N00024-23-R-4418_RFP.pdf
PDF 2 MB Posted
- Solicitation number
- N0002423R4418
About this file
This is a Request for Proposal (RFP) from the Department of the Navy Naval Sea Systems Command for repair and alteration services onboard the USS BATAAN (LHD 5) during its Fiscal Year 2024 Docking Selected Restricted Availability (DSRA). The RFP includes 75 base CLINs and 139 optional CLINs for work items, ship alterations, and other services with values to be determined. Offerors are required to prepare for and accomplish repairs in accordance with standard items, work specifications, drawings, test procedures and other documentation provided in attachments. The RFP establishes a level of effort of 328,840 labor hours and $10,811,637 of materials to complete expected growth work. Pricing is to be provided on a firm-fixed-price basis and the contract will utilize both required and optional CLINs with performance from October 2023 through September 2024.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A
X B
X C X D
EX
X
G
F 204 - 217
218 - 245
X H 246 - 257 jonathan.p.pagnucco.mil@us.navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
DO-A3 1 257
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00024 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
JON P PAGNUCCO 202-781-1024
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 111
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
112 - 148
149 - 150
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
151 - 156
157 - 166 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 167 - 175 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 176 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
177 - 202
PART II - CO NTRACT CLAUSES
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
N0002423R4418C
5. DATE ISSUED
09 Aug 2023
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0002423R4418
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
1 Lot
CDRLs
FFP
Contracts Data Requirements Lists (CDRLs) - Not Separately Priced (NSP)
FOB: Destination
PURCHASE REQUEST NUMBER: N0002423R4418C
NET AMT
TYCOM BASE Work Items
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BATAAN (LHD 5) DURING FY24 DOCKING SELECTED
RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the
Docking Selected Restricted Availability (DSRA) onboard USS BATAAN (LHD
5) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B and D - F
PMS 407 Base Work Items (OMN)
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BATAAN (LHD 5) DURING FY24 DOCKING SELECTED
5) as specified in the statement of work provided herein and in accordance with
PMS 407 Base Work Items (OPN)
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BATAAN (LHD 5) DURING FY24 DOCKING SELECTED
5) as specified in the statement of work provided herein and in accordance with
PMS 407 JSF Base Work Items (OMN)
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BATAAN (LHD 5) DURING FY24 DOCKING SELECTED
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-98552K, Ship Self Defense
FFP
ShipAlt LHD1-98552K, Ship Self Defense System (SSDS) MK 2 LHD Upgrade
Advanced Combat Direction System (ACDS) Block 0 TO MK 2 Mod 3E;
accomplish (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BATAAN (LHD 5) DURING FY24 DOCKING SELECTED
5) as specified in the statement of work provided herein and in accordance with
See Notes A - F
Prorated Work Items
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BATAAN (LHD 5) DURING FY24 DOCKING SELECTED
5) as specified in the statement of work provided herein and in accordance with
Number 2 Boiler 5-Year Strength
Number 2 Boiler 5-Year Strength and Integrity Inspection (TYCOM)
5) as specified in the statement of work provided herein and in accordance with
AER LHD Class 96572D
FFP
AER LHD Class 96572D, Number 2 Main Boiler Rear Refractory/Casing;
accomplish
5) as specified in the statement of work provided herein and in accordance with
ShipAlt LHD1-85154K
ShipAlt LHD1-85154K, Integrated Ship Controls Installation; accomplish
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-80156K, AN/SLQ-32(V)6
FFP
ShipAlt LHD1-80156K, AN/SLQ-32(V)6 Hardware Upgrade; accomplish
(OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-96356D
FFP
ShipAlt LHD1-96356D, Aircraft Elevator (ACE) Folding Gear Removal;
accomplish (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION Underwater Hull Preservation
Underwater Hull Preservation of Test Patches; accomplish (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION Nonskid Deck Covering Replacement
Nonskid Deck Covering Replacement; accomplish (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION Troop Berthing Habitability Project
