MPA 118 Scope of Work.pdf

PDF 376 KB Posted

Attached to
MPA 118 OE Hazardous Waste and Petroleum Related Services
Solicitation number
OET27007082
Issued by
Kent County, Rhode Island

About this file

This is a Scope of Work document issued by the State of Rhode Island Department of Environmental Management for MPA 118, an open enrollment Master Price Agreement soliciting immediate response and cleanup services for emergencies resulting from spills, leaks, or discharges of hazardous wastes, petroleum products, asbestos, radiological materials, and biological/medical wastes. Vendors may bid on the entire scope of services or select individual response categories including Hazardous Material/Waste Response, Oil Response, Asbestos Response, Radiological Response, and Biological and Medical Waste Response. Successful bidders must maintain 24-hour telephone communications, deploy a representative with appropriate technical expertise to emergency sites within one hour of notification by the State On-Scene Coordinator (SOSC), and commence cleanup operations within two to three hours. The solicitation requires submission of five pricing scenarios for evaluation, with initial responses due by November 18, 2026 at 12:00 p.m., and thereafter reviewed on a quarterly basis until December 31, 2028. Vendors must submit technical proposals limited to six pages addressing staff qualifications, capability and capacity, work plans, and storage approach, with minimum storage facilities located within Rhode Island or within 100 miles of the state's borders.

Technical proposals must achieve a minimum score of 70 out of 100 points to advance to the qualified vendor list, evaluated across four criteria: Staff Qualifications (25 points), Capability, Capacity, and Qualifications of the Vendor (30 points), Work Plan (25 points), and Storage Approach (20 points). Contractors must possess appropriate licenses and permits, including Hazardous Waste Transporter Permits where applicable, maintain accurate daily resource reports, obtain all necessary federal, state, and local permits prior to performance, and comply with OSHA 29 CFR Parts 1910 and 1926 safety requirements. All invoices must be processed through the SOSC and submitted within 60 calendar days of service completion, itemized by MPA item ID and accompanied by supporting documentation including manifests, bills of lading, and disposal certificates. Contractors are responsible for all spills or releases caused by their negligence and must immediately report incidents to the SOSC with written follow-up within seven days. Salvageable products and proceeds from recovered materials become the property of the State, with potential credit application against contract costs.

View the file

Other files

File Type Posted
OET27007082_Oct_26_26_solicitation_doc.pdf PDF
MPA 118 Response Pages.pdf PDF
MPA 118 Form 0012.docx DOCX document
OET27007082_Oct_22_26_solicitation_doc.pdf PDF
MPA 118 Sample Invoice 3.pdf PDF
OET27007082_Oct_23_26_solicitation_doc.pdf PDF
MPA 118 Sample Invoice 4.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OET 21000573- AGENCY SOLICITATION SPECIFICATIONS

TITLE: MPA 118 OE HAZARDOUS WASTE AND PETROLEUM RELATED SERVICES

SECTION A. BACKGROUND

MPA 118 Open Enrollment cleanup services for emergencies resulting from spilling, leaking or discharge of hazardous waste.

SECTION B: SCOPE OF WORK AND REQUIREMENTS

The State of Rhode Island on behalf of the Department of Environmental Management is seeking bids for the provision of immediate response and cleanup services including but not limited to emergencies and general services as needed resulting from the spilling, leaking or discharge of hazardous wastes, petroleum products or other materials causing a threat to the environment or to public health or safety. A vendor may bid on the entire scope of services or an individual response category. The response categories include Hazardous Material/Waste Response, Oil Response, Asbestos Response, Radiological Response, and Biological and Medical Waste Response. Each vendor must provide all the information requested herein and complete on the attached spreadsheet outlined for each scenario/category bid responding to.

Immediate Response Services

The services sought by the Department require that the successful bidders maintain a 24-hour telephone communications system and that the successful bidders be capable of having a representative with the appropriate technical expertise to initiate corrective action at the scene of an emergency within one (1) hour of verbal notification of the emergency by state on scene coordinator (SOSC). The successful bidders must also be capable of beginning cleanup operations within two to three (2-3) hours of verbal notification by the

SOSC.

The Department reserves the right to determine the number and types of personnel, vehicles, and equipment required to respond to any emergency.

Immediate Response and General Services

The successful bidders must possess expertise in the areas of hazardous waste/materials, petroleum products, asbestos, radiological response or medical waste situations that they choose to submit proposals for and be prepared to commence containment and cleanup operations within the above time frame and to continue operations uninterrupted until notified to discontinue such operations by the SOSC. The successful bidders must be prepared to work under the direction of the SOSC and be able to accurately assess the quantity and types of wastes or materials involved in an emergency. A complete roster of available response personnel must be submitted for each response category bid as part of the submittal package. These individuals must, at a minimum, possess the minimum training requirements as prescribed by OSHA 29 CFR Part 1910 where appropriate. Along with this information, bidders must also include their standard operating procedures for safety protocols.

The successful bidders must be capable of arranging for the analysis of unknown wastes or materials, as directed by the SOSC, and be capable of classifying these materials or wastes for purposes of storage, transportation and/or disposal in accordance with all applicable rules and regulations.

The successful bidders must be prepared to immediately maintain custody of waste and materials, as well as petroleum products, until their final disposition is authorized by the Department. Storage of the wastes/materials must be at a licensed facility located within Rhode Island or within one hundred miles of the borders of Rhode Island. This facility must be permitted by either the Rhode Island

Department of Environmental Management or by the comparable state or federal agency having jurisdiction in the state which the facility is located. All bidders must include as part of their bids a list of its available storage facilities and the exact types of materials that they are licensed or permitted to store.

The successful bidders must be prepared to immediately arrange for the proper disposal of all wastes and materials involved in the containment and cleanup operations including the supplying of manifests and all other necessary documents. All waste material must be tracked from its point of generation to its ultimate disposal facility. Accurate tracking documents must be made available to the Department.

The bidders must notify the Department of the waste's ultimate disposal location and all such facilities must be properly licensed. All bidders must also agree to an inspection of their facilities and equipment by Department personnel prior to the award of the contract, if requested. All successful bidders may be required to participate in one uncompensated practice response situation conducted at a time mutually convenient to the Department and the bidder, and any training sessions conducted by the bidder independently by the bidder must be made available to Department personnel.

REQUIREMENTS:

In addition to Section C Technical Proposal, five (5) scenarios (Attachment “A”) is created for the service described. Based on a comparison of authorized prices quoted for scenarios 1 - 5, pricing analysis will be considered for ranking purposes of estimated service demand statewide for these services. It is not mandatory to part take in all categories.

DESCRIPTION/SPECIFICATION/WORK-STATEMENT

Work includes labor, materials, and equipment to contain, cleanup, and/or mitigate the harmful effects of oil and hazardous substance spills and releases in or that may impact the STATE.

1. DEFINITIONS

The term SOSC or designee as used herein means the individual responsible for authorization of services outlined in the MPA.

2. USE-OF-SERVICES/EQUIPMENT/VEHICLE/VESSEL/MATERIALS/SUPPLIES

a) State Authority

i) The Contractor shall furnish the labor, material and equipment as directed by the

SOSC or designee and shall provide adequate supervision for the same.

ii) Subsequent to the start of a job the Contractor shall provide the same personnel

(labor categories), materials and equipment at the job site as authorized by the

SOSC.

iii) No services shall be rendered without the specific authorization of the SOSC or designee.

iv) The SOSC may, in writing, require the contractor to remove from the work any employee the SOSC deems incompetent, careless, or otherwise objectionable.

b) Contractor Responsibilities

i) Consistent with directions received from the SOSC or designee, the Contractor shall expend his best efforts to contain, remove and/or mitigate the harmful effects of oil and/or hazardous substances.

ii) The Contractor shall use due diligence to perform all work.

iii) The Contractor is encouraged to draw upon his expertise to suggest to the SOSC use of personnel, material, equipment, and procedures that he believes may improve the containment, cleanup, and mitigation operations. However, the decision to use such suggestions shall rest solely with the SOSC.

iv) The Contractor is responsible for knowing the normal capabilities of his equipment.

If the SOSC or designee directs the Contractor to use Contractor equipment in a manner that will exceed its normal capabilities, the Contractor shall promptly advise the SOSC of this fact. The SOSC will then either modify such directions such that the equipment will be used within its normal capabilities or, if he persists in directing that it be used in a manner exceeding its normal capabilities, the Contractor will give the SOSC written notice that the specific equipment uses directed by the SOSC is beyond the capabilities of the equipment and stating his objections to the use directed by the SOSC. If after such a writing has been submitted to the SOSC the equipment is subsequently damaged, the Contractor may submit a request for equitable adjustment for the amount of such damages directly caused by the use which was in excess of normal capabilities of the equipment.

v) If the Contractor believes that security services at the job site are required, promptly advise the SOSC.

vi) Boats or other items to be transported by water shall be cleaned to the reasonable satisfaction of the SOSC before being transported to some other location. After termination of use of equipment, the Contractor agrees to clean equipment at the spill site sufficiently to ensure that no discharge of oil or other hazardous substance will occur during the transportation of such equipment.

3. CONTRACTOR RESPONSIBILITY FOR SPILL

The Contractor is solely responsible for all spills, leaks, or releases during the performance of work under this agreement which occur because of the negligence of its agents, employees, or subcontractors.

The Contractor agrees to clean up such spills, leaks, or releases in a manner that complies with applicable federal, state, and local laws, regulations, and procedures. Cleanup shall be at no cost to the State.

The Contractor shall report all such spills, leaks, and releases, regardless of the size or quantity, to the SOSC immediately upon their discovery. A written follow-up report shall be submitted no later than seven days after the initial report. The written report shall be in narrative form and as a minimum include the following:

i) description of the item spilled (including identity, quantity, manifest number, etc.).

ii) whether amount spilled is EPA/State reportable - if so, when it was reported and to whom.

iii) exact time and location of the spill, including a description of the area involved.

iv) containment procedures initiated.

v) summary of any communication Contractor has had with press or State officials other than the SOSC; and,

vi) description of cleanup procedures employed or to be employed at the site including disposal location of spill residue.

Any such spills considered reportable within the meaning of 33 CFR 153.203 AND 40 CFR

302.6 shall be reported (by the Contractor) to the National Response Center.

4. ANALYSIS, DISPOSAL AND/OR TREATMENT OF RECOVERED OIL AND

HAZARDOUS SUBSTANCES

a) Disposal or other disposition of the oil, oil-water mixture and hazardous substances collected during the cleanup, containment or mitigation operations shall be as directed by the SOSC in accordance with applicable State and Federal regulations.

b) When directed by the SOSC, the Contractor shall draw upon its experience and industry contacts and cooperate with state and local authorities to provide disposal options to the SOSC. The Contractor shall also provide analysis of materials in accordance with Resource Recovery and Conservation Act (RCRA) guidelines when directed by the SOSC.

c) Any proceeds from the sale of such oil, oil-water mixture or hazardous substance shall become the property of the State as set forth in Section E.

5. STATE OWNED PROPERTY

a) In the event any State property is supplied to the contractor under any order of authorization to this agreement the State will be reimbursed at the contractor’s in-kind rate for similar equipment or at a rate negotiated between the contractor at the time of the authorization.

b) At its discretion the STATE may furnish Contractors entering into this agreement with

State-owned property, including communications equipment. Contractors so furnished with equipment agree to use reasonable care to safeguard such equipment. The Contractor shall be responsible for the cost of lost or damaged equipment subject to reasonable wear and tear. The Contractor specifically agrees to use the equipment only when employed by the STATE in cleanup, containment, or mitigation operation or when otherwise authorized in advance in writing by the SOSC. In any event the Contractor shall use the equipment when so directed and promptly return such equipment on demand.

6. PACKAGING AND MARKING

The Contractor shall package, mark, label, and load all waste material in accordance with all applicable Federal, state, local, Environmental Protection Agency (EPA), and Department of Transportation (DOT) regulations. If waste material must be re-packaged for proper shipment the Contractor shall perform such re-packaging and furnish all required materials. When re-packaging is necessary, the Contractor shall be responsible for disposal of the original container and packaging in a manner that complies with all applicable Federal, state, local, EPA, and DOT regulations. The Contractor shall also provide and affix the appropriate placards to each vehicle prior to transport of waste material.

7. CONTRACT ADMINISTRATION DATA

a) INVOICE-REQUIREMENTS

The Contractor shall be paid according to the rates and prices specified.

All invoices must be processed through the SOSC for certification as to their correctness and as to requested items, quantities and hours expended.

Each invoice or on accompanying documents the contractor shall itemize, by MPA item ID#, effort incurred and related charges in date sequence.

For purposes of this agreement, an invoice must also include the following items:

• Name and address of the Contractor

• Invoice date

• Master Price Agreement number

• Description, Contract Line Item Number, quantity, unit of measure, unit price, and extended price of supplies delivered, or services performed.

• Copies of Subcontractor Invoices if any

• Bill of Lading

• Hazardous Substance/Material Manifest*

• Subcontractors Invoice if any*

• (* invoices for or containing disposal shall be included.)

• Police detail Invoices if applicable

The contractor must substantiate all invoices for DISPOSAL by:

Hazardous Substances/Materials: Submission of hazardous substance/material manifest completed by all parties as required by all applicable Federal, state, and local authority, and subcontractor invoice.

Non-hazardous Substances/Materials: Submission of subcontractor's invoice(s), which clearly identifies material and quantities, disposed of for the Project being invoiced. If the invoice does not address quantities and the Project, a certification may be submitted with the subcontractor invoice certifying the Project involved and the quantities disposed of in relation to the quantity recovered.

8. SUBMISSION OF INVOICES

i) Contractor shall forward (1) copy of the invoice to each of the addresses below (unless otherwise noted):

• SOSC for the Project

b) INVOICING PERIOD

i) All requests for payment shall be invoiced and received by the SOSC within 60 calendar days after completion of services.

SPECIAL-CONTRACT-REQUIREMENTS

c) ORDERING

d) Placement of Orders

This Master Price Agreement does not provide for or imply any agreement on the part of the State to place orders or contracts with any Vendor.

The STATE may place orders under this MPA when most advantageous to the STATE considering the location, nature, and size of the spill; the prevailing weather and availability of necessary personnel; and the material and equipment and capabilities of the contractor.

9. SUBCONTRACTS AND/OR NON-MPA ITEMS, SERVICES

Subcontracts or non-MPA services, equipment, vehicles, vessels, supplies and/or material must be approved by the SOSC.

For purposes of pricing including markups or material handling charges, all subcontracts, non-MPA services, equipment and supplies are subject to the SOSC’s negotiation and approval.

No subcontract placed under this contract shall provide for payment on a cost-plus percentage of cost basis.

The responsibilities of superintendence and supervision hereunder may not be subcontracted.

10. INCIDENT DAILY RESOURCE REPORTS

a) Daily Resource Reports shall be made available for inspection by the SOSC at reasonable times. A complete and accurate copy shall be delivered to the SOSC daily. Personnel, equipment, or material not included on an Incident Daily Resource Report approved by the SOSC shall not be included in any invoice. Incident Daily Resource Report shall contain a complete daily billing of work ordered and provided by the Prime Contractor and its subcontractor(s)

b) For purposes of this MPA, only SOSC may certify inspection and acceptance of services.

11. INSURANCE

a) Prior to award of the MPA, the contractor shall furnish to the Contracting Officer a certificate or written statement of all the above required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interests of the State in such insurance shall not be effective until thirty (30) days after written notice thereof to the Purchase Agency. The contractor agrees to insert the substance of this clause, including this paragraph, in all subcontracts hereunder.

b) If a claim arising out of the work performed under this agreement is made or suit is brought against the Contractor, the Contractor shall immediately deliver to the State a copy of every demand, notice, summons, or other process received by him or his representatives. The Contractor shall cooperate with the State and, upon the State's request, shall assist in effecting settlements, securing, and giving evidence, and obtaining the attendance of witnesses when necessary.

12. SUPERINTENDENCE BY CONTRACTOR

a) The Contractor will have a competent foreman or superintendent, approved by the SOSC, at the work site at all times during contract performance unless otherwise directed by the SOSC. The foreman or superintendent will have complete authority to act for the Contractor.

13. SAFETY REQUIREMENTS

a) The Contractor must perform all operations in a prudent, conscientious, safe, and professional manner. The Contractor's personnel and equipment shall comply with applicable state, federal, local, Government laws, safety regulations, and procedures, including 29 CFR 1910, 1926 and 30 CFR 300.150; and the Contractor shall ensure that its agents, employees, and subcontractors perform in a like manner. The Contractor shall ensure that all personnel involved in handling and packaging of waste be trained for the task, and, in the areas of chemical incompatibility, general first aid procedures, and spills.

Handling and personnel protective equipment shall be provided by the contractor and must be appropriate for handling of waste in accordance with any applicable federal or state regulations.

b) The Contractor shall provide safety controls for protection to the life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruption in the performance of this agreement; and the Contractor shall comply with any accident prevention or safety requirements included or referenced in this agreement.

c) The contractor shall maintain an accurate record of, and will report to the SOSC, in the manner and on the forms prescribed by the SOSC, exposure data and all accidents resulting in death, traumatic injury, occupational disease, and damage to property, materials, supplies, and equipment incident to work performed under this agreement.

d) The SOSC will notify the Contractor of any noncompliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately take corrective action. Such notice, when delivered to the Contractor or his representatives at the site of the work, shall be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the SOSC may exercise the State's rights under the Termination clause of the contract or issue an order stopping all or part of the work until satisfactory corrective action has been taken. If a valid stop work order is issued, no part of the time lost due to any such stop work orders shall be made, the subject of claim for extension of time or for excess costs or damages by the Contractor.

14. COMPLIANCE WITH APPLICABLE LAWS AND REGULATIONS

a) All work must be in compliance with all local, state, and federal environmental laws and regulations in effect at the time of submission of offers and at the time of actual performance. The contractor is fully responsible for compliance.

15. PERMITS

a) The Contractor shall obtain all necessary licenses and permits required by applicable

Federal, state, and local laws and regulations before commencing performance on any activity requiring licenses and or permits.

16. SITE SAFETY PLAN

a) The contractor may be required by the SOSC to provide a site safety plan under any order under this agreement which will establish policies and procedures for protecting the health and safety of employees and other persons; for the prevention of damage to property, materials, supplies and equipment related to this project. The plan shall contain information about the known or suspected hazards, routine and special safety procedures that must be followed, and other instructions for safeguarding the health of individuals on site. The Site Safety Plan shall be approved by the SOSC.

b) After approval, the plan shall be, from the start of performance through completion of the work, conspicuously posted or distributed to all personnel and discussed with them. The safety plan must be periodically reviewed and updated as necessary to keep it current; such updates shall be submitted to the SOSC for concurrence.

17. SITE CONDITION AT COMPLETION OF WORK

a) The contractor shall remove from the site all materials, equipment, and rubbish. Upon completion of work the contractor shall leave the work area in a clean and orderly condition satisfactory to the SOSC.

18. DEPARTMENT OF TRANSPORTATION REQUIREMENTS

a) The Contractor agrees that transportation shall be in accordance with Department of

Transportation Hazardous Material Regulations 49 CFR 100-199.

19. SALVAGEABLE PRODUCTS

a) Salvageable products, and the proceeds derived from them, shall become the property of the

State. If the substance recovered from cleanup and containment operations is salvageable, the State may elect to have the contractor transport such recovered substances to a State specified storage site or these payments shall be applied as a credit to the contract. If the balance of allowable contract costs is less than the credit for recovered substances, the contractor shall reimburse the State for the difference.

b) The Contractor agrees that transportation shall be in accordance with Department of

Transportation Hazardous Material Regulations 49 CFR 100-199.

