N00024-16-R-2216 Attachment J-1
DEPARTMENT OF THE NAVY
Yard Patrol (YP) Craft 676 Class Specification
NOTE:
This Yard Patrol (YP) 676 Class Specification (Attachment J-1) consists of individual Work Items for evaluation purposes only. These items do not represent the actual work to be performed under the contract award, but is a representation of the scope of work that can be expected for the YP Service Life Extension Program (SLEP) efforts. Per the RFP, the Government will issue a draft Delivery Order to the winning Offeror(s) for further bidding on craft specific work packages. The Government will then down-select to the Offeror(s), whose proposal represents the best value to the government after evaluation in accordance with the factors in each delivery order. Each delivery order will be competed among the awardees based on total price of the craft specific work package and past performance of prior delivery orders on the contract.
Sam ple
CATEGORY I. FY-16 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM NO TITLE DATE
009-01 General Criteria; accomplish 07/18/2014
009-06
Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
07/18/2014
009-23 Interferences; remove and install 07/18/2014
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;
provide and manage
07/18/2014
009-65 Polychlorinated Biphenyls (PCBs); control 07/29/2011
009-69 Heavy Weather/Mooring Plan; provide 07/18/2014
009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish
07/18/2014
009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install 07/18/2014
009-82
Data Requirements When Installing an Equal Component Vice Specified Component;
provide
07/29/2011
009-87 Chemical disinfection Procedures; accomplish 07/18/2014
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
07/18/2014
009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 07/18/2014
CATEGORY II. FY-16 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER
ITEM NO.
TITLE
DATE
009-09 Process Control Procedure (PCP); provide and accomplish 07/18/2014
009-11 Insulation and Lagging Requirements; accomplish 07/18/2014
009-16 Electronic Equipment; repair 07/29/2011
009-17 Rotating Electrical Equipment, repair 07/18/2014
009-25 Structural Boundary Test; accomplish 07/18/2014
009-26 Deck Covering Requirements; accomplish 07/18/2014
009-32 Cleaning and Painting Requirements; accomplish 11/07/2013
009-32 Cleaning and Painting Requirements; accomplish 07/10/2015
009-36 Controller; repair 07/18/2014
009-37 General Procedures for Woodwork; accomplish 07/18/2014
009-63 Lubricating Oils and Hydraulic Fluids; analyze 07/18/2014
009-75 Circuit Breaker; repair 07/29/2011
INDEX
ITEM NO WORK ITEM TITLE
077-01-001 Hazardous Waste Produced on Naval Vessels; control
110-11-001 Hull; inspect and repair
110-11-002 Limber Chain Assembly; repair
111-11-001 Hull Strapping System; inspect and test
120-11-001 Transverse Bulkhead; inspect and repair
123-11-001 Fuel Oil Tank; inspect and test
123-14-001 Fresh Water Tank; inspect and test
123-17-001 Sump Tank (Grey Water); inspect and test
130-11-001 Main Deck and Fitting; inspect and repair
130-11-002 Main Deck Support Structure inspect and repair
150-11-001 Bulwark and Cap Rail; repair and preserve
167-11-001 Watertight Closure; replace
167-11-002 Structural Closure; repair
171-11-001 Mast; inspect, test, repair and preserve
233-11-001 Starboard Main Propulsion Diesel Engine Overhaul; accomplish
233-12-001 Port Main Propulsion Diesel Engine Overhaul; accomplish
241-11-001 Starboard Transmission Overhaul; accomplish
241-12-001 Port Transmission Overhaul; accomplish
243-11-001 Propeller Shafting; remove, inspect, repair and install
245-11-001 Propeller; inspect and repair
252-11-001 Operating Console; repair
252-11-002 Engine Control Cable; replace
256-11-001 Main Engine Sea Water Strainer; replace
256-11-002 Sea Water Cooling Piping; repair
259-11-001 Exhaust Piping System; repair
311-21-001 Starboard Ship Service Diesel Generator Engine Overhaul; accomplish
311-21-002 Starboard Ship Service Generator; repair
311-22-001 Port Ship Service Diesel Generator Engine Overhaul; accomplish
INDEX
ITEM NO WORK ITEM TITLE
311-22-002 Port Ship Service Generator; repair
313-11-001 Battery Control Junction Box; repair
320-11-001 Controller; repair
320-11-002 Water Heater Element; replace
320-11-003 Immersion Heater; repair
321-11-001 Shore Power Receptacle and Plug; replace
321-11-002 Junction Box Cabling; replace
324-11-001 Electric Plant Control Panel (EPCP); repair
332-11-001 Light Fixture; repair
332-11-002 Battle Lantern; inspect, repair and test
422-11-001 Navigation Mast Light Junction Box; replace
422-11-002 Searchlight; replace
431-80-001 1MC-6MC Upgrade; accomplish
432-11-001 Sound Powered Telephone Jack Box; replace
436-11-001 Engine Order Telegraph System; remove
437-80-001 Replace Fresh Water & Fuel Tank TLI; accomplish
505-11-001 Remote Valve Operating Gear; repair
508-11-001 Lagging and Insulation; repair
508-11-002 Main Engine Heat Shield Insulation and Lagging; replace
512-11-001 Vent Ducting Flex Hose; replace
512-11-002 Fan Coil Unit Blower Motor; inspect, repair and test
512-11-003 Blower Fan Repair; accomplish
512-11-004 Thermostat; inspect, repair and test
514-11-001 Chill Water Pump; replace
514-80-001 YP 676 Class A/C System Upgrade; accomplish
520-11-001 Sea Valve; replace
521-11-001 Firemain Piping; repair and test
521-11-002 Fire Pump; replace
INDEX
ITEM NO WORK ITEM TITLE
524-11-001 AC Auxiliary Sea Water Pump; replace
524-80-001 Aux Seawater System Upgrade; accomplish
528-11-001 Gray Water Pump; replace
529-11-001 Bilge Piping; repair
529-21-001 Bilge Pump; replace
529-80-001 Replace Engine Driven Bilge Pump; accomplish
531-11-001 Recirculating Brominator System; replace
533-11-001 Potable Water Piping; repair
533-11-002 Reverse Osmosis Unit; remove and repair
533-80-001 Potable Water System Upgrade; accomplish
541-11-001 Fuel Oil Strainer; replace
541-11-002 Fuel Oil Transfer Pump; replace
541-11-003 Fuel Oil Valve; replace
541-11-004 Emergency Fuel Oil Valve; replace
541-80-001 MPDE & SSDG FO Filter Upgrade; accomplish
551-80-001 Electric Whistle Installation; accomplish
561-11-001 Steering System; repair
562-11-001 Rudder; clean, inspect and repair
581-11-001 Anchor Windlass Assembly; overhaul and test
581-11-003 Anchor and Anchor Chain; clean, inspect, repair and preserve
593-11-001 Marine Sanitation Device (MSD) and Sea Water Flush Piping; repair
593-11-002 Marine Sanitation Device (MSD) Tank Washdown Nozzle; replace
593-11-003 Marine Sanitation Device (MSD) Air Compressor; replace
593-11-004 Marine Sanitation Device (MSD) Macerator/Transfer Pump; replace
593-11-005 Marine Sanitation Device (MSD) Tank; inspect, test and preserve
593-11-006 Marine Sanitation Device (MSD) Float Switch Assembly; replace
611-11-001 Rubber Fender System; inspect and repair
622-11-001 Machinery Space Floor Plate; inspect and repair
INDEX
ITEM NO WORK ITEM TITLE
625-11-001 Windshield Wiper Assembly; replace
631-13-001 Interior Compartment; clean and preserve
631-21-001 Superstructure; preserve
631-31-001 Underwater Hull; clean and preserve
631-41-001 Freeboard; clean and preserve
633-11-001 Hull Zinc Anode; replace
634-11-001 Interior Deck Covering; install
634-11-002 Electrical Grade Sheet Deck Covering; install
634-21-001 Nonskid and Deck Preservation; accomplish
640-80-001 Habitability Upgrade; accomplish
644-11-001 Plumbing Fixture; replace
651-11-001 Messroom Tables and Transoms; replace
651-80-001 Food Service Equip Upgrade; accomplish
980-31-001 Office Space; provide
992-11-001 Temporary Service; provide
992-31-001 Cleaning and Pumping; accomplish
997-11-001 Drydocking and Undocking; accomplish
STATEMENT OF GENERAL CONDITIONS
Materials
The as-built drawings for the craft specify various materials, which are no longer commercially available. PRC (PRORECO) products in particular are no longer manufactured for use. The Contractor shall develop lists of alternate materials for SUPERVISOR approval before commencing work on each Work Item.
Welding Requirements
The Contractor shall provide evidence to the satisfaction of the SUPERVISOR that the welders and operators are proficient in the type of work which they are employed to perform. All welders shall hold current qualifications or certifications by recognized society acceptable from the Government. All welding should be in accordance with ABS Steel Vessel Rules part 2 chapter 4 section 1.
Ground welding machines, for purposes of providing a return path for welding current, using a grounding bar or lead, shall be connected directly from the machine ground return connection to the ship’s hull. Welding machines used for welding on machinery, pressure vessels, or piping shall have the ground return connection in the immediate vicinity of the work to ensure that the current does not flow through bearings, pipe hangers, or other areas where arcing or high resistance paths exist. For vessels constructed of non-magnetic materials, the ground return cables shall be connected directly to the component being welded – as close to the weld zone as feasible.
Shipboard power distribution system shall not be used as the power source for welding equipment. External power source shall be used.
Woodworking
1. The use of epoxy adhesives and fillers is encouraged for each applicable Work Item.
2. Where fasteners are removed and reassembly does not use the exact same hole, the old hole is to be filled with epoxy filler. Where fasteners are loose the hole shall be filled with epoxy filler and re-drilled.
3. Cleaning to bare wood shall use the mechanical peel method.
Painting
1. The use of NAVSEA Drawing No 6170188 Paint Schedule is for information only for the performance of surface preparation, painting and preservation in conjunction with the implementation of manufacturer’s recommendations.
2. In the course of work, prepare and paint all new and disturbed surfaces to match surrounding areas.
3. For materials within NAVSEA Drawing No 6170188 Paint Schedule that are no longer commercially available, the Contractor shall prepare a list of substitution materials for use approval by the SUPERVISOR.
Calibration
The Contractor shall perform the calibration of measuring devices as required by each Work Item. Measuring devices include meters, gauges, switches, and thermometers.
If measurement devices are designated as No Calibration Required (NCR), the performance of a functional check to ensure proper functioning of the measurement device is required, if it is not required for system acceptance testing. Measurement devices identified as requiring calibration for system/acceptance testing/trials but designated as NCR shall be calibrated and shall be labeled.
If measurement device calibration is required, the measurement device shall have at least two-thirds of its calibration life remaining. If it does not, the measurement device shall be calibrated. Each measurement device shall be calibrated and adjusted, including associated accessories, to the manufacturer's specifications, using appropriate calibration procedures and test equipment for permanently installed measurement devices and portable/non-installed measurement devices.
Calibration laboratories employed for measurement device calibration shall be accredited to either ISO 17025, General Requirements for the Competence of Testing and Calibration Laboratories, First Edition or ANSI/NCSL Z540-3, Requirements for the Calibration of Measuring and Test Equipment by a Commercial Accreditation Activity and the scope of accreditation must cover the appropriate measurement parameters and ranges of the calibrations performed.
Each measurement device shall be affixed with a calibration label to the face of each measurement device, denoting the name and location of the calibration facility, the date of calibration, and date of the next calibration.
Submit one legible copy, in hard copy and transferrable media (in Excel format) of a calibration events data file for each contractor or subcontractor-performed calibration event to the SUPERVISOR. For the calibration events data file, the minimum data set shall include manufacturer, model, serial number, nomenclature, manufacturer’s CAGE (if applicable), range, procedure used, calibration standard used, date calibrated, date due, servicing laboratory, service label attached, locations, part-of (system), function within the system (if permanently installed), National Stock Number and SCAT (if applicable).
Label Plates and Cable Tags
Identifying markings shall be plastic or engraved on metal. Plastic label plates and instruction plates shall be constructed of laminated phenolic having a black exterior and a white center. Engraving shall be a 90 degree maximum included angle of sufficient depth to expose the white center.
Label plates shall be attached with stainless steel screws or SUPERVISOR approved industrial adhesives. Aluminum plates shall be insulated to prevent contact with dissimilar materials.
Per NAVSEA drawing number 6170180, label plates shall be installed with mechanical fasteners as follows: With #6 RD HD Screw (Part #2), when affixed to a wood surface. Where the label plates are fastened to an aluminum surface, #6-32 NC-2 Pan Head Screws (Part #3) or 1/8” rivets (Part #11) shall be used.
Cable tags shall be soft aluminum and be embossed with the applicable cable designation using numbers and capital letters having minimum height of 3/16 inch and embossed to at least 1/64 inch above the surface. Cable tags and securing strips shall have a thickness of 0.014 to 0.016 inch. Cable tags shall have a minimum width of one-half inch.
Technical Representative
Manufacturer’s technical representative and authorized technical representative, in the performance of a work item, shall be directly employed by the manufacturer or authorized by the manufacturer, respectively, to perform on-site technical assistance and guidance, maintenance, repair, service, troubleshooting, installation, and modification on the equipment or machinery specified in the Work Item.
Documented qualifications of the manufacturer’s technical representative or authorized technical representative shall be provided to the SUPERVISOR.
The manufacturer’s representative’s report shall be prepared and fully state the manufacturer's representative's observations and recommendations, evaluate required repairs and parts, and state that the equipment and/or system has been installed, repaired, modified, adjusted, disassembled, reassembled, and tested in accordance with the manufacturer's requirements.
The manufacturer’s representative’s report shall specifically approve the Contractor's work as satisfactorily meeting warranty requirements, and explicitly enumerate existing deficiencies.
Piping System Cleanliness
After all new and modified piping is installed, the Contractor shall clean the affected system by flushing with the service fluid or a medium approved by the SUPERVISOR. Piping systems shall be cleaned, flushed, and maintained to the extent necessary to insure satisfactory operation of the system and components in service. Flushing for cleanliness and for flux removal shall be accomplished prior to hydrostatic testing.
After the execution of each applicable work item, the surface of piping systems shall be visually free of grease, oil, flux, scale, dirt, loose particles and any other contamination foreign to the base metal. Tap water residues on all metals and light atmosphere are permitted. Light dust on cleaned surfaces is not objectionable, provided that the quantity and size of the particle does not adversely affect system operations. Accomplish local cleaning to areas where existing system cleanliness has been lost in a localized area (such as metal shavings deposited in a pipeline while removing a section for replacement). Restore cleanliness by locally swabbing, wiping, vacuuming, etc., the area to meet existing system cleanliness.
Piping System Testing Requirements
Joints requiring testing shall remain uninsulated and unpainted until completion of successful testing.
Accomplish a shop hydrostatic test of replacement piping, fittings, and components for evidence of external leakage and/or deformation. Allowable external leakage and/or deformation: None.
Accomplish liquid penetrant or magnetic particle test on root layer in accordance with the requirements of T907-AS-GIB-010/271, Requirements for Nondestructive Testing Methods and MIL-STD-2035, Nondestructive Testing Acceptance Criteria of the following welded joints:
1. Fabricated welds for design pressures exceeding 300 lbs/in2 or design temperatures exceeding 650°F, or both.
2. Fabricated welds for all piping of design pressure greater than 50 lbs/in2 and service temperature of minus 20°F and below.
Hydrostatic testing for distributive systems shall be accomplished using the pressure and testing fluid cited in the respective system’s NAVSEA drawing or in accordance with the work item, as approved by the SUPERVISOR. Allowable leakage: None.
Accomplish a static head pressure test of new and distributed gravity drain piping (unpressurized piping), using clean, fresh water for a minimum of 30 minutes, as directed by the SUPERVISOR. Allowable leakage: None.
Power and Lighting Cable Installation and Removal
Cables designated for removal shall be identified, isolated and removed in its entirety. Blank each bulkhead, deck penetration and multi-cable transit device from which the cable was removed and which will not be reused. Blank each hole not required to be used in equipment from which the cable was removed.
Cables designated to be pulled back, rerouted, relocated, or reused to support work required by the Work Package shall be identified, isolated and inspected. Inspect each cable end to be disconnected for correct conductor identification and the insulation is not damaged. Verify lugs are secured to cable leads and are of correct size and type. Coil each cable and secure to prevent damage. Record and retain electrical hook-up data.
New cable shall conform to IEEE Standard 45-2002; IEC Publication 60092-350, 60092-351, 60092-352, 60092-353, 60092-354, 60092-359, 60092-373, 60092-374, 60092-375, 60092-376; MIL-DTL-24643, or MIL-DTL-24640.
Install new metal banding for cableways affected by cable installation or removal. Plastic tie wraps are not allowable.
Install new cable, cableway, penetration, lug, connector or cable splice in accordance with IEEE Standard 45-2002 to support work required by the individual Work Items. Do not cut off strands of copper to reduce size of lead to fit lug. Use correct barrel and hole size.
Fiber Optic cable installation, removal, splice or modification shall be accomplished per NAVSEA Standard Item 009-73.
For any disturbed watertight, air tight, or oil tight boundary, accomplish the local air hose test as per Standard Item 009-25, Structural Boundary Test.
CRAFT: YP 676 CLASS ITEM NO: 077-01-001
1 of 4 ITEM NO: 077-01-001
1. SCOPE:
1.1 Title: Hazardous Waste Produced on Naval Vessels; control
1.2 Location of Work:
1.2.1 Throughout the Craft
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Resource Conservation and Recovery Act, (RCRA)
2.2 49 U.S.C. 5103, Federal Hazardous Materials Transportation Act
2.3 Applicable Hazardous Waste, Manifest Form
2.4 10 U.S.C. 7311
3. REQUIREMENTS:
3.1 Manage and dispose of all hazardous waste listed in 3.3 in accordance with 2.1 and 2.2.
3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.
Report: HAZARDOUS WASTE MANIFEST Date: + 2
3.1.2 Submit one legible copy, in hard copy or approved
transferrable media, of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.
3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.
3.2.1 Documentation related to hazardous waste generated by the combined physical actions of Navy and Contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the Contractor pursuant to applicable law. Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the Contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the Contractor.
3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law
2 of 4 ITEM NO: 077-01-001 and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the Contractor merely drains a system and such drainage creates hazardous waste or the Contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the Contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The Contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The Contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.3 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:
AMOUNT
TYPE NAVY CO-GENERATED CONTRACTOR
Acid Solutions (may include spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)
Ethylene Glycol (Antifreeze) 75 Gls
Sodium Hydroxide
Cleaning Solvents 100 Gls
Sodium Phosphates (Tri, Bi, or Mono)
Fluorocarbons
Morpholine
Sodium Chromates
Hydrazine
Carbohydrazide
Methyl Ethyl Ketone
Spent Abrasive Blast
10 Tons
(contaminated with a known hazardous waste)
Trichloroethane 100 Gls
Miscellaneous Chemicals (Ignitable)
200 Lbs 150 Lbs
3 of 4 ITEM NO: 077-01-001
Miscellaneous Chemicals (Corrosive)
150 Gls
Miscellaneous Chemicals (TCLP Toxic) Arsenic
100 Lbs
Miscellaneous Chemicals (Reactive)
20 Gls
Oil (Synthetic) 50 Gls
Paints (Enamel, Latex, 150 Gls
Epoxy, thinners, oil based, rubber paint, nonskid, lacquer, remover, varnishes)
Paints (May include lead, cadmium, or chrome)
175 Lbs
Paint Strippers (phenols, lead, chromium)
Sludge (Contaminated with 150 Gls a known hazardous waste)
Wool Felt (contaminated with chromium and PCB's)
Ventilation Debris/Residue
(heavy metals, e.g., Cadium, chromium) 750 Sq Ft
Oily Rags 500 Lbs
Wood Waste 3 Tons
Polychlorinated Bipehenyls (PCBs)
10 Lbs
3.4 Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.
Report: HAZARDOUS WASTE LISTING Date: + 3
3.5 Submit one legible copy, in hard copy or approved transferrable media, of a report identifying type, amount, and disposal cost of waste listed in 3.3 that was removed during the performance of this Job Order to the SUPERVISOR.
3.5.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.
3.5.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.5.2 The Contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of
4 of 4 ITEM NO: 077-01-001
Subtitle C of 2.1 and include a description of such efforts in the report.
3.6 Nothing contained in this Work Item shall relieve the Contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.
4. NOTES:
4.1 The waste listed in 3.3 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.3 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The Contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.3 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of Inclusion of these substances in the waste listed in 3.3 does not preclude the Contractor from taking action consistent with 2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2. Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.
4.1.1 The types and amounts of wastes listed in 3.3 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.
4.2 Hazardous wastes are determined by one or more of the following methods:
4.2.1 Chemical analysis which shows that the material
characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.
4.2.2 Reference to a Safety Data Sheet (SDS).
4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.
4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.3.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 None.
C
CRAFT: YP 676 CLASS ITEM NO: 110-11-001
1 of 4 ITEM NO: 110-11-001
1.1 Title: Hull; inspect and repair
1.2 Location of Work:
1.2.1 Interior and Exterior Hull; Port and Starboard, Stem to Stern, Extending from Longitudinal Centerline of Keel Up to Main Deck Edge, including the Transom and Underwater Hull Appendages
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
2.2 111-6170054 Rev D, 108' Yard Patrol Craft, Hull Construction, Shell
2.3 116-6170059 Rev C, 108' Yard Patrol Craft, Stem, Keel & Bow Framing Details
2.4 111-6170055 Rev F, 108' Yard Patrol Craft, Bwk. Dets., Chain Lkr, Ice Sheath & Misc. Details
2.5 120-6170061 Rev F, 108' Yard Patrol Craft, Transverse Struct, Bhds
2.6 801-6170203 Rev B, 108' Yard Patrol Craft, Docking Drawing
2.7 256-6170102 Rev C, 108' Yard Patrol Craft, Sea Water Machinery Cooling A&D W /Diagram
2.8 521-6170149 Rev C, 108' Yard Patrol Craft, Firemain Piping A&D W/Diagram
2.9 593-6170175 Rev C, 108' Yard Patrol Craft, MSD & Seawater Flush A & D W/ Diagram
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-37 of 2.1, for woodworking areas affected by this Work Item.
(V)(G) "JOINT VISUAL INSPECTION"
3.2 Accomplish a joint visual inspection with the SUPERVISOR, from the bottom of the keel up to the main deck edge, including hull planking, caulking, bilge keels, sheathing, stem band, stem bars, transom bars, sea chests and associated strainer plates, for structural integrity, deterioration, pitting, gouges, cracks and areas of damage or distortion, using 2.2 through 2.9 for guidance.
3.2.1 Mark and record areas of damage, using visual, probe and hammer testing inspection methods.
Report: Inspection Results Date: + 3
2 of 4 ITEM NO: 110-11-001
3.2.2 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.2 and 3.2.1, to the SUPERVISOR, showing exact locations, quantities and conditions of deficiencies and recommendations for repairs.
3.3 Remove bilge keels, CRES and copper sheathing, stem band, stem bars, transom bars and strainer plates. Tag for location and hold for installation, using 2.3 through 2.9 for guidance. Retain serviceable hardware for reuse.
3.3.1 Accomplish a joint visual inspection with the SUPERVISOR of the areas exposed by removals in 3.3 for structural integrity, deterioration, cracks and areas of damage or distortion, paying particular attention to the areas above the upper rubrail/fender and the planking at the junction of the main deck and hull sides.
3.3.2 Mark and record areas of damage, using visual, probe and hammer testing inspection methods.
3.3.3 Submit one legible copy, in hard copy or approved
of 3.3.1 and 3.3.2, to the SUPERVISOR, showing exact locations, quantities and conditions of deficiencies and recommendations for repairs.
3.4 Accomplish repairs resulting from the inspection reports in 3.2.2 and 3.3.3 as designated by the SUPERVISOR, in accordance with 2.2 through
2.5 as follows:
3.4.1 Remove existing and install new a total of 400 linear feet of damaged and deteriorated outer hull planking, including new wood plugs, Part No. 100 of 2.2, as designated by the SUPERVISOR, using existing hardware.
3.4.1.1 The new outer hull planking shall conform to the
material requirements of General Note 10 of 2.2.
3.4.1.2 Exact areas of replacement shall be designated by the
SUPERVISOR.
3.4.1.3 Template exact size, configuration, and location from existing craft conditions.
3.4.2 Remove existing and install new worm shoe at keel base in its entirety in accordance with 2.3, using serviceable hardware.
3.4.2.1 Install new a total of 220 flat head wood screws, Part No. 37 of 2.3, for worm shoe where found missing or defective, as designated by the SUPERVISOR.
3.4.3 Clad weld repair a total of 200 square inches of pitted areas of the bilge keels, stem band, stem bars and transom bars removed in
3.3. Chip and grind surfaces flush and smooth in way of repairs.
3 of 4 ITEM NO: 110-11-001
3.4.4 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line One, Column A for surface preparation of the equipment listed in 3.4.3.
3.4.4.1 Accomplish the requirements of 009-32 of 2.1, including Table One, Line 4, Columns B and E for preservation of surfaces prepared in 3.4.4.
3.4.5 Accomplish a joint visual inspection with the SUPERVISOR of the inner hull planking exposed by removals during replacement of the outer hull planking.
3.4.5.1 Mark and record areas of damage, using visual, probe
and hammer testing inspection methods.
3.4.5.2 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.4.5 and 3.4.5.1, to the SUPERVISOR, showing exact locations, quantities and conditions of deficiencies and recommendations for repairs.
3.5 Install the equipment removed and tagged for location in 3.3, using
2.3 through 2.9 for guidance. Install serviceable hardware retained in 3.3.
3.5.1 Install 2 new copper sheets ASTM B152 in way of missing, part numbers 9S and 10S in accordance with 2.4.
3.5.2 3.5.1.1 Install new fasteners in way of copper sheet replacement in accordance with 2.4.
3.5.3 Install new a total of 20 flat head wood screws, Part No. 38 of 2.3, for stem band where found missing or defective, as designated by the SUPERVISOR.
3.5.4 Install new a total of 300 flat head wood screws, Part No. 68 of 2.4, for copper sheathing where found missing or defective, as designated by the SUPERVISOR.
3.5.5 Install new a total of 50 flat head wood screws, Part No. 69 of 2.4, for CRES ice sheathing where found missing or defective, as designated by the SUPERVISOR.
3.5.6 Install strainer plates removed and tagged for location in 3.3 using 2.6 through 2.9 for guidance.
4 of 4 ITEM NO: 110-11-001
3.5.6 Isolate dissimilar metals in accordance with General Note 11 of 2.4.
4. NOTES:
4.1 High pressure water washing of the hull is accomplished on Work Item 997-11-001, Drydocking and Undocking; accomplish.
4.2 Work in this item interfaces with Work Item 631-31-001, Underwater Hull; clean and preserve.
4.3 Application of antifouling paint for the items identified in 3.3 may be accomplished after remounting.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
CRAFT: YP 676 CLASS ITEM NO: 110-11-002
1 of 2 ITEM NO: 110-11-002
1.1 Title: Limber Chain Assembly; repair
1.2 Location of Work:
1.2.1 Transverse Bulkhead 7, Aft Side, 9 inches off Centerline, Port and Starboard
1.2.2 Transverse Bulkhead 16, Forward and Aft Side, 9 inches off Centerline, Port and Starboard
1.2.3 Transverse Bulkhead 23, Forward and Aft Side, 9 inches off Centerline, Port and Starboard
1.2.4 Transverse Bulkhead 30, Forward and Aft Side, 9 inches off Centerline, Port and Starboard
1.2.5 Transverse Bulkhead 36, Forward and Aft Side, 9 inches off Centerline, Port and Starboard
1.2.6 Transverse Bulkhead 50, Forward and Aft Side, 9 inches off Centerline, Port and Starboard
1.2.7 Transverse Bulkhead 58, Forward and Aft Side, 9 inches off Centerline, Port and Starboard
1.2.8 Transverse Bulkhead 64, Forward and Aft Side, 9 inches off Centerline, Port and Starboard
1.2.9 Transverse Bulkhead 67, Forward Side, 9 inches off Centerline, Port and Starboard
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
2.2 111-6170055 Rev F, 108' Yard Patrol Craft, Bwk. Dets., Chain Lkr, Ice Sheath & Misc. Details
2.3 120-6170061 Rev F, 108' Yard Patrol Craft, Transverse Struct, Bhds
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-37 of 2.1 for woodworking areas
3.2 Accomplish a joint visual inspection with the SUPERVISOR of each limber chain assembly located in 1.2 including associated hardware for deterioration, damage, missing parts, or no longer serviceable for continued use, using 2.2 and 2.3 for guidance.
