Prior to the issuance of a formal solicitation (Request for Proposal) for this procurement, NAVSEA invites industry to review and provide feedback on the attached draft portions of Sections B, C, and F. Please use the provided Excel template to submit questions and comments relating to this draft solicitation package and/or information contained in the Bidders Library. Submit UNCLASSIFIED responses via email to shawn.fu@navy.mil and gary.braunstein@navy.mil. Please contact the points of contact above for.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT SOLICITATION SECTIONS – N00024-18-R-5200
SELECTED DRAFT PORTIONS OF SOLICITATION N00024-18-R-5200
SECTIONS B, C, AND F
DRAFT CONTENT IS SUBJECT TO CHANGE WITHOUT NOTICE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COST
NOTE: REQUIRED QUANTITIES OF HOURS FOR LEVEL-OF-EFFORT LINE ITEMS ARE CURRENTLY TO-BE-DETERMINED AND WILL BE POPULATED IN THE FINAL SOLICITATION
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0001 |
| CEC Capabilities Integration with AEGIS - Completion |
| 1 |
| Lot |
Development, integration, test, and delivery of CEC capabilities for AEGIS integration in accordance with Section C, paragraph 3.3.1 and its subparagraphs.
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0002 |
| CEC Facility Management and Government Furnished Property Management - Completion |
| 1 |
| Lot |
Maintenance of the CEC System in accordance with Section C, paragraph 3.3.2 and its subparagraphs, including management of the Design Agent facility in accordance with Section C, paragraph 3.3.2.2 and its subparagraphs, and Government Furnished Property (GFP) management in accordance with Section C, paragraph 3.3.2.3 and its subparagraphs.
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0003 |
| CEC Maintenance Build - Completion |
| 1 |
| Lot |
Development, integration, test, and delivery of CEC Maintenance Builds in accordance with Section C, paragraph 3.3.3 and its subparagraphs.
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0004 |
| Obsolescence Monitoring - Completion |
| 1 |
| Lot |
Recurring monitoring and identification of hardware and software obsolescence issues in accordance with Section C, paragraph 3.3.4 and its subparagraphs.
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0005 |
| Annual TDP Delivery - Completion |
| 1 |
| Lot |
Annual Delivery of the TDP in accordance with Section C, paragraph 3.3.5 and its subparagraphs.
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0006 |
| Technician Control Display (TCD) / Human Machine Interface (HMI) Master Disk and Research, Development, Test & Evaluation (RDT&E) Master Disk Delivery - Completion |
| 1 |
| Lot |
Delivery of TCD/HMI master disks and RDT&E master disks in accordance with Section C, paragraph 3.3.6 and its subparagraphs.
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0007 |
| System Tech Refresh and Obsolescence Update - Local Area Network (LAN) Interface Upgrade - Completion |
| 1 |
| Lot |
Design, development, integration, test, and delivery of CEC System Tech Refresh and Obsolescence Updates in accordance with Section C, paragraphs 3.3.7 and 3.3.7.1 and its subparagraphs.
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0008 |
| System Tech Refresh and Obsolescence Update Development - NTDS Elimination - Completion |
| 1 |
| Lot |
Design, development, integration, test, and delivery of CEC System Tech Refresh and Obsolescence Updates in accordance with Section C, paragraphs 3.3.7 and 3.3.7.2 and its subparagraphs.
