CEC_Prod_Answers_to_Industry_Amend_0010.pdf

PDF 81 KB Posted

Attached to
Manufacture, Assembly, and Test to Support the Production of the Cooperative Engagement Capability (CEC) System
Solicitation number
N00024-13-R-5228
Issued by

About this file

Amendment 0010 Answers to Industry Questions

View the file

Other files

File Type Posted
N00024-13-R-5228-0011_Conformed_Word.doc DOC document
Amendment_0011_N00024-13-R-5228.pdf PDF
CEC_Prod_Answers_to_Industry_Amend_0011.pdf PDF
N00024-13-R-5228-0010_Conformed_Word_ver.doc DOC document
Amendment_0010_to_N00024-13-R-5228.pdf PDF
N00024-13-R-5228-0009_Word_version.doc DOC document
Attach_02_Offeror_Notice.pdf PDF
Attach_08_Questions_Form.docx DOCX document
Attach_01_Reserved.pdf PDF
Attach_03_Offeror_Notice.pdf PDF
Attach_10_Reserved.pdf PDF
Attach_09_Award_Info.docx DOCX document
Attach_11_Reserved.pdf PDF
Exhibit_A_CDRLs.pdf PDF
Attach_12_Offeror_Notice.pdf PDF
Attach_05_Subcontracting_Plan.pdf PDF
Attach_04_Form_DD-254.PDF PDF
N00024-13-R-5228-0009_Conformed.pdf PDF
Attach_06_Techncial_Data_Rights.pdf PDF
N00024-13-R-5228_Amend_0009_SF30.pdf PDF
Attach_07_Compliance_Checklist.docx DOCX document
N00024-13-R-5228_Amend_0008_SF30.pdf PDF
Amendment_0007_N00024-13-R-5228.pdf PDF
Amend-0006_N00024-13-R-5228.pdf PDF
Amend-0005_Govt_Answers_N00024-13-R-5228.pdf PDF
N00034-13-R-5228_Amendment_0005_SF30.pdf PDF
Amendment_0004_N00024-13-R-5228.pdf PDF
Amendment_0003.pdf PDF
Amend-0002_Govt_Answers_N00024-13-R-5228.pdf PDF
Amend-0002_N00024-13-R-5228_Conformed.pdf PDF
Amend-0002_SF30_N00024-13-R-5228.pdf PDF
N00024-13-R-5228_Conformed_Amend_0001.pdf PDF
Amend-0001_Govt_Answers_N00024-13-R-5228.pdf PDF
Amend-0001_SF30_N00024-13-R-5228.pdf PDF
Attach_5_CEC_Production_Subcontracting_Plan.docx DOCX document
N00024_13_R_5228_CEC_Production_RFP.pdf PDF
Attach_2_CEC_Production_Configuration_List.docx DOCX document
Attach_9_Contractor_Award_Announcement_Information.docx DOCX document
Exhibit_A_CEC_Production_Contract_Data_Requirements_List.PDF PDF
Attach_7_Compliance_Checklist.docx DOCX document
Attach_1_CEC_Production_Pricing_Tables.docx DOCX document
Attach_3_CEC_Production_GFI_GFP_List.docx DOCX document
Attach_11_Offerror's_Fill_ins.docx DOCX document
Attach_8_Questions _Comments _and_Data_Requests_Form.docx DOCX document
Attach_6_CEC_Production_Technical_Data_Rights.docx DOCX document
Attach_10_Past_Performance_Questionnaire.docx DOCX document
Attach_4_CEC_Production_DD254_N0002413R5228.PDF PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For Official Use Only Questions, Comments, and Data Requests N00024-13-R-5228 Amendment 0010

Attachment 8

SOURCE SELECTION SENSITIVE INFORMATION – SEE FAR 2.101 and 3.104

Document Description

Pag e #

Section/ Paragraph Question/ Comment Proposed Action/ Change Government Response

1 Attachment

N/A Rack INCO‐R Attachment 12 lists Signal Data Processor (SDP) as a desired part.

Throughout the rest of the RFP, the SDP is assumed to be GFE.

Correct attachment 12 to remove the SDP

A revised Attachment 12 is provided in Amendment 0010. Offerors are advised that this Attachment will be sent only to those Offerors who have an executed “Terms of Use” letter and an approved executed DD‐254.

2 RFP 10 Backfit Kits for AN/USG‐2 and

LBTS

CLIN 0032 Description reads as backfit kits for "…An AN/USG‐2 System and the Land Based Test Site

(LBTS)..."

Correct the CLIN description so that the backfit kits are to “backfit an AN/USG‐2 System or the LBTS,” not both.

Line Item 0032, 1032, 2032, 3032, 4032, 5032 and 6032 description are being revised on Amendment 00010 from “…AN/USG‐2 System and Land Based Test Site (LBTS)…” to read

“…AN/USG‐2 System and/or Land Based Test Site (LBTS)…”

3 RFP 94 Section B Section B, NOTE A states, “Offeror shall complete the ‘Price Group’ and ‘Estimated Total Price’ blocks of each data item on the Contract Data Requirements List(s), attached hereto...”

NOTE J states, “Items 0055, 1055, 2055, 3055, 4055, 5055, 6055, and 7055. The item is NOT SEPARATELY

Remove NOTE A from Section B.

Section B Note A is revised to be Reserved.

For Official Use Only Questions, Comments, and Data Requests N00024-13-R-5228

Attachment 8

PRICED (NSP).”

These notes conflict, please confirm NOTE A is not applicable.

4 RFP 219 Section L 4.2 Section L, 4.2 Schedule states:

"The Offeror shall provide a detailed schedule for the first delivery for each item in accordance with Section F."

Section F consists of a listing of all CLINs.

Please correct the statement to say that offerors shall provide a detailed schedule for the first delivery for each unique end item in accordance with Section F.

Section L, 4.2 Schedule is revised to read as follows: “The Offeror shall provide a detailed schedule for the first delivery for each of the following line items 0001, 0004, 0007, 0014, 0017, 0032, 0033, 0034, 0037 and 3010, in accordance with Section F.”

5 RFP 218 L.4(2) Factor 1 – Manufacture and Assembly, Testing and Engineering

Manufacture and Assembly

Amendment 9 L.4(2) Manufacture and Assembly does not include the ability to manufacture and assemble “Radio Frequency (RF) items, specifically phased array antennas, and RF components”. This ability is still required in support of AN/USB‐ 3B System (Airborne) production.

Add the ability to manufacture and assemble “Radio Frequency (RF) items, specifically phased array antennas, and RF components” into the paragraph.

Section L.4 (2) Manufacture and Assembly is revised as follows:

Manufacture and Assembly ‐ The Offeror shall describe its ability to manufacture and assemble complex items including, but not limited to Radio Frequency (RF) items, specifically phased array antennas, and RF components, highly complex mechanical enclosures of electrical components and electronic circuit card assembles, components and processes in a

For Official Use Only Questions, Comments, and Data Requests N00024-13-R-5228

Attachment 8 production environment.

6 RFP 220 L.4(2) Factor 1 –

Manufacture and Assembly, Testing and Engineering Testing

Amendment 9 L.4(2) Testing does not include the test of “Radio Frequency (RF) items, specifically phased array antennas, and RF components”. This ability is still required in support of AN/USB‐3B System (Airborne) production.

Add the ability to test “Radio Frequency (RF) items, specifically phased array antennas, and RF components” into the paragraph.

Section L.4(2) Testing is revised as follows:

Testing ‐ The Offeror shall describe its ability to test manufactured and COTS items including, but not limited to, Radio Frequency (RF) items, specifically phased array antennas, and RF components, highly complex mechanical enclosures of electrical components and electronic circuit card assembles, components, including associated processes. The Offeror shall describe its ability to provide and use necessary test equipment to ensure component/item is manufactured to the required specifications provided in the TDP. The Offeror shall discuss previous experience in testing products of like or similar complexity.

7 RFP 220 L.4(2) Factor 1 – Manufacture and Assembly, Testing and Engineering

Engineering Services

Amendment 9 L.4(2) Engineering Services does not include the ability to provide complex engineering services of “Radio Frequency (RF) items, specifically phased array antennas, and RF components”. This ability is still required in support of AN/USB‐3B System (Airborne) production.

Add the ability to provide complex engineering services for “Radio Frequency (RF) items, specifically phased array antennas, and RF components” into the paragraph.

Section L.4(2) Engineering Services is revised as follows:

The Offeror shall describe its ability to provide complex engineering services including, detailed technical documentation and/or trouble shooting CEC or similar components, including, but not limited to, Radio Frequency (RF) items, specifically phased array

For Official Use Only Questions, Comments, and Data Requests N00024-13-R-5228

Attachment 8 antennas, and RF components, highly complex mechanical enclosures of electrical components and electronic circuit card assembles, components, including associated processes. The Offeror shall discuss previous experience in documenting products of like or similar complexity.

8 RFP 224 L.6 (1) L.6 (1) states:

"‐ The Offeror shall submit its Price and Cost summaries...for the first unit of each firm fixed price line item."

and "‐ The Offeror shall submit a material detailed Bill of Material (BOM) estimate for the first unit of each line item."

It is unclear as to whether these requirements apply to the first unit of each unique FFP end item (i.e.

AN/USG‐2B (AEGIS)) or the first unit of each FFP CLIN.

Please correct the requirement to stipulate that Price and Cost summaries and material detailed Bill of Material (BOM) estimate are only required for the first unit of each FFP unique end item (i.e., variant), not for the first unit of each Contract Line Item.

Section L.6 (1) is revised as follows:

For Firm Fixed Price (FFP) line items the Offeror shall:

‐ The Offeror shall submit its Price and Cost summaries in accordance with the Contractors accounting structure for the first unit of firm fixed price line items 0001, 0004, 0007, 0014, 0017, 0032, 0033, 0034, 0037 and 3010. The Offeror’s proposal shall provide complete visibility by calendar year (or contractor calendar year) labor hours, labor costs, material costs, other direct costs, indirect costs, Facilities Capital Cost of Money (FFCOM), and profit.

For each Section B Note D table, the Offeror shall document the stepladder unit pricing in relation to the first unit.

For Official Use Only Questions, Comments, and Data Requests N00024-13-R-5228

Attachment 8

The Offeror shall provide detailed analysis to support the proposed FFP pricing at each quantity amount and the adjustments made from the first unit pricing (i.e. production labor learning reductions, quantity reductions, escalation, etc.).

‐ The Offeror shall submit a material detailed Bill of Material (BOM) estimate for the first unit of each line items 0001, 0004, 0007, 0014, 0017, 0032, 0033, 0034, 0037 and 3010. For any major material items ($700,000 or greater of the unit price), the Offeror shall provide material quotes from the vendors for any item to provide insight into the pricing analysis. The Offeror shall provide detailed analysis to support the proposed BOM at each quantity amount and the adjustments made from the first unit pricing (i.e. quantity reductions, escalation, etc.).

09 Attachment

12: INCO‐R

1‐3 Rack INCO‐R The INCO‐R Components list contains the Signal Data Processor (SDP) as

Please clarify if the Government wants the

A revised Attachment 12 is provided in Amendment 0010. Offerors are advised that this Attachment will be sent only to

For Official Use Only Questions, Comments, and Data Requests N00024-13-R-5228

Attachment 8

Component s Pricing Table one of the items to be priced. offeror to procure the SDP from the current supplier and include it as a priced item as part of the INCO‐R Components?

those Offerors who have an executed “Terms of Use” letter and an approved executed DD‐254.

10 RFP 102

B (Note J) and Section L

Solicitation Section B identifies the Data Items as NSP, however Section L Offeror shall complete the “Price Group” and “Estimated Total” Price of on the Section J, Exhibit A.

Please confirm if pricing is to be priced separately for

CDRLS.

Section B Note A is revised to be Reserved.

File details come from the government source that posted it. Updated .