16-R-5363-0004_Amendment.pdf
PDF 138 KB Posted
- Attached to
- SEWIP Block 2 FY16-FY20 Full Rate Production
- Solicitation number
- N00024-16-R-5363
About this file
Solicitation Amendment N00024-16-R-5363 0004
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002415NR42007
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purposes of this amendment are:
(1) provide responses to questions received from industry, and
(2) provide updates to the solicitation in response to feedback received from industry.
See Summary of Changes for details. A conformed copy of the solicitation is included for reference.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Apr-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00024-16-R-5363
X 9B. DATED (SEE ITEM 11)
09-Feb-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Apr-2016
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00024-16-R-5363
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
Section J - List of Documents, Exhibits and Other Attachments
The following documents are attachments to this solicitation:
Attachment #: Description Date: Number of pages:
J-S1 Contract Data Requirements Estimated Price List 14 Dec 15 1
J-S2 Contractor Award Information 23 Oct 15 1
J-S3 RFP Government Furnished Information Request Form 23 Oct 15 1
J-S4 Work Breakdown Structure 31 Mar 16 3
J-S5 Question Submittal Form 23 Oct 15 1
The following documents are attachments to this solicitation, and will also be incorporated into the contract at award:
Attachment #: Description Date: Number of pages:
J-1 Government Furnished Information, NAVSEA Form 4340/02 1 Apr 16 2
J-2 Contract Security Classification Specification, DD Form 254 27 Oct 15 3
J-3 Government Furnished Property, NAVSEA Form 4205/19 1 Apr 16 1
J-4 Government Furnished Property, DoD Required Form 26 Oct 15 3
J-5 DoD Production Readiness Review (PRR) Checklist 27 Sep 10
(Soft copy attached)
In addition to the documents listed above, the Successful Offeror’s accepted/approved Small Business
Subcontracting plan, and portions of the Successful Offeror’s Proposal, may be incorporated at contract award.
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
The following have been deleted:
252.217-7026 Identification of Sources of Supply NOV 1995
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
SECTION L 2.3
Paper submission
2.3.1 Each volume shall be bound separately in three ring binders and shall not exceed the page limitations cited above. Volumes I, II, and III shall each be presented separate from the remainder of the proposal (i.e. each Volume shall be submitted in a single or multiple binders separately and discretely from all other volumes; no binder should contain material from more than one Volume). Discussion of each factor and subfactor within a binder shall also be separate and discrete, and shall be separated by a side tab file divider.
2.3.2 The Offeror’s company name, proposal number, and RFP number (N00024-16-R-5363) shall appear at the top of each page in the header section (from left to right). The date of submittal, page numbers and the corresponding electronic file name shall be placed on each page of the proposal in the footer section (from left to right).
2.3.3 Revisions (including but not limited to FPRs) will only be received and considered at the specific request of the Contracting Officer. Any pages revised must include the date of revision in the place of the date of submittal, and shall also contain a revision number (e.g. 12 Dec 2017 - Revision 1). Revisions shall be submitted in the form of change pages (allowing for substitution of the entire page—front and back if used—where the revision is located).
2.3.4 The narrative material in each proposal shall be single spaced, typed or printed in Times New Roman font with type no smaller than 12-point font. Paper, excluding foldout pages (see paragraph 2.3.5, below), shall be 8 1/2 x 11 inches with a minimum margin of 1 inch around the page. Any type contained within tables, graphs, etc. shall not be smaller than 8-point Times New Roman font.
2.3.5 Foldout pages (Foldouts) may be used for charts and graphs where necessary to depict organization, layout or implementation schedules. Foldouts shall be uncomplicated to preserve clarity. Written text or tabular data, beyond that which is reasonably required for clarity should not be included in the material presented on the foldout sheet.
Foldouts shall fold entirely within the volume and shall be limited in size to no more than 11 x 17 inches. Each foldout shall contain printed material on only one side of the foldout. Each foldout page will be regarded as two pages for page count purposes.
