Att_7_Dive65_Unique_Item_Identification_(UID).pdf

PDF 258 KB Posted

Attached to
65' Dive Support Boat
Solicitation number
N0002418R2209
Issued by

About this file

Attachment 7

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00024-18-R-2209

ATTACHMENT 7

UNIQUE ITEM IDENTIFICATION

ITEM IDENTIFICATION

The Contractor shall also provide Unique Item Identification (UID) marking in accordance with the information provided below.

1. UID is a set of data marked on items that is globally unique, unambiguous, and robust enough to ensure data information quality throughout the life of the unit until disposal and to support multi-faceted applications and users. The unique item identifier and the component data elements of the unique item identifier shall not change over the life of the item. The UID component data elements, at a minimum, shall be contained in a Data Matrix ECC200 symbol, as required by MIL STD 130 latest revision.

2. The enterprise (i.e., a manufacturer or vendor) shall be responsible for implementation of the

Unique Identification marking/Automatic Identification Technology (UID/AIT) program in accordance with the Department of Defense Guide to Uniquely Identifying Tangible Items

Rev 2.0 dated 01 October 2008, and with the Defense Federal Acquisition Regulation

Supplement (DFARS) clause 252.211-7003 Item Identification and Valuation and the updated final rule for UID DFARS Clause 252.211-7003, dated August 2008 (hereafter referred to as “UID DFARS Clause”) These documents can be found at http://www.acq.osd.mil/dpap/uid.

3. The physical marks that contain the UID-required elements shall remain legible until the item is destroyed. Where space is available, human readable information for UID data elements shall be marked on the item. MIL STD 130 latest revision provides information on various marking methods, surface requirements, and verification criteria. The preferred placement of the mark on the part is in the installed position whenever possible. This will allow personnel to read the mark without necessitating its removal. For parts already marked with a label or data plate, the contractor shall remove and add additional UID information if space is available on the current label or replace with a label or data plate containing UID information in addition to existing information. The verification grade for the UID marking on all items marked will be in accordance with MIL STD 130 latest revision.

4. The Contractor shall construct the UID for this contract by using the Contractors Enterpriser

Identifier; the hull number of the vessel as the Serial Number; and the respective hull sequencing number (e.g. hull 1 of 4, 2 of 4, if applicable) within the class as the part number.

5. Notwithstanding the UID DFARS Clause, the Contractor shall return to the Government a listing of the identified UID material supplied in paragraph 6 annotated with proposed UII, marking medium and location. This listing shall be provided via email to PMS325L (Cheryl

Cecil/ cheryl.cecil@navy.mil) and PMS325G (Peter Herrman/ peter.herrman@navy.mil) for approval prior to printing of UII label plates. During Pre-Delivery Inspection and Boat trials

(PDIT) and/or receipt inspection, the Government will verify the UID markings on the equipment listed in paragraph 6.

6. The following implements the UID DFARS Clause where the Contractor shall provide unique item identification or a DoD recognized unique identification equivalent for:

mailto:%20peter.herrman@navy.mil

N00024-18-R-2209

a) Hull

b) Main Engines

c) Generators

d) Navigation System

e) Crane

f) Dive Compressor

7. Data Submission

a. The contractor shall submit information required by the UID DFARS Clause in accordance with the procedures at http://www.acq.osd.mil/dpap/pdi/uid. In WAWF the

Contractor shall select “Combo” to enter the parent UID (Hull). After invoice has been accepted and certified by PMS325P in WAWF, parent UID will register in the

IUID Registry.

b. After certification, the Contractor will have 21 days to enter the children (remaining

UIIs in para. 6 above) at https://www.bpn.gov/iuid. The Government will verify all

UIIs have been registered.

c. Entering the Children in the IUID Registry: In the description field, add the acquisition cost and/or any other qualifying information pertaining to the particular UID record.

http://www.acq.osd.mil/dpap/pdi/uid https://www.bpn.gov/iuid

File details come from the government source that posted it.