ALMDS_CONTRACT_DATA_REQUIREMENTS_LIST-B005.pdf

PDF 97 KB Posted

Attached to
Airborne Laser Mine Detection System
Solicitation number
N00024-13-R-6318
Issued by

About this file

Exhibit B - CDRL B005 Depot Level Repair Instructions

View the file

Other files

File Type Posted
N002413R6318_Attachment_L-1_Bidders'_Questions_Form_3_Dec_13.xlsx XLSX spreadsheet
N0002413R6318_Amendment_0002.pdf PDF
ALMDS_Attachment_3-Shipping_Instructions_NAVSEA_Form_4336-1_Amend_0002.pdf PDF
Attachment_2_-Government_Furnished_Information_NAVSEA_Form_4340-2.pdf PDF
Attachment_1_to_Exhibit_A-ALMDS_DD1423_CDRL_Glossary_dtd_11-12-13.pdf PDF
ALMDS_Attachment_3-Shipping_Instructions_NAVSEA_Form_4336-1_rev1_(3).pdf PDF
N0002413R6318_Amendment_0001.pdf PDF
N002413R6318_Attachment_L-1_Bidders'_Questions_Form_21_Nov_13.xlsx XLSX spreadsheet
Attachment_5_Peculiar_Support_Equipment_Parts_List.pdf PDF
Exhibit B - Contract Data Requirements List —
L-4_Cost_and_Price_Tables.xls XLS spreadsheet
Attachment 3-Shipping Instructions NAVSEA Form 4336-1.docx DOCX document
Attachment 8 - ALMDS Risk Mgmt Template.docx DOCX document
Attachment 5 Peculiar Support Equipment Parts List.docx DOCX document
Attachment 6-ALMDS Government Furnished Equipment Repairs and Production Required.docx DOCX document
Attachment 2 -Government Furnished Information NAVSEA Form 4340-2.docx DOCX document
Attachment 7 - NAVSEA Technical Instruction Template.docx DOCX document
Attachment 1-SOW for Airborne Laser Mine Detection Systems.docx DOCX document
ALMDS_PreRFP_Bidders'_Questions_and_Responses.xlsx XLSX spreadsheet
ALMDS Attachment 1 to Exhibit A and B.pdf PDF
Attachment 4-ALMDS Contract Security Classification Specification Form DD254.pdf PDF
Exhibit A - Contract Data Requirements List —
ALMDS_Solicitation_N00024-13-R-6318.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0007 B TDP TM OTHER SESS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

ALMDS N00024-13-R-6318 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B005 Depot Level Repair Instructions

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SESS-81705 SOW 3.18 PMS495 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION (See BLK 16)

DD REQUIRED ASREQ 60 DACM b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQ SUBMISSION a. ADDRESSEE Draft Final

A D N/A 15 DARC Reg Rep

16. REMARKS DDL1 1

Blk 4: The documents shall also contain the data specified in ISO/IEC/IEEE 15289 Sections 10.40 Maintenance Plan and 10.41 Maintenance Procedures. In section 3, replace “Air Logistics Centers (ALCs)” with “the Contractor’s Depot facility.” In section 3.3 replace “Air Logistics Center” with “ISEA.”

Blks 8 and 13: Approval shall be for technical content. Allow 15 days for Government review. Final shall incorporate all review comments and corrections. Final shall be submitted within 15 days of receipt of Government comments.

Blk 9: Distribution Statement D: Distribution authorized to DoD and DoD contractors only; administrative/operations use by PMS495 as of 1 March 2013. Other requests for this document shall be referred to PMS495.

Blk 14: Media Requirements: All data shall be delivered to the Government in its native file format. The Contractor shall use the applications outlined in the following table for documents that are to be delivered to the government:

DOCUMENT CATEGORY APPLICATION/VERSION

Word Processing Microsoft® Word Spreadsheets Microsoft® Excel Project Planning Microsoft® Project Presentation Software Microsoft® PowerPoint Engineering Drawings Non-Proprietary Commercially Available 3-D Software Package

All draft and final submissions shall be delivered via email to all recipients and posted on the Contractor’s Government Accessible IDE’s CDRL Delivery location.

DDL2 1

DDL3 1

DDL4 1

15. TOTAL SEE BLOCK 16 4

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

LCDR David Gerace, USN 11/12/13 Sydney Brandt 11/12/13

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 5 of 8 Pages

2013-11-14T13:53:52-0500
BRANDT.SYDNEY.SOMERVILLE.1260048852

File details come from the government source that posted it. Updated .