2.3.6 The following items will not be considered pages for the purposes of page count limitations (but still shall conform to formatting requirements detailed herein):
i. Blank pages
ii. Cover letters
iii. Table of Contents, Tables, and Figures
iv. Glossary of Terms, Abbreviations, and Acronyms
v. Index of Terms
vi. Integrated Master Schedule
vii. Technical Proposal Cross-reference Matrix
2.3.7 Only pages which count against page count limitations shall be numbered. Pages excluded from page count limitations (i.e. items in paragraph 2.3.6, above) must contain only material pertinent to the page heading and the page heading must clearly indicate the name of the item. Blank pages should be marked "Intentionally Left Blank."
Pages submitted which are not excluded from page count limitations (i.e. items in paragraph 2.3.6, above), and which exceed the page count limitations provided in Section 2.1--Table 1 (e.g. any pages following the 30th page of the past performance volume), will be removed and will not be evaluated.
2.3.8 Each submitted paper proposal page shall also include standard 2-3/4" center-to-center holes positioned symmetrically at the top of each page (i.e. 2-hole filebinder punch on top edge).
SECTION L 2.7.2
Volume II (Technical Volume) content
Volume II shall not include pricing information. Volume II of the submitted proposal shall include:
2.7.2.1 Cover Letter. See paragraph 2.2.2, above, for a discussion of the content requirements for the Cover Letter.
2.7.2.2 Table of Contents, Tables, and Figures. See paragraph 2.2.3(i), above, for a discussion of the content requirements for the Table of Contents, Tables, and Figures.
2.7.2.3 Glossary of Terms, Abbreviations, and Acronyms. See paragraph 2.2.3(ii), above, for a discussion of the content requirements for the Glossary of Terms, Abbreviations, and Acronyms.
2.7.2.4 Index of Terms. See paragraph 2.2.3(iii), above, for a discussion of the content requirements for the Index of Terms.
2.7.2.5 Executive Summary. The Executive Summary shall summarize the Offeror’s planned approach to satisfy the Government’s requirements. Key elements of the proposal shall be highlighted from both technical and management perspectives.
2.7.2.6 Technical Proposal. The Technical Proposal shall enable technical/engineering personnel to make a thorough evaluation and arrive at a sound determination of whether or not the proposal is technically acceptable. To this end, the Technical Proposal Volume shall be specific, detailed, and complete. Proposals shall include any block diagrams, flow diagrams, sketches, drawings, schematics, and interface descriptions required to describe the
Offeror's proposed approach. The technical proposal must be sufficient to show how the Offeror proposes to comply with the Government's requirements and include a full explanation of the methodology and procedures to be followed. The technical proposal shall discretely address each of the following factors and subfactors (separated by side tab file dividers):
Factor 1: Technical Approach
Subfactor 1.1: Production Assembly in accordance with the TDP
Subfactor 1.2: First Article and Factory Acceptance Testing
Subfactor 1.3: Physical Assets to be used in production
Factor 2: Management Approach
An extended description of desired proposal content is included below:
A. The Offeror shall provide a manufacturing plan and work flowchart, based upon the work breakdown structure provided herein as Attachment J-S4. The offerors manufacturing plan and work flowchart shall demonstrate the offeror’s ability to produce systems in accordance with the specifications and data contained in this solicitation. The offeror shall include major process activities—beginning at contract award and continuing through acceptance of the final system—in the manufacturing plan and work flowchart to meet production requirements. The Offeror shall provide measured data for any proposed item not currently listed in the TDP by specific part number including but not limited to hardware, firmware, software, vendors, and/or processes. Documentation shall include measured data demonstrating the form, fit, and function requirements of the TDP are met.
B. The Offeror shall provide demonstration of experience as a prime contractor or subcontractor producing a Radio
Frequency (RF) system of similar size and complexity. The Offeror shall address the required technologies, equipment, and/or specialized skills proposed to build the SEWIP system configurations in accordance with the technical data package (TDP). This should include—at a minimum—discussion of the following technologies used within AN/SLQ-32(V)6:
RF over fiber assembly, integration, and test
Versa Module Eurocard (VME) systems production assembly, integration, and test
RF receiver systems assembly, integration, and test
Millimeter wave (MMW) hardware assembly, integration, and test
RF Antenna Array panel assembly, integration, test, and calibration
Linux operating environment installation and configuration
C. The Offeror shall provide description of the Offeror’s system(s) for acquisition of material, material control, and monitoring delivery status of material previously ordered. The Offeror shall describe their plans and processes to ensure complete TDP compliance prior to acquiring material and prior to release of material for manufacturing. The
Offeror shall address manufacturing processes, inspection, component level testing, and production acceptance testing.
