Copy of Cross reference Matrix 09 Mar 2010.xls
XLS spreadsheet 28 KB Posted
- Attached to
- E-6 Brakes Modification Federal contract opportunity
- Solicitation number
- N00019-09-R-0296
About this file
Cross Reference Matrix E-6 Brakes Modification
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Section L Para | Proposal Instructions Paragraph Title | Section M - Evaluation Factors | SOW Paragraph | CLIN |
| 2.0 | Volume 2 Technical | N/A | N/A | |
| 2.1 | Book 1 - Design Approach | N/A | N/A | |
| 2.1.1 | Sytems Integration | 3.13, 3.13.1 | N/A | |
| 2.1.1.1 | Mission Systems and Component Architecture | 2A1 | 3.2, 3.2.1, 3.3, 3.6, 3.8.6.2, | |
| 2.1.1.2 | BTMS | 2A1 | 3.10, 3.10.1 | |
| 2.1.2 | Subsystem Design | 2A1 | 3.2 | N/A |
| 2.1.2.1 | Hydraulic Braking System | 2A1 | 3.2, 3.2.2.1, 3.6 | |
| 2.1.2.2 | Airframe | 2A1 | 3.2, 3.2.2.1, 3.6 | |
| 2.1.2.3 | Radial Tires | 2A1 | 3.2, 3.6, 3.11, 3.16 | |
| 2.1.2.4 | Maintenance Requirements | 2A1 | 3.4, 3.8.2, 3.8.3 | |
| 2.1.2.5 | Pneumatic (Emergency) Braking System | 2A1 | 3.2, 3.6 | |
| 2.1.2.6 | Trainers | 2A1 | 3.0, 3.2, 3.6, 3.16 | |
| 2.1.3 | Logistics | 2A1 | 3.2.2.1, 3.4, 3.8, 3.8.3.1, 3.8.3.1.1, 3.8.3.1.3, 3.8.3.1.4, 3.8.4, 3.8.4.(2-5,7-9), 3.8.6.1 | N/A |
| 2.1.3.1 | Overall Approach | 2A1 | 3.8, 3.8.1, 3.8.2, 3.8.3 | |
| 2.1.3.2 | Supportability | 2A1 | 3.8.2, 3.8.3, 3.8.3.1.2, 3.8.4, 3.8.4.1, 3.8.5.1, 3.8.5.1.(1-3), 3.8.5.2, 3.8.5.4, | |
| 2.1.3.3 | Reliability | 2A1 | 3.8.2, 3.8.4.6 | |
| 2.1.3.4 | Maintainability | 2A1 | 3.8.3.2.1-9, 3.8.3.3 | |
| 2.1.3.5 | Design Interfaces | 2A1 | 3.8.2 | |
| 2.1.3.6 | Training | 2A1 | 3.1, 3.11 | |
| 2.1.3.7 | RCM | 2A1 | 3.4, 3.8.3.1.5, 3.8.3.2 | |
| 2.1.4 | Aircraft Integration | 2A1 | 3.2, 3.2.2.1, 3.6, 3.7, 3.11 | |
| 2.1.5 | Test Plans | 2A1 | 3.2.2.1 | |
| 2.1.6 | Risk Areas | 2A1 | 3.5.5 | N/A |
| 2.1.6.1 | Heat Shield Cracking | 2A1 | 3.5.5.1 | |
| 2.1.6.2 | Rubber Bumpers Cracking/Dissolving | 2A1 | 3.5.5.1 | |
| 2.1.6.3 | Rubber Seating Area Cracking | 2A1 | 3.5.5.1 | |
| 2.1.6.4 | Frozen Brakes | 2A1 | 3.5.5.1 | |
| 2.1.6.5 | Wheel Drive Key Spacer Grinding | 2A1 | 3.5.5.1 | |
| 2.1.6.6 | Other | 2A1 | 3.5.5.1 | |
| 2.1.7 | Quality Assurance Plan | 2A1 | 3.8.7, 3.8.7.1 | |
| 2.1.8 | Configuration Management | 2A1 | 3.8.8, 3.8.8.1-6, 3.8.8.6.1-2 | |
| 2.1.9 | Weight Management | 2A1 | 3.2.2.1, 3.8.8.7 | |
| 2.1.10 | Publications Handling | 2A1 | 3.2, 3.8.5.3, 3.8.6, 3.9, 3.13.1 | |
| 2.2 | Book 2 - Program Schedule Capability | N/A | N/A | |
| 2.2.1 | Program Execution Approach | 2A2 | 3.5, 3.5.1, 3.5.2, 3.5.3, 3.14, 3.15, 3.18-20 | |
| 2.2.2 | Schedule | 2A2 | 3.1, 3.5.4, 3.2.2.1.1-2, 3.5.6, 3.7, 3.16, 3.17 | |
| 2.2.3 | Risk Assessment and Mitigation | 2A2 | 3.2.2.1, 3.5.5, 3.5.5.1 3.5.6 | |
| 2.2.4 | Test and Evaluation | 2A2 | 3.2.2.1, 3.2.3, 3.3, 3.11, 3.12, 3.12.1-2, 3.13.2-4 | |
| 2.2.5 | Software Engineering Capability | 2A2 | 3.8.6.2, 3.10, 3.10.1 | |
| 2.2.6 | Small Business Concern Subcontracting Strategy | 2A2 |