Attachment_2_Government_Furnished_Information_(GFI)_List.pdf
PDF 114 KB Posted
- Solicitation number
- N0002418R5200
About this file
Attachment 2 Government Furnished Information List (15 May 2018)
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
GOVERNMENT FURNISHED INFORMATION
PURCHASE REQUEST N0002418NR46073
DATE: 15 May 2018
CODE: PEO IWS 6.0
(1) NUMBER (2) DOCUMENT TITLE (3) DOCUMENT NUMBER VOL PRT REV CHG SUP (4) DOC DATE (5) GFI
DUE DATE
1 CM Plan Rev 3 2 DoDM 5000.04-M-1. CSDR Manual 3 NAVSEA IWS Technical Review Manual
4 CEC SCG 5/13/2008
5 IWS6 DMSMS Mgmt Plan 11/1/2012 6 CEC Capability Package 7 Navy CEC CONOPS 4/12/2013
Unified INFOSEC Criteria (UIC) Security Requirements for the Cooperative Engagement Capability (CEC) Signal Data Processor (SDP) Program, Revision 1.1
6/18/2007
9 IWS 6 IUID Rev 2 Final 10/8/2013 10 Signed Risk Mgmt Plan for PEO IWS 6 0 Revision 5 01 11 CEC Milestone Chart 12 CEC Systems Engineering Plan v 4.7 draft without password 6/30/2014
13 SSPP
14 NAVSEA_IWS Technical Review Manual 15 Technical Reviews SOP 5/12/2010 16 CEC Specification Tree 17 Element Certification Policy (PEOIWSINST 4732 1) pdf 18 PAFOS Manual
19 NAVSEAINST 9410. 2A Wafare Systems Certificaiton Policy
20 CEC PESHE
21 PEOIWSINST 3960.2
22 PEOIWSINST 3086.01
23 PEOIWSINST 5200.3
24 CEC CPD
25 System Specification for the Cooperative Engagement Capability (CEC) WS32890-2 - 9/1/2011
Software Requirement Specification Cooperative Engagement Processor for the Cooperative Engagement Capability Maintenance CSCI
8240619-001 - 10/24/2007
Software Requirement Specification Cooperative Engagement Processor for the Cooperative Engagement Capability Startup in the CSCI in the Signal Data Processor (SDP)
8240620-001 A 10/24/2008
Software Requirement Specification Cooperative Engagement Processor for the Cooperative Engagement Capability Technician Control Interface (TCI) CSCI for the Signal Data Processor (SDP) Terminal
8240621-001 - 8/28/2007
29 Software Requirement Specification for the Composite Tracking Network (CTN) Web Services CSCI 8486721-002 - 10/30/2015
Software Requirement Specification Cooperative Engagement Processor of the Cooperative Engagement Capability Signal Data Processor (SDP) AEGIS CSCI
WS32892-7 APX A A 12/1/2011
Software Requirements Specification for the CEP of the Cooperative Engagement Capability Signal Data Processor(SDP) Kernel CSCI - Appendix E - CEP SSDS CSCI
WS32892-7 APX E A 8/21/2012
Software Requirements Specification (SRS) for the Cooperative Engagement Processor (CEP) of the Cooperative Engagement Capability (CEC) Signal Data Processor Sierra II (SDP-S) United States Marine Corps (USMC) Computer Software Configuration Item (CSCI)
WS32892-7 APX F - 10/30/2015
CONTRACT NUMBER:PROGRAM TITLE: TO BE FILLED AT AWARDCOOPERATIVE ENGAGEMENT CAPABILITY
NAVSEA 4340/02 (Rev. Mar 2018) Page 1 of 11
PURCHASE REQUEST N0002418NR46073
DATE: 15 May 2018
CODE: PEO IWS 6.0
(1) NUMBER (2) DOCUMENT TITLE (3) DOCUMENT NUMBER VOL PRT REV CHG SUP (4) DOC DATE (5) GFI
DUE DATE
CONTRACT NUMBER:PROGRAM TITLE: TO BE FILLED AT AWARDCOOPERATIVE ENGAGEMENT CAPABILITY
Software Requirements Specification (SRS) for the Cooperative Engagement Processor of the Cooperative Engagement Capability Zumwalt Adaptive Layer CSCI
WS32892-7 APX G 9/8/2014
Software Requirements Specification for the Cooperative Engagement Processor of the Cooperative Engagement Capability (Baseline 2.1) E-2D Adaptive Layer CSCI
WS32892-7 APX H A 6/7/2011
