J-3

View the file

Other files

File Type Posted
Amendment_0013_Conformed.docx DOCX document
Amendment_0013.docx DOCX document
J-4_Pricing_Workbook_BONHOMME_RICHARD_(Amendment_0012).xlsx XLSX spreadsheet
Amendment_0012.docx DOCX document
Amendment_0012_Confromed.docx DOCX document
Amendment_0011.docx DOCX document
Amendment_0011_Conformed.docx DOCX document
N00024-18-R-4404-0010.docx DOCX document
N00024-18-R-4404-0010_Conformed.docx DOCX document
N00024-18-R-4404-0009_Conformed.docx DOCX document
N00024-18-R-4404-0009.docx DOCX document
J-4_Pricing_Workbook_BONHOMME_RICHARD_(Amendment_0009).xlsx XLSX spreadsheet
J-3_BHR_Milestones_(Amendment_0008).xlsx XLSX spreadsheet
Amendment_0008_Conformed.docx DOCX document
Amendment_0008.docx DOCX document
J-4_Pricing_Workbook_BONHOMME_RICHARD_(Amendment_0008).xlsx XLSX spreadsheet
BONHOMME_RICHARD_QA__4.xlsx XLSX spreadsheet
BONHOMME_RICHARD_QA__3.xlsx XLSX spreadsheet
Amendment_0007_Conformed.docx DOCX document
Amendment_0007.docx DOCX document
Amendment_0006.docx DOCX document
Amendment_0006_Conformed.docx DOCX document
Amendment_0005_Conformed.docx DOCX document
BONHOMME_RICHARD_QA__2.xlsx XLSX spreadsheet
Amendment_0005.docx DOCX document
J-3_BHR_Milestones_(Amendment_0004).xlsx XLSX spreadsheet
Amendment_0003_Conformed.docx DOCX document
Amendment_0003.docx DOCX document
Amendment_0004.docx DOCX document
Amendment_0004_Conformed.docx DOCX document
Amendment_0002.docx DOCX document
Amendment_0002_Conformed.docx DOCX document
BONHOMME_RICHARD_QA__1.xlsx XLSX spreadsheet
BHR_Amendment_001.docx DOCX document
BHR_Amendment_001_Conform.docx DOCX document
J-5_QASP_BHR_FY_18_DPMA.docx DOCX document
S-4_PP_Reference_List.docx DOCX document
S-2_Past_Performance_Questionnaire_BHR.docx DOCX document
S-5_Eligibility_Criteria_Data_Sheet_BHR.docx DOCX document
S-1_Technical_Capabilities_Data_Sheet_BHR.docx DOCX document
S-3_PPI_Form.docx DOCX document
S-5_Enclosure_(1).PDF PDF
J-4_Pricing_Workbook_BONHOMME_RICHARD_RFP_FINAL_Rev_1.xlsx XLSX spreadsheet
N00024-18-R-4404.docx DOCX document
J-3_BHR_Milestones_Final_REV_1.xlsx XLSX spreadsheet
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Events Readiness List (ERL)

Work SpecTitleKey event
042-11-001Accountability of Manhour and Material Reservation; accomplishAvail Complete
042-11-002Availability Associated Reports; provide and manageAvail Complete
077-11-001Hazardous Waste Produced on Naval Vessels; controlAvail Complete
110-11-002Structural Repairs and Preservation; accomplishPCD
110-21-001Structural Framing; repairPCD
110-90-001ShipAlt LHD6-76664K, Stern Flap Installation, Propeller Anitfouling Coating system, and Underwater Hull Anitfouling Coating System; accomplishUNDOCK
120-11-001Sewage Receiving Station; repairCSPCD
120-11-002Bulk Head; repairDock Trials
120-11-003Structural Repair; accomplishPCD
120-11-004Structural Repairs; accomplishPCD
120-11-005Structural Repair; accomplishPCD
120-11-006Machinery Room Structural Repair; accomplishPCD
120-11-007Structural Repairs; accomplishHabitability work Complete
120-11-008Structural Repairs; accomplishPCD
120-11-009Structural Repairs; accomplishPCD
123-10-001Tanks and Voids Open, Pump, Clean and Gas Free; accomplishDock Trials
123-11-001Compensated Fuel Oil Tank Group One; preserveUNDOCK
123-11-002Fuel/Ballast Tank Partial Preserve; accomplishUNDOCK
123-11-003Compensated Fuel Oil Tank Group 2 Partial Preserve; accomplishUNDOCK
123-11-004Compensated Fuel Oil Tank Group 3 Partial Preserve; accomplishUNDOCK
123-11-005Fuel Oil Service Tank; preservePCD
123-11-006Compensated Fuel Oil Tank Group 4 Partial Preserve; accomplishUNDOCK
123-11-007Compensated Fuel Tank Structural Repair, Group 2; accomplishUNDOCK
123-11-008Compensated Fuel Oil Tank Group 2; preserveUNDOCK
123-11-009Compensated Fuel Tank Structural Repair, Group One; AccomplishUNDOCK
123-11-010Fuel/Ballast Tank; preservePCD
123-11-011Compensated Fuel Tank Structural Repair, Group 3; AccomplishUNDOCK
123-11-012Compensated Fuel Tank Structural Repair, Group 4; AccomplishUNDOCK
123-11-013Compensated Fuel Oil Tank Group One Partial Preserve; accomplishUNDOCK
123-11-014Fuel Ballast Tank Structural Repair; AccomplishPCD
123-11-015Compensated Fuel Oil Tank Group 3; preservePCD
123-11-016Compensated Fuel Oil Tank Group 4; preservePCD
123-11-017Sounding Tube; replacePCD
123-12-001JP-5 Tank Structural Repair; AccomplishPCD
123-12-002JP-5 Storage Tank; preservePCD
123-13-001Feed Water Tank Structural Repair; AccomplishPCD
123-13-002Feed Water Tank; preservePCD
123-14-001Potable Water Tank Structural Repair; accomplishPCD
123-14-002Potable Water Tank; preservePCD
123-14-003Sounding Tube Striker Plate; replaceUNDOCK
123-15-001Lube Oil Tank Structural Repair; AccomplishPCD
123-16-001Ballast Tank Structural Repair; AccomplishPCD
123-16-002Salt Water Ballast Tank; preservePCD
123-17-001Contaminated Oil Tank Structural Repair; AccomplishPCD
123-17-002Oily Waste Tank Structural Repair; AccomplishPCD
123-17-003Contaminated Oil Tank; preservePCD
123-17-004Contaminated Oil Tank; preservePCD
123-19-001Collection, Holding and Transfer (CHT) Tank Structural Repair; AccomplishCSPCD
123-19-002Collection, Holding and Transfer (CHT) Tank Structural Repair; AccomplishCSPCD
123-19-003Collection, Holding and Transfer (CHT) Tank; preserveCSPCD
123-21-001Chain Locker; preservePCD
123-22-001Chain Locker Structural Repair; accomplishPCD
130-11-001Aircraft Securing Fitting; replaceDock Trials
130-11-002Well Deck Vent Tunnel; inspect and repairPCD
130-11-003Structural Repairs And Preserve; AccomplishPCD
130-90-001ShipAlt LHD6-82042K, JSF Topside Mods: Flight Deck Structure; accomplishDock Trials
130-90-002ShipAlt LHD6-22677, JSF Cornerstone Upgrade; accomplishCSPCD
138-11-001Sideport Ramp; refurbishDT
150-11-001Fan Room Deck; repairDock Trials
160-90-001ShipAlt LHD6-82034K JSF Topside Mods: C5I Systems; accomplishCSPCD
163-11-001Waster Sleeve; replaceUNDOCK
163-11-002Sea Chest; inspectUNDOCK
167-11-001Watertight Door; preservePCD
167-11-002Structural Door Assembly; replaceHabitability work Complete
167-11-003Well Deck Vent Plenum Door; preservePCD
167-11-004Door, Watertight, Individually Dogged; replacePCD
167-11-006Well Deck Vent Plenum Door, Hydraulic System; repairDock Trials
167-11-007Door, Viewport; repair and preserveDock Trials
167-11-008Ballistic Door; preserveDock Trials
168-12-001Ballistic Door; repairDock Trials
171-11-001Forward Mast; repairCSPCD
171-11-002SLQ-32 Antenna Retractable Platform; repairCSPCD
172-11-001FAS Station 1A King Post; inspect, replace and preserveDock Trials
179-11-001Global Broadcast Service(GBS)Antenna Platform; repairCSPCD
221-11-0015-Year Strength and Integrity Inspection (SAI) and Completion of Availability (CAI), Main Propulsion Boiler; accomplishPCD
221-11-002GIS Safety Valve and Pilot Panel, Main Propulsion Boiler No. One; overhaulPCD
221-12-001GIS Safety Valve and Pilot Panel, Main Propulsion Boiler No. 2; overhaulPCD
221-12-00218-Month Boiler Inspection, Main Propulsion Boiler No. 2; accomplishPCD
231-12-001Main Engine High Pressure (HP) Turbine Thrust Bearing; repairPCD
241-11-001Main Engine HP Turbine Coupling Distance Piece; replacePCD
241-11-002Number One Shaft Turning Gear Assembly; repairUNDOCK
243-10-001Stern Tube Shaft Seal; overhaulUNDOCK
243-11-001Bulkhead Shaft Seal; clean, inspect and testUNDOCK
243-11-002Propulsion Shafting; inspect and repairUNDOCK
243-12-001Propulsion Shafting; inspect and repairUNDOCK
243-12-002Bulkhead Shaft Seal Assembly; repairUNDOCK
244-11-001Outboard Propulsion Shafting, Bearing Clearance Measurement; accomplishUNDOCK
244-12-001Outboard Propulsion Shafting, Bearing Clearance Measurement; accomplishUNDOCK
244-12-002Line Shaft Bearing Seal; replaceUNDOCK
245-10-001Propulsion Propeller, Port and Starboard; repairUNDOCK
251-10-002Forced Draft Blower Lube Oil Cooler; clean, inspect and testPCD
253-11-001Main Steam System Valve; repairPCD
253-12-001Superheater Protection Sentinel Relief Valve; test and setPCD
253-12-002Main Steam System Valve; repairPCD
253-12-003Main Steam System Valve; repairPCD
253-12-004Main Steam System Valve; repairPCD
253-12-005Main Steam System Valve; repairPCD
254-11-001Main Condenser; clean, inspect and testPCD
254-12-001Main Condenser; clean, inspect and testPCD
254-22-001Auxiliary Air Ejector Relief Valve; test and setPCD
255-11-001DFT Shell Relief Valve; test and setPCD
255-12-001Main Feed Pump Recirculating Piping (P-1); replacePCD
255-21-0011A Main Feed Pump; repairPCD
255-22-001Main Feed Pump (MFP); repairPCD
255-22-002No. 2A and 2B Main Feed Pump Lube Oil Cooler; clean, inspect and testPCD
255-41-001Number 5 Ship Service Turbine Generator (SSTG) Hot Well Level Control Valve; repairPCD
255-42-002Condensate System Valve; repairPCD
255-42-003Condensate System Valve; replacePCD
255-51-001Main Condensate Pump Unit Number One; repairPCD
255-52-001Main Condensate Pump Number 2; repairPCD
255-61-001Condensate Pump Number One; repairPCD
255-61-002Auxiliary Condensate Pump and Motor Number One; repairPCD
255-62-002Auxiliary Condensate Pump and Motor Number 2; repairPCD
255-65-001Auxiliary Condensate Pump Number 5; repairPCD
255-72-001DFT Shell Relief Valve; test and setPCD
256-10-001Main and Auxiliary Condenser Sea Water Rubber Expansion Joint; replaceUNDOCK
256-11-002Main Circulating Pump Suction Check Valve; repairUNDOCK
256-12-001Auxiliary Sea Water Strainer; repairUNDOCK
256-30-001Auxiliary Sea Water Circulating Pump; repairUNDOCK
256-33-001Auxiliary Sea Water Circulating Pump; repairUNDOCK
258-11-001High Pressure Steam Drain Valve; replace (Level I)PCD
258-11-002High Pressure Steam Drain Relief Valve; test and setPCD
258-11-003Remote Gear Assembly; replacePCD
258-12-001High Pressure Steam Drain Valve and Piping; replace (P-1)PCD
258-12-002High Pressure Steam Drain Valve and Piping; replace (Level I)PCD
258-12-003High Pressure Steam Drain Relief Valve; test and setPCD
258-12-004High Pressure Steam Drain Valve and Piping; replace (Level I)PCD
261-11-001Fuel Oil Service System Flush; accomplishPCD
261-12-001Fuel Oil Service Valve Motor Operator; repairPCD
261-12-002Fuel Oil Quick Closing Valve; repairPCD
261-12-003Fuel Oil Quick Closing Valve; repairPCD
264-31-001Lube Oil Purifier (LOP); repairPCD
300-11-001Cable Stuffing Tube; replaceDock Trials
300-11-002Cable Stuffing Tube; replaceDock Trials
300-11-003Cable Stuffing Tube; replaceDock Trials
311-10-001Ship's Service Turbine Generator (SSTG) Casing Plug; inspectPCD
311-11-001Ship's Service Turbine Generator (SSTG) Sight Flow Indicator; replacePCD
311-11-003Ship's Service Turbine Generator (SSTG) Number One; clean and inspectUNDOCK
311-14-002Number 4 Ship Service Turbine Generator (SSTG) Reduction Gear; repairPCD
311-14-003Number 4 Ship Service Turbine Generator (SSTG) Labyrinth Seal; replacePCD
311-15-002Number 5 Ship Service Turbine Generator (SSTG) Reduction Gear; repairPCD
313-90-001ShipAlt LHD6-83220K, Lithium-Ion Battery Shop to Support JSF; accomplishDock Trials
321-11-001Cableway Bracket; replaceDock Trials
321-11-002Shore Power Cable Support; replaceCSPCD
324-11-001Control Center Switchboard; repairPCD
324-11-002Control Center Switchboard; repairPCD
324-11-003LCAC Service Station Disconnect Switch; replaceDock Trials
332-11-001Light Fixture Foundation; repairDock Trials
332-11-002Lighting Fixture Foundation; replaceDock Trials
341-10-001Lube Oil Duplex Strainer; repairPCD
341-12-001Ship Service Turbine Generator (SSTG) Lube Oil Flushing Strainer Filter Bag; providePCD
342-21-001Emergency Diesel Generator (EDG) Sea Water Booster Pump; overhaulUNDOCK
342-22-001Emergency Diesel Generator (EDG) Sea Water Cooling Pump; overhaulUNDOCK
421-00-001Exposed Conning Station Movable Pelorus Cable; replaceCSPCD
426-23-001Digital Dead Reckoning Tracer (DDRT); replaceCSPCD
427-21-001Alignment Outlet Box (AOB) Pigtail Cable; replaceCSPCD
436-11-001External Control System Assembly; removeCSPCD
436-11-002Refrigerant Monitor; replacePCD
437-11-001Oily Waste Holding Tank Liquid Level Switch; repairPCD
437-21-001Tank Level Indicator (TLI); repairPCD
441-11-001Antenna Bracket; replaceCSPCD
441-61-001Automated Digital Network System (ADNS) Cable; replaceCSPCD
441-71-001AN/WSC-3A(V) Receiver/Transmitter; repairCSPCD
441-71-002Communications Data Link System (CDLS) Antenna Radome; repairCSPCD
446-14-001Secure Audio System Switching Matrix SA-2112(V)8/STQ; repairCSPCD
451-73-001AN/SPS-73(V)12 Radar Cable; replaceCSPCD
454-41-001AN/SPN-41 Retractable Mast; replaceCSPCD
475-11-001Degaussing Cable; replaceCSPCD
492-61-001Deck Edge Light Fixture; replaceDock Trials
492-71-001Rotary Beacon Light Brackets (Green); replaceCSPCD
492-90-001ShipAlt LHD6-82041K, JSF Topside Mods: Short Take-Off (STO) Lighting; accomplishDock Trials
508-11-001Lagging and Insulation, Inside Machinery Space; replacePCD
508-11-002Lagging and Insulation, Inside Machinery Space; replacePCD
508-12-001Lagging and Insulation, Outside Machinery Space; replaceHabitability work Complete
508-12-002Lagging and Insulation, Outside Machinery Space; replaceDock Trials
508-12-003Lagging and Insulation, Outside Machinery Space; replaceHabitability work Complete
508-12-004Lagging and Insulation, Outside Machinery Space; replaceDock Trials
508-12-005Lagging and Insulation, Outside Machinery Space; replaceHabitability work Complete
511-11-001Preheater Supply and Return Valves; replaceHabitability work Complete
511-11-002Service Steam Piping; replaceHabitability work Complete
511-11-003Steam Heater and Piping; replaceHabitability work Complete
511-11-004Steam Supply/Return Piping, Valve; replaceHabitability work Complete
511-11-005Steam Supply/Return Piping and Valve; replaceHabitability work Complete
511-11-006Steam Supply/Condensate Piping and Valve; replacePCD
511-11-007Ventilation Heater; replacePCD
511-11-008Chain Pipe; repairDock Trials
511-11-009Preheater (PHR) Supply and Return Valve; replaceHabitability work Complete
511-11-010Temperature Regulating Valve; replaceHabitability work Complete
511-11-011Steam Preheater Thermostat/Valve; replaceHabitability work Complete
511-11-012Preheater (PHR) Return Valve; replaceHabitability work Complete
511-11-013Preheater (PHR) Supply Valve; replaceHabitability work Complete
511-11-014Preheater Steam Drain Valve and Temperature Regulating Valve; replacePCD
511-11-015Preheater Steam Supply Valve and Temperature Regulating Valve; replacePCD
511-11-016Pre-Heater; repairPCD
511-11-017Preheater (PHR) Valve; replaceHabitability work Complete
511-11-018Preheater; replaceHabitability work Complete
511-11-019L Type Thermostat; installHabitability work Complete
511-11-020Unit heater; repairHabitability work Complete
511-11-021Preheater (PHR) W-Type Thermostat; replaceHabitability work Complete
511-11-022Preheater (PHR) W-Type Thermostat; replaceHabitability work Complete
511-11-023Preheater Valve; replacePCD
511-11-024Preheater (PHR) Steam Drain and Regulating Valve; replaceHabitability work Complete
511-11-025Temperature Regulating Valve; replacePCD
511-11-026Temperature Regulating Valve; replacePCD
511-11-027Temperature Regulating Valve; replacePCD
511-11-028Temperature Regulating Valve; replacePCD
511-11-029Preheater; replaceHabitability work Complete
511-11-030Temperature Regulating Valve; replaceHabitability work Complete
511-11-031Preheater and Temperature Regulating Valve; replacePCD
511-11-032Preheater; replaceHabitability work Complete
511-11-033Preheater (PHR) Supply and Return Valve; replaceHabitability work Complete
511-11-034Preheater; replaceHabitability work Complete
511-11-035Preheater (PHR) Valve; replaceHabitability work Complete
511-11-036Preheater (PHR) Strainer and Orifice; replaceHabitability work Complete
511-11-037W and L Type Thermostat; installHabitability work Complete
511-11-038Preheater (PHR) Steam Valves; replaceHabitability work Complete
511-11-039Preheater Humidistat; replaceHabitability work Complete
511-11-040Preheater; replaceHabitability work Complete
512-11-001Supply Vent Fan Motor; rewindPCD
512-11-002Fan Coil Unit (FCU); repairPCD
512-11-003Fan Coil Assembly; replaceHabitability work Complete
512-11-005Ventilation Duct Insulation and Lagging; install newHabitability work Complete
512-11-006Ventilation Supply System, Structure and Plating; replacePCD
512-11-007Corroded Ventilation; replacePCD
512-11-008Exhaust Ventilation; cleanHabitability work Complete
512-11-009Insulation; repairDock Trials
512-11-010Ventilation Duct; replaceHabitability work Complete
512-11-012Vaneaxial Fan, repairHabitability work Complete
512-11-013Ventilation Ducting; replaceDock Trials
512-11-014Corroded Exhaust Duct; replacePCD
512-11-015Ventilation System Ducting Access Plate; installDock Trials
512-11-016HVAC Cooling Coil; replaceHabitability work Complete
512-11-017Ducting, Ventilation; replacePCD
512-11-018Ventilation Supply System, Structural and Plating; replacePCD
512-11-019Ventilation Diffuser; replaceHabitability work Complete
512-11-020Vaneaxial Fan; repairPCD
512-11-021Ducting, Ventilation; repairHabitability work Complete
512-11-022Ducting, Ventilation; repairCSPCD
512-11-023Ventilation System Ducting Access Panel; installHabitability work Complete
512-11-024Ventilation Duct; replacePCD
512-90-001ShipAlt LHD6-82038K, JSF Topside Mods: HVAC Supply Vent Mods Material; accomplishCSPCD
513-11-001Ventilation Supply System, Structure and Plating; replacePCD
513-11-002Ventilation Supply System, Structural and Plating; replacePCD
513-11-004Ventilation Intake Supply System, Structure and Plating; replacePCD
514-11-001Air Conditioning (A/C) Chilled Water Pump; repairPCD
514-11-002Air Conditioning (A/C) Chilled Water Pump; repairPCD
514-11-003Air Conditioning (A/C) Chilled Water Pump; repairPCD
514-11-004HVAC Cooling Coil; cleanPCD
516-10-001Refrigeration Compressor Unit Resilient Mount; replacePCD
516-11-001Refrigeration System; repairDock Trials
520-11-001Underwater Log Sea Valve Assembly, Rodmeter Lift Mechanism; repairUNDOCK
520-11-002Sea Valve; repairUNDOCK
521-11-001Firemain System Valve; replacePCD
521-11-002Firemain System Valve; replacePCD
521-11-003Firemain System Valve; repairPCD
521-11-004Firemain Valve; repairPCD
521-11-005Firemain System Valve; repairPCD
521-11-006Firemain Valve; repairPCD
521-11-007Firemain Cross Connect Cut Out Valve; repairPCD
521-11-008Motor Operated Valve: replacePCD
521-11-009Firemain System Valve; repairPCD
521-11-010Firemain System Valve; replacePCD
521-11-011Firemain Valve Motor Operator; repairPCD
521-11-012Firemain Root Valve Remote Operating Assembly; replacePCD
521-11-013Firemain Valve; repairPCD
521-21-001Fire Pump Motor; repairPCD
521-21-002Fire Pump; repairPCD
521-21-005Fire Pump Emergency Trip Valve; repairPCD
521-21-006Fire Pump Emergency Trip Valve; repairPCD
521-21-007Sea Chest; preserveUNDOCK
524-21-001Auxiliary Sea Water Circulating Pump; replaceUNDOCK
528-11-001Remote Operator Deck Box; repairPCD
528-11-002Discharge Drain Piping; alignHabitability work Complete
528-11-003Plumbing Drain Piping; replacePCD
529-11-002Main Drainage Overboard Valve; replaceUNDOCK
529-11-003Remote Valve Operator Assembly; replacePCD
529-11-004Main Drain Cutout Actuating Valve; replacePCD
529-11-006Overboard Discharge Valve; replaceUNDOCK
529-11-007Main Drainage Valve; repairUNDOCK
529-11-008Eductor E19 Overboard Discharge Valve; replaceUNDOCK
529-11-010Eductor E12 Discharge Cut Out Valve; replaceUNDOCK
529-11-011Teleflex Remote Valve Operator Assembly; replacePCD
529-11-012Oily Waste Transfer Piping; replacePCD
529-11-013Waste Water Drain Piping; replacePCD
529-11-014Drainage System Eductor; replaceUNDOCK
529-11-015Compression Fitted Hydraulic Piping; repairPCD
529-11-016Stud and Pipe Hanger; replacePCD
529-31-001Hydraulic Ballast Valve and Reach Rod Assembly; replace (P-1)PCD
529-31-002Deballast Valve Electric Actuator; replacePCD
529-31-003Ballast Valve Electric Actuator; replacePCD
531-10-001No. One Sea Water Feed Pump; replaceUNDOCK
531-11-001Number One Distillation Plant Distillate Pump; repairUNDOCK
531-11-002Brine Pump, Distilling Plant; repairUNDOCK
531-11-003Distilling Plant Feedwater Heater/After Condenser; replacePCD
531-11-004Number One Distilling Plant Feedwater Heater Relief Valve; test and setPCD
531-11-005Distilling Plant Chemically Cleaning; accomplishPCD
531-11-006Number One Distilling Plant; repairPCD
531-12-001Pump, Distillate, Number 2 Distillation Plant; repairPCD
531-12-002Brine Pump, Distilling Plant; repairUNDOCK
531-12-003Sea Water Feed Pump and Motor; repairUNDOCK
531-12-004Number 2 Distilling Plant; repairPCD
531-12-005Number 2 Distillation Plant Condensate Pump; repairPCD
532-11-001Heat Exchanger; clean, inspect, and testCSPCD
533-11-001Hot Water Heater; repairHabitability work Complete
533-11-002Hot Water Heater, replaceHabitability work Complete
533-11-003Brig Shower Mixing Valve Assembly; replaceHabitability work Complete
533-11-004Potable Water Valve and Piping; removeDock Trials
533-11-005Potable Water Heater, Piping; replacePCD
533-11-006Potable Water Heater Piping; ReplacePCD
533-11-007Potable Water Heater Number 3 Replace, Piping Upgrade; accomplishPCD
533-11-008Potable Water Heater Number 8 Replace, Piping Upgrade; accomplishHabitability work Complete
534-11-001Auxiliary Exhaust Relief Valve; testPCD
534-11-002Auxiliary Steam Relief Valve; test and setPCD
534-11-003Auxiliary Steam Bulkhead Cross Connect Valve; repairPCD
534-11-004Auxiliary Steam Relief Valve; test and setPCD
534-11-005Auxiliary Steam 600/150 Reducer Control Valve; repairPCD
534-11-006Auxiliary Exhaust System Valve; repairPCD
534-11-007150 PSI Auxiliary Steam System Valve; replacePCD
534-11-008600 PSI Auxiliary Steam System Valve; repairPCD
534-11-009Steaming Out Connection Relief Valve; test and setPCD
534-11-010Auxiliary Steam Pressure Relief Valve; replacePCD
534-11-011Valve Reach Rod and Operator Gear Box Assembly; replacePCD
534-11-013Leslie Regulating Valve and Controller (Steam Exhaust to Atmosphere Exhaust System Dump Valve);repair and testPCD
534-11-014150 PSI Auxiliary Steam System Valve; replacePCD
534-11-015Auxiliary Steam System Valve; repairPCD
534-11-016Steam Supply and Steam Supply Root Valve (In-line repair), 1A FDB; accomplishPCD
534-11-019Steam Supply and Steam Root Valve (in-line repair) and Bypass Valve (replace); accomplishPCD
534-11-020Steam Supply and Steam Root Valve (in-line repair) and Bypass Valve (replace); accomplishPCD
534-11-021Steam Supply and Steam Root Valve (in-line repair) and Bypass Valve (replace); accomplishPCD
534-12-001600 PSI Auxiliary Steam System Valve; replace (P-1)PCD
534-12-002600 PSI Auxiliary Steam System Drain Valve and Piping; replace (P-1)PCD
534-12-004Auxiliary Steam Bulkhead Cross Connect Valve; repairPCD
534-12-006150 PSI Auxiliary Steam Valve; replacePCD
534-12-007600 PSI Auxiliary Steam System Valve; repairPCD
534-12-008Auxiliary Exhaust System Valve; repairPCD
534-12-010150 PSI Auxiliary Steam System Drain Valve and Piping; replacePCD
534-12-011Auxiliary Exhaust Relief Valve; test and setPCD
534-12-012Auxiliary Steam Relief Valve: replacePCD
534-20-001Gland Seal Relief Valve; test and setPCD
534-20-002Gland Seal Low Point Drain Piping; clean and inspectPCD
534-21-001Number 5 Ships Service Turbine Generator (SSTG) Gland Seal Valve; replacePCD
534-21-002Number 4 SSTG Gland Seal Regulating Valve; repairPCD
534-42-001Auxiliary Exhaust Cross-Connect Valve; repairPCD
534-42-002Combination Exhaust and Relief Valve; repairPCD
534-42-003Combination Exhaust and Relief Valve; repairPCD
534-52-001Fresh Water Drain System Valve and Piping; replacePCD
534-52-002Fresh Water Drain Collecting Tank (FWDCT) Pump; replacePCD
535-11-001Numbers One and 2 Sea Chest Steaming Out Connections Relief Valve; test and setUNDOCK
535-11-002Numbers 4 and 7 Sea Chest Steaming Out Connections Relief Valve; test and setUNDOCK
535-11-003Numbers 5 and 6 Sea Chest Steaming Out Connection Relief Valve; test and setUNDOCK
535-11-004Shore Steam Strainer Bypass Valve; replacePCD
541-11-001Fuel Stripping Piping; replacePCD
541-11-002Fuel Transfer Piping; replacePCD
541-12-001Fuel Oil Valve; replacePCD
541-12-002Fuel Oil Valve; replacePCD
541-12-003Fuel Oil Valve; replacePCD
541-12-004Sea Water Supply Valve; replaceUNDOCK
542-11-001JP-5 Storage Tank Air Escape Piping; replacePCD
542-11-002JP-5 Service Main Valve; repairPCD
542-11-003JP-5 Fill and Transfer Main Segregation Valve; replacePCD
542-11-004JP-5 Air Escape Vent Screens; replacePCD
542-21-001JP-5 Purifier; repairPCD
542-21-002Number 2 JP-5 Fuel/Defuel Pump and Reducer; repair and replacePCD
542-21-003Number 3 JP-5 Fuel/Defuel Pump and Reducer; repair and replacePCD
542-21-004Number 4 JP-5 Fuel/Defuel Pump and Reducer; repair and replacePCD
542-21-005Number 5 JP-5 Fuel/Defuel Pump and Reducer; repair and replacePCD
542-21-006Number 6 JP-5 Fuel/Defuel Pump and Reducer; repair and replacePCD
542-21-007Number 8 JP-5 Fuel/Defuel Pump and Reducer; repair and replacePCD
542-21-008Number One JP-5 Fuel/Defuel Pump and Reducer; repair and replacePCD
542-21-009Number 10 JP-5 Fuel/Defuel Pump Reducer; replacePCD
542-21-010Number 2 JP-5 Service Pump; repairHabitability work Complete
542-21-011Number One JP-5 Transfer Pump; repairHabitability work Complete
542-21-012Number 4 JP-5 Transfer Pump; repairHabitability work Complete
551-11-001Pressure Reducing Manifold; repairPCD
551-53-001Low Pressure Air Compressor (LPAC) Motor; rewindPCD
551-53-002Low Pressure Air Compressor (LPAC) Motor; repairPCD
553-11-001Nitrogen Production and Distribution System; cleanDock Trials
555-12-001Aqueous Film Forming Foam (AFFF) Pump; repairDock Trials
555-12-002Aqueous Film Forming Foam (AFFF) Pump; repairDock Trials
555-12-003AFFF Hose Reel; preserve (Option Item)Dock Trials
555-12-004AFFF Valve Deck Box; replacePCD
555-12-005AFFF Cross-Connect Valve; replacePCD
555-12-006AFFF Valve; repairPCD
555-31-001Halon Emergency Generator Room Number 2 Discharge Nozzle/Piping (P1); replacePCD
555-31-002Auxiliary Machinery Room Halon System Discharge Nozzle/Piping (P-1); replacePCD
555-90-001ShipAlt LHD6-82036K JFS Topside Mods: Fire Fighting Protection Mods; accomplishDock Trials
561-11-001Steering Gear Hydraulic Power Unit (HPU) Main Hydraulic Pump; inspect and repairPCD
562-11-001Rudder Bearing Seal and Rudderstock Seal; repairUNDOCK
571-41-001Spanwire Stowage Padeye and Probe Stowage Rack; repair and replaceDock Trials
572-11-001Number 2 Dumbwaiter; test (OPTION ITEM)Dock Trials
573-21-001Number 2 Vertical Package Conveyor; test (OPTION ITEM)Dock Trials
581-11-001Anchor and Anchor Chain; Inspect and PreserveDock Trials
581-11-002Hawse Pipe; repairDock Trials
581-11-003Anchor Windlass Hydraulic Power Unit (HPU) Pump; repairDock Trials
581-11-004Anchor Windlass Hydraulic Power Unit (HPU) Motor; repairHabitability work Complete
582-11-002Fairlead; repairDock Trials
582-11-003Starboard Warping Capstan and Number 3 Mooring Capstan; overhaulDock Trials
583-11-002Cable Hanger; replaceDock Trials
583-11-003Boat Davit Wire Rope; replace and testDock Trials
583-11-004Boat Davit Wire Rope and Chock Cover; replaceDock Trials
583-11-005Slewing Arm Davit System; repairDock Trials
583-90-001ShipAlt LHD6-82043K, JSF Topside Mods: Liferaft Stowage; accomplishDock Trials
584-10-001Sideport Stores, Shell Closure Door; repairHabitability work Complete
584-11-001Sideport Shell Door; repairPCD
584-13-001Hangar Deck Ramp Access Roller Curtain Door; repairPCD
584-13-002Balloon Inflation Room Roller Door; repairPCD
584-15-001Aircraft Elevator Door; repairPCD
584-21-001Stern Gate Upper and Lower Hydraulic Cylinder Assembly; repairPCD
584-31-001Vehicle and Amphibian Recovery Winch Motor Brake; repairDock Trials
588-11-001Deck Edge Aircraft Elevator Wire Rope; replacePCD
588-11-002Hydraulic Pump Mechanical Seal; replacePCD
588-11-003Aircraft Elevator Pump Relief Valve; test and setPCD
588-11-004Aircraft Elevator Platform Safety Hold-Back Device; preserve (Option Item)Habitability work Complete
588-11-005Aircraft Elevator Platform Lockbar System; repair and preserveHabitability work Complete
588-21-001Aircraft Bridge Crane; assess and weight testPCD
588-21-002Naval Air Warfare Center, Aviation Facilities Assist Visit Discrepancy; correctSea Trials
589-21-001Sideport Cargo Crane Weight Test; accomplish (OPTION ITEM)Dock Trials
589-21-002Sideport Stores Crane Weight Test; accomplish (OPTION ITEM)Dock Trials
589-31-001Medical Evacuation (MEDEVAC) Elevator; testDock Trials
589-31-002Medevac Elevator Door; repairHabitability work Complete
589-62-001Starboard Sideport Shell Closure Door; repairSea Trials
589-62-002Starboard Sideport Shell Closure Door; repairSea Trials
593-11-001Macerator Pump; replacePCD
593-11-002Collection, Holding and Transfer (CHT) Piping; replaceCSPCD
593-11-003Remote Operating Valve Deck Box; replacePCD
593-11-004Remote Operating Valve Deck Box and Teleflex Cable; replacePCD
593-11-005Remote Operating Valve Deck Box and Universal; replacePCD
593-11-006Sewage Collection, Holding, and Transfer (CHT) Piping; replaceCSPCD
593-11-007Remote Operating Valve Deck Box; replaceHabitability work Complete
593-11-008Collection Holding and Transfer (CHT) System Valve Remote Operator Deck Box and Valve; replaceCSPCD
593-11-009Collection, Holding and Transfer (CHT) System Hydroblast; accomplishCSPCD
593-11-010Remote Operating Valve Deck Box; replaceHabitability work Complete
593-11-011Remote Operating Valve Deck Box; replaceHabitability work Complete
593-11-012Urinal Piping; replaceHabitability work Complete
593-11-013Urinal Piping; replaceHabitability work Complete
593-11-014Urinal Piping; replaceHabitability work Complete
593-11-015Urinal Piping; replaceHabitability work Complete
593-11-016Urinal Piping; replaceHabitability work Complete
593-11-017Remote Teleflex Valve Operator Assembly; replacePCD
593-11-018Water Closet Discharge Piping; replaceHabitability work Complete
593-11-019Urinal Piping; replaceHabitability work Complete
593-11-020Scupper Valve; replacePCD
593-11-021Remote Operating Valve Deck Box; replacePCD
593-11-022Teleflex Remote Operator Assembly; inspect and repairPCD
593-11-023Urinal Piping; replaceHabitability work Complete
593-11-024Urinal Piping; replaceHabitability work Complete
593-11-025Urinal Piping; replaceHabitability work Complete
593-11-026Urinal Piping; replaceHabitability work Complete
593-11-027Urinal Piping; replaceHabitability work Complete
593-11-028Urinal Piping; replaceHabitability work Complete
593-11-029Urinal Piping; replaceHabitability work Complete
593-11-030Urinal Piping; replaceHabitability work Complete
593-11-031Collection, Holding and Transfer (CHT) Eddy Pump; repairCSPCD
593-11-032Remote Operating Valve Deck Box; replacePCD
593-11-033Remote Operating Valve Deck Box and Teleflex Cable; replacePCD
593-11-035Urinal Piping; replaceHabitability work Complete
593-12-001Waste Water Drain Piping; replacePCD
593-31-001Plastic Waste Compress Melt Unit; replaceHabitability work Complete
611-11-001Weight Test Certification; accomplish (OPTION ITEM)Dock Trials
611-11-002Elevator Portable Ramp; repairDock Trials
612-11-001Safety Rails and Lifelines; replaceDock Trials
612-11-002Handrail; repairDock Trials
612-21-001Net Gratings Load Test; accomplish (OPTION ITEM)Dock Trials
612-90-001ShipAlt LHD6-82047K, JSF Personnel Safety - Safety Nets/Liferails; accomplishDock Trials
613-11-001Stack Cover; replaceUNDOCK
621-11-002Joiner Bulkhead; preserve and repairHabitability work Complete
622-11-003Catwalk Grating and Support; replace and preserveHabitability work Complete
622-12-001Storeroom Grating; replaceHabitability work Complete
622-12-002Storeroom Grating; replaceHabitability work Complete
623-11-001Access Ladder; repairCSPCD
623-11-002Vertical Ladder; replacePCD
623-11-003Vertical Ladder; replacePCD
623-12-001Vertical Ladder; replacePCD
623-21-001Accommodation Ladder; repairDock Trials
624-11-001Balanced Joiner Doors; remove, store and installPCD
624-11-002Non Structural Door; installHabitability work Complete
624-12-002Port Vent Plenum Hydraulic Manifold; replaceHabitability work Complete
624-12-003Starboard Vent Plenum Hydraulic Manifold; replaceHabitability work Complete
624-12-004Roller Curtain Door Assembly; replaceDock Trials
625-11-001Primary Flight Control Station Window; replaceDock Trials
625-11-002Conflag Station Number 7 and Hanger Deck Control Office Window; replaceDock Trials
625-11-003Window; replaceDock Trials
631-11-001AFFF Station; preservePCD
631-11-002Machinery Space Bilge; preservePCD
631-11-003Main Machinery Room Number 2 Bilge; repair and preservePCD
631-11-005Machinery Space Bilge; preservePCD
631-11-006Underwater Log Trunk; preservePCD
631-11-007Shaft Alley; preserve, touch-upPCD
631-11-008Machinery Space; repair and preservePCD
631-11-009Hangar Bay Overhead; PreserveDT
631-12-001Compartment; preservePCD
631-12-002Compartment; preservePCD
631-12-003Structral Bulkheads; repair and preservePCD
631-13-001Ramp Grating; preserveDock Trials
631-13-002Landing Craft Well Deck And Wing Wall; preserveDock Trials
631-13-003Lower Vehicle Stowage Overhead; preserveDock Trials
631-13-004Upper Vehicle Stowage Overhead; preserveDock Trials
631-13-005Deck Touch-Up; preservePCD
631-13-006Deck; preserveHabitability work Complete
631-13-007Fan Room; preserveHabitability work Complete
631-13-008Deck; repair and preservePCD
631-13-009Well Deck Vent Tunnel; preserveHabitability work Complete
631-13-010Interior Compartment; insulate and preserveDock Trials
631-13-011Storeroom Deck; preserveHabitability work Complete
631-13-012Fan Room Deck; preserveHabitability work Complete
631-13-013Cleaning Gear Locker; preserveHabitability work Complete
631-21-001Mast; preserveUNDOCK
631-21-002AN/SPN-35 and AN/WSC-6 Radome Platform Preservation; accomplishCSPCD
631-31-001Underwater Hull; inspect, repair, and preserveUNDOCK
631-41-001Freeboard; preserveUNDOCK
633-21-001Impressed Current Cathodic Protection (ICCP) System; inspect and repairUNDOCK
633-21-002Impressed Current Cathodic Protection (ICCP) Epoxy; installUNDOCK
634-11-001Cosmetic Polymeric Deck Covering (PRC); repair and resurfaceHabitability work Complete
634-11-002Cosmetic Polymeric Deck Covering System; installHabitability work Complete
634-11-003Peel and Stick Nonskid; replaceHabitability work Complete
634-11-004Vinyl Tile Deck Covering System; replacePCD
634-11-005Cleaning Gear Locker Vinyl Tile Deck Covering System; repairHabitability work Complete
634-11-006Deck Covering, Ammunition Magazine; replacePCD
634-11-007Deck Covering, Nonskid; replaceDock Trials
634-11-008Electrical Grade Sheeting Deck Covering System; installCSPCD
634-11-009Quarry Tile Deck Covering System; installHabitability work Complete
634-11-010Porcelain Tile Deck Covering System; repairHabitability work Complete
634-11-013Porcelain Tile Deck Covering System; installHabitability work Complete
634-11-014Deck Covering, Non-Skid (Ramp); replaceDock Trials
634-11-015Deck Covering, Non-skid; replaceHabitability work Complete
634-11-017Non-Critical Nonskid; replaceDock Trials
634-11-020Cosmetic Polymeric Deck Covering System; installHabitability work Complete
634-11-021Cosmetic Polymeric Deck Covering (PRC); repair and resurfaceHabitability work Complete
634-11-022Deck Covering, Nonskid; replaceDock Trials
634-11-023Electrical Grade Sheeting Deck Covering System; installCSPCD
634-11-024Porcelain Tile Deck Covering System; repairHabitability work Complete
634-11-025Deck Covering, Electrical Grade Sheeting; replaceCSPCD
634-11-026Deck Covering, Nonskid; replaceDock Trials
634-11-027Cosmetic Polymeric Deck Covering (PRC); repair and resurfaceDock Trials
634-11-028Cosmetic Polymeric Deck Covering System; installHabitability work Complete
634-11-029Deck Covering, Non-skid; replaceDock Trials
634-11-030Cosmetic Polymeric Deck Covering System; installDock Trials
634-11-031Cosmetic Polymeric Deck Covering (PRC); repair and resurfaceHabitability work Complete
634-11-032Cosmetic Polymeric Deck Covering System; installHabitability work Complete
634-11-033Cosmetic Polymeric Deck Covering; resurfaceHabitability work Complete
634-11-034Cosmetic Polymeric Deck Covering System; installDock Trials
634-11-035Cargo Elevator Platform Nonskid; replaceHabitability work Complete
634-21-001Flight Deck Nonskid; replaceDock Trials
634-21-002Hangar Deck Nonskid; replaceDock Trials
635-11-001Bulkhead Insulation; replaceDock Trials
635-11-002Bulkhead Insulation; replaceDock Trials
635-11-003Bulkhead Insulation; replaceDock Trials
635-11-004Hull Insulation; repairHabitability work Complete
635-11-005Bulkhead Insulation; replaceHabitability work Complete
635-11-006Bulkhead Insulation; replaceHabitability work Complete
635-11-007Bulkhead Insulation; replaceHabitability work Complete
637-11-001False Overhead Sheathing and Tee; replaceHabitability work Complete
643-11-001Habitability Project BTRM-S0433, Troop Living Space Modification; accomplishHabitability work Complete
643-11-002Berthing; refurbishHabitability work Complete
644-11-001Habitability Project HTRP-S0434, Troop Sanitary Space Modifications; accomplishHabitability work Complete
644-11-002Crew Shower Stall; replaceHabitability work Complete
644-11-003Officer Wash Room; refurbishHabitability work Complete
644-11-005Troop Officer Wash Room and Water Closet; refurbishHabitability work Complete
644-11-006Officer Wash Room; refurbishHabitability work Complete
644-11-007Officer Sanitation Space; refurbishHabitability work Complete
644-11-008Troop Officer Shower Space; refurbishHabitability work Complete
644-11-009Officer Shower Space; refurbishHabitability work Complete
644-11-010Officer Water Closet; repairHabitability work Complete
644-11-011Troop Officer Washroom, Water Closet, Shower; refurbishHabitability work Complete
651-11-001High Compression Steam Cooker; replaceHabitability work Complete
651-11-002Dishwasher; replaceHabitability work Complete
651-11-003Garbage Disposal; replaceHabitability work Complete
651-11-004Drop-in Griddle; replaceHabitability work Complete
651-11-005Steam Kettle; replaceHabitability work Complete
651-11-006Wardroom Galley Frozen Food Cabinet; replaceHabitability work Complete
651-11-007Crew/Troop Galley Freezer; replaceHabitability work Complete
651-11-008Crew/Troop Galley Undercounter Reefer; replaceHabitability work Complete
651-11-010CPO & SSNCO Galley Undercounter Freezer; replaceHabitability work Complete
651-11-011Crew and Troop Galley Undercounter Freezer Size 10; replaceHabitability work Complete
651-11-012Crew and Troop Galley Undercounter Freezer Size 20; replaceHabitability work Complete
651-11-013Steam Jacketed Kettle; replaceHabitability work Complete
651-11-014Wardroom Galley Refrigerator; replaceHabitability work Complete
651-11-015Cold Food Counter; replaceHabitability work Complete
651-11-016Deep Fat Fryer; removeHabitability work Complete
652-10-001Medical Gowning Room Bulkhead and Deck: replaceHabitability work Complete
652-11-001Refrigerator, Blood Bank; replaceHabitability work Complete
654-11-001Brig Water Closet/Lavatory; replaceHabitability work Complete
654-11-002Refrigerator; replaceHabitability work Complete
654-11-003Countertop; replaceHabitability work Complete
654-11-004Access Panel; replaceHabitability work Complete
654-11-005Counter Top; replaceHabitability work Complete
655-11-001Laundry Washer/Extractor; replaceHabitability work Complete
655-11-002Laundry Dryer; replaceHabitability work Complete
661-10-001Flag Plot and Flag Brief Restoration; accomplishCSPCD
663-90-001ShipAlt LHD6-82483K, Capstone Space Arrangement; accomplishCSPCD
665-90-001ShipAlt LHD6-82046K, JSF Shops and Services; accomplishDock Trials
671-11-001AESS Enclosure; replaceCSPCD
672-11-001Sonobouy Latch Locking Pin; replaceHabitability work Complete
672-11-002Teleflex Remote Valve Operator Assembly; replacePCD
700-90-001ShipAlt LHD6-82876K, (CMBRE)Common Munitions BIT/Reprogramming Equipment; accomplishDock Trials
712-11-001Close In Weapon System (CIWS) Ammunition Hoist; repair (OPTION ITEM)Dock Trials
721-90-001ShipAlt LHD6-82035K JSF Topside Mods: Warfare Systems; accomplishCSPCD
722-11-001Sling, Ordnance Handling Equipment; test (OPTION ITEM)Dock Trials
763-11-001Small Arms and Pyrotechnics Stowage; repair (OPTION ITEM)Dock Trials
772-11-001Cargo Weapons Elevator Door; repairHabitability work Complete
772-20-001Cargo Weapons Elevator Platform Portable Stanchion and Chain; replaceDock Trials
772-21-001Number One Cargo Weapons Elevator; test (OPTION ITEM)Dock Trials
772-21-002Cargo Elevator Door; repairDock Trials
772-22-001Number 2 Cargo Weapons Elevator; test (OPTION ITEM)Dock Trials
772-23-001Number 3 Cargo Weapons Elevator; test (OPTION ITEM)Dock Trials
772-23-002Cargo Weapons Elevator Door Rail Track; repairHabitability work Complete
772-24-001Cargo Weapons Elevator Door; repairHabitability work Complete
772-26-001Number 6 Cargo Weapons Elevator; test (OPTION ITEM)Dock Trials
837-11-001Antenna Photographs; provideDock Trials
844-31-001Combat Systems Discrepancy Correction; accomplishDT
857-11-001Temporary Duty Section Berthing Off-Ship; provide (OPTION ITEM)Avail Complete
857-11-002Crew Transportation; provide (OPTION ITEM)Dock Trials
897-11-001Cable Management Plan; provideCSPCD
980-11-001Light-Off Discrepancy Correction Assistance; providePCD
980-31-001Temporary Office, Parking, and Classroom for Ship's Force; provide (OPTION ITEM)Avail Complete
980-80-002ShipAlt LHD6-84419D, Stanchon Modification, Alteration Installation Team (AIT) Support Service; provideHabitability work Complete
980-80-003ShipAlt LHD6-85667D, Install Radar TLIs/TDRs on Auxiliary Tanks Alteration Installation Team (AIT) Support Services; providePCD
980-80-004ShipAlt LHD6-85677D, Install Radar TLIs on Collection, Holding and Transfer (CHT) Tanks, Alteration Installation Team (AIT) Support Service; provideCSPCD
980-80-005ShipAlt LHD6-80868D, Fuel Oil Service Valve and Actuator Replacement, Alteration Installation Team (AIT) Support Service; providePCD
980-80-006ShipAlt LHD6-86260D, Deaerating Feed Tank (DFT) Level Sight Glass Replacement Alteration Installation Team (AIT) Support Service; providePCD
980-90-001ShipAlts LHD6-80153K, LHD6-78358K, and LHD6-78381K, AN/SPN-41A Upgrade, Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-002ShipAlt LHD6-85027, CEC AN/USG-2B Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-003ShipAlt LHD6-70430K, Mark XIIA Mode 5 Identification Friend or Foe (IFF), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-004OrdAlt LHD6-86395K, Upgrade IC Switchboards for NCDS, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-005ShipAlt LHD6-89501K, Mk 38 Mod 3 Machine Gun System, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-006ShipAlt LHD6-86950K, Scalable Integrated Bridge System (S-IBS) Electronic Charting Display and Information System-Navy (ECDIS-N) Tech Refresh Upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-007ShipAlt LHD6-92482K, Computer Network Defense (CND) Deployer ToolKit (CDT), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-009ShipAlt LHD6-85294K, F-35 Autonomic Logistics Information System (ALIS), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-010ShipAlt LHD6-85077K, AN/SPQ-9B Initial Install, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-011ShipAlt LHD6-75874K, Ship's Signal Exploitation Equipment (SSEE) Increment F, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-012ShipAlt LHD6-81402K, Battle Force Tactical Trainer (BFTT) Hardware Build 4.2 Upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-013ShipAlt LHD6-84700K, Link Monitoring and Management Tool (LMMT) Afloat Over the Horizon (OTH) Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-014ShipAlt LHD6-89486K, Consolidated Afloat Networks and Enterprise Services (CANES) HW 1.2, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-015Shipalt SCD 13463K, A/F27T-12, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-016ShipAlt 75736K/OA 80405, RAM MK 31 Mod 3, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-018ShipAlt SCD 85742K, NSSMS MOD 14 OCP2, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-019ShipAlt 80020K, Moriah Wind System, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-020ShipAlt 88635K, PHALANC/CIWS Overhaul, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-021ShipAlt 86112 K , NAVSSI AN/SSN-6 SA, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-023ShipAlt 0678, AN/SPS-48G Upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-024ShipAlt 80897K, NMT AN/WSC-9(V)1, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-025ShipAlt 12776, JPALS NPC Install, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-026ShipAlt 20787K, SSDS MK 2 Upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)CSPCD
