Attachment 8 - Risk Mgmt Template

View the file

Other files

File Type Posted
N002413R6318_Attachment_L-1_Bidders'_Questions_Form_3_Dec_13.xlsx XLSX spreadsheet
N0002413R6318_Amendment_0002.pdf PDF
ALMDS_Attachment_3-Shipping_Instructions_NAVSEA_Form_4336-1_Amend_0002.pdf PDF
Attachment_2_-Government_Furnished_Information_NAVSEA_Form_4340-2.pdf PDF
Attachment_1_to_Exhibit_A-ALMDS_DD1423_CDRL_Glossary_dtd_11-12-13.pdf PDF
ALMDS_Attachment_3-Shipping_Instructions_NAVSEA_Form_4336-1_rev1_(3).pdf PDF
N0002413R6318_Amendment_0001.pdf PDF
ALMDS_CONTRACT_DATA_REQUIREMENTS_LIST-B005.pdf PDF
N002413R6318_Attachment_L-1_Bidders'_Questions_Form_21_Nov_13.xlsx XLSX spreadsheet
Attachment_5_Peculiar_Support_Equipment_Parts_List.pdf PDF
Exhibit B - Contract Data Requirements List —
L-4_Cost_and_Price_Tables.xls XLS spreadsheet
Attachment 3-Shipping Instructions NAVSEA Form 4336-1.docx DOCX document
Attachment 5 Peculiar Support Equipment Parts List.docx DOCX document
Attachment 6-ALMDS Government Furnished Equipment Repairs and Production Required.docx DOCX document
Attachment 2 -Government Furnished Information NAVSEA Form 4340-2.docx DOCX document
Attachment 7 - NAVSEA Technical Instruction Template.docx DOCX document
Attachment 1-SOW for Airborne Laser Mine Detection Systems.docx DOCX document
ALMDS_PreRFP_Bidders'_Questions_and_Responses.xlsx XLSX spreadsheet
ALMDS Attachment 1 to Exhibit A and B.pdf PDF
Attachment 4-ALMDS Contract Security Classification Specification Form DD254.pdf PDF
Exhibit A - Contract Data Requirements List —
ALMDS_Solicitation_N00024-13-R-6318.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 8 Risk Data Spreadsheet Template

PMS495 ALMDS Risk Submission and Change Form

SECTION ONE, IDENTIFICATION INFORMATION

1. Name of Requestor:
2. Date of Request:
3. POC for Risk:
4. Risk ID (if applicable):

SECTION TWO, RISK AND EVENT

5. State the Future Root Cause to be tied to the Risk. A future root cause is the most basic reason for the presence of a risk. It must be an event in the future, which, if eliminated or corrected, would prevent a potential consequence from occurring.

6. Realization Date:
7. Realization Event:

8. State the Consequence (or effect) of the future occurrence stated in item 5.

9. Is the consequence a Schedule, Cost, or Technical consequence?

SECTION THREE, SCORING

10. Use the following guidelines to provide a LIKELIHOOD level, assessed at the present time that the Root Cause stated above (item 5) will occur.

Level
Likelihood
Probability of Occurrence
1
Not Likely
<10%
2
Low Likelihood
10-30%
3
Likely
>30-70%
4
Highly Likely
>70-90%
5
Near Certainty
>90%

Level:

11. State rationale for level selection:

SECTION THREE, SCORING (CONTINUED)

12. Use the following guidelines to provide an appropriate Score and Rationale for the Cost, Schedule, and Technical Consequences.

Rating/Description
Cost
Schedule
Technical
5 (Critical) Safety: Jeopardizes an exit criterion of current acquisition phase.
Contract cost grows by 10%; LCS MM delivery commitment jeopardized; Development or production costs exceeded by 25%
LCS MM delivery commitment not met; Key program milestone would be late by more than 2 weeks; Development schedule goals exceeded by 25%
Performance degraded by greater than 8%; No viable alternatives exist; Successful LCS MM delivery commitment success jeopardized.
4 (Significant): Potentially fails Key Performance Parameter (KPP) or Operational Assessment (OA)
Contract cost grows by 5-10%; LCS MM delivery commitment in doubt; Development or production cost goals exceeded by 15-25%; Program management reserves (schedule, cost) must be used to implement workarounds.
Critical path activities one month late; Workarounds would not meet program milestones; LCS MM Delivery Commitment success in doubt; Development schedule goals exceeded by 15-25%
Performance degraded by greater than 8%; Significant changes required; Possible alternatives may exist; Successful LCS MM delivery commitment success in doubt.
3 (Moderate): Shorts a critical mission need but expect no breech
Contract cost grows by 1-5%; Limited impact on LCS MM delivery commitment; Development or production cost goals exceeded by 5-15%; Program management reserves (schedule, cost) do not need to be used to implement workarounds.
Non critical path activities one month late; Workarounds would avoid impact on critical path; Limited impact LCS MM delivery commitment; Development schedule goals exceeded by 5-15%.
Performance below goal; Moderate changes required; Alternatives would provide acceptable system performance; Limited impact on successful LCS MM delivery commitment.

2 (Minor):

Shorts a significant mission need

Contract cost grows by 1%; Minor impact on LCS MM delivery commitment; Development or production cost goals exceeded by 1-5%; Program management reserves (schedule, cost) do not need to be used to implement workarounds.
Non-critical path activities late; Workarounds would avoid impact on key and non-key program milestones; Minor impact on LCS MM delivery commitment; Development schedule goals exceeded by 1-5%.
Performance below goal but within acceptable limits; No changes required; Acceptable alternative exist; Minor impact on Limited impact on successful LCS MM delivery commitment.
1 (Minimal): Remedy will cause disruption to the program
Contract cost not dependent on the issue; No impact on LCS MM delivery commitment; Development or production cost goals not exceeded or not dependent on the issue.
Schedule not dependent on the issue; No impact on LCS MM delivery commitment; Development schedule goals not exceeded or not dependent on the issue.
Performance goals met; No impact on program success.
Cost:
Rationale:
Schedule:
Rationale:
Technical:
Rationale:

SECTION FOUR, MITIGATION

13. Supply any mitigation steps and tentative completion dates.

Mitigation
Date

N00024-13-R-6318