Derived Requirements Specification for the Cooperative Engagement Processor of the Cooperative Engagement Capability (Baseline 2.1) E-2D Adaptive Layer CSCI
WS32892-7 APX H (Derived) A 4/29/2016
Software Requirements Specification for the Cooperative Engagement Processor of the Cooperative Engagement Capability Signal Data Processor (SDP) Kernel CSCI
WS32892-7 Rev - 6/8/2011
37 Software Requirements Specification for the DDS Tactical CSCI in the SDP Terminal of the Cooperative Engagement Capability WS32895-4 - 6/8/2011
Specification for the Cooperative Engagement Capability (CEC) Common Array Block – Family of Antennas (CAB-FoA) Antenna System
WS35589 E 8/25/2014
Prime Item Development Specification for the Sierra Cryptographic Module Cooperative Engagement Capability System Appendix A Shipboard
WS32896-8 APX A - 7/11/2011
Prime Item Development Specification for the Sierra Cryptographic Module Cooperative Engagement Capability System – Appendix B Airborne
WS32896-8 APX B - 7/11/2011
Prime Item Development Specification for the Sierra Cryptographic Module Cooperative Engagement Capability System - Appendix C USMC
WS32896-8 APX C - 7/11/2011
Prime Item Development Specification for the Sierra II Cryptographic Module Cooperative Engagement Capability System
WS32896-8 - 7/11/2011
43 Interface Design Document for the E-2D Mission Computer Tactical LAN and the Cooperative Engagement Processor 123AHEMCIDD06-12 2/28/2013
Interface Design Document for the E-2D Mission Computer Tactical LAN and the Cooperative Engagement Processor
DSSC-3 and DSSC-4
123AHEMCIDD06-15 7/15/2016
Interface Definition Document for the Avionics Flight Management Computer (AFMC) E2D Advanced Hawkeye (AHE) NCDS to the USG-3B CEC System
123UIDD161 A 12/8/2010
Interface Design Document for the Cooperative Engagement Transmission Processing Set AN/USG-2 and NAVSSI AN/SSN- 6 Block 3 Via Shipboard Wide Area Network
7392658-001 A 6/30/2000
IDD for the Cooperative Engagement Transmission Processing Set AN/USG-2 and NAVSSI AN/SSG-6 Block 4.2 Via Integrated Communications & Advanced Networks
7392659-002 - 6/15/2001
48 Interface Design Document for the Cooperative Engagement Processor and AN/TPS-59 (V)3 (SDP Terminal) 8240590-001 A 9/30/2008
49 Interface Design Document for the Cooperative Engagement Processor and AN/TPS-59A (V)3 With Mode 5 IFF 8240590-002 C1 10/13/2015
Interface Design Document for the Technician Control Interface of the Cooperative Engagement Processor Signal Data Processor (SDP) Terminal
8240623-001 B 7/26/2011
NAVSEA 4340/02 (Rev. Mar 2018) Page 2 of 11
PURCHASE REQUEST N0002418NR46073
DATE: 15 May 2018
CODE: PEO IWS 6.0
(1) NUMBER (2) DOCUMENT TITLE (3) DOCUMENT NUMBER VOL PRT REV CHG SUP (4) DOC DATE (5) GFI
DUE DATE
CONTRACT NUMBER:PROGRAM TITLE: TO BE FILLED AT AWARDCOOPERATIVE ENGAGEMENT CAPABILITY
Interface Design Description (IDD) for the United States Marine Corps (USMC) Aviation Command and Combat (AC2) and the Cooperative Engagement Capability (CEC) Cooperative Engagement Processor (CEP)
8423397-001 D1 1/16/2015
Interface Design Description (IDD) for the United States Marine Corps (USMC) Aviation Command and Combat (AC2) and the Cooperative Engagement Capability (CEC) Cooperative Engagement Processor (CEP)
8423397-001 D2 12/14/2016
Interface Design Description (IDD) for the United States Marine Corps (USMC) Aviation Command and Combat (AC2) and the Cooperative Engagement Capability (CEC) Cooperative Engagement Processor (CEP)
8423397-001 E
54 Cooperative Engagement Processor Host Display System Interface Design Specification Volume I of II 8423419-001 A 7/22/2011
