This is a Request for Proposal (RFP) from the Department of the Navy Naval Sea Systems Command for repair and alteration services onboard the USS BATAAN (LHD 5) during its Fiscal Year 2024 Docking Selected Restricted Availability (DSRA). The RFP includes 75 base CLINs and 139 optional CLINs for work items, ship alterations, and other services with values to be determined. Offerors are required to prepare for and accomplish repairs in accordance with standard items, work specifications, drawings, test procedures and other documentation provided in attachments. The RFP establishes a level of effort of 328,840 labor hours and $10,811,637 of materials to complete expected growth work. Pricing is to be provided on a firm-fixed-price basis and the contract will utilize both required and optional CLINs with performance from October 2023 through September 2024.

View the file

Other files

File Type Posted
N0002423R4418 A0005.pdf PDF
(USS BAT) Attachment J-11 SBPCD_(Insert Offeror Name) - A0005.xlsx XLSX spreadsheet
(USS BATAAN) Attachment S-3 PPI Responses BQs - A0005.pdf PDF
N0002423R4418 Conformed through A0005.pdf PDF
N0002423R4418 A0004.pdf PDF
(USS BATAAN) Attachment S-3 PPI Responses BQs - A0004.pdf PDF
N0002423R4418 Conformed through A0004.pdf PDF
N0002423R4418 Conformed through A0003.pdf PDF
N0002423R4418 A0003.pdf PDF
N0002423R4418 Conformed through A0002.pdf PDF
(USS BATAAN) Attachment S-3 PPI Responses BQs - A0002.pdf PDF
N0002423R4418 A0002.pdf PDF
N0002423R4418 A0001.pdf PDF
N0002423R4418 Conformed through A0001.pdf PDF
(USS BATAAN) Attachment S-3 PPI Responses BQs - A0001.pdf PDF
(USS BAT) CDRL Exhibit A.pdf PDF
(USS BAT) CDRL Exhibit C.pdf PDF
(USS BAT) CDRL Exhibit B.pdf PDF
(USS BAT) Attachment S-7 Proposal Assessment.xlsx XLSX spreadsheet
(USS BAT) Attachment S-8 Pier and Dry-dock Graphical Representation Template.xlsx XLSX spreadsheet
(USS BAT) Attachment J-11 SBPCD_(Insert Offeror Name).xlsx XLSX spreadsheet
(USS BAT) Attachment S-3 Pre-Proposal Information (PPI) Form.xlsx XLSX spreadsheet
(USS BAT) Attachment S-5 Eligibility Criteria Data Sheet.docx DOCX document
(USS BAT) Attachment S-2 Past Performance CPARS.docx DOCX document
(USS BAT) Attachment S-4 Manpower Plan to Actual Data Sheet.xlsx XLSX spreadsheet
(USS BAT) Attachment J-7 Schedule Model Review.docx DOCX document
(USS BAT) Attachment J-8 Government Furnished Material (GFM) List.xlsx XLSX spreadsheet
(USS BAT) Attachment J-10 Open and Inspect List_(Insert Offeror Name).xlsx XLSX spreadsheet
(USS BAT) Attachment S-9 Past Performance Questionnaire (PPQ).docx DOCX document
(USS BAT) Attachment J-5 Quality Assurance Surveillance Plan.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local time

X

A

X B

X C X D

EX

X

G

F 204 - 217

218 - 245

X H 246 - 257 jonathan.p.pagnucco.mil@us.navy .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c)

DO-A3 1 257

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00024 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

JON P PAGNUCCO 202-781-1024

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 111

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

112 - 148

149 - 150

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

151 - 156

157 - 166 X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 167 - 175 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 176 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

177 - 202

PART II - CO NTRACT CLAUSES

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2030

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

N0002423R4418C

5. DATE ISSUED

09 Aug 2023

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0002423R4418

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

CLIN

Number

1 Lot

CDRLs

FFP

Contracts Data Requirements Lists (CDRLs) - Not Separately Priced (NSP)

FOB: Destination

PURCHASE REQUEST NUMBER: N0002423R4418C

NET AMT

TYCOM BASE Work Items

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS BATAAN (LHD 5) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the

Docking Selected Restricted Availability (DSRA) onboard USS BATAAN (LHD

5) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B and D - F

PMS 407 Base Work Items (OMN)

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS BATAAN (LHD 5) DURING FY24 DOCKING SELECTED

5) as specified in the statement of work provided herein and in accordance with

PMS 407 Base Work Items (OPN)

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS BATAAN (LHD 5) DURING FY24 DOCKING SELECTED

5) as specified in the statement of work provided herein and in accordance with

PMS 407 JSF Base Work Items (OMN)

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS BATAAN (LHD 5) DURING FY24 DOCKING SELECTED

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-98552K, Ship Self Defense

FFP

ShipAlt LHD1-98552K, Ship Self Defense System (SSDS) MK 2 LHD Upgrade

Advanced Combat Direction System (ACDS) Block 0 TO MK 2 Mod 3E;

accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS BATAAN (LHD 5) DURING FY24 DOCKING SELECTED

5) as specified in the statement of work provided herein and in accordance with

See Notes A - F

Prorated Work Items

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS BATAAN (LHD 5) DURING FY24 DOCKING SELECTED

5) as specified in the statement of work provided herein and in accordance with

Number 2 Boiler 5-Year Strength

Number 2 Boiler 5-Year Strength and Integrity Inspection (TYCOM)

5) as specified in the statement of work provided herein and in accordance with

AER LHD Class 96572D

FFP

AER LHD Class 96572D, Number 2 Main Boiler Rear Refractory/Casing;

accomplish

5) as specified in the statement of work provided herein and in accordance with

ShipAlt LHD1-85154K

ShipAlt LHD1-85154K, Integrated Ship Controls Installation; accomplish

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-80156K, AN/SLQ-32(V)6

FFP

ShipAlt LHD1-80156K, AN/SLQ-32(V)6 Hardware Upgrade; accomplish

(OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-96356D

FFP

ShipAlt LHD1-96356D, Aircraft Elevator (ACE) Folding Gear Removal;

accomplish (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION Underwater Hull Preservation

Underwater Hull Preservation of Test Patches; accomplish (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION Nonskid Deck Covering Replacement

Nonskid Deck Covering Replacement; accomplish (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION Troop Berthing Habitability Project

FFP

Troop Berthing Habitability Project (BTRP-S1133) Installation; accomplish

5) as specified in the statement of work provided herein and in accordance with

FFP

Troop Berthing Habitability Project (BTRP-S9944) Installation; accomplish

5) as specified in the statement of work provided herein and in accordance with

FFP

Troop Berthing Habitability Project (BTRP-S9717) Installation; accomplish

5) as specified in the statement of work provided herein and in accordance with

OPTION Troop Sanitary Space Habitability

FFP

Troop Sanitary Space Habitability Project (HTRP-S1134) Installation; accomplish

5) as specified in the statement of work provided herein and in accordance with

FFP

Troop Sanitary Space Habitability Project (HTRP-S9718) Installation; accomplish

5) as specified in the statement of work provided herein and in accordance with

FFP

Troop Sanitary Space Habitability Project (HTRP-S9945) Installation; accomplish

5) as specified in the statement of work provided herein and in accordance with

ShipAlt LHD1-82483K

ShipAlt LHD1-82483K, Capstone Space Arrangement; accomplish

5) as specified in the statement of work provided herein and in accordance with

ShipAlt LHD1-92217K

FFP

ShipAlt LHD1-92217K, Navy Amphibious Baseline (NAB) LHD/LHA Armory

Modernization; accomplish

5) as specified in the statement of work provided herein and in accordance with

OPTION Temporary Galley and Messing Facility

Temporary Galley and Messing Facility; provide (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION Temporary Duty Section Berthing Off-Ship

Temporary Duty Section Berthing Off-Ship; provide (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION OrdAlt LHD1-94282

FFP

OrdAlt LHD1-94282, RAM MK 31 Mod 5 GMLS Upgrade, Alteration Installation

Team (AIT) Support Service; provide (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION OrdAlt 86395, NCDS Switchboard, Alt

FFP

OrdAlt 86395, NCDS Switchboard, Alteration Installation Team (AIT) Support

Service; provide (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-88635K

FFP

ShipAlt LHD1-88635K, CIWS Block 1B Overhaul, Alteration Installation Team

(AIT) Support Service; provide (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-94903K

FFP

ShipAlt LHD1-94903K, NSSMS Mk 57 Mod 16 Min-Mod Upgrade, Alteration

Installation Team (AIT) Support Service; provide (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-95520K, 95532K, and 97194K

FFP

ShipAlt LHD1-95520K, 95532K, and 97194K, ECASS RF-A/RF-B and EPATS, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-86033K, MOS Mod Alteration

FFP

ShipAlt LHD1-86033K, MOS Mod Alteration, Alteration Installation Team (AIT)

Support Service; provide (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-90149K, ADNS AN/USQ-144L(V)

FFP

ShipAlt LHD1-90149K, ADNS AN/USQ-144L(V)2, Alteration Installation Team

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-92525K, EMF-TDMA

FFP

ShipAlt LHD1-92525K, EMF-TDMA Modem Support, Alteration Installation

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-93526K, GPNTS(V)8 Alt

FFP

ShipAlt LHD1-93526K, GPNTS(V)8 Alteration, Alteration Installation Team

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-95946K

FFP

ShipAlt LHD1-95946K, C2P Tech Refresh Alteration, Alteration Installation Team

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-96034K, BFTN AN/USQ-195A(V)

FFP

ShipAlt LHD1-96034K, BFTN AN/USQ-195A(V)1 Upgrade, Alteration

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-97990K, (RTSO) (OFM) (AIT)

FFP

ShipAlt LHD1-97990K, Real Time Spectrum Operations (RTSO) Own Force

Monitoring (OFM), Alteration Installation Team (AIT) Support Service; provide

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-93584K

FFP

ShipAlt LHD1-93584K, AIS V1 Cyber Hardening, Alteration Installation Team

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-93780K, AN/SPN-50 HW

FFP

ShipAlt LHD1-93780K, AN/SPN-50 HW, Alteration Installation Team (AIT)

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-93785K, Upgrade to SYY-1 HW

FFP

ShipAlt LHD1-93785K, Upgrade to SYY-1 HW, Alteration Installation Team

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-85027K, CEC AN/USG-2B

FFP

ShipAlt LHD1-85027K, CEC AN/USG-2B Installation, Alteration Installation

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-96483K, CAC2S

FFP

ShipAlt LHD1-96483K, CAC2S Afloat Flight 0+ Hardware, Alteration Installation

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD7-78358K, 78381K, 78389K

FFP

ShipAlt LHD7-78358K, 78381K, 78389K, 81053K and OrdAlt 91838, AN/SPN-

41B Upgrade, Alteration Installation Team (AIT) Support Service; provide

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-85077K, AN/SPQ-9

FFP

ShipAlt LHD1-85077K, AN/SPQ-9 Production Tech Refresh, Alteration

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-95864K, AN/USQ-T52A(V)4

FFP

ShipAlt LHD1-95864K, AN/USQ-T52A(V)4 Training, Alteration Installation

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-95989K, TSSS SPS-67

FFP

ShipAlt LHD1-95989K, TSSS SPS-67 Simulation, Alteration Installation Team

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-95037K

FFP

ShipAlt LHD1-95037K, NAVAIR Fleet System Array, Alteration Installation

5) as specified in the statement of work provided herein and in accordance with

OPTION LHD1-85294K, F-35 (ALIS)

FFP

LHD1-85294K, F-35 Autonomic Logistics Information System (ALIS), Alteration

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-95267K and 03144K

FFP

ShipAlt LHD1-95267K and 03144K, Moriah Aviation Land/Launch Enclave

(AAS) and Moriah Wind System (MWS) Installation, Alteration Installation Team

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-86395K

FFP

ShipAlt LHD1-86395K, Switchboard to Support Navigation Critical Distribution

System Alteration, Alteration Installation Team (AIT) Support Service; provide

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-87785K, AS-4775

FFP

ShipAlt LHD1-87785K, AS-4775 Link 16 Antenna, Alteration Installation Team

5) as specified in the statement of work provided herein and in accordance with

ShipAlt LHD1-78069K, TMP 93545, SSLS/JPA

FFP

ShipAlt LHD1-78069K, TMP 93545, SSLS/JPALS Install Alteration, Alteration

Installation Team (AIT) Support Service; provide

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-77259K

FFP

ShipAlt LHD1-77259K, Digital Hybrid Speed Log (DHYSL) Indicator-

Transmitter Set AN/WSN-9(V)1, Alteration Installation Team (AIT) Support

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-98552K, SSDS MK 2 Upgrade

FFP

ShipAlt LHD1-98552K, SSDS MK 2 Upgrade, Alteration Installation Team (AIT)

5) as specified in the statement of work provided herein and in accordance with

OPTION ShipAlt LHD1-93868K, I-Stalker HW, (AIT)

FFP

ShipAlt LHD1-93868K, I-Stalker HW, Alteration Installation Team (AIT) Support

5) as specified in the statement of work provided herein and in accordance with

ShipAlt LHD1-83325K, OPA

FFP

ShipAlt LHD1-83325K, OPA System Improvement for LHD Class Ship, Alteration Installation Team (AIT) Support Service; provide

5) as specified in the statement of work provided herein and in accordance with

OPTION Messing and Berthing Barge Tow Service

Messing and Berthing Barge Tow Service; provide (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION Ship Towing Service; provide

Ship Towing Service; provide (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION Messing and Berthing Barge Electric Temp

FFP

Messing and Berthing Barge Electric Temporary Service in Contractor Plant;

provide (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION Messing and Berthing Barge Steam Temp

FFP

Messing and Berthing Barge Steam Temporary Service in Contractor Plant;

provide (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION Messing and Berthing Barge, Temp Service

FFP

Messing and Berthing Barge, Temporary Service, Inspection and Repair in

Contractor Plant, Steam Barge; accomplish (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION Messing and Berthing Barge, Temp Service

FFP

Messing and Berthing Barge, Temporary Service, Inspection and Repair in

Contractor Plant, Electric Barge; accomplish (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION Messing and Berthing Barge Tow Service

Messing and Berthing Barge Tow Service (Local); provide (OPTION ITEM)

5) as specified in the statement of work provided herein and in accordance with

OPTION Growth Reservation for CLIN 0004

Growth Reservation Associated with CLIN 0004. See attachment J-4.

Growth Reservation for CLIN 0004

Growth Reservation for CLIN 0005

Growth Reservation Associated with CLIN 0005. See attachment J-4.

Growth Reservation for CLIN 0006

Growth Reservation Associated with CLIN 0006. See attachment J-4.

OPTION Growth Reservation for CLIN 0006

Growth Reservation for CLIN 0006

OPTION Growth Reservation for CLIN 0007

Growth Reservation Associated with CLIN 0007. See attachment J-4.

Growth Reservation for CLIN 0007

Growth Reservation for CLIN 0007

OPTION Growth Reservation for CLIN 0008

Growth Reservation Associated with CLIN 0008. See attachment J-4.

Growth Reservation for CLIN 0009

Growth Reservation Associated with CLIN 0009. See attachment J-4.

OPTION Growth Reservation for CLIN 0009

Growth Reservation Associated with CLIN 0009. See attachment J-4.

OPTION Growth Reservation for CLIN 0010

Growth Reservation Associated with CLIN 0010. See attachment J-4.

OPTION Growth Reservation for CLIN 0011

Growth Reservation Associated with CLIN 0011. See attachment J-4.

OPTION Growth Reservation for CLIN 0012

Growth Reservation Associated with CLIN 0012. See attachment J-4.

OPTION Growth Reservation for CLIN 0013

Growth Reservation Associated with CLIN 0013. See attachment J-4.

OPTION Growth Reservation for CLIN 0014

Growth Reservation Associated with CLIN 0014. See attachment J-4.

OPTION Growth Reservation for CLIN 0015

Growth Reservation Associated with CLIN 0015. See attachment J-4.

OPTION Growth Reservation for CLIN 0016

Growth Reservation Associated with CLIN 0016. See attachment J-4.

OPTION Growth Reservation for CLIN 0017

Growth Reservation Associated with CLIN 0017. See attachment J-4.

OPTION Growth Reservation for CLIN 0018

Growth Reservation Associated with CLIN 0018. See attachment J-4.

OPTION Growth Reservation for CLIN 0019

Growth Reservation Associated with CLIN 0019. See attachment J-4.

OPTION Growth Reservation for CLIN 0020

Growth Reservation Associated with CLIN 0020. See attachment J-4.

OPTION Growth Reservation for CLIN 0021

Growth Reservation Associated with CLIN 0021. See attachment J-4.

OPTION Growth Reservation for CLIN 0022

Growth Reservation Associated with CLIN 0022. See attachment J-4.

OPTION Growth Reservation for CLIN 0023

Growth Reservation Associated with CLIN 0023. See attachment J-4.

OPTION Growth Reservation for CLIN 0023

Growth Reservation Associated with CLIN 0023. See attachment J-4.

OPTION Growth Reservation for CLIN 0024

Growth Reservation Associated with CLIN 0024. See attachment J-4.

OPTION Growth Reservation for CLIN 0025

Growth Reservation Associated with CLIN 0025. See attachment J-4.

OPTION Growth Reservation for CLIN 0026

Growth Reservation Associated with CLIN 0026. See attachment J-4.

OPTION Growth Reservation for CLIN 0027

Growth Reservation Associated with CLIN 0027. See attachment J-4.

OPTION Growth Reservation for CLIN 0028

Growth Reservation Associated with CLIN 0028. See attachment J-4.

OPTION Growth Reservation for CLIN 0029

Growth Reservation Associated with CLIN 0029. See attachment J-4.

OPTION Growth Reservation for CLIN 0030

Growth Reservation Associated with CLIN 0030. See attachment J-4.

OPTION Growth Reservation for CLIN 0031

Growth Reservation Associated with CLIN 0031. See attachment J-4.

OPTION Growth Reservation for CLIN 0032

Growth Reservation Associated with CLIN 0032. See attachment J-4.

OPTION Growth Reservation for CLIN 0033

Growth Reservation Associated with CLIN 0033. See attachment J-4.

OPTION Growth Reservation for CLIN 0034

Growth Reservation Associated with CLIN 0034. See attachment J-4.

OPTION Growth Reservation for CLIN 0035

Growth Reservation Associated with CLIN 0035. See attachment J-4.

OPTION Growth Reservation for CLIN 0036

Growth Reservation Associated with CLIN 0036. See attachment J-4.

OPTION Growth Reservation for CLIN 0037

Growth Reservation Associated with CLIN 0037. See attachment J-4.

OPTION Growth Reservation for CLIN 0038

Growth Reservation Associated with CLIN 0038. See attachment J-4.

OPTION Growth Reservation for CLIN 0039

Growth Reservation Associated with CLIN 0039. See attachment J-4.

OPTION Growth Reservation for CLIN 0040

Growth Reservation Associated with CLIN 0040. See attachment J-4.

OPTION Growth Reservation for CLIN 0041

Growth Reservation Associated with CLIN 0041. See attachment J-4.

OPTION Growth Reservation for CLIN 0042

Growth Reservation Associated with CLIN 0042. See attachment J-4.

OPTION Growth Reservation for CLIN 0043

Growth Reservation Associated with CLIN 0043. See attachment J-4.

OPTION Growth Reservation for CLIN 0044

Growth Reservation Associated with CLIN 0044. See attachment J-4.

OPTION Growth Reservation for CLIN 0045

Growth Reservation Associated with CLIN 0045. See attachment J-4.

OPTION Growth Reservation for CLIN 0046

Growth Reservation Associated with CLIN 0046. See attachment J-4.

OPTION Growth Reservation for CLIN 0047

Growth Reservation Associated with CLIN 0047. See attachment J-4.

OPTION Growth Reservation for CLIN 0048

Growth Reservation Associated with CLIN 0048. See attachment J-4.

OPTION Growth Reservation for CLIN 0049

Growth Reservation Associated with CLIN 0049. See attachment J-4.

OPTION Growth Reservation for CLIN 0050

Growth Reservation Associated with CLIN 0050. See attachment J-4.

OPTION Growth Reservation for CLIN 0051

Growth Reservation Associated with CLIN 0051. See attachment J-4.

OPTION Growth Reservation for CLIN 0052

Growth Reservation Associated with CLIN 0052. See attachment J-4.

OPTION Growth Reservation for CLIN 0053

Growth Reservation Associated with CLIN 0053. See attachment J-4.

OPTION Growth Reservation for CLIN 0054

Growth Reservation Associated with CLIN 0054. See attachment J-4.

OPTION Growth Reservation for CLIN 0055

Growth Reservation Associated with CLIN 0055. See attachment J-4.

OPTION Growth Reservation for CLIN 0056

Growth Reservation Associated with CLIN 0056. See attachment J-4.

OPTION Growth Reservation for CLIN 0057

Growth Reservation Associated with CLIN 0057. See attachment J-4.

OPTION Growth Reservation for CLIN 0058

Growth Reservation Associated with CLIN 0058. See attachment J-4.

OPTION Growth Reservation for CLIN 0059

Growth Reservation Associated with CLIN 0059. See attachment J-4.

OPTION Growth Reservation for CLIN 0060

Growth Reservation Associated with CLIN 0060. See attachment J-4.

OPTION Growth Reservation for CLIN 0061

Growth Reservation Associated with CLIN 0061. See attachment J-4.

OPTION Growth Reservation for CLIN 0062

Growth Reservation Associated with CLIN 0062. See attachment J-4.

OPTION Growth Reservation for CLIN 0063

Growth Reservation Associated with CLIN 0063. See attachment J-4.

OPTION Growth Reservation for CLIN 0064

Growth Reservation Associated with CLIN 0064. See attachment J-4.

NOTE A: LEVEL OF EFFORT TO COMPLETION –SHIP REPAIR

1. The Contractor agrees to provide the level of effort to completion (LOE to Completion) in the performance of growth CLINs in the execution of the USS BATAAN DSRA:

a. 328,840 direct labor hours (labor hours) and $10,811,637 ($TBD fully burdened) materials to complete expected, within scope growth work on the USS BATAAN DSRA work package under

CLINS 0065 – 00139.

2. The total LOE to Completion for the performance of the above growth CLINs shall be comprised of labor hours and the associated material required to support the expected, within scope growth. The mix of labor hours and material may be adjusted. Adjustments to the labor hour and material mix will be documented via weekly

Technical Direction Letter (TDL) and subsequently unilaterally adjusted via contract modification. The

Government reserves the right to reconcile the weekly TDLs via unilateral modification at the Administrative

Contracting Officer’s (ACO) discretion.

3. LOE to Completion obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as local travel to and from an employee's usual work location, uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee's residence or other non-work locations.

4. LOE to Completion labor hours and material are within the scope and pricing of this contract and are not subject to an equitable adjustment under FAR 52.243-1 ‘Changes – Fixed Price’. The utilization of LOE to

Completion is at the discretion of the Contracting Officer and subject to the schedule phasing identified in Note

F.

5. If, in the opinion of the Contractor, any effort directed in the Growth Management Request Form (GMR) calls for effort outside the scope of the contract, the Contractor shall notify the Administrative Contracting Officer

(ACO) in writing within two (2) working days after the receipt of any such direction. In the event of a cost dispute, the ACO may unilaterally authorize hours and material against LOE work. The Contractor shall not proceed with the work directed by the GMR unless and until the Contractor is notified by the ACO to proceed with the directed work. The Contractor is required to proceed with the directed work as directed by the ACO.

Thereafter, any remaining disagreement shall be addressed in accordance with FAR 52.233-1(Alt. 1) ‘Disputes.’

Additionally, if the cost of performing the disputed direction exceeds $100,000, the Contractor is required to comply with FAR 52.243-6 ‘Change Order Accounting.’

6. The labor hours and material requirements listed in Section B, Note A, paragraph 1 above are part of this contract. Prime contrac

This is the start of the file's text. The full file is on GovTribe.