L-4_Cost_and_Price_Tables.xls

XLS spreadsheet 126 KB Posted

Attached to
Airborne Laser Mine Detection System
Solicitation number
N00024-13-R-6318
Issued by

About this file

L-4 Cost and Price Tables

View the file

Other files

File Type Posted
N002413R6318_Attachment_L-1_Bidders'_Questions_Form_3_Dec_13.xlsx XLSX spreadsheet
N0002413R6318_Amendment_0002.pdf PDF
ALMDS_Attachment_3-Shipping_Instructions_NAVSEA_Form_4336-1_Amend_0002.pdf PDF
Attachment_2_-Government_Furnished_Information_NAVSEA_Form_4340-2.pdf PDF
Attachment_1_to_Exhibit_A-ALMDS_DD1423_CDRL_Glossary_dtd_11-12-13.pdf PDF
ALMDS_Attachment_3-Shipping_Instructions_NAVSEA_Form_4336-1_rev1_(3).pdf PDF
N0002413R6318_Amendment_0001.pdf PDF
ALMDS_CONTRACT_DATA_REQUIREMENTS_LIST-B005.pdf PDF
N002413R6318_Attachment_L-1_Bidders'_Questions_Form_21_Nov_13.xlsx XLSX spreadsheet
Attachment_5_Peculiar_Support_Equipment_Parts_List.pdf PDF
Exhibit B - Contract Data Requirements List —
Attachment 3-Shipping Instructions NAVSEA Form 4336-1.docx DOCX document
Attachment 8 - ALMDS Risk Mgmt Template.docx DOCX document
Attachment 5 Peculiar Support Equipment Parts List.docx DOCX document
Attachment 6-ALMDS Government Furnished Equipment Repairs and Production Required.docx DOCX document
Attachment 2 -Government Furnished Information NAVSEA Form 4340-2.docx DOCX document
Attachment 7 - NAVSEA Technical Instruction Template.docx DOCX document
Attachment 1-SOW for Airborne Laser Mine Detection Systems.docx DOCX document
ALMDS_PreRFP_Bidders'_Questions_and_Responses.xlsx XLSX spreadsheet
ALMDS Attachment 1 to Exhibit A and B.pdf PDF
Attachment 4-ALMDS Contract Security Classification Specification Form DD254.pdf PDF
Exhibit A - Contract Data Requirements List —
ALMDS_Solicitation_N00024-13-R-6318.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

Table 1 - FFP CLINS
CLINQuantityUnitPriceTotal Price
0001AA1EA
0001AB2EA
0001AC3EA
0001AD4EA
0001AE5EA
00041LotNSPNSP
0005TBDTBD$ 20,000,000$ 20,000,000
0100AA1SET
0100AB2SET
0100AC3SET
0100AD4SET
0100AE5SET
0200AA1EA
0200AB2EA
0200AC3EA
0200AD4EA
0205AA1SET
0205AB2SET
0205AC3SET
0205AD4SET
0300AA1EA
0300AB2EA
0300AC3EA
0300AD4EA
0305AA1SET
0305AB2SET
0305AC3SET
0305AD4SET
0400AA1EA
0400AB2EA
0400AC3EA
0400AD4EA
0405AA1SET
0405AB2SET
0405AC3SET
0405AD4SET
0500AA1EA
0500AB2EA
0500AC3EA
0500AD4EA
0505AA1SET
0505AB2SET
0505AC3SET
0505AD4SET
0600AA1EA
0600AB2EA
0600AC3EA
0600AD4EA
Note 1: All Table 1 entries shall be entered as whole dollar amounts.
Note 2: This summary shall track to Section B and costs/prices offered under this solicitation.
Note 3: Up to four (4) ALMDS Option Items (0200, 0300, 0400, 0500, and/or 0600) may be exercised under this contract.
Note 4: CLIN 0004 is not separately priced and as such will not be evaluated.
Note 5: Due to the fact that there are no current PIO requirements, CLIN 0005 will not be evaluated.