55 Ground Air Task Oriented Radar (G/ATOR) to CAC2S/CTN Interface Design Description (IDD) 8486799-001 C1 10/25/2016
56 Ground Air Task Oriented Radar (G/ATOR) to CAC2S/CTN Interface Design Description (IDD) 8486799-001 D
Interface Design Description DDG 7 & 8 Gigabit Ethernet Data Multiplex System and Japanese Shipwide Area Network Revision 3
C15-045/WEO 7/21/2016
JOINT LAND ATTACK CRUISE MISSILE DEFENSE
ELEVATED NETTED SENSOR SYSTEM (JLENS)
COOPERATIVE ENGAGEMENT CAPABILITY (CEC)
INTERFACE DESIGN DESCRIPTION (IDD)
H409134 D 5/22/2013
59 Interface Design Description (IDD) document for the Phalanx MK 15 Block 1B Baseline 2 Close-in Weapons System (CIWS) IDD-PHA.2008-0503
Interface Design Description (IDD) Navigation Sensor System Interface (NAVSSI) Block 4.2.1 Navigation Data Distribution Network (NDDN) Architecture on LHD 8
NAVSSI-B4-IDD-406 3 4/22/2005
Interface Design Description (IDD) for the Navigation Sensor System Interface (NAVSSI) with the CEC for NAVSSI Block
4.2.0 and 4.2.1
NAVSSI-B4-IDD-434-CEC-DDS 11/5/2007
62 RCPN 963-0792-004 F 1/30/2009
Interface Design Description DDG 53 Class Navigation Sensor System Inerface (NAVSSI) to Fiber Optics Data Multiplex System (FODMS) and Fiber Optics Data Multiplex System (FODMS) to Cooperative Engagement Capability (CEC)
T01-24/WEO FODMS 9/14/2001
Interface Design Description (IDD) DDG 51 CLASS
NAVIGATION SENSOR SYSTEM INTERFACE (NAVSSI) TO
FIBER OPTIC DATA MULTIPLEX SYSTEM (FODMS) AND
FIBER OPTIC DATA MULTIPLEX SYSTEM (FODMS) TO CEC
T01-24/WEO FODMS
(SPAWAR) 7/1/2003
Interface Design Description Royal Australian Navy Air Warfare Destroyer Internet Protocol Over Ethernet Systems and Gigabit Ethernet Data Multiplex System AN/USQ-82(V)
T09-001/WEO 2/16/2011
66 Cooperative Engagement Processor / Aegis Display System Interface Design Specification WS19706 4 8/19/2011
AEGIS Command and Decision Systems MK2 MOD 5/Cooperative Engagement Processor Interface Design Specificaiton
WS19729/3 3 7/1/2014
68 Command and Decision System (C&D) MK3 MOD 5 / CEP Interface Design Specification (Baseline 7 Phase 1R) WS19729/4 1 7/11/2014
NAVSEA 4340/02 (Rev. Mar 2018) Page 3 of 11
PURCHASE REQUEST N0002418NR46073
DATE: 15 May 2018
CODE: PEO IWS 6.0
(1) NUMBER (2) DOCUMENT TITLE (3) DOCUMENT NUMBER VOL PRT REV CHG SUP (4) DOC DATE (5) GFI
DUE DATE
CONTRACT NUMBER:PROGRAM TITLE: TO BE FILLED AT AWARDCOOPERATIVE ENGAGEMENT CAPABILITY
Command and Decision System (C&D) MK 3 MOD5 - Cooperative Engagement Processor (CEP) Interface Design Specification
WS19729/5 1 11/5/2013
70 Radar System AN/SPY/Cooperative Engagement Processor Interface Design Specifications WS19730/3 1 1/1/2004
71 Radar System AN/SPY/Cooperative Engagement Processor Interface Design Specifications WS19730/3 2 12/1/2006
72 Radar System AN/SPY/Cooperative Engagement Processor Interface Design Specifications WS19730/4 3/1/2007
73 Interface Requirements Specification for the SSDS MK 2 / CEC
CEP WS23299B 4/14/2010
Interface Design Description for the Ship Self-Defense System MK 2 MOD () (SSDS MK 2 MOD ())/Cooperative Engagement Capability (CEC) Cooperative Engagement Processor
WS23302E.1 5/15/2013
Interface Design Description for the Ship Self-Defense System MK 2 MOD () (SSDS MK 2 MOD ())/Cooperative Engagement Capability (CEC) Cooperative Engagement Processor
WS23302G 1 10/5/2016
Interface Design Description for the Ship Self-Defense System MK 2 MOD () (SSDS MK 2 MOD ())/Cooperative Engagement Capability (CEC) Cooperative Engagement Processor
WS23302G 4