FFP
Troop Berthing Habitability Project (BTRP-S1133) Installation; accomplish
5) as specified in the statement of work provided herein and in accordance with
FFP
Troop Berthing Habitability Project (BTRP-S9944) Installation; accomplish
5) as specified in the statement of work provided herein and in accordance with
FFP
Troop Berthing Habitability Project (BTRP-S9717) Installation; accomplish
5) as specified in the statement of work provided herein and in accordance with
OPTION Troop Sanitary Space Habitability
FFP
Troop Sanitary Space Habitability Project (HTRP-S1134) Installation; accomplish
5) as specified in the statement of work provided herein and in accordance with
FFP
Troop Sanitary Space Habitability Project (HTRP-S9718) Installation; accomplish
5) as specified in the statement of work provided herein and in accordance with
FFP
Troop Sanitary Space Habitability Project (HTRP-S9945) Installation; accomplish
5) as specified in the statement of work provided herein and in accordance with
ShipAlt LHD1-82483K
ShipAlt LHD1-82483K, Capstone Space Arrangement; accomplish
5) as specified in the statement of work provided herein and in accordance with
ShipAlt LHD1-92217K
FFP
ShipAlt LHD1-92217K, Navy Amphibious Baseline (NAB) LHD/LHA Armory
Modernization; accomplish
5) as specified in the statement of work provided herein and in accordance with
OPTION Temporary Galley and Messing Facility
Temporary Galley and Messing Facility; provide (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION Temporary Duty Section Berthing Off-Ship
Temporary Duty Section Berthing Off-Ship; provide (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION OrdAlt LHD1-94282
FFP
OrdAlt LHD1-94282, RAM MK 31 Mod 5 GMLS Upgrade, Alteration Installation
Team (AIT) Support Service; provide (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION OrdAlt 86395, NCDS Switchboard, Alt
FFP
OrdAlt 86395, NCDS Switchboard, Alteration Installation Team (AIT) Support
Service; provide (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-88635K
FFP
ShipAlt LHD1-88635K, CIWS Block 1B Overhaul, Alteration Installation Team
(AIT) Support Service; provide (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-94903K
FFP
ShipAlt LHD1-94903K, NSSMS Mk 57 Mod 16 Min-Mod Upgrade, Alteration
Installation Team (AIT) Support Service; provide (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-95520K, 95532K, and 97194K
FFP
ShipAlt LHD1-95520K, 95532K, and 97194K, ECASS RF-A/RF-B and EPATS, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-86033K, MOS Mod Alteration
FFP
ShipAlt LHD1-86033K, MOS Mod Alteration, Alteration Installation Team (AIT)
Support Service; provide (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-90149K, ADNS AN/USQ-144L(V)
FFP
ShipAlt LHD1-90149K, ADNS AN/USQ-144L(V)2, Alteration Installation Team
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-92525K, EMF-TDMA
FFP
ShipAlt LHD1-92525K, EMF-TDMA Modem Support, Alteration Installation
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-93526K, GPNTS(V)8 Alt
FFP
ShipAlt LHD1-93526K, GPNTS(V)8 Alteration, Alteration Installation Team
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-95946K
FFP
ShipAlt LHD1-95946K, C2P Tech Refresh Alteration, Alteration Installation Team
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-96034K, BFTN AN/USQ-195A(V)
FFP
ShipAlt LHD1-96034K, BFTN AN/USQ-195A(V)1 Upgrade, Alteration
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-97990K, (RTSO) (OFM) (AIT)
FFP
ShipAlt LHD1-97990K, Real Time Spectrum Operations (RTSO) Own Force
Monitoring (OFM), Alteration Installation Team (AIT) Support Service; provide
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-93584K
FFP
ShipAlt LHD1-93584K, AIS V1 Cyber Hardening, Alteration Installation Team
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-93780K, AN/SPN-50 HW
FFP
ShipAlt LHD1-93780K, AN/SPN-50 HW, Alteration Installation Team (AIT)
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-93785K, Upgrade to SYY-1 HW
FFP
ShipAlt LHD1-93785K, Upgrade to SYY-1 HW, Alteration Installation Team
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-85027K, CEC AN/USG-2B
FFP
ShipAlt LHD1-85027K, CEC AN/USG-2B Installation, Alteration Installation
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-96483K, CAC2S
FFP
ShipAlt LHD1-96483K, CAC2S Afloat Flight 0+ Hardware, Alteration Installation
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD7-78358K, 78381K, 78389K
FFP
ShipAlt LHD7-78358K, 78381K, 78389K, 81053K and OrdAlt 91838, AN/SPN-
41B Upgrade, Alteration Installation Team (AIT) Support Service; provide
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-85077K, AN/SPQ-9
