Attachment 1 Yard Patrol (YP) Craft 676 Craft Specification

View the file

Other files

File Type Posted
N00024-16-R-2216-0005.pdf PDF
J-9_Bidder's_Questions_and_Answers_REV_4.pdf PDF
N00024-16-R-2216-0004.pdf PDF
J-9_Bidder's_Questions_and_Answers_REV_3.pdf PDF
N00024-16-R-2216-0003.pdf PDF
J-9_Bidder's_Questions_and_Answers_REV_2.pdf PDF
J-1_Yard_Patrol_(YP)_Craft_676_Class_Specification_REV_1_(19_July).pdf PDF
J-9_Bidder's_Questions_and_Answers_REV_1.docx DOCX document
FBO_Amendment_2.pdf PDF
N00024-16-R-2216-0001.pdf PDF
J-9_Bidder's_Questions_and_Answers.pdf PDF
J-3d_Technical_Manuals.zip ZIP file
J-3e_Specification_References.zip ZIP file
J-2_Labor_and_Material_Burden_Rates_Price_Sheet.xlsx XLSX spreadsheet
J-1_Yard_Patrol_(YP)_Craft_676_Class_Specification_(24_June).pdf PDF
J-5__Government_Furnished_Information_(GFI).docx DOCX document
J-3c_As_Built _Current_Configuration_Dravings.zip ZIP file
N00024-16-R-2216.pdf PDF
J-4__Government_Furnished_Equipment_(GFE).docx DOCX document
J-8_Bidder's_Questions.docx DOCX document
J-3b_Boat_Information_Manual.zip ZIP file
J-3a_Ship_Installation_Drawings.zip ZIP file
J-7_Past_Performance_Questionnaire.doc DOC document
J-5__Government_Furnished_Information_(GFI).docx DOCX document
J-7_Past_Performance_Questionnaire.doc DOC document
J-8_Bidder's_Questions.docx DOCX document
J-4__Government_Furnished_Equipment_(GFE).docx DOCX document
J-2_Labor_and_Material_Burden_Rates_Price_Sheet.xlsx XLSX spreadsheet
N00024-16-R-2216_DRAFT.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00024-16-R-2216 Attachment J-1

DEPARTMENT OF THE NAVY

Yard Patrol (YP) Craft 676 Class Specification

NOTE:

This Yard Patrol (YP) 676 Class Specification (Attachment J-1) consists of individual Work Items for evaluation purposes only. These items do not represent the actual work to be performed under the contract award, but is a representation of the scope of work that can be expected for the YP Service Life Extension Program (SLEP) efforts. Per the RFP, the Government will issue a draft Delivery Order to the winning Offeror(s) for further bidding on craft specific work packages. The Government will then down-select to the Offeror(s), whose proposal represents the best value to the government after evaluation in accordance with the factors in each delivery order. Each delivery order will be competed among the awardees based on total price of the craft specific work package and past performance of prior delivery orders on the contract.

Sam ple

CATEGORY I. FY-16 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM NO TITLE DATE

009-01 General Criteria; accomplish 07/18/2014

009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 07/18/2014

009-03 Toxic and Hazardous Substances; control 07/18/2014

009-04 Quality Management System; provide 07/18/2014

009-05 Temporary Accesses; provide 07/18/2014

009-06

Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

07/18/2014

009-10 Shipboard Asbestos-Containing Material (ACM); control 07/18/2014

009-18 Magnetic Material; control 07/18/2014

009-19 Provisioning Technical Documentation (PTD); provide 07/18/2014

009-20 Government Property; control 07/18/2014

009-21 Logistics and Technical Data; provide 07/18/2014

009-23 Interferences; remove and install 07/18/2014

009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish 07/18/2014

009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/17/2013 009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for

Commercial Equipment/ Component; provide

07/19/2007

009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling 07/18/2014

009-59 Equipment at Naval Facilities; accomplish Organotin Antifouling Material; control 07/29/2011

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

07/18/2014

009-61 Shipboard Use of Fluorocarbons; control 07/18/2014

009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 07/18/2014

009-65 Polychlorinated Biphenyls (PCBs); control 07/29/2011

009-67 Integrated Total Ship Testing; manage 07/18/2014

009-69 Heavy Weather/Mooring Plan; provide 07/18/2014

009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

07/18/2014

009-72 Physical Security at Private Contractor's Facility; accomplish 07/18/2014

009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install 07/18/2014

009-74 Occupational, Safety and Health Requirements; accomplish 07/18/2014

009-79 Government Owned Material (GOM); status reporting 07/18/2014

009-81 Compartment Closeout; accomplish 07/18/2014

009-82

Data Requirements When Installing an Equal Component Vice Specified Component;

provide

07/29/2011

009-84 Accountability of Temporary Fasteners; provide 07/18/2014

009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H) Materials; accomplish

08/01/2008

009-87 Chemical disinfection Procedures; accomplish 07/18/2014

CATEGORY I. FY-16 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM NO TITLE DATE

009-88

Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;accomplish 07/29/2011

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 07/18/2014

009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide

01/17/2013

009-99 Ship Departure Report; provide 07/18/2014

009-102 Alteration Verification; provide 07/29/2011

009-103 Weight and Moment Change Data; provide 07/18/2014

009-120 Fact Finding and Critique of Unplanned Events; manage 07/18/2014

009-121 Ship Assessment/Inspection Requirements; provide 07/18/2014

CATEGORY II. FY-16 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER

ITEM NO.