Interface Design Document (IDD) for the Cooperative Engagement Processor (CEP) and Data Distribution System (DDS) (Baselines 1 and 2)
WS32901-1 E 2/8/2012
Interface Design Document for the Cooperative Engagement Processor (CEP and Data Distribution System (DDS) (DS Operating Mode)
WS32901-2 -
79 Interface Design Document (IDD) for the Cooperative Engagement Processor and Radar Set AN/SPS-48E(V) WS32905 A 1 6/9/1998
80 Interface Design Specification for Radar Set AN/SPS-49A(V) and the Sensor Integration and Tracking System WS33110A D 1/5/1996
81 Interface Design Document (IDD) for the Sensor Integration System Interface of Radar Set AN/SPQ-9B WS33551 4 2.4 6/30/2017
82 Combat System To Interrogator System AN/UPX-29(V) Interface Design Specification WS33578 10/1/2002
83 NAVSSI to CND WS33629 3/27/2009
84 Combat Systems to Interrogator System AN/UPX-29(V) with Mark XIIA/Mode S Interface Design Specification WS33715 7/15/2005
85 Combat Systems to Interrogator System AN/UPX-29(V) with Mark XIIA/Mode S Interface Design Specification WS33715A 4/3/2014
Interface Design Description (IDD) for the Navigation Critical Distribution System (NCDS) Interface with Cooperative Engagement Capability (CEC) AN/USG-2
WS34094 3/13/2006
Cooperative Engagement Capability (CEC) to Aegis Lan Interconnect System (ALIS) Interface Design Specification for Navigation Information
WS35284 1 2/1/2012
Interface Design Specification for Radar System AN/SPY-1D(V) / Cooperative Engagement Processor (CEP) for the Royal Australian Navy (RAN) File # 5125-10-003
WS35404A 4/26/2017
INTERFACE DESIGN SPEC FOR COMMAND AND DECISION
SYSTEM (C&D) Mark 3 MOD 7 / COOPERATIVE
ENGAGEMENT PROCESSOR (CEP) FOR THE ROYAL
AUSTRALIAN NAVY (RAN) File # 5401-09-009B
WS35405A 4/26/2017
NAVSEA 4340/02 (Rev. Mar 2018) Page 4 of 11
PURCHASE REQUEST N0002418NR46073
DATE: 15 May 2018
CODE: PEO IWS 6.0
(1) NUMBER (2) DOCUMENT TITLE (3) DOCUMENT NUMBER VOL PRT REV CHG SUP (4) DOC DATE (5) GFI
DUE DATE
CONTRACT NUMBER:PROGRAM TITLE: TO BE FILLED AT AWARDCOOPERATIVE ENGAGEMENT CAPABILITY
90 Cooperative Engagement Processor/Aegis Display System Interface Design Specification WS35412 1 6/1/2012
Cooperative Engagement Processor/Aegis Display System Interface Design Specification (AEGIS Modernization Advanced Capability Build 12)
WS35412 2 9/1/2013
Command and Decision System (C&D) MK 3 Mod 5/Cooperative Engagement Processor Interface Design Specification (AEGIS Modernization Advanced Capability Build 12)
WS35420 2 6/1/2013
Command and Decision System (C&D) MK 3 Mod 5/Cooperative Engagement Processor Interface Design Specification
WS35420 2 10/3/2014
94 Radar System AN/SPY/Cooperative Engagement Processor Interface Design Specifications WS35422 1 11/8/2011
Radar System AN/SPY/Cooperative Engagement Processor Interface Design Specifications (AEGIS Modernization Advanced Capability Build 12)
WS35422 2 11/12/2015
Cooperative Engagement Capability (CEC) to Aegis Lan Interconnect System (ALIS) Interface Design Specification for Navigation Information
WS35437 1 12/1/2012
97 Cooperative Engagement Processor / Aegis Display System Interface Design Specification for Royal Australian Navy (RAN) WS35547A 4/26/2017
INTERFACE DESIGN DESCRIPTION FOR THE DUAL BAND
RADAR INTEGRATION SOFTWARE CONFIGURATION IITEM
(DBRIN SCI) of the SHIP SELF-DEFENSE SYSTEM MK 2 MOD
(SSDS MK 2 MOD ( ))/COOPERATIVE ENGAGEMENT
CAPABILITY (CEC) COOPERATIVE ENGAGEMENT
PROCESSOR (CEP)
WS35569A 3/19/2014
99 Combat System To Interrogator System AN/UPX-29(V) Ethernet Interface Design Specification WS35603 1 11/2/2015