&LAttachment L-4&RN00024-13-R-6318

Table 2

Table 2 - Cost and CPFF CLINs
CLINQuantityUnitEstimated CostFixed FeeCost Plus Fixed Fee
000210,000M/Hs
0003*1Lot$ 50,000$ - 0$ 50,000.00
0006TBDTBDTBDTBD10,000,000
00071LotNSPNSPNSP
020110,000M/Hs
020210,000M/Hs
0203*1Lot$ 50,000$ - 0$ 50,000
0204*1Lot$ 50,000$ - 0$ 50,000
030110,000M/Hs
030210,000M/Hs
0303*1Lot$ 50,000$ - 0$ 50,000
0304*1Lot$ 50,000$ - 0$ 50,000
040110,000M/Hs
040210,000M/Hs
0403*1Lot$ 50,000$ - 0$ 50,000
0404*1Lot$ 50,000$ - 0$ 50,000
050110,000M/Hs
050220,000M/Hs
0503*1Lot$ 50,000$ - 0$ 50,000
0504*1Lot$ 50,000$ - 0$ 50,000

&LAttachment L-4&RN00024-13-R-6318

Tables 3A through 3J

Table 3A - CLIN 0002 Cost SummaryTable 3B - CLIN 0201 Cost Summary
ELEMENT OF COSTGFY 20XXGFY 20XXTOTALELEMENT OF COSTGFY 20XXGFY 20XXTOTAL
Labor HoursRateDollarsLabor HoursRateDollarsLabor HoursDollarsLabor HoursRateDollarsLabor HoursRateDollarsLabor HoursDollars
DIRECT LABORDIRECT LABOR
Direct Labor Rate 10$0.00$0.000$0.00$0.000$0.00Direct Labor Rate 10$0.00$0.000$0.00$0.000$0.00
Direct Labor Rate 20$0.00$0.000$0.00$0.000$0.00Direct Labor Rate 20$0.00$0.000$0.00$0.000$0.00
Direct Labor Rate 30$0.00$0.000$0.00$0.000$0.00Direct Labor Rate 30$0.00$0.000$0.00$0.000$0.00
Total Direct Labor0$0.000$0.000$0.00Total Direct Labor0$0.000$0.000$0.00
INDIRECT COSTSINDIRECT COSTS
Fringe0%$0.000%$0.00$0.00Fringe0%$0.000%$0.00$0.00
Labor Overhead 10%$0.000%$0.00$0.00Labor Overhead 10%$0.000%$0.00$0.00
Labor Overhead 20%$0.000%$0.00$0.00Labor Overhead 20%$0.000%$0.00$0.00
Labor Overhead 30%$0.000%$0.00$0.00Labor Overhead 30%$0.000%$0.00$0.00
Total Indirect$0.00$0.00$0.00Total Indirect$0.00$0.00$0.00
SUBCONTRACTSSUBCONTRACTS
Subcontractor 10$0.000$0.000$0.00Subcontractor 10$0.000$0.000$0.00
Subcontractor 20$0.000$0.000$0.00Subcontractor 20$0.000$0.000$0.00
Subcontractor 30$0.000$0.000$0.00Subcontractor 30$0.000$0.000$0.00
Subcontractor 40$0.000$0.000$0.00Subcontractor 40$0.000$0.000$0.00
Subcontractor 50$0.000$0.000$0.00Subcontractor 50$0.000$0.000$0.00
Subcontractor 60$0.000$0.000$0.00Subcontractor 60$0.000$0.000$0.00
Total Subcontracts0$0.000$0.000$0.00Total Subcontracts0$0.000$0.000$0.00
SubTotal Costs$0.00$0.00$0.00SubTotal Costs$0.00$0.00$0.00
G&A0%$0.000%$0.00$0.00G&A0%$0.000%$0.00$0.00
Total Fee Bearing Cost$0.00$0.00$0.00Total Fee Bearing Cost$0.00$0.00$0.00
FCCOM0%$0.000%$0.00$0.00FCCOM0%$0.000%$0.00$0.00
Total Estimated Cost$0.00$0.00$0.00Total Estimated Cost$0.00$0.00$0.00
Fixed Fee0.000%$0.000.000%$0.00$0.00Fixed Fee0.000%$0.000.000%$0.00$0.00
Total Hours000Total Hours000
GRAND TOTAL$0.00$0.00$0.00GRAND TOTAL$0.00$0.00$0.00
NOTES:
The Offeror must add and/or adjust specific rate categories to reflect their accounting system and proposed costs
Table 3C - CLIN 0202 Cost SummaryTable 3D - CLIN 0301 Cost Summary
ELEMENT OF COSTGFY 20XXGFY 20XXTOTALELEMENT OF COSTGFY 20XXGFY 20XXTOTAL
Labor HoursRateDollarsLabor HoursRateDollarsLabor HoursDollarsLabor HoursRateDollarsLabor HoursRateDollarsLabor HoursDollars
DIRECT LABORDIRECT LABOR
Direct Labor Rate 10$0.00$0.000$0.00$0.000$0.00Direct Labor Rate 10$0.00$0.000$0.00$0.000$0.00
Direct Labor Rate 20$0.00$0.000$0.00$0.000$0.00Direct Labor Rate 20$0.00$0.000$0.00$0.000$0.00