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0009 |
| Advanced Studies - LOE |
Hours
| Option |
| Advanced studies in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0010 |
| Advanced Studies - AEGIS - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for AEGIS integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0011 |
| Advanced Studies - SSDS - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for SSDS integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0012 |
| Advanced Studies - NAVAIR - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for NAVAIR integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0013 |
| Advanced Studies - USMC - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for USMC integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0014 |
| Advanced Studies - FMS - Australia - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for FMS - Australia integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0015 |
| Advanced Studies - FMS -Japan - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for FMS - Japan integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0016 |
| Advanced Studies - Zumwalt - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for Zumwalt integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0017 |
| Future Software Capability Enhancements and Hardware Technology Refresh - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0018 |
| Future Software Capability Enhancements and Hardware Technology Refresh - AEGIS - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for AEGIS integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0019 |
| Future Software Capability Enhancements and Hardware Technology Refresh - SSDS - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for SSDS integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0020 |
| Future Software Capability Enhancements and Hardware Technology Refresh - NAVAIR - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for NAVAIR integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0021 |
| Future Software Capability Enhancements and Hardware Technology Refresh - USMC - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for USMC integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0022 |
| Future Software Capability Enhancements and Hardware Technology Refresh - FMS - Australia - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for FMS - Australia integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0023 |
| Future Software Capability Enhancements and Hardware Technology Refresh - FMS -Japan - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for FMS - Japan integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0024 |
| Future Software Capability Enhancements and Hardware Technology Refresh - Zumwalt - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for Zumwalt integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0025 |
| Ad-Hoc Delivery Support - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0026 |
| Ad-Hoc Delivery Support - AEGIS - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of AEGIS integration in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0027 |
| Ad-Hoc Delivery Support - SSDS - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of SSDS integration in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0028 |
| Ad-Hoc Delivery Support - NAVAIR - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of NAVAIR in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0029 |
| Ad-Hoc Delivery Support - USMC - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of USMC in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0030 |
| Ad-Hoc Delivery Support - FMS - Australia - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of FMS - Australia in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0031 |
| Ad-Hoc Delivery Support - FMS - Japan - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of FMS- Japan in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0032 |
| Ad-Hoc Delivery Support - Zumwalt - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of Zumwalt in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0033 |
| Post-Delivery Support - LOE |
Hours
| Option |
| Post-delivery support in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0034 |
| Post-Delivery Support - AEGIS - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for AEGIS integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0035 |
| Post-Delivery Support - SSDS - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for SSDS integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0036 |
| Post-Delivery Support - NAVAIR - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for NAVAIR integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0037 |
| Post-Delivery Support - USMC - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for USMC integration in accordance with Section C, paragraph 3.2.4. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0038 |
| Post-Delivery Support - FMS - Australia - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for FMS - Australia integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0039 |
| Post-Delivery Support - FMS - Japan - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for FMS - Japan integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0040 |
| Post-Delivery Support - Zumwalt - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for Zumwalt integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0041 |
| Travel/Other Direct Costs (ODC) |
| 1 |
| Lot |
| Option |
| Travel and ODCs in support of CLINs 0009-0040, if options are exercised |
FOB: Origin
COST
See Note B
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0042 |
| Data |
| 1 |
| Lot |
Data in support of CLINs 0001-0008, and, if options are exercised, 0009-0040, 1002-1006, 1009-1040, 2002-2006, 2009-2040, 3002-3006, 3009-3040, 4002-4006, and 4009-4040, in accordance with Exhibit A.
Not separately priced. The price of this line item is included in the price of other, related line items.
FOB: Origin
NSP
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0043 |
| Enhanced Data Rights |
| 1 |
| Lot |
Option
FOB: Origin
FFP
See Notes A and B
NET AMOUNT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0044 |
| Provisioned Item Order |
| 1 |
| Lot |
Option
FOB: Origin
FFP
See Notes B and C
NET AMOUNT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1002 |
| CEC Facility Management and Government Furnished Property Management - Completion |
| 1 |
| Lot |
| Option |
| Maintenance of the CEC System in accordance with Section C, paragraph 3.3.2 and its subparagraphs, including management of the Design Agent facility in accordance with Section C, paragraph 3.3.2.2 and its subparagraphs, and Government Furnished Property (GFP) management in accordance with Section C, paragraph 3.3.2.3 and its subparagraphs. |
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1003 |
| CEC Maintenance Build - Completion |
| 1 |
| Lot |
| Option |
| Development, integration, test, and delivery of CEC Maintenance Builds in accordance with Section C, paragraph 3.3.3 and its subparagraphs. |
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1004 |
| Obsolescence Monitoring - Completion |
| 1 |
| Lot |
| Option |
| Recurring monitoring and identification of hardware and software obsolescence issues in accordance with Section C, paragraph 3.3.4 and its subparagraphs. |
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1005 |
| Annual TDP Delivery - Completion |
| 1 |
| Lot |
| Option |
| Annual Delivery of the TDP in accordance with Section C, paragraph 3.3.5 and its subparagraphs. |
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1006 |
| Technician Control Display (TCD) / Human Machine Interface (HMI) Master Disk and Research, Development, Test & Evaluation (RDT&E) Master Disk Delivery - Completion |
| 1 |
| Lot |
| Option |
| Delivery of TCD/HMI master disks and RDT&E master disks in accordance with Section C, paragraph 3.3.6 and its subparagraphs. |
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1009 |
| Advanced Studies - LOE |
Hours
| Option |
| Advanced studies in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1010 |
| Advanced Studies - AEGIS - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for AEGIS integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1011 |
| Advanced Studies - SSDS - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for SSDS integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1012 |
| Advanced Studies - NAVAIR - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for NAVAIR integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1013 |
| Advanced Studies - USMC - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for USMC integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1014 |
| Advanced Studies - FMS - Australia - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for FMS - Australia integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1015 |
| Advanced Studies - FMS -Japan - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for FMS - Japan integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1016 |
| Advanced Studies - Zumwalt - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for Zumwalt integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1017 |
| Future Software Capability Enhancements and Hardware Technology Refresh - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1018 |
| Future Software Capability Enhancements and Hardware Technology Refresh - AEGIS - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for AEGIS integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1019 |
| Future Software Capability Enhancements and Hardware Technology Refresh - SSDS - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for SSDS integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1020 |
| Future Software Capability Enhancements and Hardware Technology Refresh - NAVAIR - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for NAVAIR integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1021 |
| Future Software Capability Enhancements and Hardware Technology Refresh - USMC - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for USMC integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1022 |
| Future Software Capability Enhancements and Hardware Technology Refresh - FMS - Australia - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for FMS - Australia integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1023 |
| Future Software Capability Enhancements and Hardware Technology Refresh - FMS -Japan - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for FMS - Japan integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1024 |
| Future Software Capability Enhancements and Hardware Technology Refresh - Zumwalt - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for Zumwalt integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1025 |
| Ad-Hoc Delivery Support - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1026 |
| Ad-Hoc Delivery Support - AEGIS - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of AEGIS integration in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1027 |
| Ad-Hoc Delivery Support - SSDS - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of SSDS integration in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1028 |
| Ad-Hoc Delivery Support - NAVAIR - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of NAVAIR in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1029 |
| Ad-Hoc Delivery Support - USMC - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of USMC in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1030 |
| Ad-Hoc Delivery Support - FMS - Australia - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of FMS - Australia in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1031 |
| Ad-Hoc Delivery Support - FMS - Japan - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of FMS- Japan in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1032 |
| Ad-Hoc Delivery Support - Zumwalt - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of Zumwalt in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1033 |
| Post-Delivery Support - LOE |
Hours
| Option |
| Post-delivery support in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1034 |
| Post-Delivery Support - AEGIS - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for AEGIS integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1035 |
| Post-Delivery Support - SSDS - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for SSDS integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1036 |
| Post-Delivery Support - NAVAIR - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for NAVAIR integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1037 |
| Post-Delivery Support - USMC - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for USMC integration in accordance with Section C, paragraph 3.2.4. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1038 |
| Post-Delivery Support - FMS - Australia - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for FMS - Australia integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1039 |
| Post-Delivery Support - FMS - Japan - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for FMS - Japan integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1040 |
| Post-Delivery Support - Zumwalt - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for Zumwalt integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1041 |
| Travel/Other Direct Costs (ODC) |
| 1 |
| Lot |
| Option |
| Travel and ODCs in support of CLINs 1009-1040, if options are exercised |
FOB: Origin
COST
See Note B
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1044 |
| Provisioned Item Order |
| 1 |
| Lot |
Option
FOB: Origin
FFP
See Notes B and C
NET AMOUNT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2002 |
| CEC Facility Management and Government Furnished Property Management - Completion |
| 1 |
| Lot |
| Option |
| Maintenance of the CEC System in accordance with Section C, paragraph 3.3.2 and its subparagraphs, including management of the Design Agent facility in accordance with Section C, paragraph 3.3.2.2 and its subparagraphs, and Government Furnished Property (GFP) management in accordance with Section C, paragraph 3.3.2.3 and its subparagraphs. |
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2003 |
| CEC Maintenance Build - Completion |
| 1 |
| Lot |
| Option |
| Development, integration, test, and delivery of CEC Maintenance Builds in accordance with Section C, paragraph 3.3.3 and its subparagraphs. |
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2004 |
| Obsolescence Monitoring - Completion |
| 1 |
| Lot |
| Option |
| Recurring monitoring and identification of hardware and software obsolescence issues in accordance with Section C, paragraph 3.3.4 and its subparagraphs. |
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2005 |
| Annual TDP Delivery - Completion |
| 1 |
| Lot |
| Option |
| Annual Delivery of the TDP in accordance with Section C, paragraph 3.3.5 and its subparagraphs. |
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2006 |
| Technician Control Display (TCD) / Human Machine Interface (HMI) Master Disk and Research, Development, Test & Evaluation (RDT&E) Master Disk Delivery - Completion |
| 1 |
| Lot |
| Option |
| Delivery of TCD/HMI master disks and RDT&E master disks in accordance with Section C, paragraph 3.3.6 and its subparagraphs. |
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2009 |
| Advanced Studies - LOE |
Hours
| Option |
| Advanced studies in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2010 |
| Advanced Studies - AEGIS - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for AEGIS integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2011 |
| Advanced Studies - SSDS - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for SSDS integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2012 |
| Advanced Studies - NAVAIR - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for NAVAIR integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2013 |
| Advanced Studies - USMC - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for USMC integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2014 |
| Advanced Studies - FMS - Australia - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for FMS - Australia integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2015 |
| Advanced Studies - FMS -Japan - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for FMS - Japan integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2016 |
| Advanced Studies - Zumwalt - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for Zumwalt integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2017 |
| Future Software Capability Enhancements and Hardware Technology Refresh - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2018 |
| Future Software Capability Enhancements and Hardware Technology Refresh - AEGIS - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for AEGIS integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2019 |
| Future Software Capability Enhancements and Hardware Technology Refresh - SSDS - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for SSDS integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2020 |
| Future Software Capability Enhancements and Hardware Technology Refresh - NAVAIR - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for NAVAIR integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2021 |
| Future Software Capability Enhancements and Hardware Technology Refresh - USMC - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for USMC integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2022 |
| Future Software Capability Enhancements and Hardware Technology Refresh - FMS - Australia - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for FMS - Australia integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2023 |
| Future Software Capability Enhancements and Hardware Technology Refresh - FMS -Japan - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for FMS - Japan integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2024 |
| Future Software Capability Enhancements and Hardware Technology Refresh - Zumwalt - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for Zumwalt integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2025 |
| Ad-Hoc Delivery Support - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2026 |
| Ad-Hoc Delivery Support - AEGIS - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of AEGIS integration in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2027 |
| Ad-Hoc Delivery Support - SSDS - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of SSDS integration in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2028 |
| Ad-Hoc Delivery Support - NAVAIR - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of NAVAIR in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2029 |
| Ad-Hoc Delivery Support - USMC - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of USMC in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2030 |
| Ad-Hoc Delivery Support - FMS - Australia - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of FMS - Australia in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2031 |
| Ad-Hoc Delivery Support - FMS - Japan - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of FMS- Japan in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2032 |
| Ad-Hoc Delivery Support - Zumwalt - LOE |
Hours
| Option |
| Ad-Hoc delivery of software builds maintained under configuration management in support of Zumwalt in accordance with Section C, paragraph 3.2.3 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2033 |
| Post-Delivery Support - LOE |
Hours
| Option |
| Post-delivery support in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2034 |
| Post-Delivery Support - AEGIS - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for AEGIS integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2035 |
| Post-Delivery Support - SSDS - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for SSDS integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2036 |
| Post-Delivery Support - NAVAIR - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for NAVAIR integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2037 |
| Post-Delivery Support - USMC - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for USMC integration in accordance with Section C, paragraph 3.2.4. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2038 |
| Post-Delivery Support - FMS - Australia - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for FMS - Australia integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2039 |
| Post-Delivery Support - FMS - Japan - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for FMS - Japan integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2040 |
| Post-Delivery Support - Zumwalt - LOE |
Hours
| Option |
| Post-delivery support of CEC capabilities for Zumwalt integration in accordance with Section C, paragraph 3.2.4 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2041 |
| Travel/Other Direct Costs (ODC) |
| 1 |
| Lot |
| Option |
| Travel and ODCs in support of CLINs 2009-2040, if options are exercised |
FOB: Origin
COST
See Note B
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2044 |
| Provisioned Item Order |
| 1 |
| Lot |
Option
FOB: Origin
FFP
See Notes B and C
NET AMOUNT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3002 |
| CEC Facility Management and Government Furnished Property Management - Completion |
| 1 |
| Lot |
| Option |
| Maintenance of the CEC System in accordance with Section C, paragraph 3.3.2 and its subparagraphs, including management of the Design Agent facility in accordance with Section C, paragraph 3.3.2.2 and its subparagraphs, and Government Furnished Property (GFP) management in accordance with Section C, paragraph 3.3.2.3 and its subparagraphs. |
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3003 |
| CEC Maintenance Build - Completion |
| 1 |
| Lot |
| Option |
| Development, integration, test, and delivery of CEC Maintenance Builds in accordance with Section C, paragraph 3.3.3 and its subparagraphs. |
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3004 |
| Obsolescence Monitoring - Completion |
| 1 |
| Lot |
| Option |
| Recurring monitoring and identification of hardware and software obsolescence issues in accordance with Section C, paragraph 3.3.4 and its subparagraphs. |
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3005 |
| Annual TDP Delivery - Completion |
| 1 |
| Lot |
| Option |
| Annual Delivery of the TDP in accordance with Section C, paragraph 3.3.5 and its subparagraphs. |
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3006 |
| Technician Control Display (TCD) / Human Machine Interface (HMI) Master Disk and Research, Development, Test & Evaluation (RDT&E) Master Disk Delivery - Completion |
| 1 |
| Lot |
| Option |
| Delivery of TCD/HMI master disks and RDT&E master disks in accordance with Section C, paragraph 3.3.6 and its subparagraphs. |
FOB: Origin
CPIF
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
MAXIMUM FEE
MINIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3009 |
| Advanced Studies - LOE |
Hours
| Option |
| Advanced studies in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3010 |
| Advanced Studies - AEGIS - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for AEGIS integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3011 |
| Advanced Studies - SSDS - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for SSDS integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3012 |
| Advanced Studies - NAVAIR - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for NAVAIR integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3013 |
| Advanced Studies - USMC - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for USMC integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3014 |
| Advanced Studies - FMS - Australia - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for FMS - Australia integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3015 |
| Advanced Studies - FMS -Japan - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for FMS - Japan integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3016 |
| Advanced Studies - Zumwalt - LOE |
Hours
| Option |
| Advanced studies in support of CEC capabilities for Zumwalt integration in accordance with Section C, paragraph 3.2.1 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3017 |
| Future Software Capability Enhancements and Hardware Technology Refresh - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3018 |
| Future Software Capability Enhancements and Hardware Technology Refresh - AEGIS - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for AEGIS integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3019 |
| Future Software Capability Enhancements and Hardware Technology Refresh - SSDS - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for SSDS integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMATED COST
See Note B
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 3020 |
| Future Software Capability Enhancements and Hardware Technology Refresh - NAVAIR - LOE |
Hours
| Option |
| Development, design, integration, test, and delivery of future software capability enhancements and hardware technology refresh initiatives in support of CEC capabilities for NAVAIR integration in accordance with Section C, paragraph 3.2.2 and its subparagraphs. |
FOB: Origin
CPFF
ESTIMAT…