CRAFT: YP 676 CLASS ITEM NO: 110-11-002
2 of 2 ITEM NO: 110-11-002
3.3 Disconnect and remove each limber chain assembly including associated hardware located in 1.2, using 2.2 and 2.3 for guidance. Tag for location and hold for installation.
3.3.1 Clean limber chain assemblies including associated hardware free of dirt, grease, corrosion and rust.
3.3.2 Clean limber chain holes free of obstructions, debris and foreign matter.
3.4 Accomplish a visual inspection of the components cleaned in 3.3.1 and 3.3.2 for defects or damage, using 2.2 and 2.3 for guidance.
Report: Visual Inspection Results Date: + 2
3.4.1 Submit one legible copy, in hard copy or approved
of 3.2 and 3.4 to the SUPERVISOR, showing exact locations, quantities and conditions of deficiencies and recommendations for repairs.
3.5 Accomplish repairs to defective limber chain assemblies resulting from the inspection in 3.2 and 3.4 as follows:
3.5.1 Install new a total of 15 limber chain assemblies including associated hardware in accordance with 2.2 as designated by the
SUPERVISOR.
3.5.2 Install remaining serviceable limber chain assemblies
including associated hardware removed in 3.3.
3.5.3 Template exact size, configuration, and location from existing craft conditions.
(V)(G) "OPERATIONAL TEST"
3.6 Accomplish an operational test of each limber chain assembly located in 1.2. Cycle each assembly to ensure correct operation. Allowable sticking or binding: None.
4. NOTES:
4.1 None.
CRAFT: YP 676 CLASS ITEM NO: 111-11-001
1 of 2 ITEM NO: 111-11-001
1.1 Title: Hull Strapping System; inspect and test
1.2 Location of Work:
1.2.1 Throughout the Craft
1.3 Identification:
1.3.1 Quantity (16 EA), Plate, 1/4" x 5 1/2" X 18", Silicon Bronze (Part No. 32 of 2.2)
1.3.2 Quantity (12 EA), Plate, 1/4" x 5 1/2" X 36", Silicon Bronze (Part No. 33 of 2.2)
1.3.3 Quantity (40 EA), Plate, 1/4" x 8" X 8", Silicon Bronze (Part No. 36 of 2.2)
1.3.4 Quantity (22 EA), Plate, 1/4" x 8" X 10", Silicon Bronze (Part No. 38 of 2.2)
2. REFERENCES:
2.1 Standard Items
2.2 111-6170056 Rev B, 108' Yard Patrol Craft, Hull Strapping
2.3 MIL-STD-1310, Shipboard Bonding, Grounding and Other Techniques for Electromagnetic Compatibility and Safety
2.4 406-6170119 Rev E, 108' Yard Patrol Craft, Grounding System
3. REQUIREMENTS:
3.1 Accomplish visual inspection and hammer test of each accessible hull strap plate listed in 1.3 and located in 1.2. Inspect for improper and loose connections, missing parts, deteriorated components and other defects in accordance with 2.2 and 2.3, using 2.4 for guidance.
3.1.1 Submit one legible copy, in hard copy or approved
of 3.1 to the SUPERVISOR. Include recommended repairs for each defective hull strap.
3.2 Disassemble, clean, and reassemble the grounding
connections.
(V)(G) "VERIFICATION READING"
3.3 Accomplish a check for proper electrical continuity
between the hull strapping and the grounding system using 2.3 and 2.4 as guidance. Replace the capacitors of 2.4.
Report: Test Results Date: + 3
3.3.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.2 to the
SUPERVISOR.
3.4 Accomplish the requirements of 009-37 of 2.1, for woodworking areas
CRAFT: YP 676 CLASS ITEM NO: 111-11-001
2 of 2 ITEM NO: 111-11-001
4. NOTES:
4.1 Capacitors of 2.4 have a 12 week lead time.
4.2 Known source of supply for capacitors of 2.4: Cornell Dubilier, manufacturer part number CG102U100R4C, www.cde.com
5.1 None
CRAFT: YP 676 CLASS ITEM NO: 120-11-001
1 of 2 ITEM NO: 120-11-001
1.1 Title: Transverse Bulkhead; inspect and repair
1.2 Location of Work:
1.2.1 Bilge (3-23-0-V)
1.2.2 Fuel Tank Compartment (2-30-0-F)
1.3 Identification:
1.3.1 Transverse Bulkhead, Frame 30
2. REFERENCES:
2.1 Standard Items
2.2 120-6170061 Rev F, 108' Yard Patrol Craft, Transverse Struct. Bhds
2.3 601-6170178 Rev D, 108' Yard Patrol Craft, Inboard Profile
2.4 635-6170191 Rev B, Acoustic and Thermal Hull Insulation
2.5 631-6170188 Rev H, 108' Yard Patrol Craft, Paint Schedule
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-25 of 2.1 for
preliminary air test of the compartment listed in 1.2.2. Air test fitting is shown in Section View "10-B" and Detail "22-D of 2.2.
Report: Air Test Results Date: + 2 transferrable media, of a report listing the results of 3.1 to the SUPERVISOR.
3.2 A total of 80 square feet of bulkhead surfaces shall have the surface prepared and hand tool cleaned or power tool cleaned to bare wood.
(V)(G) "VISUAL AND PROBE INSPECTION"
3.3 Accomplish a joint visual, probe and hammer test inspection with the SUPERVISOR, of the forward and aft sides of bulkhead surfaces listed in 1.3 and located in 1.2, for structural integrity, deterioration, gouges, cracks and areas of damage or distortion, using 2.2 and 2.3 for guidance.
Report: Visual Inspection And Test Results Date: + 3
3.3.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing the results of the inspection in 3.3 to the SUPERVISOR showing exact locations, quantities and conditions of deficiencies and recommended repair procedures.
