the FAR, and issue a unilateral order subject to Contractor appeal as provided in the "Disputes" clause (FAR 52.233-1). In any event, the Contractor shall proceed with completion of the order, subject to the "Limitation of Government Liability" clause (FAR 52.216-24).

(f) Limitation of Government Liability. (1) Each undefinitized order shall set forth the limitation of Government liability, which shall be the maximum amount that the Government will be obligated to pay the Contractor for performance of the order until the order is definitized. The Contractor is not authorized to make expenditures or incur obligations exceeding the limitation of Government liability set forth in the order. If such expenditures are made, or if such obligations are incurred, they will be at the Contractor's sole risk and expense. Further, the limitation of Government liability shall be the maximum Government liability if the order is terminated. The "Limitation of Government Liability" clause shall be included in any undefinitized order.

(2) Except for undefinitized orders for Foreign Military Sales; purchases of less than $25,000; special access programs; and Congressionally-mandated long-lead procurements; and except as otherwise provided in subparagraph (f)(3) below, the limitation of Government liability shall not exceed fifty percent (50%) of the ceiling amount of an undefinitized order. In the case of orders within these excepted categories, however, the procedures set forth herein shall be followed to the maximum extent practical.

(3) If the Contractor submits a qualifying proposal (as defined in DFARS 217.7401) to definitize an order before the Government has obligated fifty percent (50%) of the ceiling amount, the Contracting Officer may increase the limitation of Government liability to up to seventy-five percent (75%) of the maximum ceiling amount or up to seventy-five percent (75%) of the price proposed by the Contractor, whichever is less.

(4) If at any time the Contractor believes that its expenditure under an undefinitized order will exceed the limitation of Government liability, the Contractor shall so notify the Contracting Officer, in writing, and propose an appropriate increase in the limitation of Government liability of such order. Within thirty (30) days of such notice, the Contracting Officer will either (i) notify the Contractor in writing of such appropriate increase, or (ii) instruct the Contractor how and to what extent the work shall be continued; provided, however, that in no event shall the Contractor be obligated to proceed with work on an undefinitized order beyond the point where its costs incurred plus a reasonable profit thereon exceed the limitation of Government liability, and provided also that in no event shall the Government be obligated to pay the Contractor any amount in excess of the limitation of Government liability specified in any such order prior to establishment of firm prices.

(g) Initial Spares. The limitations set forth in paragraph (c) and subparagraphs (e)(2), (f)(2) and (f)(3) do not apply to undefinitized orders for the purchase of initial spares.

(h) Terminal Date for Placement of Orders. The Contractor shall not be obligated to accept any orders placed hereunder beyond 180 days after delivery of the last end item.

(i) Segregation of Costs. The Contractor shall segregate the costs of performance of each undefinitized order from the cost of any other work performed by the Contractor.

C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

C-243-H001 CONTRACTOR PROBLEM IDENTIFICATION REPORTS (NAVSEA) (OCT 2018)

(a) Contract Problem Identification Reports (CPIRs) shall be used by the Contractor for the purpose of alerting the Government to actual or potential contract problems and of establishing an early dialogue between the Contractor and the Government with regard thereto.

(b) A "contract problem" is a fact or circumstance of which the Contractor is aware that does, will or reasonably is anticipated to (1) have a significant or substantial impact on the delivery schedule or completion of contract performance or the cost of performance of the contract (increase or decrease) or (2) requires modification to the contract or specification(s). The terms "significant" and "substantial" shall be interpreted in the same manner as they would be interpreted by a reasonably prudent business person under the relevant circumstances.

(c) The Contractor shall report each contract problem promptly and in no event later than ten (10) calendar days, after the Contractor identifies such contract problem. A written CPIR shall be transmitted via the Administrative Contracting Officer (ACO) to the Procuring Contracting Officer and to the cognizant NAVSEA Program Office. Each CPIR shall be entitled "Contract Problem Identification Report", shall be dated, numbered sequentially and shall set forth the following based on the best and most complete information then known or available to the Contractor:

(1) The nature of the contract problem;

(2) The date on which the contract problem arose and the date on which the contract problem was identified as such;

(3) The anticipated direct and consequential effects of the contract problem upon the delivery schedule or completion of contract performance or the cost of performance of the contract;

(4) Identification of the supplies and/or services which are or may be affected; and

(5) The Contractor's recommended solution to the reported contract problem.

(d) Follow-up status reports of each contract problem, identified by the original CPIR number, shall be furnished monthly or more frequently as required by the Contracting Officer. A final follow-up report shall be furnished immediately following resolution of each contract problem.

(e) CPIRs shall not be submitted when notice of the same contract problem is required to be furnished to the Government pursuant to any other requirement of this contract. The submission of a CPIR, however, does not relieve the Contractor of its obligations to provide notice required under any other requirement of this contract.

C-243-H002 NOTIFICATION OF CHANGES (NAVSEA) (MAY 2019)

(a) Definitions. As used in this requirement, the term "Contracting Officer" does not include any representative of the Contracting Officer whether or not such representative is acting within the scope of his authority nor does it include any other individuals or activities that in any way communicate with the Contractor. As used in this requirement, the term "conduct" includes both actions and failures to act, and includes the furnishing of, or the failure to furnish, any item under any provision of this contract.

(b) Notice.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .