Copy of Cross reference Matrix 09 Mar 2010.xls

XLS spreadsheet 28 KB Posted

Attached to
E-6 Brakes Modification Federal contract opportunity
Solicitation number
N00019-09-R-0296
Issued by
Department of the Navy Naval Air Systems Command

About this file

Cross Reference Matrix E-6 Brakes Modification

View the file

Other files for this federal contract opportunity

Other files attached to E-6 Brakes Modification, newest first.
File Type Posted
Posted E-6 Brakes RFP Questions as of 27Apr2010.docx DOCX document
Posted E-6 Brakes RFP Questions as of 23Apr2010.docx DOCX document
Amendment 5 to Brakes Modification RFP N00019-09-R-0296.doc DOC document
Posted E-6 Brakes RFP Questions as of 19Apr2010.docx DOCX document
Amendment 4 to Brakes Modification RFP N00019-09-R-0296.doc DOC document
Amendment 3 to Brakes Modification RFP N00019-09-R-0296.doc DOC document
Attachment 4 PAST PERFORMANCE QUESTIONNAIRE.doc DOC document
Amendment 2 to Brakes Modification RFP N00019-09-R0296.doc DOC document
CA 1 - GFE GFP GFF GFI List.xls XLS spreadsheet
Amendment 1 to Brakes Modification RFP N00019-09-R-0296.doc DOC document
Attachment 3 CDRL address lst.doc DOC document
Brakes SOW 5 April 2010.doc DOC document
CDRL Attachment 3 Data Product Defs 5APR2010.doc DOC document
CDRLS Brakes.pdf PDF
CDRL Attachment 2 LMI data reqmts 5APR2010.doc DOC document
Final E-6B Brakes RFP 6_April 2010.doc DOC document
Brakes SPEC 5 April 2010.doc DOC document
CDRL Attachment 1 Product Draw List 5APR2010.DOC DOC document
DRAFT Section B.doc DOC document
Attachment 1 03SEP2009.doc DOC document
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Section L ParaProposal Instructions Paragraph TitleSection M - Evaluation FactorsSOW ParagraphCLIN
2.0Volume 2 TechnicalN/AN/A
2.1Book 1 - Design ApproachN/AN/A
2.1.1Sytems Integration3.13, 3.13.1N/A
2.1.1.1Mission Systems and Component Architecture2A13.2, 3.2.1, 3.3, 3.6, 3.8.6.2,
2.1.1.2BTMS2A13.10, 3.10.1
2.1.2Subsystem Design2A13.2N/A
2.1.2.1Hydraulic Braking System2A13.2, 3.2.2.1, 3.6
2.1.2.2Airframe2A13.2, 3.2.2.1, 3.6
2.1.2.3Radial Tires2A13.2, 3.6, 3.11, 3.16
2.1.2.4Maintenance Requirements2A13.4, 3.8.2, 3.8.3
2.1.2.5Pneumatic (Emergency) Braking System2A13.2, 3.6
2.1.2.6Trainers2A13.0, 3.2, 3.6, 3.16
2.1.3Logistics2A13.2.2.1, 3.4, 3.8, 3.8.3.1, 3.8.3.1.1, 3.8.3.1.3, 3.8.3.1.4, 3.8.4, 3.8.4.(2-5,7-9), 3.8.6.1N/A
2.1.3.1Overall Approach2A13.8, 3.8.1, 3.8.2, 3.8.3
2.1.3.2Supportability2A13.8.2, 3.8.3, 3.8.3.1.2, 3.8.4, 3.8.4.1, 3.8.5.1, 3.8.5.1.(1-3), 3.8.5.2, 3.8.5.4,
2.1.3.3Reliability2A13.8.2, 3.8.4.6
2.1.3.4Maintainability2A13.8.3.2.1-9, 3.8.3.3
2.1.3.5Design Interfaces2A13.8.2
2.1.3.6Training2A13.1, 3.11
2.1.3.7RCM2A13.4, 3.8.3.1.5, 3.8.3.2
2.1.4Aircraft Integration2A13.2, 3.2.2.1, 3.6, 3.7, 3.11
2.1.5Test Plans2A13.2.2.1
2.1.6Risk Areas2A13.5.5N/A
2.1.6.1Heat Shield Cracking2A13.5.5.1
2.1.6.2Rubber Bumpers Cracking/Dissolving2A13.5.5.1
2.1.6.3Rubber Seating Area Cracking2A13.5.5.1
2.1.6.4Frozen Brakes2A13.5.5.1
2.1.6.5Wheel Drive Key Spacer Grinding2A13.5.5.1
2.1.6.6Other2A13.5.5.1
2.1.7Quality Assurance Plan2A13.8.7, 3.8.7.1
2.1.8Configuration Management2A13.8.8, 3.8.8.1-6, 3.8.8.6.1-2
2.1.9Weight Management2A13.2.2.1, 3.8.8.7
2.1.10Publications Handling2A13.2, 3.8.5.3, 3.8.6, 3.9, 3.13.1
2.2Book 2 - Program Schedule CapabilityN/AN/A
2.2.1Program Execution Approach2A23.5, 3.5.1, 3.5.2, 3.5.3, 3.14, 3.15, 3.18-20
2.2.2Schedule2A23.1, 3.5.4, 3.2.2.1.1-2, 3.5.6, 3.7, 3.16, 3.17
2.2.3Risk Assessment and Mitigation2A23.2.2.1, 3.5.5, 3.5.5.1 3.5.6
2.2.4Test and Evaluation2A23.2.2.1, 3.2.3, 3.3, 3.11, 3.12, 3.12.1-2, 3.13.2-4
2.2.5Software Engineering Capability2A23.8.6.2, 3.10, 3.10.1
2.2.6Small Business Concern Subcontracting Strategy2A2

Sheet2

Sheet3

File details come from the government source that posted it. Updated .