100 Combat System To Interrogator System AN/UPX-29(V) Ethernet Interface Design Specification WS35603A
BATTLE FORCE TACTICAL TRAINING (BFTT) SYSTEM,
AN/USQ-T46X(V) to COOPERATIVE ENGAGEMENT
CAPABILITY (CEC) ENHANCED TRAINING (CET)
WS35605 1 7/15/2015
102 Interface Design Description (IDD) for Navigation Critical Distribution System (NCDS) 100 Base FX Interface with CEC WS35842 2/6/2017
103 IDD for Navigation Critical Distribution System interface with CEC for LHD 1 Class WS35862 B 6/5/2017
104 Interface Design Specification for the Advanced Training Domain (ATD) 1.0.X.X and NCTE WS35863 Version 1.0 9/30/2016
Interface Design Specification for the Advanced Training Domain (ATD) 1.0.X.X to the Cooperative Engagement Capability Enhanced Training (CET)
WS35864 Version 1.0 9/30/2016
INTERFACE CONTROL DOCUMENT FOR THE SIGNAL DATA
PROCESSOR (SDP) TO THE ENHANCED INERTIAL
REFERENCE UNIT (E-IRU)
8240986-001 - 7/27/2007
107 Computer System, Ruggedized, TEMPEST - Technician Control Device (TCD) 8423643 G 5/16/2013
108 8940772 E 9/6/2006
NAVSEA 4340/02 (Rev. Mar 2018) Page 5 of 11
PURCHASE REQUEST N0002418NR46073
DATE: 15 May 2018
CODE: PEO IWS 6.0
(1) NUMBER (2) DOCUMENT TITLE (3) DOCUMENT NUMBER VOL PRT REV CHG SUP (4) DOC DATE (5) GFI
DUE DATE
CONTRACT NUMBER:PROGRAM TITLE: TO BE FILLED AT AWARDCOOPERATIVE ENGAGEMENT CAPABILITY
NAVSTAR GPS PHASE III INTERFACE CONTROL
DOCUMENT (ICD) - GPS USER EQUIPMENT, PRECISE TIME
AND TIME INTERVAL (PTTI) INTERFACE
ICD-GPS-060 A 6/2/1986
Interface Control Document for the Cooperative Engagement Capability (CEC) Common Array Block - Expeditionary (CAB- E)Antenna Assembly
WS35590 C 8/25/2014
Interface Control Document for the Cooperative Engagement Capability (CEC) Common Array Block - Expeditionary (CAB- E)Antenna Assembly
WS35591 D 8/25/2014
112 SDP_CEP_Tactical_7_4C_8240890-096 SVD 113 SDP_CEP_Tactical_7_4C_Rev_A_8240890-096 SVD A 114 CEC_Config_Files_4_6_8570631-023 SVD
115 CEC_SRD_5.5B_8570633-029 SVD
116 SDP_DDS_Tactical_4_3A_8240996-064 SVD 117 SDP_Maintenance_4_2A_8241005-062 SVD 118 SDP_Startup_4_2A_8241017-041 SVD 119 NAD Master Document 1
120 ECP CEC-0617R1 NEEDS-
FY17ESA039F0800_signed_170329 1/17/2003
121 20170711_CEC_NEEDS_SSDS_FCLIP_TIM
122 2.0 Processing UC and SQD-10-01-14 10/1/2014 123 3.0 Range Processing UC and SQD-10-01-14 10/1/2014
124 Final NEEDS Use Cases-09-23-15-WG-Package-Final-delivered 9/23/2015
125 NEEDS SW Engineering Brief-Processor Trade Study 126 NEEDS TPMS for CDR-6-13-16 6/13/2016 127 Summary of Final NEEDS Use Cases-11-10-15-delivered 11/10/2015 128 Algorithm Status-final_for_customer 129 1.0 Manage System UC and SQD-10-01-14 10/1/2014 130 1-NEEDS Reqt Changes since PDR-Post CDR Update 131 2-NEEDS SW Eng Brief-CDR Overview-Post CDR Update 132 3-NEEDS SW Eng Brief-Track Update-Post CDR Update 133 4-NEEDS SW Eng Brief-Repository-Post CDR Update
134 5-NEEDS SW Eng Brief-Track management-Post CDR Update
135 6-NEEDS SW Eng Brief--Post CDR Update 136 AMRDR-CEC NEEDS Scenarios R2 137 SCN-CEC Systems Specification for ACB-20
138 ACB20 TPM SRR
139 CEC_ACB-20_SRR_Combined_A-Spec_SCN
140 CEC_ACB-20-SRR_KPP_TPM
141 CEC_ACB-20_SRR_NCD_Req_Trace 142 CEC_ACB-20_SRR_Req_Gap_Investigation 143 CPD KPP with A4 Specs v3 144 System Functional Flow Diagrams 145 SRHA Memo 146 CEC_ACB-20_SRR_ALIS_Bandwidth_Trade_Study- 147 SRR Presentation from 20 September
148 22-23 Aug CEC AEGIS BL10 TRT artifact review and comment adj 170825 8/25/2017
149 Beacon_Tracking_SRS 150 VI_Track_ReAssocation 151 AMDR_SRS_Environmental_Filter 152 Phase_II_Acceleration_Estimate_Trade_Study_Summary 153 Advanced_Association_Algorithms_Trade_Study_Summary
NAVSEA 4340/02 (Rev. Mar 2018) Page 6 of 11
PURCHASE REQUEST N0002418NR46073
DATE: 15 May 2018
CODE: PEO IWS 6.0
(1) NUMBER (2) DOCUMENT TITLE (3) DOCUMENT NUMBER VOL PRT REV CHG SUP (4) DOC DATE (5) GFI
DUE DATE
CONTRACT NUMBER:PROGRAM TITLE: TO BE FILLED AT AWARDCOOPERATIVE ENGAGEMENT CAPABILITY
154 Initial_Track_Processing_VI 155 Initial_Track_processing_TC 156 Sensor_Adaptation_VI 157 Sensor_Adaptation_TC 158 Environmental_Filter_VI 159 Environmental_Filter_TC 160 Coordinate_Transformation_VI 161 Coordinate_Transformation_TC 162 AMDR Design Document
163 CEC_AMDR_SRS_SW_BLD-3
164 Data_Recording_TC_WIPR_919 165 Data_Recording_VI_WIPR_920 166 Interface_TC_WIPR_910 167 Interface_VI_WIPR_912 168 Ref_Cor_TC 169 Ref_Cor_VI
170 AMDR_SRS_(FOR-REFERENCE_ONLY)
171 AMDR Design Document - Adv TIM 172 Track_Re-Association_Test_Case 173 Environmentail_Filter_SRS 174 Adv_Track_Mgmt_SRS 175 Acceleration_Estimation_Verification_Items 176 AccelerationEstimation_Test_Case 177 Track_Re-Association_Verification_items 178 Reassociation_SRS 179 Acceleration_Estimation_SRS 180 Re-Assoc_DD-Append_C-JVC_Algorithm 181 Adv_Track-Management-Test_Case 182 Adv-Track_Management_Verification_items 183 InitialTrackProcessing_Test_Case 184 IntialTrackProcessing_Verification_Items 185 Environmental_Filter_Test_case 186 Environmental_Filter_Verification_Items
187 AMDR_SRS
188 PTP_VI_WIPR_955
189 PTP_TC_WIPR_956
190 TC_Track_ReAssociation 191 TC_Accleration_Estimation 192 AMDR_SRS_Track_Mgmt 193 Accleration Estimation Study_Phase II 194 Accleration_Estimation_SRS 195 Advanced Association Algorithms 196 Advanced_Association_Algorithms_Update 197 AMDR Design Document-Section 4 Acronym List Sept2015 9/1/2015 198 AMDR Track Category Overview 06 Jan 2016 1/6/2016 199 AMDR Use Cases 200 AMDR_TM_DD_SW_BLD_1and2 201 AMDR-CEC NEEDS Scenarios R2
202 CEC_AMDR_PTP_2002_SRS
203 Env Lite Design Document 204 Interface Initialization Design Document June 2015 6/1/2015 205 Phase_II_Acceleration_Estimate 206 Ray-Tracing Refraction Error Estimation Algorithm for Adaptive
Processing207 Re-Assoc_Accel_Filter-DD 208 SPY-6-Air-Track_Initiation-DD May 2015 5/1/2015
NAVSEA 4340/02 (Rev. Mar 2018) Page 7 of 11
PURCHASE REQUEST N0002418NR46073
DATE: 15 May 2018
CODE: PEO IWS 6.0
(1) NUMBER (2) DOCUMENT TITLE (3) DOCUMENT NUMBER VOL PRT REV CHG SUP (4) DOC DATE (5) GFI
DUE DATE
CONTRACT NUMBER:PROGRAM TITLE: TO BE FILLED AT AWARDCOOPERATIVE ENGAGEMENT CAPABILITY
209 SPY-6-Sen-Adap-Design_Doc 2015 210 Surface_Tracking 211 Track Association Design Document July 2015 7/1/2015 212 Track Initiation Concepts 213 Track_Association_Test_Case 214 Track_Association_Verification_Items 215 Track_Management_DD 216 Track_Management_SRS 217 Track_Management_Test_Case 218 Track_Management_Verification_Items 219 TrackInitialization_Memo_DRAFT 220 CEC CEP Kernel CSC and Adaptive Layer Functionality 7486403-001 C 10/20/2010 221 Appendix A 222 A.1 Track Management 7486403-002 D 7/24/2012 223 A.2 Update (with Compression) 7486403-003 C 9/9/2011 224 A.3 Gridlock 7486403-004 A 9/9/2011 225 A.4 Composite ID Processing 7486403-005 D 7/18/2012 226 A.5 DDS Interface 7486403-006 D 9/8/2011 227 A.6 Cooperative Engagement Decision 7486403-007 - 1/30/2002 228 A.7 Reserved 229 Appendix B 230 B.1 ACDS Block 1 Interface (Retired) 7486403-009 231 B.2 AN/SPS-48E(V) Sensor Processing 7486403-010 B 8/2/2004 232 B.3 AN/SPS-48E(V) Track Association 7486403-011 B 10/25/2010 233 B.4 AN/SPS-49A Sensor Prcoessing 7486403-012 B 8/2/2004 234 B.5 AN/SPS-49A Track Association 7486403-013 B 8/3/2004 235 B.6 Sensor Integration 7486403-014 C 9/17/2004 236 B.7 AEGIS C&D Interface 7486403-015 C 7/18/2012 237 B.8 AN/SPY-1 Interface 7486403-016 B 11/30/2011 238 B.9 IFF Sensor Integration 7486403-017 E 7/31/2012 239 B.10 IFF Contact Association 7486403-018 E 11/18/2010 240 B.11 SSDS Mk-2 Mod 0 Interface Document (retired) 7486403-019 A 1/30/2002 241 B.12 AN/SPQ-9B Interface 7486403-020 F 3/5/2013 242 B.13 Reserved 7486403-021 243 B.14 Airborne (E-2C) Interface 7486403-022 C 3/21/2005 244 B.15 Airborne Tracker 7486403-023 C 4/4/2005 245 B.16 Local Sensor Alignment 7486403-024 B 9/17/2004 246 B.17 SSDS Mk-2 Mod 1/2/3 7486403-025 D 10/20/2010 247 B.18 Track Transition 7486403-026 B 9/15/2004 248 B.19 Combat System Track Processing 7486403-027 C 3/5/2013 249 B.20 Display Interface 7486403-008 A 1/3/2002 250 B.21 AN/TPS-59(V)3 Sensor Prcessor 7486403-028 - 2/20/2003 251 B.22 AN/TPS-59(V)3 Track Association 7486403-029 - 2/20/2003
252 B.23 Navigation System Interface Navigation Manager Training Navigation Manager 7486403-031 B 6/18/2010
253 Zumwalt Adaptive Layer 7486403-032 A 8/15/2014 254 Zumwalt Adaptive Layer AN/UPX-42 7486403-033 A 8/15/2014
255 Electronic Protection/Electronic Warfare Support Function
(EP/ES) 7486403-035 - 6/3/2016
256 Draft CET TDP
257 SDP-S TDP 8360204-004 4/28/2015
258 AN/USG-2B TDP 3/5/2015
259 AN/USG-3B TDP 3/5/2015
260 AN/USG-4B TDP 3/5/2015
NAVSEA 4340/02 (Rev. Mar 2018) Page 8 of 11
PURCHASE REQUEST N0002418NR46073
DATE: 15 May 2018
CODE: PEO IWS 6.0
(1) NUMBER (2) DOCUMENT TITLE (3) DOCUMENT NUMBER VOL PRT REV CHG SUP (4) DOC DATE (5) GFI
DUE DATE
CONTRACT NUMBER:PROGRAM TITLE: TO BE FILLED AT AWARDCOOPERATIVE ENGAGEMENT CAPABILITY
IETM: DDG 113 , Cooperative Engagement Transmission Processing Set, AN/USG-2B, Interactive Electronic Technical Manual, Operation and Maintenance Instruction
SW264-DG-IEM-113
CD Volume
ID:
N63394018
CD Stock Number
0910-LP-116-
00 4/1/2015
ULSS: Cooperative Engagement Capability (CEC), AN/USG-2B, Processing Set, Cooperative Engagement Transmission, User's Logistics Support Summary
SL172-AN-LSS-030 NSN: 0910-LP-
112-2076 00 3/1/2013
IETM Classified Supplement (Addendum C, SECRET): AN/USG- 2/2A/2B, Cooperative Engagement Transmission Processing Set (CETPS), Operation and Maintenance Instructions, Classified Supplement
SW264-SB-SUP-010 NSN: 0910-LP-
111-8212 00 4/1/2012
Information Assurance (IA) System Administrator Technical Manual For the Cooperative Engagement Transmission Processing Set, AN/USG-2B
SW264-AG-TMM-010 NSN: 0910-LP-
113-8900 00 10/1/2015
Technical Manual, Organizational Maintenance With Illustrated Parts Breakdown (IPB), Cooperative Engagement Transmission Processing Set, AN/USG-3
A1-E2CEC-690-100 5 7/1/2016
IETM Classified Supplement (Addendum C, SECRET): AN/USG- 3/3B, Cooperative Engagement Transmission Processing Set (CETPS), Operation and Maintenance Instructions, Classified Supplement
SW264-NA-SUP-010 NSN: 0910-LP-
111-8843 00 4/1/2012
IETM: Operation and Maintenance Manual For Cooperative Engagement Transmission Processing Set, AN/USG-4B for the
AN/MSQ-143A(V)1
11406B-OI/4 PCN:
17611406500 3/28/2014
IETM Classified Supplement (Addendum C, SECRET): AN/USG- 4B, Cooperative Engagement Transmission Processing Set (CETPS), Operation and Maintenance Instructions, Classified Supplement
SW264-MC-SUP-010 NSN: 0910-LP-
116-0612 01 7/1/2016