FFP
ShipAlt LHD1-85077K, AN/SPQ-9 Production Tech Refresh, Alteration
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-95864K, AN/USQ-T52A(V)4
FFP
ShipAlt LHD1-95864K, AN/USQ-T52A(V)4 Training, Alteration Installation
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-95989K, TSSS SPS-67
FFP
ShipAlt LHD1-95989K, TSSS SPS-67 Simulation, Alteration Installation Team
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-95037K
FFP
ShipAlt LHD1-95037K, NAVAIR Fleet System Array, Alteration Installation
5) as specified in the statement of work provided herein and in accordance with
OPTION LHD1-85294K, F-35 (ALIS)
FFP
LHD1-85294K, F-35 Autonomic Logistics Information System (ALIS), Alteration
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-95267K and 03144K
FFP
ShipAlt LHD1-95267K and 03144K, Moriah Aviation Land/Launch Enclave
(AAS) and Moriah Wind System (MWS) Installation, Alteration Installation Team
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-86395K
FFP
ShipAlt LHD1-86395K, Switchboard to Support Navigation Critical Distribution
System Alteration, Alteration Installation Team (AIT) Support Service; provide
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-87785K, AS-4775
FFP
ShipAlt LHD1-87785K, AS-4775 Link 16 Antenna, Alteration Installation Team
5) as specified in the statement of work provided herein and in accordance with
ShipAlt LHD1-78069K, TMP 93545, SSLS/JPA
FFP
ShipAlt LHD1-78069K, TMP 93545, SSLS/JPALS Install Alteration, Alteration
Installation Team (AIT) Support Service; provide
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-77259K
FFP
ShipAlt LHD1-77259K, Digital Hybrid Speed Log (DHYSL) Indicator-
Transmitter Set AN/WSN-9(V)1, Alteration Installation Team (AIT) Support
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-98552K, SSDS MK 2 Upgrade
FFP
ShipAlt LHD1-98552K, SSDS MK 2 Upgrade, Alteration Installation Team (AIT)
5) as specified in the statement of work provided herein and in accordance with
OPTION ShipAlt LHD1-93868K, I-Stalker HW, (AIT)
FFP
ShipAlt LHD1-93868K, I-Stalker HW, Alteration Installation Team (AIT) Support
5) as specified in the statement of work provided herein and in accordance with
ShipAlt LHD1-83325K, OPA
FFP
ShipAlt LHD1-83325K, OPA System Improvement for LHD Class Ship, Alteration Installation Team (AIT) Support Service; provide
5) as specified in the statement of work provided herein and in accordance with
OPTION Messing and Berthing Barge Tow Service
Messing and Berthing Barge Tow Service; provide (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION Ship Towing Service; provide
Ship Towing Service; provide (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION Messing and Berthing Barge Electric Temp
FFP
Messing and Berthing Barge Electric Temporary Service in Contractor Plant;
provide (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION Messing and Berthing Barge Steam Temp
FFP
Messing and Berthing Barge Steam Temporary Service in Contractor Plant;
provide (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION Messing and Berthing Barge, Temp Service
FFP
Messing and Berthing Barge, Temporary Service, Inspection and Repair in
Contractor Plant, Steam Barge; accomplish (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION Messing and Berthing Barge, Temp Service
FFP
Messing and Berthing Barge, Temporary Service, Inspection and Repair in
Contractor Plant, Electric Barge; accomplish (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION Messing and Berthing Barge Tow Service
Messing and Berthing Barge Tow Service (Local); provide (OPTION ITEM)
5) as specified in the statement of work provided herein and in accordance with
OPTION Growth Reservation for CLIN 0004
Growth Reservation Associated with CLIN 0004. See attachment J-4.
Growth Reservation for CLIN 0004
Growth Reservation for CLIN 0005
Growth Reservation Associated with CLIN 0005. See attachment J-4.
Growth Reservation for CLIN 0006
Growth Reservation Associated with CLIN 0006. See attachment J-4.
OPTION Growth Reservation for CLIN 0006
Growth Reservation for CLIN 0006
OPTION Growth Reservation for CLIN 0007
Growth Reservation Associated with CLIN 0007. See attachment J-4.
Growth Reservation for CLIN 0007
Growth Reservation for CLIN 0007
OPTION Growth Reservation for CLIN 0008
Growth Reservation Associated with CLIN 0008. See attachment J-4.
Growth Reservation for CLIN 0009
Growth Reservation Associated with CLIN 0009. See attachment J-4.
OPTION Growth Reservation for CLIN 0009
Growth Reservation Associated with CLIN 0009. See attachment J-4.
OPTION Growth Reservation for CLIN 0010
Growth Reservation Associated with CLIN 0010. See attachment J-4.