TITLE

DATE

009-09 Process Control Procedure (PCP); provide and accomplish 07/18/2014

009-11 Insulation and Lagging Requirements; accomplish 07/18/2014

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

07/18/2014

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

09/01/2015

009-13 Meters; repair and certify calibration 07/18/2014

009-14 Gages, Switches, and Thermometers; repair and certify calibration

07/18/2014

009-15 Rotating Machinery; balance 01/17/2013

009-16 Electronic Equipment; repair 07/29/2011

009-17 Rotating Electrical Equipment; repair 07/18/2014

009-25 Structural Boundary Test; accomplish 07/18/2014

009-26 Deck Covering Requirements; accomplish 07/18/2014

009-32 Cleaning and Painting Requirements; accomplish 11/07/2013

009-32 Cleaning and Painting Requirements; accomplish 07/10/2015

009-36 Controller; repair 07/18/2014

009-37 General Procedures for Woodwork; accomplish 07/18/2014

009-63 Lubricating Oils and Hydraulic Fluids; analyze 07/18/2014

009-71 Testing Requirements for Piping Systems; accomplish 07/18/2014

009-71 Testing Requirements for Piping Systems; accomplish 07/10/2015

009-75 Circuit Breaker; repair 07/29/2011

009-90 Technical Representative; provide 07/18/2014

009-107 Piping System Cleanliness (Non-Nuclear); accomplish 07/18/2014

INDEX

ITEM NO WORK ITEM TITLE

077-01-001 Hazardous Waste Produced on Naval Vessels; control

110-11-001 Underwater Hull; inspect and repair

110-11-002 Limber Chain Assembly; repair

111-11-001 Hull Strapping System; inspect, repair and test

120-11-001 Transverse Bulkhead; inspect and repair

123-11-001 Fuel Oil Tank; inspect and test

123-14-001 Fresh Water Tank; inspect and test

123-17-001 Sump Tank (Grey Water); inspect and test

130-11-001 Main Deck and Fitting; inspect and repair

130-11-002 Main Deck Support Structure inspect and repair

150-11-001 Bulwark and Cap Rail; repair and preserve

167-11-001 Watertight Closure; replace

167-11-002 Structural Closure; repair

171-11-001 Mast; inspect, test, repair and preserve

233-11-001 Starboard Main Propulsion Diesel Engine Overhaul; accomplish

233-12-001 Port Main Propulsion Diesel Engine Overhaul; accomplish

241-11-001 Starboard Transmission Overhaul; accomplish

241-12-001 Port Transmission Overhaul; accomplish

243-11-001 Propeller Shafting; remove, inspect, repair and install

245-11-001 Propeller; inspect and repair

252-11-001 Operating Console; repair

252-11-002 Engine Control Cable; replace

256-11-001 Main Engine Sea Water Strainer; replace

256-11-002 Sea Water Cooling Piping; repair

259-11-001 Exhaust Piping System; repair

311-21-001 Starboard Ship Service Diesel Generator Engine Overhaul; accomplish

311-21-002 Starboard Ship Service Generator; repair

311-22-001 Port Ship Service Diesel Generator Engine Overhaul; accomplish

INDEX

ITEM NO WORK ITEM TITLE

311-22-002 Port Ship Service Generator; repair

313-11-001 Battery Control Junction Box; repair

320-11-001 Controller; repair

320-11-002 Water Heater Element; replace

320-11-003 Immersion Heater; repair

321-11-001 Shore Power Receptacle and Plug; replace

321-11-002 Junction Box Cabling; replace

324-11-001 Electric Plant Control Panel (EPCP); repair

332-11-001 Light Fixture; repair

332-11-002 Battle Lantern; inspect, repair and test

422-11-001 Navigation Mast Light Junction Box; replace

422-11-002 Searchlight; replace

431-80-001 1MC-6MC Upgrade; accomplish

432-11-001 Sound Powered Telephone Jack Box; replace

436-11-001 Engine Order Telegraph System; remove

437-80-001 Replace Fresh Water & Fuel Tank TLI; accomplish

505-11-001 Remote Valve Operating Gear; repair

508-11-001 Lagging and Insulation; repair

508-11-002 Main Engine Heat Shield Insulation and Lagging; replace

512-11-001 Vent Ducting Flex Hose; replace

512-11-002 Fan Coil Unit Blower Motor; inspect, repair and test

512-11-003 Blower Fan Repair; accomplish

512-11-004 Thermostat; inspect, repair and test

514-11-001 Chill Water Pump; replace

514-80-001 YP 676 Class A/C System Upgrade; accomplish

520-11-001 Sea Valve; replace

521-11-001 Firemain Piping; repair and test

521-11-002 Fire Pump; replace

INDEX

ITEM NO WORK ITEM TITLE

524-11-001 AC Auxiliary Sea Water Pump; replace

524-80-001 Aux Seawater System Upgrade; accomplish

528-11-001 Gray Water Pump; replace

529-11-001 Bilge Piping; repair

529-21-001 Bilge Pump; replace

529-80-001 Replace Engine Driven Bilge Pump; accomplish

531-11-001 Recirculating Brominator System; replace

533-11-001 Potable Water Piping; repair

533-11-002 Reverse Osmosis Unit; remove and repair

533-80-001 Potable Water System Upgrade; accomplish

541-11-001 Fuel Oil Strainer; replace

541-11-002 Fuel Oil Transfer Pump; replace

541-11-003 Fuel Oil Valve; replace

541-11-004 Emergency Fuel Oil Valve; replace

541-80-001 MPDE & SSDG FO Filter Upgrade; accomplish

551-80-001 Electric Whistle Installation; accomplish

561-11-001 Steering System; repair

562-11-001 Rudder; clean, inspect and repair

581-11-001 Anchor Windlass Assembly; overhaul and test

581-11-003 Anchor and Anchor Chain; clean, inspect, repair and preserve

593-11-001 Marine Sanitation Device (MSD) and Sea Water Flush Piping; repair

593-11-002 Marine Sanitation Device (MSD) Tank Washdown Nozzle; replace

593-11-003 Marine Sanitation Device (MSD) Air Compressor; replace

593-11-004 Marine Sanitation Device (MSD) Macerator/Transfer Pump; replace

593-11-005 Marine Sanitation Device (MSD) Tank; inspect, test and preserve

593-11-006 Marine Sanitation Device (MSD) Float Switch Assembly; replace

611-11-001 Rubber Fender System; inspect and repair

622-11-001 Machinery Space Floor Plate; inspect and repair

INDEX

ITEM NO WORK ITEM TITLE

625-11-001 Windshield Wiper Assembly; replace

631-13-001 Interior Compartment; clean and preserve

631-21-001 Superstructure; preserve

631-31-001 Underwater Hull; clean and preserve

631-41-001 Freeboard; clean and preserve