980-90-028EC 82924 SMQ-11, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)Dock Trials
980-90-029SA 88306 C2P, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)Dock Trials
982-31-001Machinery Space Production Completion and Requirement for Light-Off Assessment (LOA)(Complex); accomplishPCD
982-31-002Dock Trial, Fast Cruise, and Sea Trial; accomplishAvail Complete
982-41-001Dock Trial and Sea Trial Discrepancy Correction; accomplishAvail Complete
991-12-001Staging/Temporary Fall Protection for Ship's Force Use; provideAvail Complete
992-11-001Temporary Service; provideAvail Complete
992-11-002Temporary Flammable Liquid Storage and Hazardous Material Storage Unit; provideDock Trials
992-11-003Pierside Small Boat Storage; provide (OPTION ITEM)Dock Trials
992-11-004Regional Maintenance Center (RMC) Office Space; provideAvail Complete
992-11-005Support Service for Ship's Force Security; provide (OPTION ITEM)Dock Trials
992-11-006Tow Service, Temporary Service, Equipment and Systems Test, Inspection and Repair in Contractor Plant, Barge; accomplish (OPTION ITEM)Dock Trials
992-11-007Temporary Stowage Area for Ship's Force; provideAvail Complete
992-11-008Temporary Air Conditioning; providePCD
992-11-009Fuel Assistance and Towboat Service for Fuel Barge; provide (OPTION ITEM)PCD
992-11-010Temporary Refrigerated Storage Facility; provideDock Trials
992-11-011Transport Control Protocol/Internet Protocol Based T-1 Type Computer Network (T-1 Line) Support Service; provide (OPTION ITEM)Avail Complete
992-11-012Ship's Force Parking; provideAvail Complete
992-11-013Oil Spillage and Floating Sandblasting Debris Boom; install (OPTION ITEM)Avail Complete
992-11-014Boat Storage and Work Area; provide (OPTION ITEM)Avail Complete
992-11-015Demineralized Water; provideHabitability work Complete
992-21-001Ships Ballast Tanks Pump Down; accomplish (OPTION ITEM)Dock
992-21-002Defuel Ship's Operating Fuel, Fuel Oil, and JP-5 Tanks; accomplish (OPTION ITEM)Avail Complete
992-31-001Cleaning and Pumping; accomplishDock Trials
993-21-001Rigging, Crane and Transportation Service; provideAvail Complete
993-31-001Temporary Deck Covering; installAvail Complete
993-31-002Waveguide and Transmission Line Dry Air Lay-Up; accomplishDock Trials
993-31-003Main Reduction Gear Temporary Dehumidification System Installation; accomplishPCD
997-11-001Drydocking and Undocking; accomplishUNDOCK

Ships Force Work

Activity NameProblem DescriptionRecommended SolutionEquip NameCSMP SummaryLocationSWLINAPL
USS BONHOMME RICHARDIT WAS DISCOVERED THAT BOOKHOLDERS ARE NEEDED FOR THE PROPER STOWAGE OF EOSS BOOKS IN THE ENGINEERING SPACES.S/F WILL PROCURE EOSS BOOKHOLDERS.MISC PARTS AUXILIARY SYSTEMSEOSS BOOKHOLDER NEEDEDNOT APPLIC59911895003457
USS BONHOMME RICHARDDURING PMS, IT WAS DISCOVERED THAT STBD ANCHOR WINDLASS CAPSTAN WOULD NOT MOVE WHEN ATTEMPTING TO ENGAGE IT. UPON FURTHER TROUBLESHOOTING IT WAS FOUND THAT THE DIRECTIONAL CONTROL VALVE WOULD NOT SHIFT AND NEEDS TO BE REPLACED.S/F WILL PROCURE A NEW DIRECTIONAL CONTROL VALVE, REPLACE FAULTY DIRECTIONAL CONTROL VALVE AND PERFORM OPERATIONAL TEST.STBD AWNDLS HYDR PWR UNITFAULTY DIRECTIONAL CONTROL VLV1-13-0-E58111529990662A
USS BONHOMME RICHARDHYDRAULIC FLUID NEEDED FOR REPLENISHMENT OF SYSTEM.S/F WILL REQUEST HYDRAULIC FLUID NEEDED FOR REPLENISHMENT.MN STRG STBD HYDRAULIC POWER UNIT 1AREPLENISHMENT OF HYDRAULIC FL.7-121-3-E56111529990644A
USS BONHOMME RICHARDDURING COMPARTMENT INSPECTION, IT WAS DISCOVERED IT WAS CORRODED AND REQUIRES PRESERVATION.S/F WILL PRESERVE SPACE AND PAINT SPACE FOR ACCOMPLISHMENT DURING DPMA/8C1 AVAILABLITY.WINDLASS MCHRY RM SP 1-13-0-EPRESERVATION OF SPACE NEEDED.1-13-0-E66210XCOMPARTMNT
USS BONHOMME RICHARDDURING COMPARTMENT INSPECTION, IT WAS DISCOVERED THERE WAS CORROSION AND REQUIRES PRESERVATION.S/F WILL PRESERVE AND PAINT SPACE FOR ACCOMPLISHMENT DURING DPMA/8C1 AVAILABITLY.WKS HME SP 2-122-4-Q SHIPS HYDRAULIC SHOPPRESERVATION OF SPACE NEEDED.2-122-4-Q66510XCOMPARTMNT
USS BONHOMME RICHARDDURING COMPARTMENT INSPECTION, IT WAS DISCOVERED THERE WAS CORROSION AND REQUIRES PRESERVATIONS/F WILL PRESERVE AND PAINT SPACE FOR ACCOMPLISHMENT DURING DPMA/8C1 AVAILABILITY.STEERING GEAR ROOM NO1 SP 7-121-3-EPRESERVATION OF SPACE NEEDED.7-121-3-E66210XCOMPARTMNT
USS BONHOMME RICHARDDURING COMPARTMENT INSPECTION, IT WAS DISCOVERED THERE WAS CORROSION AND REQUIRES PRESERVATION.S/F WILL PRESERVE AND PAINT SPACE FOR ACCOMPLISHMENT DURING DPMA/8C1 AVAILABILITY.STEERING GEAR ROOM NO2 SP 7-121-2-EPRESERVATION OF SPACE NEEDED.7-121-2-E66210XCOMPARTMNT
USS BONHOMME RICHARDPER 22202EA01ZAA6XX ICMP ASSESSMENT, ITEM# 5775, DURING TSRA VISIT, ANCHOR WINDLASS, PITTARD, MATTHEW --- PORT MOTOR CONTROLLER HAS INCORRECT ELECTRICAL SCHEMATIC POSTED INSIDE.PRINT AND POST CORRECT ELECTRICAL SCHEMATIC FROM TECH MANUAL S9581-BU-MMA-010, FIG 3-3 PORT AND FIG 7-16 SH 1/3.WINDLASS MCHRY RM SP 1-13-0-E-STRUCTINCORRECT SCHEMATIC1-13-0-E12341XSTRUCTITEM
USS BONHOMME RICHARDPER 22202EA01ZAA7XX ICMP ASSESSMENT, ITEM# 5775, DURING TSRA VISIT, ANCHOR WINDLASS, PITTARD, MATTHEW --- STBD MOTOR CONTROLLER HAS INCORRECT ELECTRICAL SCHEMATIC POSTED INSIDE.PRINT AND POST CORRECT ELECTRICAL SCHEMATIC FROM TECH MANUAL S9581-BU-MMA-010, FIG 3-2 STBD, FIG 7-16 SH 1/3.WINDLASS MCHRY RM SP 1-13-0-E-STRUCTINCORRECT SCHEMATIC1-13-0-E12341XSTRUCTITEM
USS BONHOMME RICHARDPER 22202OD01ZA10XX ICMP ASSESSMENT, ITEM# 5788, DURING TSRA VISIT, MORNING CAPSTAN, HANEY, TIMOTHY --- COVER HAS 1 MISSING BOLT AND 1 BOLT NOT FULLY ENGAGED.REPLACE COVER BOLTS.CAPSTAN NO. 2, MOORING AND TOWINGMISSING HARDWARE2-54-4-Q58211531020011A