OPTION Growth Reservation for CLIN 0011
Growth Reservation Associated with CLIN 0011. See attachment J-4.
OPTION Growth Reservation for CLIN 0012
Growth Reservation Associated with CLIN 0012. See attachment J-4.
OPTION Growth Reservation for CLIN 0013
Growth Reservation Associated with CLIN 0013. See attachment J-4.
OPTION Growth Reservation for CLIN 0014
Growth Reservation Associated with CLIN 0014. See attachment J-4.
OPTION Growth Reservation for CLIN 0015
Growth Reservation Associated with CLIN 0015. See attachment J-4.
OPTION Growth Reservation for CLIN 0016
Growth Reservation Associated with CLIN 0016. See attachment J-4.
OPTION Growth Reservation for CLIN 0017
Growth Reservation Associated with CLIN 0017. See attachment J-4.
OPTION Growth Reservation for CLIN 0018
Growth Reservation Associated with CLIN 0018. See attachment J-4.
OPTION Growth Reservation for CLIN 0019
Growth Reservation Associated with CLIN 0019. See attachment J-4.
OPTION Growth Reservation for CLIN 0020
Growth Reservation Associated with CLIN 0020. See attachment J-4.
OPTION Growth Reservation for CLIN 0021
Growth Reservation Associated with CLIN 0021. See attachment J-4.
OPTION Growth Reservation for CLIN 0022
Growth Reservation Associated with CLIN 0022. See attachment J-4.
OPTION Growth Reservation for CLIN 0023
Growth Reservation Associated with CLIN 0023. See attachment J-4.
OPTION Growth Reservation for CLIN 0023
Growth Reservation Associated with CLIN 0023. See attachment J-4.
OPTION Growth Reservation for CLIN 0024
Growth Reservation Associated with CLIN 0024. See attachment J-4.
OPTION Growth Reservation for CLIN 0025
Growth Reservation Associated with CLIN 0025. See attachment J-4.
OPTION Growth Reservation for CLIN 0026
Growth Reservation Associated with CLIN 0026. See attachment J-4.
OPTION Growth Reservation for CLIN 0027
Growth Reservation Associated with CLIN 0027. See attachment J-4.
OPTION Growth Reservation for CLIN 0028
Growth Reservation Associated with CLIN 0028. See attachment J-4.
OPTION Growth Reservation for CLIN 0029
Growth Reservation Associated with CLIN 0029. See attachment J-4.
OPTION Growth Reservation for CLIN 0030
Growth Reservation Associated with CLIN 0030. See attachment J-4.
OPTION Growth Reservation for CLIN 0031
Growth Reservation Associated with CLIN 0031. See attachment J-4.
OPTION Growth Reservation for CLIN 0032
Growth Reservation Associated with CLIN 0032. See attachment J-4.
OPTION Growth Reservation for CLIN 0033
Growth Reservation Associated with CLIN 0033. See attachment J-4.
OPTION Growth Reservation for CLIN 0034
Growth Reservation Associated with CLIN 0034. See attachment J-4.
OPTION Growth Reservation for CLIN 0035
Growth Reservation Associated with CLIN 0035. See attachment J-4.
OPTION Growth Reservation for CLIN 0036
Growth Reservation Associated with CLIN 0036. See attachment J-4.
OPTION Growth Reservation for CLIN 0037
Growth Reservation Associated with CLIN 0037. See attachment J-4.
OPTION Growth Reservation for CLIN 0038
Growth Reservation Associated with CLIN 0038. See attachment J-4.
OPTION Growth Reservation for CLIN 0039
Growth Reservation Associated with CLIN 0039. See attachment J-4.
OPTION Growth Reservation for CLIN 0040
Growth Reservation Associated with CLIN 0040. See attachment J-4.
OPTION Growth Reservation for CLIN 0041
Growth Reservation Associated with CLIN 0041. See attachment J-4.
OPTION Growth Reservation for CLIN 0042
Growth Reservation Associated with CLIN 0042. See attachment J-4.
OPTION Growth Reservation for CLIN 0043
Growth Reservation Associated with CLIN 0043. See attachment J-4.
OPTION Growth Reservation for CLIN 0044
Growth Reservation Associated with CLIN 0044. See attachment J-4.
OPTION Growth Reservation for CLIN 0045
Growth Reservation Associated with CLIN 0045. See attachment J-4.
OPTION Growth Reservation for CLIN 0046
Growth Reservation Associated with CLIN 0046. See attachment J-4.