633-11-001 Hull Zinc Anode; replace

634-11-001 Interior Deck Covering; install

634-11-002 Electrical Grade Sheathing Deck Covering; install

634-21-001 Nonskid and Deck Preservation; accomplish

640-80-001 Habitability Upgrade; accomplish

644-11-001 Plumbing Fixture; replace

651-11-001 Messroom Table and Transom; replace

651-80-001 Food Service Equip Upgrade; accomplish

980-31-001 Office Space; provide

992-11-001 Temporary Service; provide

992-31-001 Cleaning and Pumping; accomplish

997-11-001 Drydocking and Undocking; accomplish

CRAFT: YP 676 CLASS ITEM NO: 077-01-001

1 of 5 ITEM NO: 077-01-001

1. SCOPE:

1.1 Title: Hazardous Waste Produced on Naval Vessels; control

1.2 Location of Work:

1.2.1 Throughout the Craft

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Resource Conservation and Recovery Act, (RCRA)

2.2 49 U.S.C. 5103, Federal Hazardous Materials Transportation Act

2.3 Applicable Hazardous Waste, Manifest Form

2.4 10 U.S.C. 7311

3. REQUIREMENTS:

3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.

3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.

3.1.2 Manage and transport for Navy disposal, Navy-generated

hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.

Report: HAZARDOUS WASTE MANIFEST Date: + 2

3.1.3 Submit one legible copy, in hard copy or approved

transferrable media, of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.

3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.

3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Craft's Force or Navy employees (termed Navy Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.

2 of 5 ITEM NO: 077-01-001

Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.

3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.

3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.

3.5 Hazardous waste, as identified in 2.1, expected to be

produced during performance of this Job Order:

AMOUNT

TYPE NAVY CO-GENERATED CONTRACTOR

Acid Solutions (may include spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)

3 of 5 ITEM NO: 077-01-001

Ethylene Glycol (Antifreeze) 75 Gls

Sodium Hydroxide

Cleaning Solvents 100 Gls

Sodium Phosphates (Tri, Bi, or Mono)

Fluorocarbons

Morpholine

Sodium Chromates

Hydrazine

Carbohydrazide

Methyl Ethyl Ketone

Spent Abrasive Blast

10 Tons

(contaminated with a known hazardous waste)

Trichloroethane 100 Gls

Miscellaneous Chemicals (Ignitable)

200 Lbs 150 Lbs

Miscellaneous Chemicals (Corrosive)

150 Gls

Miscellaneous Chemicals (TCLP Toxic) Arsenic

100 Lbs

Miscellaneous Chemicals (Reactive)

20 Gls

Oil (Synthetic) 50 Gls

Paints (Enamel, Latex, 150 Gls

Epoxy, thinners, oil based, rubber paint, nonskid, lacquer, remover, varnishes)

Paints (May include lead, cadmium, or chrome)

175 Lbs

Paint Strippers (phenols, lead, chromium)

4 of 5 ITEM NO: 077-01-001

Sludge (Contaminated with 150 Gls a known hazardous waste)

Wool Felt (contaminated with chromium and PCB's)

Ventilation Debris/Residue

(heavy metals, e.g., Cadium, chromium) 750 Sq Ft

Oily Rags 500 Lbs

Wood Waste 3 Tons

Polychlorinated Bipehenyls (PCBs)

10 Lbs

3.6 Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.

Report: HAZARDOUS WASTE LISTING Date: + 3

3.7 Submit one legible copy, in hard copy or approved transferrable media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.

3.7.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.

3.7.1.1 Chemical analysis shall be accomplished by

laboratories with state or EPA approved quality assurance programs.

3.7.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.

3.8 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

4. NOTES:

4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be

5 of 5 ITEM NO: 077-01-001 neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in

3.5 does not preclude the contractor from taking action consistent with

2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.

Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.

4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.

4.2 Hazardous wastes are determined by one or more of the following methods:

4.2.1 Chemical analysis which shows that the material

characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.

4.2.2 Reference to a Material Safety Data Sheet (MSDS).

4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.

4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 None.

C

CRAFT: YP 676 CLASS ITEM NO: 110-11-001

1 of 4 ITEM NO: 110-11-001

1.1 Title: Underwater Hull; inspect and repair

1.2 Location of Work:

1.2.1 Exterior Hull; Port and Starboard, Stem to Stern, Extending from Longitudinal Centerline of Keel Up to Main Deck Edge, including the Transom and Underwater Hull Appendages

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 111-6170054 Rev D, 108' Yard Patrol Craft, Hull Construction, Shell

2.3 116-6170059 Rev C, 108' Yard Patrol Craft, Stem, Keel & Bow Framing Details

2.4 111-6170055 Rev F, 108' Yard Patrol Craft, Bwk. Dets., Chain Lkr, Ice Sheath & Misc. Details

2.5 120-6170061 Rev F, 108' Yard Patrol Craft, Transverse Struct, Bhds

2.6 801-6170203 Rev B, 108' Yard Patrol Craft, Docking Drawing

2.7 256-6170102 Rev C, 108' Yard Patrol Craft, Sea Water Machinery Cooling A&D W /Diagram

2.8 521-6170149 Rev C, 108' Yard Patrol Craft, Firemain Piping A&D W/Diagram

2.9 593-6170175 Rev C, 108' Yard Patrol Craft, MSD & Seawater Flush A & D W/ Diagram

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-37 of 2.1, for woodworking areas affected by this Work Item.

(V)(G) "JOINT VISUAL INSPECTION"

3.2 Accomplish a joint visual inspection with the SUPERVISOR, from the bottom of the keel up to the main deck edge, including hull planking, caulking, bilge keels, sheathing, stem band, stem bars, transom bars, sea chests and associated strainer plates, for structural integrity, deterioration, pitting, gouges, cracks and areas of damage or distortion, using 2.2 through 2.9 for guidance.