269 IETM Classified Supplement SW264-AU-SUP-010 00 12/1/2016 270 A-150-9010 LP Approved 271 A-150-9010 TG Approved
272 A-150-9010_CMS
273 CEC 2B TCCD
274 USG-2B TPP
275 USG2B_CEC 01-01_02-VG_Intro 276 USG2B_CEC 01-02-VG_System_Doc 277 USG2B_CEC 01-03-VG_System_Hardware_Baseline (1) 278 USG2B_CEC 02-01-VG_Operations 279 USG2B_CEC 02-02-VG_DDS_Ops 280 USG2B_CEC 02-03-VG_CEP_Ops (1) 281 USG2B_CEC 02-04-VG_Ancillary_Equipment_Operation
282 USG2B_CEC 03-01-VG_Hardware_Controls_and_Indicators (1)
283 USG2B_CEC 03-02-
VG_Software_Operational_Controls_and_Indicators
284 USG2B_CEC 03-03-
VG_Software_Maintenance_Controls_and_Indicators
285 USG2B_CEC 04-01-VG_System_Operational_Procedures (1)
286 USG2B_CEC 04-02-VG_Network_Operational_Procedures (1)
287 USG2B_CEC 05-01-VG_On-Line_BIT 288 USG2B_CEC 05-02-VG_Offline_Bit 289 USG2B_CEC 06-01-VG_Preventative Maint 290 USG2B_CEC 06-02-VG_Removal_Replacement_Procedures
NAVSEA 4340/02 (Rev. Mar 2018) Page 9 of 11
PURCHASE REQUEST N0002418NR46073
DATE: 15 May 2018
CODE: PEO IWS 6.0
(1) NUMBER (2) DOCUMENT TITLE (3) DOCUMENT NUMBER VOL PRT REV CHG SUP (4) DOC DATE (5) GFI
DUE DATE
CONTRACT NUMBER:PROGRAM TITLE: TO BE FILLED AT AWARDCOOPERATIVE ENGAGEMENT CAPABILITY
291 Maintenance Plan for the Cooperative Engagement Transmission Processing Set (CETPS) System AN/USG-2B 8487029-001 E
292 Maintenance Plan for the Cooperative Engagement Transmission Processing Set (CETPS) AN/USG-3B 8423663-001 F1
293 Maintenance Plan for the Cooperative Engagement Transmission Processing Set (CETPS) AN/USG-4B 8486872-001 B
294 IFCK_Models which are IFC_Kernel_SE and IFC_Kernel_SW.
295 AL_Common which is AL_Framework.
296 Engineering Display Software 297 OCT Tool
298 SFAT
299 SA-CEP Information 300 2017-0619-ADVISER-HighLevelOverview 301 8360498set_srs 302 CEC Display User Guide 303 CEP WASP Summary and Overview.5.29.17 5/29/2017 304 CEPWASP Users_Guide 305 CHAPTER 8 - Display Overview 306 CTN (USG-4B) Pedigree Assessment 20140723_FINAL 7/23/2014 307 CTN SA Display Users Guide 308 NSSAT-Overview 309 NSWCDD_MPITB_Pedigree_Assessment_20140808_Final 8/8/2014
SER239 - 9410 MS ACCREDITATION DECISION LETTER
FOR THE RAPID SYSTEM INTEGRATION LABORATORY
(SIL) (22 August 2016)
8/22/2016
SER240 - 9410 MS ACCREDITATION DECISION LETTER
FOR CEP WASP PV 7.4 FOR USE DURING CEC FQT IVV
DTE AND OTHER SIMILAR USES )
312 The WASP Installation Guide 12 6 12 12/6/2012 313 WASP Scripter 12 6 12 12/6/2012
314 WASP.101.5.29.17 5/29/2017
315 Build 2.1.7.2 SWR
2.1.7.2 4/15/2011
316 Build 2.1.7.3 SWR
2.1.7.3 11/15/2011
317 Build 2.1.7.4 SWR
2.1.7.4 10/1/2012
318 Build 2.1.9.6 SWR 2.24C 3/15/2011
319 Build 2.1.9.9 SWR 4.21 10/15/2012
320 Build 2.1.10.5 SWR 4.24 5/1/2013
321 Build 2.1.9.10 SWR 4.26 7/1/2013
322 Build 2.1.10.6 SWR 4.26 7/1/2013
323 Build 2.1.10.8 SWR 4.32 6/1/2014
324 Build 2.1.10.10 SWR 5.5A 6/15/2015
325 Build 2.1.10.11 SWR 5.5B 3/2/2016
NAVSEA 4340/02 (Rev. Mar 2018) Page 10 of 11
PURCHASE REQUEST N0002418NR46073
DATE: 15 May 2018
CODE: PEO IWS 6.0
(1) NUMBER (2) DOCUMENT TITLE (3) DOCUMENT NUMBER VOL PRT REV CHG SUP (4) DOC DATE (5) GFI
DUE DATE
CONTRACT NUMBER:PROGRAM TITLE: TO BE FILLED AT AWARDCOOPERATIVE ENGAGEMENT CAPABILITY
326 Build 2.1.10.12 SWR 7.2A 3/11/2016
327 Build 2.1.10.13 SWR 7.2A 3/11/2016
328 Build 2.1.10.14 SWR 7.7 2/17/2016
329 Build 2.1.10.16 SWR 7.8A 10/3/2016
330 Build 2.1.10.24 SWR 9.5C 8/14/2017
331 Build 2.1.10.26 SWR 9.7B 12/1/2017
332 Build AU1.0.0
SWR
AU1.0.0:4.
5/15/2017
NAVSEA 4340/02 (Rev. Mar 2018) Page 11 of 11
File details come from the government source that posted it.