Direct Labor Rate 30$0.00$0.000$0.00$0.000$0.00Direct Labor Rate 30$0.00$0.000$0.00$0.000$0.00
Total Direct Labor0$0.000$0.000$0.00Total Direct Labor0$0.000$0.000$0.00
INDIRECT COSTSINDIRECT COSTS
Fringe0%$0.000%$0.00$0.00Fringe0%$0.000%$0.00$0.00
Labor Overhead 10%$0.000%$0.00$0.00Labor Overhead 10%$0.000%$0.00$0.00
Labor Overhead 20%$0.000%$0.00$0.00Labor Overhead 20%$0.000%$0.00$0.00
Labor Overhead 30%$0.000%$0.00$0.00Labor Overhead 30%$0.000%$0.00$0.00
Total Indirect$0.00$0.00$0.00Total Indirect$0.00$0.00$0.00
SUBCONTRACTSSUBCONTRACTS
Subcontractor 10$0.000$0.000$0.00Subcontractor 10$0.000$0.000$0.00
Subcontractor 20$0.000$0.000$0.00Subcontractor 20$0.000$0.000$0.00
Subcontractor 30$0.000$0.000$0.00Subcontractor 30$0.000$0.000$0.00
Subcontractor 40$0.000$0.000$0.00Subcontractor 40$0.000$0.000$0.00
Subcontractor 50$0.000$0.000$0.00Subcontractor 50$0.000$0.000$0.00
Subcontractor 60$0.000$0.000$0.00Subcontractor 60$0.000$0.000$0.00
Total Subcontracts0$0.000$0.000$0.00Total Subcontracts0$0.000$0.000$0.00
SubTotal Costs$0.00$0.00$0.00SubTotal Costs$0.00$0.00$0.00
G&A0%$0.000%$0.00$0.00G&A0%$0.000%$0.00$0.00
Total Fee Bearing Cost$0.00$0.00$0.00Total Fee Bearing Cost$0.00$0.00$0.00
FCCOM0%$0.000%$0.00$0.00FCCOM0%$0.000%$0.00$0.00
Total Estimated Cost$0.00$0.00$0.00Total Estimated Cost$0.00$0.00$0.00
Fixed Fee0.000%$0.000.000%$0.00$0.00Fixed Fee0.000%$0.000.000%$0.00$0.00
Total Hours000Total Hours000
GRAND TOTAL$0.00$0.00$0.00GRAND TOTAL$0.00$0.00$0.00
Table 3E - CLIN 0302 Cost SummaryTable 3F - CLIN 0401 Cost Summary
ELEMENT OF COSTGFY 20XXGFY 20XXTOTALELEMENT OF COSTGFY 20XXGFY 20XXTOTAL
Labor HoursRateDollarsLabor HoursRateDollarsLabor HoursDollarsLabor HoursRateDollarsLabor HoursRateDollarsLabor HoursDollars
DIRECT LABORDIRECT LABOR
Direct Labor Rate 10$0.00$0.000$0.00$0.000$0.00Direct Labor Rate 10$0.00$0.000$0.00$0.000$0.00
Direct Labor Rate 20$0.00$0.000$0.00$0.000$0.00Direct Labor Rate 20$0.00$0.000$0.00$0.000$0.00
Direct Labor Rate 30$0.00$0.000$0.00$0.000$0.00Direct Labor Rate 30$0.00$0.000$0.00$0.000$0.00
Total Direct Labor0$0.000$0.000$0.00Total Direct Labor0$0.000$0.000$0.00
INDIRECT COSTSINDIRECT COSTS
Fringe0%$0.000%$0.00$0.00Fringe0%$0.000%$0.00$0.00
Labor Overhead 10%$0.000%$0.00$0.00Labor Overhead 10%$0.000%$0.00$0.00
Labor Overhead 20%$0.000%$0.00$0.00Labor Overhead 20%$0.000%$0.00$0.00
Labor Overhead 30%$0.000%$0.00$0.00Labor Overhead 30%$0.000%$0.00$0.00
Total Indirect$0.00$0.00$0.00Total Indirect$0.00$0.00$0.00
SUBCONTRACTSSUBCONTRACTS
Subcontractor 10$0.000$0.000$0.00Subcontractor 10$0.000$0.000$0.00
Subcontractor 20$0.000$0.000$0.00Subcontractor 20$0.000$0.000$0.00
Subcontractor 30$0.000$0.000$0.00Subcontractor 30$0.000$0.000$0.00
Subcontractor 40$0.000$0.000$0.00Subcontractor 40$0.000$0.000$0.00
Subcontractor 50$0.000$0.000$0.00Subcontractor 50$0.000$0.000$0.00
Subcontractor 60$0.000$0.000$0.00Subcontractor 60$0.000$0.000$0.00
Total Subcontracts0$0.000$0.000$0.00Total Subcontracts0$0.000$0.000$0.00
SubTotal Costs$0.00$0.00$0.00SubTotal Costs$0.00$0.00$0.00
G&A0%$0.000%$0.00$0.00G&A0%$0.000%$0.00$0.00
Total Fee Bearing Cost$0.00$0.00$0.00Total Fee Bearing Cost$0.00$0.00$0.00
FCCOM0%$0.000%$0.00$0.00FCCOM0%$0.000%$0.00$0.00