3.2.1 Mark and record areas of damage, using visual, probe and hammer testing inspection methods.

Report: Inspection Results Date: + 3

2 of 4 ITEM NO: 110-11-001

3.2.2 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.2 and 3.2.1, to the SUPERVISOR, showing exact locations, quantities and conditions of deficiencies and recommendations for repairs.

3.3 Remove bilge keels, cres and copper sheathing, stem band, stem bars, transom bars and strainer plates. Tag for location and hold for installation, using 2.3 through 2.9 for guidance. Retain serviceable hardware for reuse.

3.3.1 Accomplish a joint visual inspection with the SUPERVISOR of the areas exposed by removals in 3.3 for structural integrity, deterioration, cracks and areas of damage or distortion, paying particular attention to the areas above the upper rubrail/fender and the planking at the junction of the main deck and hull sides.

3.3.2 Mark and record areas of damage, using visual, probe and hammer testing inspection methods.

3.3.3 Submit one legible copy, in hard copy or approved

of 3.3.1 and 3.3.2, to the SUPERVISOR, showing exact locations, quantities and conditions of deficiencies and recommendations for repairs.

3.4 Accomplish repairs resulting from the inspection reports in 3.2.2 and 3.3.3 as designated by the SUPERVISOR, in accordance with 2.2 through

2.5 as follows:

3.4.1 Remove existing and install new a total of 400 linear feet of damaged and deteriorated outer hull planking, including new wood plugs, Part No. 100 of 2.2, as designated by the SUPERVISOR, using existing hardware.

3.4.1.1 The new outer hull planking shall conform to the

material requirements of General Note 10 of 2.2.

3.4.1.2 Exact areas of replacement shall be designated by the

SUPERVISOR.

3.4.1.3 Template exact size, configuration, and location from existing craft conditions.

3.4.2 Remove existing and install new worm shoe at keel base in its entirety in accordance with 2.3, using serviceable hardware.

3.4.2.1 Install new a total of 220 flat head wood screws, Part No. 37 of 2.3, for worm shoe where found missing or defective, as designated by the SUPERVISOR.

3.4.3 Clad weld repair a total of 200 square inches of pitted areas of the bilge keels, stem band, stem bars and transom bars removed in 3.3

3 of 4 ITEM NO: 110-11-001

3.4.3.1 Accomplish the requirements of 009-12 of 2.1, including Table 4, Columns A, Lines One through 7.

3.4.3.2 Accomplish nondestructive testing in accordance

with Line 10.

3.4.3.3 Chip and grind surfaces flush and smooth in way

of repairs.

3.4.4 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line One, Column A for surface preparation of the equipment listed in 3.4.3.

3.4.4.1 Accomplish the requirements of 009-32 of 2.1, including Table One, Line 4, Columns B and E for preservation of surfaces prepared in 3.4.4.

3.4.5 Accomplish a joint visual inspection with the SUPERVISOR of the inner hull planking exposed by removals during replacement of the outer hull planking.

3.4.5.1 Mark and record areas of damage, using visual, probe

and hammer testing inspection methods.

3.4.5.2 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.4.5 and 3.4.5.1, to the SUPERVISOR, showing exact locations, quantities and conditions of deficiencies and recommendations for repairs.

3.5 Install the equipment removed and tagged for location in 3.3, using

2.3 through 2.9 for guidance. Install serviceable hardware retained in 3.3.

3.5.1 Install 2 new copper sheets in way of missing, part numbers 9S and 10S in accordance with 2.4.

3.5.1.1 Install new fasteners in way of copper sheet

replacement in accordance with 2.4.

3.5.2 Install new a total of 20 flat head wood screws, Part No. 38 of 2.3, for stem band where found missing or defective, as designated by the SUPERVISOR.

3.5.3 Install new a total of 300 flat head wood screws, Part No.

68 of 2.4, for copper sheathing where found missing or defective, as designated by the SUPERVISOR.

3.5.4 Install new a total of 50 flat head wood screws, Part No.

69 of 2.4, for CRES ice sheathing where found missing or defective, as designated by the SUPERVISOR.

3.5.5 Install strainer plates removed and tagged for location in

4 of 4 ITEM NO: 110-11-001

3.3, using 2.6 through 2.9 for guidance.

3.5.6 Isolate dissimilar metals in accordance with General Note 11 of 2.4.

3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 High pressure water washing of the hull is accomplished on Work Item 997-11-001, Drydocking and Undocking; accomplish.

4.2 Surface preparation and preservation required in 3.4.4 and 3.4.4.1 is accomplished on Work Item 631-31-001, Underwater Hull; clean and preserve.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

CRAFT: YP 676 CLASS ITEM NO: 110-11-002

1 of 2 ITEM NO: 110-11-002

1.1 Title: Limber Chain Assembly; repair

1.2 Location of Work:

1.2.1 Transverse Bulkhead 7, Aft Side, 9 inches off Centerline, Port and Starboard

1.2.2 Transverse Bulkhead 16, Forward and Aft Side, 9 inches off Centerline, Port and Starboard

1.2.3 Transverse Bulkhead 23, Forward and Aft Side, 9 inches off Centerline, Port and Starboard

1.2.4 Transverse Bulkhead 30, Forward and Aft Side, 9 inches off Centerline, Port and Starboard

1.2.5 Transverse Bulkhead 36, Forward and Aft Side, 9 inches off Centerline, Port and Starboard

1.2.6 Transverse Bulkhead 50, Forward and Aft Side, 9 inches off Centerline, Port and Starboard

1.2.7 Transverse Bulkhead 58, Forward and Aft Side, 9 inches off Centerline, Port and Starboard

1.2.8 Transverse Bulkhead 64, Forward and Aft Side, 9 inches off Centerline, Port and Starboard

1.2.9 Transverse Bulkhead 67, Forward Side, 9 inches off Centerline, Port and Starboard

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 111-6170055 Rev F, 108' Yard Patrol Craft, Bwk. Dets., Chain Lkr, Ice Sheath & Misc. Details

2.3 120-6170061 Rev F, 108' Yard Patrol Craft, Transverse Struct, Bhds

2.4 S9086-CJ-STM-010, NSTM CH 075, Fasteners

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-37 of 2.1 for woodworking areas

3.2 Accomplish a joint visual inspection with the SUPERVISOR of each limber chain assembly located in 1.2 including associated hardware for deterioration, damage, missing parts, or no longer serviceable for continued use, using 2.2 and 2.3 for guidance.

CRAFT: YP 676 CLASS ITEM NO: 110-11-002

2 of 2 ITEM NO: 110-11-002

3.3 Disconnect and remove each limber chain assembly including associated hardware located in 1.2, using 2.2 and 2.3 for guidance. Tag for location and hold for installation.

3.3.1 Clean limber chain assemblies including associated hardware free of dirt, grease, corrosion and rust.

3.3.2 Clean limber chain holes free of obstructions, debris and foreign matter.

3.4 Accomplish a visual inspection of the components cleaned in 3.3.1 and 3.3.2 for defects or damage, using 2.2, 2.3 and Section 8 of 2.4 for guidance.

Report: Visual Inspection Results Date: + 2

3.4.1 Submit one legible copy, in hard copy or approved

of 3.2 and 3.4 to the SUPERVISOR, showing exact locations, quantities and conditions of deficiencies and recommendations for repairs.

3.5 Accomplish repairs to defective limber chain assemblies resulting from the inspection in 3.2 and 3.4 as follows:

3.5.1 Install new a total of 15 limber chain assemblies including associated hardware in accordance with 2.2 as designated by the

SUPERVISOR.

3.5.2 Install remaining serviceable limber chain assemblies

including associated hardware removed in 3.3.

3.5.3 Template exact size, configuration, and location from existing craft conditions.

(V)(G) "OPERATIONAL TEST"

3.6 Accomplish an operational test of each limber chain assembly located in 1.2. Cycle each assembly a total of four times to ensure correct operation. Allowable sticking or binding: None.

3.7 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None.

CRAFT: YP 676 CLASS ITEM NO: 111-11-001

1 of 2 ITEM NO: 111-11-001

1.1 Title: Hull Strapping System; inspect, repair and test

1.2 Location of Work:

1.2.1 Throughout the Craft

1.3 Identification:

1.3.1 Quantity (16 EA), Plate, 1/4" x 5 1/2" X 18", Silicon Bronze (Part No. 32 of 2.2)

1.3.2 Quantity (12 EA), Plate, 1/4" x 5 1/2" X 36", Silicon Bronze (Part No. 33 of 2.2)

1.3.3 Quantity (40 EA), Plate, 1/4" x 8" X 8", Silicon Bronze (Part No. 36 of 2.2)

1.3.4 Quantity (22 EA), Plate, 1/4" x 8" X 10", Silicon Bronze (Part No. 38 of 2.2)

2. REFERENCES:

2.1 Standard Items

2.2 111-6170056 Rev B, 108' Yard Patrol Craft, Hull Strapping

2.3 MIL-STD-1310, Shipboard Bonding, Grounding and Other Techniques for Electromagnetic Compatibility and Safety

2.4 406-6170119 Rev E, 108' Yard Patrol Craft, Grounding System

3. REQUIREMENTS:

3.1 Accomplish electrical readings of each hull strap listed in 1.3 and located in 1.2. Inspect for improper and loose connections, missing parts, deteriorated components and other defects in accordance with 2.2 and 2.3, using 2.4 for guidance.

3.1.1 Submit one legible copy, in hard copy or approved

of 3.1 to the SUPERVISOR.

3.2 Accomplish the requirements of 009-09 of 2.1 for the equipment identified in 3.1 to include the following:

3.2.1 Location and electrical connection reading of each defective hull strap reported in 3.1.1.

3.2.2 Recommended repairs for each defective hull strap.

3.2.3 Material requirements and application process of bedding compound in accordance with General Note 8 of 2.2.

CRAFT: YP 676 CLASS ITEM NO: 111-11-001

2 of 2 ITEM NO: 111-11-001

3.3 Accomplish repairs to the equipment listed in 1.3 and located in 1.2 in accordance with the approved procedure of 3.2, using 2.2 through 2.4 for guidance.

3.4 Accomplish the requirements of 009-37 of 2.1, for woodworking areas affected by this Work Item.

3.5 Accomplish the requirements of 009-12 of 2.1, including Table 4, Column F, Lines One through 7, using General Note 3 of 2.2 for guidance.

3.5.1 Chip and grind surfaces flush and smooth in way of weld repairs in accordance with General Note 4 of 2.2.

3.6 Accomplish the requirements of 009-32 of 2.1, including Table 2,3, Line 51, using General Note 8 of 2.2 for guidance.

(V)(G) "VERIFICATION READING"

3.7 Accomplish electrical readings of each hull strap listed in 1.3 and located in 1.2 upon completion of repairs in accordance with 2.2 and 2.3, using 2.4 for guidance.

Report: Test Results Date: + 3

3.7.1 Submit one legible copy, in hard copy or approved

of 3.7 to the SUPERVISOR.

3.8 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None

5.1 None

CRAFT: YP 676 CLASS ITEM NO: 120-11-001

1 of 2 ITEM NO: 120-11-001

1.1 Title: Transverse Bulkhead; inspect and repair

1.2 Location of Work:

1.2.1 Bilge (3-23-0-V)

1.2.2 Fuel Tank Compartment (2-30-0-F)

1.3 Identification:

1.3.1 Transverse Bulkhead, Frame 30

2. REFERENCES:

2.1 Standard Items

2.2 120-6170061 Rev F, 108' Yard Patrol Craft, Transverse Struct. Bhds

2.3 601-6170178 Rev D, 108' Yard Patrol Craft, Inboard Profile

2.4 631-6170188 Rev H, 108' Yard Patrol Craft, Paint Schedule

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-25 of 2.1 for preliminary air test of the compartment listed in 1.2.2. Air test fitting is shown in Section View "10-B" and Detail "22-D of 2.2.

3.2 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 51, Column A, for a total of 80 square feet of bulkhead surfaces listed in 1.3 and located in 1.2 as designated by the SUPERVISOR.

(V)(G) "VISUAL AND PROBE INSPECTION"

3.3 Accomplish a joint visual, probe and hammer test inspection with the SUPERVISOR, of the forward and aft sides of bulkhead surfaces listed in

1.3 and located in 1.2, for structural integrity, deterioration, gouges, cracks and areas of damage or distortion, using 2.2 and 2.3 for guidance.

3.3.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing the results of the inspection in 3.3 to the SUPERVISOR showing exact locations, quantities and conditions of deficiencies and recommendations for repairs.

3.4 Remove existing and install new a total of 160 square feet of plywood sheathing of bulkhead surfaces listed in 1.3 and located in 1.2, as designated by the SUPERVISOR as a result of 3.1.1 and 3.3.1 in accordance with 2.2.

3.4.1 New plywood shall conform to the material requirements of General Notes 3 and 4 of 2.2.

3.4.2 Template exact size, configuration, and location from existing craft conditions.

CRAFT: YP 676 CLASS ITEM NO: 120-11-001

2 of 2 ITEM NO: 120-11-001

3.4.3 Accomplish the requirements of 009-37 of 2.1 for woodworking areas affected by this Work Item.

(V)(G) "AIR TEST"

3.5 Accomplish the requirements of 009-25 of 2.1, for air test of the compartment listed in 1.2.2. Maintain test pressure for 15 minutes for temperature stabilization prior to start of test. Hold test pressure for 10 minutes. Allowable drop in pressure: None.

3.6 Apply a wood preservative, in way of new installations in 3.4, in accordance with 2.4.

3.6.1 Accomplish the requirements of 009-32 of 2.1.

3.7 Accomplish the requirements of 009-32 of 2.1 for new and disturbed

4.1 None.

CRAFT: YP 676 CLASS ITEM NO: 123-11-001

1 of 1 ITEM NO: 123-11-001

1.1 Title: Fuel Oil Tank; inspect and test

1.2 Location of Work:

1.2.1 Fuel Tank Compt. (2-30-0-F)

1.3 Identification:

1.3.1 Quantity (2 EA), Fuel Oil Tank, Port & Starboard

2. REFERENCES:

2.1 Standard Items

2.2 977-6170215 Rev A, 108' Yard Patrol Craft, IIP-Fuel Oil Tank Assemblies

3.1 Accomplish a joint visual inspection with the SUPERVISOR of each tank listed in 1.3 and located in 1.2 for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, including sounding tubes, tank vents, overflows, piping, structural members, and manhole covers, using 2.2 for guidance.

Report: Inspection Results Date: + 2

3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing the results of the requirements of 3.1 to the SUPERVISOR, noting specific locations and sizes of discrepancies and recommendations for repairs.

3.2 Accomplish the requirements of 009-25 of 2.1, for air test of each tank listed in 1.3 and located in 1.2. Test pressure shall be 2 PSIG.

Maintain test pressure for 15 minutes for temperature stabilization prior to start of test. Hold test pressure for 10 minutes. Allowable drop in pressure: None.

Report: Air Test Results Date: + 2

3.2.1 Submit one legible copy, in hard copy or approved

of 3.2 to the SUPERVISOR.

3.3 Accomplish the requirements of 009-32 of 2.1 for disturbed surfaces.

4. NOTES:

4.1 Work in this item interfaces with Work Item 437-80-001, Replace Fresh Water & Fuel Tank TLI'S; accomplish.

4.2 Tanks are opened and closed on Work Item Number 992-31-001, Cleaning and Pumping; accomplish.

CRAFT: YP 676 CLASS ITEM NO: 123-14-001

1 of 2 ITEM NO: 123-14-001

1.1 Title: Fresh Water Tank; inspect and test

1.2 Location of Work:

1.2.1 Engine Room (2-36-0-E)

1.2.2 Bilge (3-50-0-V)

1.3 Identification:

1.3.1 Quantity (One EA), Forward Fresh Water Tank, Frame 36 1/2 - 43 1/2

1.3.2 Quantity (One EA), Aft Fresh Water Tank, Frame 50 - to 57 1/2

2. REFERENCES:

2.1 Standard Items

2.2 977-6170214 Rev D, 108' Yard Patrol Craft, IIP- Fwd Fresh Water Tank Assembly

2.3 127-6170162 Rev E, 108' Yard Patrol Craft, Misc. Tanks

2.4 601-6170178 Rev D, 108' Yard Patrol Craft, Inboard Profile

2.5 631-6170188 Rev H, 108' Yard Patrol Craft, Paint Schedule

2.6 NAVMED P-5010-5, Chapter 5, Manual of Preventive Medicine

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-25 of 2.1 for preliminary air test of the tank listed in 1.3.1 and located in 1.2.1. Test pressure shall be 2 PSIG.

3.2 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 37, Column A for surface preparation of the exterior surfaces of the tank top plating listed in 1.3.1 and located in 1.2.1, including manhole cover, using aluminum oxide discs conforming to A-A-1016, stainless steel wire brushes or stainless steel pads.

3.3 Accomplish a joint visual inspection with the SUPERVISOR of each deterioration, pitting, cracks, and areas of damage or distortion, including sounding tubes, tank vents, overflows, piping, structural members and manhole covers, using 2.2 through 2.4 for locations and

Report: Visual Inspection Results Date: + 3 of 3.3 to the SUPERVISOR.

3.4 Accomplish the requirements of 009-25 of 2.1, for air test of each tank listed in 1.3 and located in 1.2. Test pressure shall be 2 PSIG.

Maintain test pressure for 15 minutes for temperature stabilization

CRAFT: YP 676 CLASS ITEM NO: 123-14-001

2 of 2 ITEM NO: 123-14-001 prior to start of test. Hold test pressure for 10 minutes. Allowable drop in pressure: None.

Report: Air Test Results Date: + 3 transferrable media, of a report listing results of the requirements of 3.5 to the SUPERVISOR.

3.5 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 34, Columns B and E for preservation of surfaces prepared in 3.2, using 2.5 for guidance.

(V)(G) "CLEANLINESS INSPECTION"

3.6 Inspect each tank listed in 1.3 and located in 1.2 for cleanliness and completion of work prior to chlorination and final closing. Tanks shall be clean of any industrial debris and foreign matter.

Report: Cleanliness Inspection Results Date: + 3

3.6.1 Submit one legible copy, in hard copy or approved

of 3.6 to the SUPERVISOR.

3.7 Accomplish the requirements of 009-32 of 2.1 for new and disturbed

(V)(G) "CHLORINATION"

3.8 Chlorinate each tank listed in 1.3 and located in 1.2, including the associated piping, in accordance with 2.6.

(V)(G) "SAMPLING"

3.9 Obtain water samples from each tank listed in 1.3 and located in

1.2 and analyze by a certified chemist to ensure that the water is safe for human consumption upon completion of chlorination.

Report: Chemist's Analysis Date: + 2

3.9.1 Submit one legible copy, in hard copy or approved

transferrable media, of the chemist's analysis to the SUPERVISOR.

3.9.2 Do not unseal fresh water tanks access covers after the chlorination process has been completed.

4. NOTES:

4.1 Work in this item interfaces with Work Item 533-80-002, Potable Water System Upgrade; accomplish, Work Item 533-11- 001, Potable Water Piping; repair, Work Item 437-80-001, Replace Fresh Water & Fuel Tank TLI; accomplish, Work Item 533-11-002, Reverse Osmosis Unit; replace.

4.2 Tanks are opened and closed on Work Item 992-31-001, Cleaning and Pumping; accomplish.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 None.

CRAFT: YP 676 CLASS ITEM NO: 123-17-001

1 of 1 ITEM NO: 123-17-001

1.1 Title: Sump Tank (Grey Water); inspect and test

1.2 Location of Work:

1.2.1 Bilge (3-23-0-V)

1.2.2 Bilge (3-58-0-V)

1.3 Identification:

1.3.1 Quantity (2 EA), Sump Tank

2. REFERENCES:

2.1 Standard Items

2.2 601-6170178 Rev D, 108' Yard Patrol Craft, Inboard Profile

2.3 127-6170162 Rev E, 108' Yard Patrol Craft, Misc Tanks deterioration, pitting, cracks, and areas of damage or distortion, including sounding tubes, tank vents, overflows, piping, structural members, and manhole covers, using 2.2 and 2.3 for locations and

3.1.1 Submit one legible copy, in hard copy or approved

of 3.1 to the SUPERVISOR, noting specific locations and sizes of discrepancies and recommendations for repairs.

3.2 Accomplish the requirements of 009-25 of 2.1, for an air test of each tank listed in 1.3 and located in 1.2. Test pressure shall be 2 PSIG. Maintain test pressure for 15 minutes for temperature stabilization prior to start of test. Hold test pressure for 10 minutes. Allowable drop in pressure: None.

Report: Air Test Results Date: + 2

3.2.1 Submit one copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.2 to the

SUPERVISOR.

3.3 Accomplish the requirements of 009-32 of 2.1 for disturbed surfaces.

4.1 Tanks are opened and closed on Work Item Number 992-31-001, Cleaning and Pumping; accomplish.

CRAFT: YP 676 CLASS ITEM NO: 130-11-001

1 of 4 ITEM NO: 130-11-001

1.1 Title: Main Deck and Fitting; inspect and repair

1.2 Location of Work:

1.2.1 Main Deck, Stem to Stern

1.3 Identification:

1.3.1 Quantity (One EA), 300 Pound Davit, (Including Stowage

Brackets)

1.3.2 Quantity (2 EA), Davit Socket, (Including Base Plate and Brace)

1.3.3 Quantity (10 EA), Double Barrel Bitt, (Including Base Plate)

1.3.4 Quantity (16 EA), Cleat, 6 Inch

1.3.5 Quantity (One EA), Towing Bollard, (Including Base Plate and Brackets)

1.3.6 Quantity (11 EA), Spool, (Item Nos. S8, S12, S15, S16 and S25 of 2.2)

1.3.7 Quantity (2 EA), Goose Neck, (Item No. S25 of 2.8)

2. REFERENCES:

2.1 Standard Items

2.2 512-6170142 Rev B, 108' Yard Patrol Craft, HVAC A&D Main Deck House

2.3 611-6170183 Rev B, 108' Yard Patrol Craft, Hull Fittings A/D

2.4 671-6170197 Rev C, 108' Yard Patrol Craft, Boat Handling, Canvas, Lockers and Equipment Stowages Arrgt. & Det.

2.5 582-6170174 Rev B, 108' Yard Patrol Craft, Mooring & Towing Arrg't & Details

2.6 130-6170062 Rev F, 108' Yard Patrol Craft, Main Deck Sheathing & Framing

2.7 Test No. 092-582 Rev C, YP 676 Class Shipboard Test Procedure Mooring and Towing Fittings

2.8 512-6170140 Rev C, 108' Yard Patrol Craft, HVAC Fr30 - Fwd Below Main Deck

2.9 512-5900285 Rev E, 108' YP - 676 Class Ventilation Arrg't. & Details

2.10 602-6170180 Rev E, 108' Yard Patrol Craft, Labels & Signs

2 of 4 ITEM NO: 130-11-001

3.1 Accomplish the requirements of 009-37 of 2.1, for woodworking areas affected by this Work Item.

3.2 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 26, Column A, for aluminum surfaces; and Table 2, Line One, Column A for steel surfaces for surface preparation of the equipment listed in 1.3 and located in 1.2, using 2.2 through 2.5 and 2.8 for locations and guidance.

3.2.1 Accomplish a joint visual inspection with the SUPERVISOR of the equipment listed in 1.3 and located in 1.2 for structural integrity, deterioration, gouges, cracks and areas of damage or distortion, using 2.2 through 2.5 and 2.8 for locations and guidance.

3.2.1.1 Accomplish a joint visual, probe and hammer test

inspection with the SUPERVISOR of the exposed surfaces of the wood foundations for the equipment listed in 1.3 and located in

1.2 for damage, cracks, deformation, and splitting, using 2.2 through 2.5 and 2.8 for locations and guidance.

3.2.1.2 Submit one legible copy, in hard copy or approved

requirements of 3.2.1 and 3.2.1.1 to the SUPERVISOR showing exact locations, quantities and conditions of deficiencies and recommendations for repairs.

3.3 Accomplish a joint visual inspection with the SUPERVISOR of the main deck plywood surfaces located in 1.2 for structural integrity, damage, cracks, splitting, and deterioration, using 2.6 for guidance.

3.3.1 Accomplish a joint visual, probe and hammer test inspection with the SUPERVISOR of suspect plywood surfaces located in 1.2, using

2.6 for guidance.

3.3.2 Submit one legible copy, in hard copy or approved

of 3.3 and 3.3.1 to the SUPERVISOR showing exact locations, quantities and conditions of deficiencies and recommendations for repairs.

3.4 Remove existing and install new a total of 8 wood foundations for the equipment listed in 1.3 and located in 1.2, as designated by the

3 of 4 ITEM NO: 130-11-001

SUPERVISOR as a result of 3.2.1.1, using new hardware, in accordance with

2.2 through 2.5 and 2.8, using Section "20-G" of 2.9 for guidance.

3.4.1 Chip and grind surfaces flush and smooth in way of repairs.

3.4.2 Template exact size, configuration, type and location from existing craft conditions.

(I)(G) "STATIC LOAD TEST"

3.4.3 Accomplish a static load test in way of each new installation in accordance with 2.7.

3.4.3.1 Provide documentation and current certification of

approved test fixture prior to start of load test.

3.4.3.2 Accomplish a visual inspection of each assembly tested and the surrounding deck structure, associated joints, and below deck support structure, for structural integrity, cracks, and areas of damage or distortion.

Report: Load Test and Inspection Results Date: + 3

3.4.3.3 Submit one legible copy, in hard copy or approved

requirements of 3.4.3 and 3.4.3.2 to the SUPERVISOR.

3.5 Remove existing and install new a total of 480 square feet of plywood, using new hardware, in locations as designated by the SUPERVISOR, as a result of 3.3 in accordance with 2.6.

3.5.1 Upon removal of existing top plywood layer, accomplish a joint visual, probe and hammer test inspection with the SUPERVISOR of bottom layer of plywood, for structural integrity, damage, cracks, splitting and deterioration.

3.5.1.1 Submit one legible copy, in hard copy or approved

requirements of 3.5.1 to the SUPERVISOR.

3.5.2 Accomplish repairs to bottom layer of plywood by removing existing and installing new a total of 160 square feet of plywood , using new hardware, in locations as designated by the SUPERVISOR, as a result of 3.5.1 in accordance with 2.6.

3.6 Accomplish the requirements of 009-12 of 2.1, including Table 4, Columns A and C, Lines One through 7 for clad welding a total of 44 square inches of defects for the equipment listed in 1.3 and located in

1.2 as designated by the SUPERVISOR, as a result of 3.2.1.

3.6.1 Accomplish nondestructive testing in accordance with Line 10.

3.6.2 Chip and grind surfaces flush and smooth in way of repairs.

4 of 4 ITEM NO: 130-11-001

3.7 Accomplish a static load test of the 300 pound J-Davit listed in

1.3.1 at each socket listed in 1.3.2. Apply a test load of 600 pounds.

Hold for 10 minutes.

3.7.1 Position the davit arm fully outboard and the boat hook above the water level.

3.7.2 Remove the test load and inspect the davit, socket and

surrounding structure for structural damage, cracks or permanent deformation. Allowable damage: None.

3.7.3 Remove existing and install new J-Davit label plate Part No.

137 of 2.10 upon satisfactory completion of test.

Report: Static Load Results Date: + 3

3.7.4 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing the test results of the requirements of 3.7 to the SUPERVISOR.

3.7.5 Remove existing and install new J-Davit label plate, Part No.

137 of 2.10 upon satisfactory completion of test.

3.8 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line One, Columns B, C (One full coat of MIL-PRF-23236, TYPE V or VI, CLASS 5 or 7, 4 - 8 mils), and G for preservation of steel surfaces prepared in 3.2.

3.8.1 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 26, Columns B, D and G for preservation of aluminum surfaces prepared in 3.2.

3.9 Accomplish the requirements of 009-32 of 2.1 for new and disturbed

4.1 Surface preparation and preservation of main deck surfaces is covered under Work Item 634-21-001, Nonskid and Deck Preservation;

accomplish.

CRAFT: YP 676 CLASS ITEM NO: 130-11-002

1 of 1 ITEM NO: 130-11-002

1.1 Title: Main Deck Support Structure; inspect and repair

1.2 Location of Work:

1.2.1 Engine Room (2-36-0-E)

1.2.1.1 Frames 42 To 44, Starboard

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 601-6170179 Rev D, 108' Yard Patrol Craft, General Arrangement

2.3 130-6170062 Rev F, 108' Yard Patrol Craft, Main Deck Sheathing & Framing

2.4 116-6170060 Rev E, Longitudinal Framing

3.1 Accomplish a joint visual inspection with the SUPERVISOR, of the support structure on the underside of the main deck areas located in 1.2, for structural integrity, deterioration, gouges, cracks and areas of damage or distortion, using 2.2 through 2.4 for guidance.

3.1.1 Submit one legible copy of a report, in hard copy or approved transferrable media, listing results of the requirements of 3.1 to the SUPERVISOR.

3.2 Accomplish the requirements of 009-09 of 2.1 for repairs as a result of 3.1.1.

3.3 Accomplish repairs of the support structure on the underside of the main deck located in 1.2 as designated by the SUPERVISOR, in accordance with the approved procedure of 3.2, using 2.2 through 2.4 for guidance.

3.3.1 Template exact size, configuration, and location from existing craft conditions.

3.3.2 Accomplish the requirements of 009-37 of 2.1 for woodworking areas affected by this Work Item.

3.4…