CEC_Prod_Answers_to_Industry_Amend_0011.pdf

PDF 87 KB Posted

Attached to
Manufacture, Assembly, and Test to Support the Production of the Cooperative Engagement Capability (CEC) System
Solicitation number
N00024-13-R-5228
Issued by

About this file

CEC Production Answers to the Industry Amendment 0011

View the file

Other files

File Type Posted
N00024-13-R-5228-0011_Conformed_Word.doc DOC document
Amendment_0011_N00024-13-R-5228.pdf PDF
N00024-13-R-5228-0010_Conformed_Word_ver.doc DOC document
CEC_Prod_Answers_to_Industry_Amend_0010.pdf PDF
Amendment_0010_to_N00024-13-R-5228.pdf PDF
N00024-13-R-5228-0009_Word_version.doc DOC document
Attach_02_Offeror_Notice.pdf PDF
Attach_08_Questions_Form.docx DOCX document
Attach_01_Reserved.pdf PDF
Attach_03_Offeror_Notice.pdf PDF
Attach_10_Reserved.pdf PDF
Attach_09_Award_Info.docx DOCX document
Attach_11_Reserved.pdf PDF
Exhibit_A_CDRLs.pdf PDF
Attach_12_Offeror_Notice.pdf PDF
Attach_05_Subcontracting_Plan.pdf PDF
Attach_04_Form_DD-254.PDF PDF
N00024-13-R-5228-0009_Conformed.pdf PDF
Attach_06_Techncial_Data_Rights.pdf PDF
N00024-13-R-5228_Amend_0009_SF30.pdf PDF
Attach_07_Compliance_Checklist.docx DOCX document
N00024-13-R-5228_Amend_0008_SF30.pdf PDF
Amendment_0007_N00024-13-R-5228.pdf PDF
Amend-0006_N00024-13-R-5228.pdf PDF
Amend-0005_Govt_Answers_N00024-13-R-5228.pdf PDF
N00034-13-R-5228_Amendment_0005_SF30.pdf PDF
Amendment_0004_N00024-13-R-5228.pdf PDF
Amendment_0003.pdf PDF
Amend-0002_Govt_Answers_N00024-13-R-5228.pdf PDF
Amend-0002_N00024-13-R-5228_Conformed.pdf PDF
Amend-0002_SF30_N00024-13-R-5228.pdf PDF
N00024-13-R-5228_Conformed_Amend_0001.pdf PDF
Amend-0001_Govt_Answers_N00024-13-R-5228.pdf PDF
Amend-0001_SF30_N00024-13-R-5228.pdf PDF
Attach_5_CEC_Production_Subcontracting_Plan.docx DOCX document
N00024_13_R_5228_CEC_Production_RFP.pdf PDF
Attach_2_CEC_Production_Configuration_List.docx DOCX document
Attach_9_Contractor_Award_Announcement_Information.docx DOCX document
Exhibit_A_CEC_Production_Contract_Data_Requirements_List.PDF PDF
Attach_7_Compliance_Checklist.docx DOCX document
Attach_1_CEC_Production_Pricing_Tables.docx DOCX document
Attach_3_CEC_Production_GFI_GFP_List.docx DOCX document
Attach_11_Offerror's_Fill_ins.docx DOCX document
Attach_8_Questions _Comments _and_Data_Requests_Form.docx DOCX document
Attach_6_CEC_Production_Technical_Data_Rights.docx DOCX document
Attach_10_Past_Performance_Questionnaire.docx DOCX document
Attach_4_CEC_Production_DD254_N0002413R5228.PDF PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For Official Use Only Questions, Comments, and Data Requests N00024-13-R-5228 Amendment 0011

Attachment 8

Document Description

Page

Section/ Paragraph Question/ Comment Proposed Action/ Change Government Response

11 Will other Government owned property be provided under this contract?

The GFP provided under this contract is identified in Section H Clause 5252.245‐ 9109 Government‐Furnished Property (T/R Modules). It is required by all Offerors to identify and price, in their responses, all associated (and/or ancillary) hardware/software that they will considered required to manufacture, assemble and test the required CEC production systems, backfit kits and Installation and Checkout Replacements (INCO‐R) components as defined in Section C paragraph 3.2.1 of the RFP.

12 Attachment

2: CEC

Production Configuration List

13 AN/USG 2

Backfit Kit

CLIN X032 combines the AN/USG 2 and LBTS backfit kits. However, the AN/USG 2 backfit kit includes an additional component identified as a Centrifugal fan. The part number is incomplete but appears to be PN:

8486661‐001 which is included in the rack assembly.

Please clarify the contents of both the AN/USG 2 and LBTS backfit kits.

The Government will provide a revised Attachment 2 and a Supplement to the TDP with Amendment 0011. The Offeror is directed to the revised Attachment and TDP Supplement for Backfit kit configurations. Offerors are advised that this supplemental drawing package and revised Attachments 2 and 3 will be sent only to those Offerors who have an executed “Terms of Use” letter and an approved executed DD 254.

13 Attachment

2: CEC

Production Configuration List

13 AN/USG 2A

Backfit Kit

The AN/USG 2A backfit kit contains a rack conversion kit to convert a 2A rack to a 2B rack. There is no part number for the conversion kit.

Please identify the conversion kit part number and supply the parts list if not included in the current

TDP.

The Government will provide a revised Attachment 2 and a Supplement to the TDP with Amendment 0011. The Offeror is directed to the TDP Supplement. Offerors are advised that this supplemental drawing package and revised Attachments 2 and 3 will be sent only to those Offerors who

For Official Use Only Questions, Comments, and Data Requests N00024-13-R-5228 Amendment 0011

Attachment 8 have an executed “Terms of Use” letter and an approved executed DD 254.

14 RFP

114‐

Requirements paragraph 3.7.3

Requirements paragraph 3.7.3.1

On May 6, 2014 the DFARs clause 252.246–7007 Contractor Counterfeit Electronic Part Detection and Avoidance System was updated.

Will there be an update to the RFP to reflect this change?

Amendment 0011 has incorporated DFARS clause 252.246‐7007 Contractor Counterfeit Electronic Part Detection and Avoidance System to the solicitation.

Section C 3.7.3 has been modified.

15 215 L.3 Volume I Amendment 10, still has the requirement of pricing the CDRLs “Estimated Total Price” and “Price Group” block identified

Amendment 0011 has deleted the following line in Section L.3 Volume I:

* The Offeror shall complete the “Price Group” and “Estimated Total Price” blocks of each data item on the Section J Exhibit A.

File details come from the government source that posted it. Updated .