Total Estimated Cost$0.00$0.00$0.00Total Estimated Cost$0.00$0.00$0.00
Fixed Fee0.000%$0.000.000%$0.00$0.00Fixed Fee0.000%$0.000.000%$0.00$0.00
Total Hours000Total Hours000
GRAND TOTAL$0.00$0.00$0.00GRAND TOTAL$0.00$0.00$0.00
Table 3G - CLIN 0402 Cost SummaryTable 3H - CLIN 0501 Cost Summary
ELEMENT OF COSTGFY 20XXGFY 20XXTOTALELEMENT OF COSTGFY 20XXGFY 20XXTOTAL
Labor HoursRateDollarsLabor HoursRateDollarsLabor HoursDollarsLabor HoursRateDollarsLabor HoursRateDollarsLabor HoursDollars
DIRECT LABORDIRECT LABOR
Direct Labor Rate 10$0.00$0.000$0.00$0.000$0.00Direct Labor Rate 10$0.00$0.000$0.00$0.000$0.00
Direct Labor Rate 20$0.00$0.000$0.00$0.000$0.00Direct Labor Rate 20$0.00$0.000$0.00$0.000$0.00
Direct Labor Rate 30$0.00$0.000$0.00$0.000$0.00Direct Labor Rate 30$0.00$0.000$0.00$0.000$0.00
Total Direct Labor0$0.000$0.000$0.00Total Direct Labor0$0.000$0.000$0.00
INDIRECT COSTSINDIRECT COSTS
Fringe0%$0.000%$0.00$0.00Fringe0%$0.000%$0.00$0.00
Labor Overhead 10%$0.000%$0.00$0.00Labor Overhead 10%$0.000%$0.00$0.00
Labor Overhead 20%$0.000%$0.00$0.00Labor Overhead 20%$0.000%$0.00$0.00
Labor Overhead 30%$0.000%$0.00$0.00Labor Overhead 30%$0.000%$0.00$0.00
Total Indirect$0.00$0.00$0.00Total Indirect$0.00$0.00$0.00
SUBCONTRACTSSUBCONTRACTS
Subcontractor 10$0.000$0.000$0.00Subcontractor 10$0.000$0.000$0.00
Subcontractor 20$0.000$0.000$0.00Subcontractor 20$0.000$0.000$0.00
Subcontractor 30$0.000$0.000$0.00Subcontractor 30$0.000$0.000$0.00
Subcontractor 40$0.000$0.000$0.00Subcontractor 40$0.000$0.000$0.00
Subcontractor 50$0.000$0.000$0.00Subcontractor 50$0.000$0.000$0.00
Subcontractor 60$0.000$0.000$0.00Subcontractor 60$0.000$0.000$0.00
Total Subcontracts0$0.000$0.000$0.00Total Subcontracts0$0.000$0.000$0.00
SubTotal Costs$0.00$0.00$0.00SubTotal Costs$0.00$0.00$0.00
G&A0%$0.000%$0.00$0.00G&A0%$0.000%$0.00$0.00
Total Fee Bearing Cost$0.00$0.00$0.00Total Fee Bearing Cost$0.00$0.00$0.00
FCCOM0%$0.000%$0.00$0.00FCCOM0%$0.000%$0.00$0.00
Total Estimated Cost$0.00$0.00$0.00Total Estimated Cost$0.00$0.00$0.00
Fixed Fee0.000%$0.000.000%$0.00$0.00Fixed Fee0.000%$0.000.000%$0.00$0.00
Total Hours000Total Hours000
GRAND TOTAL$0.00$0.00$0.00GRAND TOTAL$0.00$0.00$0.00
Table 3J - CLIN 0502 Cost Summary
ELEMENT OF COSTGFY 20XXGFY 20XXTOTAL
Labor HoursRateDollarsLabor HoursRateDollarsLabor HoursDollars
DIRECT LABOR
Direct Labor Rate 10$0.00$0.000$0.00$0.000$0.00
Direct Labor Rate 20$0.00$0.000$0.00$0.000$0.00
Direct Labor Rate 30$0.00$0.000$0.00$0.000$0.00
Total Direct Labor0$0.000$0.000$0.00
INDIRECT COSTS
Fringe0%$0.000%$0.00$0.00
Labor Overhead 10%$0.000%$0.00$0.00
Labor Overhead 20%$0.000%$0.00$0.00
Labor Overhead 30%$0.000%$0.00$0.00
Total Indirect$0.00$0.00$0.00
SUBCONTRACTS
Subcontractor 10$0.000$0.000$0.00
Subcontractor 20$0.000$0.000$0.00
Subcontractor 30$0.000$0.000$0.00
Subcontractor 40$0.000$0.000$0.00
Subcontractor 50$0.000$0.000$0.00
Subcontractor 60$0.000$0.000$0.00
Total Subcontracts0$0.000$0.000$0.00
SubTotal Costs$0.00$0.00$0.00
G&A0%$0.000%$0.00$0.00
Total Fee Bearing Cost$0.00$0.00$0.00
FCCOM0%$0.000%$0.00$0.00
Total Estimated Cost$0.00$0.00$0.00
Fixed Fee0.000%$0.000.000%$0.00$0.00
Total Hours000
GRAND TOTAL$0.00$0.00$0.00

