PPTA_RFP_Industry_Questions_22_Nov_2017.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- S-92A Pilot Proficiency Training Aircraft
- Solicitation number
- N00019-17-R-0108
About this file
S-92A Pilot Proficiency Training Aircraft (PPTA) RFP Industry Questions 22 Nov 2017
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0001917R01080001_27_Nov_2017.docx | DOCX document | |
| PPTA_RFP_Industry_Questions_27_Nov_2017.xlsx | XLSX spreadsheet | |
| Att_1_PPTA_SOW_24_Oct_2017.docx | DOCX document | |
| Att_2_PPTA_PHSF_SOP_1_Rev_12_FOD_Prevention_and_TCP.pdf | ||
| Att_4_PPTA_PHSF_SOP_5_Rev_6_Hangar_Safety.pdf | ||
| Att_5_PPTA_PHSF_SOP_9_Rev_2_Severe_Weather.pdf | ||
| Redacted_PPTA_J_and_A.pdf | ||
| Exhibit_A_PPTA_CDRL_A001.pdf | ||
| N00019-17-R-0108_PPTA_RFP.docx | DOCX document | |
| Att_6_PPTA_PHSF_SOP_10_Rev_1_Access_Hangar_Flightline_Aircraft.pdf | ||
| Att_3_PPTA_PHSF_SOP_2_Rev_7_HazMat.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Set 2
| Question # | Date Question Submitted | Reference | Question | Answer | Date Question Answered/Posted |
| 25 | 11/8/17 | Section L | The Solicitation contains specific format requirements for an Offeror's proposal. Will the submission of an Offeror's existing Comprehensive Small Business Plan, despite not conforming to the format requirements, be acceptable? | ||
| The Offeror's Comprehensive Small Business Plan may be submitted in the format as approved. | 11/22/17 | ||||
| 26 | 11/16/17 | Will the Government (PCO) be available on Wednesday 22 November or Friday 24 November to receive submissions for the subject solicitation should Offerors want to submit early? | Government is available to receive proposals on Nov 22 and 24. | 11/22/17 | |
| 27 | 11/17/17 | Section 2.0 PROPOSAL FORMAT, 2.1.7 File Naming Conventions. “Each volume, book, or annex should be provided separately in a 3-ring binder. The binders should be of an appropriate thickness for the number of pages it contains (e.g., a 30-page book shall not be placed in a 2-inch binder.) “ | With binder size in mind, since the suggested page count for EXECUTIVE SUMMARY and TECHNICAL total 18 pages and the same number of copies is required for each, can Volumes 1 and 2 be combined into a single binder? Likewise, since Annex #1 SB Subcontracting Plan comprises relatively few pages and logically is part of the Volume 4 documentation, can Annex #1 and Vol 4 be combined? | Volumes 1 and 2 can be combined into one binder, with separate tabs. Volume 4 and Annex #1 can be combined into one binder, with separate tabs. | 11/22/17 |
| 28 | 11/17/17 | Section 2.0 PROPOSAL FORMAT, 2.1.7 File Naming Conventions. Table G-2 Offeror Electronic File Naming Convention | With regard to file naming conventions, Table ES-1 Offeror Summary and the Technical Cross Reference Matrix are provided in a Word format; however, under File Naming Convention, they are shown as Excel files. Will the Government provide these files in Excel or revise the requirement to allow Word files? | ES-1 and Example of Cross Reference Matrix in the solicitation are tables for illustrative purposes that shows the format for the Offeror Summary and Example of Cross Reference Matrix. The requirement is for the Offeror to provide the Offeror Summary and the Cross Reference Matrix in separate Excel files. There is no need to replicate the Offeror Summary or the Cross Reference Matrix in Word format. | 11/22/17 |
| 29 | 11/17/17 | PART B SPECIFIC INSTRUCTIONS, 2.0 VOLUME 2: TECHNICAL, 2.1.2 – “The Offeror shall provide a copy of aircraft insurance policy which shall include third-party liability for the period of performance as described in SOW paragraph 2.18.” | Do we need to submit the entire insurance policy or will the Certificate of Insurance suffice? | The Offeror shall provide the aircraft insurance policy that includes third party liability for the period of performance IAW Section L, para. 2.1.2. | 11/22/17 |
| 30 | 11/17/17 | Att_2_PPTA_PHSF_SOP_1_Rev_12_FOD_Prevention_and_TCP.” This document refers to the Maintenance Action Form (MAF) or Optimized Organizational Maintenance Activity (OOMA) work order. | Will the contractor be expected to utilize the NAVAIR maintenance system, or will the contractor maintain their own maintenance software system? | The Offeror will utilize their own maintenance software system. | 11/22/17 |
| 31 | 11/17/17 | REFERENCE: SF 1449, Block 8. Offer Due Date/Local Time. | Can the Government extend the offer due date? | Yes, the Offer Due Date is extended to 02:00 PM 01 Dec 2017. An amendment is forthcoming. | 11/22/17 |
S-92A Pilot Proficiency Training Aircraft 22 Nov 2017