JS-3 Cost Element Table.xlsx

XLSX spreadsheet 166 KB Posted

Attached to
AN/BLQ-10 Electronic Warfare (EW) System Program
Solicitation number
N0002418R6200
Issued by

About this file

This document provides details regarding a forthcoming solicitation from the Naval Sea Systems Command for the AN/BLQ-10 Electronic Warfare System program. The solicitation will be issued in April 2018 as an indefinite delivery indefinite quantity contract containing cost plus incentive fee, firm-fixed-price, and cost-only line items. The contract will be awarded to a single awardee to provide radio and communications band threat warning and situational awareness capabilities for all U.S. Navy submarine classes. The AN/BLQ-10 program delivers technological upgrades on a biennial cycle through the Submarine Warfare Federated Tactical System technology insertion and advanced processing build process. This requirement specifically covers technology insertions 20, 22, and 24, which will modernize hardware every even year and software every odd year through 2024. Interested offerors are advised to monitor the FedBizOpps website for additional details regarding this forthcoming solicitation.

JS-3 Cost Element Table.xlsx

View the file

Other files

File Type Posted
N00024-18-R-6200_Questions_&_Answers_3.xlsx XLSX spreadsheet
N00024-18-R-6200_RFP_Amendment_2.docx DOCX document
N00024-18-R-6200_RFP_Amendment_1.docx DOCX document
N00024-18-R-6200_Questions_&_Answers_2.xlsx XLSX spreadsheet
J-4 DD254.pdf PDF
JS-1 Interested Offeror Questions Form.docx DOCX document
JS-4 DD2794 Co-Plan.xlsx XLSX spreadsheet
N00024-18-R-6200_RFP_(Final).pdf PDF
JS-2 Past Performance Questionnaire.docx DOCX document
JS-5 DD2794 Co-Plan.xlsx XLSX spreadsheet
J-2 BLQ10 GFI.doc DOC document
N00024-18-R-6200_Questions_&_Answers_1.xlsx XLSX spreadsheet
Exhibit A CDRLs DD1423.pdf PDF
J-1 GFP.pdf PDF
J-6 Terms of Use Agreement.docx DOCX document
Draft_Solicitation_N00024-18-R-6200.pdf PDF
Draft_RFP_Attachments.zip ZIP file
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

PROPOSAL SUMMARY
CLINDESCRIPTIONHOURSCOSTFEETOTALNOTES
CLIN 0001Engineering and Technical Services0$0$0$0Amounts will calculate from 'CLIN 0001' tab
CLIN 0002Material, Travel, Subsistence SupportN/A$4,080,000N/A$4,080,000Amounts will calculate from 'CLIN 0002,1002' tab
CLIN 0003IDIQ Orders AN/BLQ-10 Shipsets - CPIFN/A$0$0$0Amounts will calculate from 'CLIN 0003 Scenario' tab
CLIN 0004IDIQ Orders AN/BLQ-10 Shipsets - FFPN/A$71,450,000$0$71,450,000Offeror to complete Profit Fill-in below (Cell B16)
CLIN 0005DataN/AN/AN/AN/ANot Separately Priced
CLIN 0006Data RightsN/A$0N/A$0Offeror to enter FFP in Cost Column
CLIN 1001Engineering and Technical Services0$0$0$0Amounts will calculate from 'CLIN 1001' tab
CLIN 1002Material, Travel, Subsistence SupportN/A$4,640,000N/A$4,640,000Amounts will calculate from 'CLIN 0002,1002' tab
CLIN 1003IDIQ Orders AN/BLQ-10 Shipsets - CPIFN/A$64,150,000$0$64,150,000Amounts will calculate from 'CLIN 1003' tab
CLIN 1004IDIQ Orders AN/BLQ-10 Shipsets - FFPN/A$299,000,000$0$299,000,000Offeror to complete Profit Fill-in below (Cell B17)
TOTAL0$443,320,000$0$443,320,000
PROFIT FILL-INSCPIF MULTIPLIER
CLIN 0004CLIN 00035
CLIN 1004

Note: Offerors may add additional tabs as necessary to support the existing tabs. This workbook may be modified slightly as provided for in the workbook. The Offeror is responsible for ensuring that all formulas are correct and intact.

&"Times New Roman,Regular"N00024-18-R-6200 JS-3 Cost Element Table

CLIN 0001

COST ELEMENTYEAR 1YEAR 2YEAR 3YEAR 4YEAR 5TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.000$0.000$0.00
Fringe$0.00$0.00$0.00$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.00$0.00$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the Year 1-5 sheets. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 1

COST ELEMENT20192020YEAR 1 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 0001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 2

COST ELEMENT20202021YEAR 2 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 0001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 3

COST ELEMENT20212022YEAR 3 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 0001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 4

COST ELEMENT20222023YEAR 4 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 0001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 5

COST ELEMENT20232024YEAR 5 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 0001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

CLIN 1001

COST ELEMENTYEAR 6YEAR 7YEAR 8YEAR 9YEAR 10TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.000$0.000$0.00
Fringe$0.00$0.00$0.00$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.00$0.00$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the Year 6-10 sheets. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 6

COST ELEMENT20242025YEAR 6 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 1001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 7

COST ELEMENT20252026YEAR 7 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 1001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 8

COST ELEMENT20262027YEAR 8 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 1001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 9

COST ELEMENT20272028YEAR 9 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 1001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 10

COST ELEMENT20282029YEAR 10 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 1001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

CLIN 0002,1002

COST ELEMENTYear 1Year 2Year 3Year 4Year 5CLIN 0002 TOTAL
Government Provided MTS$816,000$816,000$816,000$816,000$816,000$4,080,000
INDIRECT COSTSRateTotal $RateTotal $RateTotal $RateTotal $RateTotal $RateTotal $
Overhead$ - 0
General and Administrative$ - 0
{Add more rows as necessary}$ - 0
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ 816,000 $ 816,000 $ 816,000 $ 816,000 $ 816,000 $ 4,080,000

COST OF MONEYRateTotal $RateTotal $RateTotal $RateTotal $RateTotal $RateTotal $
Cost of Money$ - 0
{Add more rows as necessary}$ - 0
TOTAL COM$ - 0
$ - 0
ESTIMATED COST (w/ COM)$ 816,000$ 816,000$ 816,000$ 816,000$ 816,000$ 4,080,000
COST ELEMENTYear 6Year 7Year 8Year 9Year 10CLIN 1002 TOTAL
Government Provided MTS$928,000$928,000$928,000$928,000$928,000$4,640,000
INDIRECT COSTSRateTotal $RateTotal $RateTotal $RateTotal $RateTotal $RateTotal $
Overhead$ - 0
General and Administrative$ - 0
{Add more rows as necessary}$ - 0
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ 928,000 $ 928,000 $ 928,000 $ 928,000 $ 928,000 $ 4,640,000

COST OF MONEYRateTotal $RateTotal $RateTotal $RateTotal $RateTotal $RateTotal $
Cost of Money$ - 0
{Add more rows as necessary}$ - 0
TOTAL COM$ - 0
$ - 0
ESTIMATED COST (w/ COM)$ 928,000$ 928,000$ 928,000$ 928,000$ 928,000$ 4,640,000
NOTE: Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

CLIN 0003 Scenario

COST ELEMENTYEAR 1YEAR 2YEAR 3TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.00
Fringe$0.00$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0$ - 0
MATERIAL COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Material
Material Burden #1
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM$ - 0$ - 0$ - 0$ - 0
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0$ - 0

NOTE: Please link this sheet as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

N00024-18-R-6200 JS-3 Cost Element Table

CLIN 1003

COST ELEMENTYEAR 6YEAR 7TOTAL
DIRECT LABOR(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total Cost
Total Labor$3,875,000$3,875,000$7,750,000
Fringe$0$0$0
{Add more rows as necessary}$0$0$0
TOTAL DIRECT LABOR$3,875,000$3,875,000$7,750,000
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Cost
Overhead$0
General and Administrative$0
{Add more rows as necessary}$0
TOTAL INDIRECT COSTS$0$0$0
MATERIAL COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Cost
Material$28,200,000$28,200,000$56,400,000
Material Indirects$0$0$0
{Add more rows as necessary}$0$0$0
TOTAL MATERIAL COSTS$28,200,000$28,200,000$56,400,000

TOTAL COST LESS COM AND FEE $32,075,000 $32,075,000 $64,150,000

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Cost
Cost of Money$0
{Add more rows as necessary}$0
TOTAL COM$0$0$0
ESTIMATED COST (w/ COM)$32,075,000$32,075,000$64,150,000
TARGET FEE$0$0$0
TOTAL ESTIMATED COST + TARGET FEE$32,075,000$32,075,000$64,150,000

NOTE: Please link this sheet as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

N00024-18-R-6200 JS-3 Cost Element Table

File details come from the government source that posted it. Updated .