&LAttachment L-4&RN00024-13-R-6318

Table 4

Table 4 - Historical/Proposed Direct Rates Summary Schedule
RATEHistorical RateProposed Rate
GFY 2011GFY 2012GFY 2013GFY 2014GFY 2015GFY 2016GFY 2017GFY 2018
Direct Labor Category$0$0$0$0$0$0$0$0
Direct Labor Category$0$0$0$0$0$0$0$0
Direct Labor Category$0$0$0$0$0$0$0$0
Direct Labor Category$0$0$0$0$0$0$0$0
Direct Labor Escalation0%0%0%0%0%0%0%0%
NOTES:
The Offeror must add and/or adjust specific rate categories to reflect their accounting system and proposed costs.

&LAttachment L-4&RN00024-13-R-6318

Table 5

Table 5 - Historical/Proposed Indirect Rates Summary Schedule
RATEHistorical RateProposed Rate
GFY 2011GFY 2012GFY 2013GFY 2014GFY 2015GFY 2016GFY 2017GFY 2018
Fringe0%0%0%0%0%$0$0$0
Overhead0%0%0%0%0%$0$0$0
G&A0%0%0%0%0%$0$0$0
Subcontractor Burden0%0%0%0%0%0%0%0%
FCCOM0%0%0%0%0%0%0%0%
Other Escalation Factor Utilized0%0%0%0%0%0%0%0%
NOTES:
The Offeror must add and/or adjust specific rate categories to reflect their accounting system and proposed costs.

&LAttachment L-4&RN00024-13-R-6318

File details come from the government source that posted it. Updated .