3.4 Remove existing and install new a total of 160 square feet of plywood sheathing of bulkhead surfaces listed in 1.3 and located in
CRAFT: YP 676 CLASS ITEM NO: 120-11-001
2 of 2 ITEM NO: 120-11-001
1.2, as designated by the SUPERVISOR as a result of 3.1.1 and 3.3.1 in accordance with 2.2.
3.4.1 New plywood shall be Marine AB grade i.a.w. NIST PS-1 and be Hoover ‘Exterior Fire-X’ pressure treated or equal.
3.4.2 Template exact size, configuration, and location from existing craft conditions.
3.4.3 Accomplish the requirements of 009-37 of 2.1 for woodworking areas affected by this Work Item.
(V)(G) "AIR TEST"
3.5 Accomplish the requirements of 009-25 of 2.1, for air test of the compartment listed in 1.2.2. Maintain test pressure for 15 minutes for temperature stabilization prior to start of test. Hold test pressure for 10 minutes. Allowable drop in pressure: None.
3.6 Apply a wood preservative, in way of new installations in 3.4, in accordance with 2.5.
3.6.1 Accomplish the requirements of 009-32 of 2.1.
3.7 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4.1 None.
CRAFT: YP 676 CLASS ITEM NO: 123-11-001
1 of 1 ITEM NO: 123-11-001
1.1 Title: Fuel Oil Tank; inspect and test
1.2 Location of Work:
1.2.1 Fuel Tank Compt. (2-30-0-F)
1.3 Identification:
1.3.1 Quantity (2 EA), Fuel Oil Tank, Port & Starboard
2. REFERENCES:
2.1 Standard Items
2.2 977-6170215 Rev A, 108' Yard Patrol Craft, IIP-Fuel Oil Tank Assemblies
3.1 Accomplish a joint visual inspection with the SUPERVISOR of each tank listed in 1.3 and located in 1.2 for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, including sounding tubes, tank vents, overflows, piping, structural members, and manhole covers, using 2.2 for guidance.
Report: Inspection Results Date: + 2
3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing the results of the requirements of 3.1 to the SUPERVISOR, noting specific locations and sizes of discrepancies and recommendations for repairs.
3.2 Accomplish the requirements of 009-25 of 2.1, for air test of each tank listed in 1.3 and located in 1.2. Test pressure shall be 2 PSIG.
Maintain test pressure for 15 minutes for temperature stabilization prior to start of test. Hold test pressure for 10 minutes. Allowable drop in pressure: None.
3.2.1 Submit one legible copy, in hard copy or approved
of 3.2 to the SUPERVISOR.
3.3 Accomplish the requirements of 009-32 of 2.1 for disturbed surfaces.
4. NOTES:
4.1 Work in this item interfaces with Work Item 437-80-001, Replace Fresh Water & Fuel Tank TLI'S; accomplish.
4.2 Tanks are opened and closed on Work Item Number 992-31-001, Cleaning and Pumping; accomplish.
CRAFT: YP 676 CLASS ITEM NO: 123-14-001
1 of 2 ITEM NO: 123-14-001
1.1 Title: Fresh Water Tank; inspect and test
1.2 Location of Work:
1.2.1 Engine Room (2-36-0-E)
1.2.2 Bilge (3-50-0-V)
1.3 Identification:
1.3.1 Quantity (One EA), Forward Fresh Water Tank, Frame 36 1/2 - 43 1/2
1.3.2 Quantity (One EA), Aft Fresh Water Tank, Frame 50 - to 57 1/2
2. REFERENCES:
2.1 Standard Items
2.2 977-6170214 Rev D, 108' Yard Patrol Craft, IIP- Fwd Fresh Water Tank Assembly
2.3 127-6170162 Rev E, 108' Yard Patrol Craft, Misc. Tanks
2.4 601-6170178 Rev D, 108' Yard Patrol Craft, Inboard Profile
2.5 631-6170188 Rev H, 108' Yard Patrol Craft, Paint Schedule
2.6 NAVMED P-5010-5, Chapter 5, Manual of Preventive Medicine
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 37, Column A for surface preparation of the exterior surfaces of the tank top plating listed in 1.3.1 and located in 1.2.1, including manhole cover, using aluminum oxide discs conforming to A-A-1016, stainless steel wire brushes or stainless steel pads.
3.2 Inspect each tank listed in 1.3 and located in 1.2 for cleanliness and completion of work prior to chlorination and final closing. Tanks shall be clean of any debris and foreign matter.
3.3 Accomplish a joint visual inspection with the SUPERVISOR of each deterioration, pitting, cracks, and areas of damage or distortion, including sounding tubes, tank vents, overflows, piping, structural members and manhole covers, using 2.2 through 2.4 for locations and
Report: Visual Inspection Results Date: + 3
3.3.1 Submit one legible copy, in hard copy or approved
of 3.3 to the SUPERVISOR.
3.4 After work is complete, accomplish the requirements of 009-25 of 2.1, for air test of each tank listed in 1.3 and located in 1.2. Test pressure shall be 2 PSIG. Maintain test pressure for 15 minutes for temperature stabilization prior to start of test. Hold test pressure
CRAFT: YP 676 CLASS ITEM NO: 123-14-001
2 of 2 ITEM NO: 123-14-001 for 10 minutes. Allowable drop in pressure: None.
Report: Air Test Results Date: + 3 transferrable media, of a report listing results of the requirements of 3.4 to the SUPERVISOR.
3.5 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 34, Columns B and E for preservation of surfaces prepared in 3.1, using 2.5 for guidance.
3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed
(V)(G) "CHLORINATION"
3.7 Chlorinate each tank listed in 1.3 and located in 1.2, including the associated piping, in accordance with 2.6.
(V)(G) "SAMPLING"
3.8 Obtain water samples from each tank listed in 1.3 and located in
1.2 and analyze by a certified chemist to ensure that the water is safe for human consumption upon completion of chlorination.