D. The Offeror shall discuss the Offeror’s process for configuration management including engineering changes and variances in a change management approach. The discussion should address both variances requested by the
Offeror, and variances ordered by the Government. The Offeror shall provide specific examples supporting any claims made. Examples cited should include: a description of specific actions undertaken (e.g. production line and process updates, coordination with vendors, etc.), impact(s) on production, and outcomes.
Subfactor 1.2: First Article and Factory Acceptance Testing
A. The Offeror shall describe its approach for conducting first article and factory acceptance testing to ensure that production units comply with the configuration and functional requirements specified by the TDP.
B. The Offeror shall describe how first article and factory acceptance testing will be implemented in its facility, identify any testing requirements that cannot be performed in its present facility, and provide a contingency plan for any such requirements. The Offeror shall address facilities, fixtures, software, and test equipment required to successfully conduct first article and factory acceptance testing.
C. The offeror may submit a request for waiver of First Article Approval, which shall comply with the requirements of solicitation provision HQ M-2-0013, Waiver of First Article Requirements (Contractor Testing) - Alternate I
(NAVSEA) (JUL 2000).
A. The Offeror shall describe the proposed production assets, test assets, and capital assets in sufficient detail as to demonstrate adequate infrastructure, capability, and capacity for the production and test of the proposed systems at the rates required by Section F. Proposal shall specifically discuss availability of assets during the contract period of performance. The Government reserves the right to conduct an on-site review (pre-award site survey) of the
Offeror’s proposed physical assets.
B. The Offeror shall describe availability of necessary assets including fixtures, software, physical plant facilities, required production and test equipment, special test ranges or facilities and skilled production, test and engineering support personnel.
Factor 2: Management approach
A. The Offeror shall demonstrate its ability to successfully manage a production program of similar scope and complexity. The Offeror shall describe within a Project Management Plan its approach to: maintaining project schedule, operating within approved budgets, meeting project milestones, early notification of potential problems, utilizing management metrics to track progress and trends, providing deliverables on-time, and maintaining ongoing operations in an effective manner. The Offeror shall describe within its Project Management Plan the production and manufacturing for meeting the Government requirements. The Offeror shall describe within the plan how it will ensure deliveries will meet schedule and quality requirements.
B. The Offeror shall describe within a Schedule Management Plan its approach to ensure satisfaction of the delivery requirements of Section F, as well as First Article Test requirements. The Offeror shall provide an Integrated
Master Schedule (IMS) demonstrating its ability to meet schedule, management activities, and delivery requirements. A direct and traceable correlation should exist between events in the IMS, SOW, and WBS.
2.7.2.7 Technical Proposal Cross-reference Matrix. The Offeror shall submit a Cross Reference Matrix (CRM) for the Technical Volume, similar to the example below, to help ensure that all solicitation requirements are addressed and to facilitate the evaluators’ review of the Offeror’s proposal. The CRM should be a single integrated matrix and cross-reference the proposal volumes and paragraphs to specific RFP requirements, as well as other parts of the proposal that contain relevant information. The Offeror’s CRM may be identical to the example below or revised such as to add columns to indicate the page number on which information may be found, identify where other relevant information in the proposal is located, or provide other comments. The CRM does not count against any of the proposal page limitations.
EXAMPLE OF A CROSS REFERENCE MATRIX (CRM)
Section L – Proposal
Instructions Government SOW
Section M –
Evaluation Factor
Offeror’s Proposal
Reference CLIN Reference
Section L, 2.7.2.6, Subfactor 1.2
Section C, 4.5
Section M, Factor
1, Subfactor 1.2
<Provide reference to the page/paragraph in the
Offeror’s Proposal>
0001, 0061
SECTION M - EVALUATION FACTORS FOR AWARD
SECTION M 3.0 FACTOR 1
TECHNICAL APPROACH
The Technical Approach factor will be evaluated to determine the offeror’s ability to satisfy the requirements of this solicitation, including but not limited to: the acceptability of the offeror’s approach, the ability to understand and solve technical issues related to this effort, the ability to produce systems in accordance with the Technical Data
Package (TDP), and the ability to demonstrate significant experience in the production of systems of similar or greater complexity than AN/SLQ-32(V)6.