OPTION Growth Reservation for CLIN 0047
Growth Reservation Associated with CLIN 0047. See attachment J-4.
OPTION Growth Reservation for CLIN 0048
Growth Reservation Associated with CLIN 0048. See attachment J-4.
OPTION Growth Reservation for CLIN 0049
Growth Reservation Associated with CLIN 0049. See attachment J-4.
OPTION Growth Reservation for CLIN 0050
Growth Reservation Associated with CLIN 0050. See attachment J-4.
OPTION Growth Reservation for CLIN 0051
Growth Reservation Associated with CLIN 0051. See attachment J-4.
OPTION Growth Reservation for CLIN 0052
Growth Reservation Associated with CLIN 0052. See attachment J-4.
OPTION Growth Reservation for CLIN 0053
Growth Reservation Associated with CLIN 0053. See attachment J-4.
OPTION Growth Reservation for CLIN 0054
Growth Reservation Associated with CLIN 0054. See attachment J-4.
OPTION Growth Reservation for CLIN 0055
Growth Reservation Associated with CLIN 0055. See attachment J-4.
OPTION Growth Reservation for CLIN 0056
Growth Reservation Associated with CLIN 0056. See attachment J-4.
OPTION Growth Reservation for CLIN 0057
Growth Reservation Associated with CLIN 0057. See attachment J-4.
OPTION Growth Reservation for CLIN 0058
Growth Reservation Associated with CLIN 0058. See attachment J-4.
OPTION Growth Reservation for CLIN 0059
Growth Reservation Associated with CLIN 0059. See attachment J-4.
OPTION Growth Reservation for CLIN 0060
Growth Reservation Associated with CLIN 0060. See attachment J-4.
OPTION Growth Reservation for CLIN 0061
Growth Reservation Associated with CLIN 0061. See attachment J-4.
OPTION Growth Reservation for CLIN 0062
Growth Reservation Associated with CLIN 0062. See attachment J-4.
OPTION Growth Reservation for CLIN 0063
Growth Reservation Associated with CLIN 0063. See attachment J-4.
OPTION Growth Reservation for CLIN 0064
Growth Reservation Associated with CLIN 0064. See attachment J-4.
NOTE A: LEVEL OF EFFORT TO COMPLETION –SHIP REPAIR
1. The Contractor agrees to provide the level of effort to completion (LOE to Completion) in the performance of growth CLINs in the execution of the USS BATAAN DSRA:
a. 328,840 direct labor hours (labor hours) and $10,811,637 ($TBD fully burdened) materials to complete expected, within scope growth work on the USS BATAAN DSRA work package under
CLINS 0065 – 00139.
2. The total LOE to Completion for the performance of the above growth CLINs shall be comprised of labor hours and the associated material required to support the expected, within scope growth. The mix of labor hours and material may be adjusted. Adjustments to the labor hour and material mix will be documented via weekly
Technical Direction Letter (TDL) and subsequently unilaterally adjusted via contract modification. The
Government reserves the right to reconcile the weekly TDLs via unilateral modification at the Administrative
Contracting Officer’s (ACO) discretion.
3. LOE to Completion obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as local travel to and from an employee's usual work location, uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee's residence or other non-work locations.
4. LOE to Completion labor hours and material are within the scope and pricing of this contract and are not subject to an equitable adjustment under FAR 52.243-1 ‘Changes – Fixed Price’. The utilization of LOE to
Completion is at the discretion of the Contracting Officer and subject to the schedule phasing identified in Note
F.
5. If, in the opinion of the Contractor, any effort directed in the Growth Management Request Form (GMR) calls for effort outside the scope of the contract, the Contractor shall notify the Administrative Contracting Officer
(ACO) in writing within two (2) working days after the receipt of any such direction. In the event of a cost dispute, the ACO may unilaterally authorize hours and material against LOE work. The Contractor shall not proceed with the work directed by the GMR unless and until the Contractor is notified by the ACO to proceed with the directed work. The Contractor is required to proceed with the directed work as directed by the ACO.
Thereafter, any remaining disagreement shall be addressed in accordance with FAR 52.233-1(Alt. 1) ‘Disputes.’
Additionally, if the cost of performing the disputed direction exceeds $100,000, the Contractor is required to comply with FAR 52.243-6 ‘Change Order Accounting.’
6. The labor hours and material requirements listed in Section B, Note A, paragraph 1 above are part of this contract. Prime contrac
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .