This package contains responses to questions received from industry in connection with this solicitation.

View the file

Other files

File Type Posted
N00024-18-R-5200_Bidder's_Question_Responses_6.27.18.pdf PDF
N00024-18-R-5200_Bidder's_Question_Responses_6.26.18.pdf PDF
N00024-18-R-5200-0006_Conformed.docx DOCX document
Attachment_18_SLOC_Worksheet_Rev1.zip ZIP file
N00024-18-R-5200-0006.docx DOCX document
N00024-18-R-5200_Bidder's_Question_Responses_6.22.18.pdf PDF
Attachment_18_SLOC_Worksheet.zip ZIP file
N00024-18-R-5200-0005_Conformed.docx DOCX document
Attachment_3_Government_Furnished_Property_List_13-Jun-2018.xlsx XLSX spreadsheet
N00024-18-R-5200-0005.docx DOCX document
Exhibit_A_to_N00024-18-R-5200_DD_Form_1423s_CDRLs_20_June_2018.pdf PDF
N00024-18-R-5200_Bidder's_Question_Responses_6.18.18.pdf PDF
N00024-18-R-5200_Bidder's_Question_Responses_5.25.18.pdf PDF
N00024-18-R-5200-0004_Conformed.docx DOCX document
N00024-18-R-5200-0004.docx DOCX document
N00024-18-R-5200_Bidder's_Question_Responses_5.17.18.pdf PDF
N00024-18-R-5200-0003.docx DOCX document
Attachment_2_Government_Furnished_Information_(GFI)_List.pdf PDF
N00024-18-R-5200-0003_Conformed.docx DOCX document
N00024-18-R-5200_Bidder's_Question_Responses_5.11.18.pdf PDF
N00024-18-R-5200-0002.docx DOCX document
N00024-18-R-5200-0001_Conformed.docx DOCX document
N00024-18-R-5200-0001.docx DOCX document
Attachment_21_Bidder's_Library_Access_Instructions_rev1.pdf PDF
N00024-18-R-5200_Bidder's_Question_Responses_5.1.18.pdf PDF
N00024-18-R-5200_CDRLs.zip ZIP file
N00024-18-R-5200_Solicitation.docx DOCX document
N00024-18-R-5200_Public_Attachments.zip ZIP file
N00024-18-R-5200_Question-Comments_4.18.18.xlsx XLSX spreadsheet
N00024-18-R-5200_Question-Comments_3.6.18.xlsx XLSX spreadsheet
N00024-18-R-5200_Question-Comments_12.22.17.xlsx XLSX spreadsheet
N00024-18-R-5200_Question-Comments_12.13.17.xlsx XLSX spreadsheet
N00024-18-R-5200_CEC_DA-ES_Draft_Sections_L.docx DOCX document
N00024-18-R-5200 CEC DA-ES Draft Sections B-C-F.docx DOCX document
N00024-18-R-5200_Question-Comment_Template.xlsx XLSX spreadsheet
N00024-18-R-5200_DD_Form_254.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIDDER’S QUESTIONS RESPONSES – JUNE 20, 2018

FEDBIZOPPS VERSION

N00024-18-R-5200 – Cooperative Engagement Capability Design Agent & Engineering Services

[Responses to questions 0001-0032, 0036-0037, 0040-0042, 0044-0051, and 0053 were previously released] [Responses to questions 0033-0035, 0038-0039, and 0043 contain controlled unclassified information and will be posted to the Bidder’s Library]

NOTE: This response supersedes the previous response to question 0016 that was provided on 25 May 2018.

Question No.: 0016

Source Document Page Number Item Excerpt of Content Proprietary Information

RFP

Paragraph 2.6 Non-Gov’t and commercial Standards, Specifications and other applicable publications

Paragraph 3.1.1.11.3.1

1.1.1.1.1.1 Integrated

Product and Process Development (IPPD) Completion Tasks

Paragraph 3.2.1 Element 1: Software Development Approach

CMMI-DEV+IPPDD V1.2

Capability maturity Model Integration (CMMI) Maturity Level

For completion tasks, the Contractor shall implement an IPPD team approach for the performance of this contract using Capability Maturity Model Integration (CMMI) Maturity Level 5 methodologies as referenced in CMMI-DEV+IPPD V1.2 or higher.

Offerors shall also submit an SDP rationale which describes why their specific approach is appropriate for the system to be procured, developed or maintained and how their proposed processes are equivalent to those articulated by CMMI® capability level 3.

Proprietary Non-Proprietary

Question/Comment & Requested Action

Please elaborate on the requirement for CMMI level certification, as follows:

(i) Is it sufficient for the Prime Contractor to be at a Level 5 and flow down their processes to subcontractors, as well as maintain oversight of subcontractor processes? Or, do subcontractors need to be certified at CMMI Level 5 as well as the Prime?

(ii) Are Completion CLINs required to be performed using CMMI Level 5 processes, per paragraph 3.1.1.11.3.1?

Government Response

(i) It is sufficient for a CMMI Level 5-certified prime contractor to flow down processes to subcontractors. Subcontractors are not required to be certified at CMMI Level 5. Subcontractors shall use CMMI Level 5 methodologies when performing work under this contract.

(ii) Yes.

Question No.: 0052

Source Document Page Number Item Excerpt of Content Proprietary Information

RFP 97

Section C, Paragraph 3.3.2.2

The Contractor shall obtain all Software Licenses and Maintenance agreements required to support the facility.

Should the Offeror assume software license and maintenance agreement coverage for CLIN 0001 effort only?

As specific scope on future Technical Instructions under LOE Option CLINs is unknown at this time, bidding software license and maintenance agreement coverage on a FFP basis is not possible.

Please identify the specific scope the Offeror should assume for the Software License and Maintenance Agreement coverage contemplated under CLIN 0002.

Revise the referenced excerpt to read:

The Contractor shall obtain all Software Licenses and Maintenance agreements required to support the facility for CLIN 0001 requirements.

Government Response

Please see solicitation amendment 0005 for updated language in Section C paragraphs 3.3.1 and 3.3.2.2 relating to the referenced requirement.

Question No.: 0054

Source Document Page Number Item Excerpt of Content Proprietary Information

RFP, Amendment 0004

Q&A Response dated 25 May 2018

3.1.1.11.3.1

Question 0016

For completion tasks, the Contractor and its subcontractors shall implement an IPPD team approach for the performance of this contract using Capability Maturity Model Integration (CMMI) Maturity Level 5 methodologies as referenced in CMMI-DEV+IPPD V1.2 or higher

It is not sufficient for a CMMI Level 5-certified prime contractor to flow down processes to subcontractors.

Subcontractors must be certified at CMMI Level 5. Please see solicitation amendment 04 for updated language clarifying this requirement.

Question/Comment & Requested Action

Request the Government provide clarification that subcontractors may for the performance of this contract use Capability Maturity Model Integration (CMMI) Maturity Level 5 methodologies as per Amendment 4. Many small business subcontractors perform tasking under Federal Government contracts applying CMMI Level 5 methodologies and processes but are not required to have the certification due to the substantial monetary investment that is required to obtain it. By allowing performance in this manner, it enables the Government to ensure they have adequate competition and/or small business participation in performance of contracts as required by Federal Law.

Government Response

Please refer to the Government’s updated response to question 0016. While subcontractors do not need to be CMMI Level 5-certified, subcontractors performing under this contract shall use CMMI Level 5 methodologies when performing work under this contract. The prime contractor is responsible for ensuring subcontractors without CMMI Level 5 certification adhere to the prime contractor’s CMMI Level 5 methodologies.

Question No.: 0055

Source Document Page Number Item Excerpt of Content Proprietary Information

RFP 175

Section L, Paragraph 2.2

"Box 1 must include all copies of electronic media and a master packing list…" "CD-ROM/DVD media shall be secured to the proposals in a manner that prevents the media from falling out or becoming dislodged during transport and handling."

RFP page 175, Section 2.2 "Binding, Labeling, and Packing," the first paragraph states: "Box 1 must include all copies of electronic media and a master packing list." Two sentences later it states:

"CD-ROM/DVD media shall be secured to the proposals in a manner that prevents the media from falling out or becoming dislodged during transport and handling."

The assumption is the Navy wants all the CD/DVDs in Box 1 and not attached to individual proposal volumes. Please clarify.

Government Response

CD-ROM/DVD media does not need to be secured to proposals. Please refer to solicitation amendment 0005 for an update to Section L Paragraph 2.2.