The offeror will be evaluated to determine the Offeror’s ability to produce systems in accordance with the specifications and data contained in this solicitation. The offeror will be evaluated on its demonstrated understanding of all aspects of the technical data contained in the solicitation and an ability to apply that understanding to meet the production requirements. The Government will evaluate information required by Section
L, above, to determine the acceptability of the offeror’s approach to production assembly. The offeror will be evaluated based on its demonstration of experience on RF programs similar in complexity to AN/SLQ-32(V)6. The complexity evaluation will include evaluation of demonstrated experience with the following technologies used within AN/SLQ-32(V)6:
RF over fiber assembly, integration, and test
Versa Module Eurocard (VME) systems production assembly, integration, and test
RF receiver systems assembly, integration, and test
Millimeter wave (MMW) hardware assembly, integration, and test
RF Antenna Array panel assembly, integration, test, and calibration
Linux operating environment installation and configuration
The Offeror will be evaluated on its approach to acquisition of system material, material control, and approach to monitoring delivery status of material previously ordered. The Offeror will be evaluated on their plans and processes to ensure complete TDP compliance prior to acquiring material and prior to release of material for manufacturing. The Offeror will be evaluated on their approach to address manufacturing processes, inspection, component level testing, and production acceptance testing.
The offeror's manufacturing processes and planning will be evaluated against the SOW. The offeror will be evaluated on its ability to address engineering changes and update production requirements. Any proposed item not currently listed in the TDP by specific part number will be evaluated by review of measured data to confirm the form, fit and function requirements of the TDP are met. The Offeror alone bears the burden of submitting sufficient measured data to demonstrate that its proposed non-TDP item(s) meet(s) the form, fit, and function requirements of the TDP. Failure to provide sufficient data to demonstrate that a proposed non-TDP item meets the form, fit, and function requirements of the TDP may result in an evaluation finding of increased technical risk, and could ultimately result in a determination that the offeror’s technical approach is unacceptable.
Subfactor 1.2: First Article and Factory Acceptance testing
The Offeror’s proposal will be evaluated to determine the offeror’s ability to execute First Article and Factory
Acceptance testing in accordance with the Government furnished testing plans and procedures to ensure production units comply with the configuration and functional requirements specified in the solicitation.
The offeror will be evaluated on its demonstrated understanding of all aspects of associated plans and procedures as set forth in its proposal.
If a request for waiver of First Article Approval is submitted, the offeror will be evaluated on compliance with the requirements of solicitation provision HQ M-2-0013, Waiver of First Article Requirements (Contractor Testing) -
Alternate I (NAVSEA) (JUL 2000).
Physical Assets proposed to be used in production will be evaluated to determine if the offeror has adequate capability and capacity to produce and test the proposed systems identified in Section B of this solicitation.
The offeror will be evaluated on its demonstrated ability provide facilities to adequately fulfill production throughput and schedule requirements in accordance with Section F of this solicitation. Production and schedule requirements shall assume maximum quantities per year. Adequacy will be determined by a clear correlation of the offeror’s proposed use of facilities for the successful completion of the contract requirements at maximum production levels. In addition, the offeror will be evaluated on its approach to updating the production line and processes.
Pre-award site surveys may be used to help evaluate this subfactor. Offerors will be evaluated on availability of adequate space for production, manufacturing, testing, and delivery of AN/SLQ-32(V)6 systems in accordance with this solicitation. Offerors will be evaluated on physical assets, production equipment, and test equipment to determine whether the offeror has the capacity to meet the requirements of the solicitation.
(End of Summary of Changes)
| 2016-04-06T17:01:31-0400 | |
| DESELLE.NICHOLAS.JOSEPH.1234721425 |
File details come from the government source that posted it. Updated .