Report: Chemist's Analysis Date: + 2
3.8.1 Submit one legible copy, in hard copy or approved
transferrable media, of the chemist's analysis to the SUPERVISOR.
3.8.2 Do not unseal fresh water tanks access covers after the chlorination process has been completed.
4. NOTES:
4.1 Work in this item interfaces with Work Item 533-80-001, Potable Water System Upgrade; accomplish, Work Item 533-11- 001, Potable Water Piping; repair, Work Item 437-80-001, Replace Fresh Water & Fuel Tank TLI; accomplish, Work Item 533-11-002, Reverse Osmosis Unit; remove and repair.
4.2 Tanks are opened and closed on Work Item 992-31-001, Cleaning and Pumping; accomplish.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 None.
CRAFT: YP 676 CLASS ITEM NO: 123-17-001
1 of 1 ITEM NO: 123-17-001
1.1 Title: Sump Tank (Grey Water); inspect and test
1.2 Location of Work:
1.2.1 Bilge (3-23-0-V)
1.2.2 Bilge (3-58-0-V)
1.3 Identification:
1.3.1 Quantity (2 EA), Sump Tank
2. REFERENCES:
2.1 Standard Items
2.2 601-6170178 Rev D, 108' Yard Patrol Craft, Inboard Profile
2.3 127-6170162 Rev E, 108' Yard Patrol Craft, Misc Tanks deterioration, pitting, cracks, and areas of damage or distortion, including sounding tubes, tank vents, overflows, piping, structural members, and manhole covers, using 2.2 and 2.3 for locations and of 3.1 to the SUPERVISOR, noting specific locations and sizes of discrepancies and recommendations for repairs.
3.2 Accomplish the requirements of 009-25 of 2.1, for an air test of each tank listed in 1.3 and located in 1.2. Test pressure shall be 2 PSIG. Maintain test pressure for 15 minutes for temperature stabilization prior to start of test. Hold test pressure for 10 minutes. Allowable drop in pressure: None.
3.2.1 Submit one copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.2 to the
SUPERVISOR.
3.3 Accomplish the requirements of 009-32 of 2.1 for disturbed surfaces.
4.1 Tanks are opened and closed on Work Item Number 992-31-001, Cleaning and Pumping; accomplish.
CRAFT: YP 676 CLASS ITEM NO: 130-11-001
1 of 4 ITEM NO: 130-11-001
1.1 Title: Main Deck and Fitting; inspect and repair
1.2 Location of Work:
1.2.1 Main Deck, Stem to Stern
1.3 Identification:
1.3.1 Quantity (One EA), 300 Pound Davit, (Including Stowage
Brackets)
1.3.2 Quantity (2 EA), Davit Socket, (Including Base Plate and Brace)
1.3.3 Quantity (10 EA), Double Barrel Bitt, (Including Base Plate)
1.3.4 Quantity (16 EA), Cleat, 6 Inch
1.3.5 Quantity (One EA), Towing Bollard, (Including Base Plate and Brackets)
1.3.6 Quantity (11 EA), Spool, (Item Nos. S8, S12, S15, S16 and S25 of 2.2)
1.3.7 Quantity (2 EA), Goose Neck, (Item No. S25 of 2.8)
2. REFERENCES:
2.1 Standard Items
2.2 512-6170142 Rev B, 108' Yard Patrol Craft, HVAC A&D Main Deck House
2.3 611-6170183 Rev B, 108' Yard Patrol Craft, Hull Fittings A/D
2.4 671-6170197 Rev C, 108' Yard Patrol Craft, Boat Handling, Canvas, Lockers and Equipment Stowages Arrgt. & Det.
2.5 582-6170174 Rev B, 108' Yard Patrol Craft, Mooring & Towing Arrg't & Details
2.6 130-6170062 Rev F, 108' Yard Patrol Craft, Main Deck Sheathing & Framing
2.7 Test No. 092-582 Rev C, YP 676 Class Shipboard Test Procedure Mooring and Towing Fittings
2.8 512-6170140 Rev C, 108' Yard Patrol Craft, HVAC Fr30 - Fwd Below Main Deck
2.9 512-5900285 Rev E, 108' YP - 676 Class Ventilation Arrg't. & Details
2.10 602-6170180 Rev E, 108' Yard Patrol Craft, Labels & Signs
2 of 4 ITEM NO: 130-11-001
3.1 Accomplish the requirements of 009-37 of 2.1, for woodworking areas affected by this Work Item.
3.2 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 26, Column A, for aluminum surfaces; and Table 2, Line One, Column A for steel surfaces for surface preparation of the equipment listed in
1.3 and located in 1.2, using 2.2 through 2.5 and 2.8 for locations and
3.2.1 Accomplish a joint visual inspection with the SUPERVISOR of the equipment listed in 1.3 and located in 1.2 for structural integrity, deterioration, gouges, cracks and areas of damage or distortion, using 2.2 through 2.5 and 2.8 for locations and guidance.
3.2.1.1 Accomplish a joint visual, probe and hammer test
inspection with the SUPERVISOR of the exposed surfaces of the wood foundations for the equipment listed in 1.3 and located in
1.2 for damage, cracks, deformation, and splitting, using 2.2 through 2.5 and 2.8 for locations and guidance.
3.2.1.2 Submit one legible copy, in hard copy or approved
requirements of 3.2.1 and 3.2.1.1 to the SUPERVISOR showing exact locations, quantities and conditions of deficiencies and recommendations for repairs.
3.3 Accomplish a joint visual inspection with the SUPERVISOR of the main deck plywood surfaces located in 1.2 for structural integrity, damage, cracks, splitting, and deterioration, using 2.6 for guidance.
3.3.1 Accomplish a joint visual, probe and hammer test inspection with the SUPERVISOR of suspect…