RESPONSES INVOLVING HAZARDOUS WASTES/MATERIALS: Make copy and insert as part of technical proposal.

All bid packages submitted for the provision of immediate response and cleanup for emergencies involving hazardous wastes are desired to poses capabilities which address the items listed below. Please acknowledge each item by indicating “Y” (yes), no “N” (no). The State reserves the right to reject any proposal that does not address each of these items.

Hazardous Waste Transporter Permit. Y___________ N___________

Ability to respond on a 24-hour basis. Y___________ N___________

Maintain a 24-hour telephone communications service. Y___________ N___________

Define normal working hours. _______________________________

1-hour response time capability for representative with appropriate technical expertise to initiate corrective action at the scene on an emergency. Y___________ N___________

Ability to initiate cleanup operations within 2 to 3 hours of verbal notification from the Department. Y___________ N___________

Demonstrated expertise in all hazardous waste/materials situations. Y_________ N_________

Ability to accurately assess the quantity and types of hazardous wastes/materials. This includes the ability to arrange for the analysis of unknown hazardous wastes/materials.

Y_________N_______

Roster of available qualified response personnel. Y___________ N___________

Standard Operating Procedures for safety protocol. Y___________ N___________

Ability to immediately maintain custody of all classes of hazardous wastes and materials and to arrange for the transportation and storage of said material until their final disposition is authorized by the Department. Y___________ N___________

Ability to store the hazardous wastes/materials within 50 miles of the borders of Rhode Island in a permitted facility. Y___________ N___________

List of available equipment.

Identification of any required sub-contractor assistance for labor or equipment .

RESPONSES INVOLVING OIL AND OTHER PETROLEUM RELATED MATERIALS:Make copy and insert as part of technical proposal.

All bid packages submitted for the provision of immediate response and cleanup of oil related emergencies are desired to poses capabilities which address the items listed below. Please acknowledge each item by indicating “Y” (yes), no “N” (no). The State reserves the right to reject any proposal that does not address each of these items.

Hazardous Waste Transporter Permit. Y___________ N___________

Ability to respond on a 24-hour basis. Y___________ N___________

Maintain a 24-hour telephone communications service. Y___________ N___________

Define normal working hours._________________________________

1-hour response time capability for representative with appropriate technical expertise to initiate corrective action at the scene on an emergency. Y___________ N___________

Ability to initiate cleanup operations within 2 hours of verbal notification from the Department.

Y___________ N___________

Demonstrated expertise in all petroleum waste/materials situations including spills on both land and water. Y___________ N___________

Ability to accurately assess the quantity and types of wastes or materials. This includes the ability to arrange for the analysis of unknown wastes or materials. Y___________ N___________

Roster of available qualified response personnel and list of available equipment Y___________ N___________

Standard Operating Procedures for safety protocol. Y___________ N___________

Ability to immediately maintain custody of all wastes and materials and to arrange for the transportation and storage of said material until their final disposition is authorized by the Department. Y___________ N___________

Ability to arrange for the proper disposal of all wastes or materials generated during containment and cleanup operations, including the preparation of manifests and all other necessary documents. Y___________ N___________

Ability to store the wastes/materials within 100 miles of the borders of Rhode Island in a permitted facility. Y_________ N__________

Identification of any required sub-contractor assistance for labor or equipment.

RESPONSES INVOLVING ASBESTOS MATERIALS: Make copy and insert as part of technical proposal.

All bid packages submitted for the provision of immediate response and cleanup for emergencies involving asbestos materials are desired to poses capabilities which address the items listed below. Please acknowledge each item by indicating “Y” (yes), no “N” (no). The State reserves the right to reject any proposal that does not address each of these items.

Ability to respond on a 24-hour basis. Y_________ N__________

Maintain a 24-hour telephone communications service. Y_________ N__________

Define normal working hours. ____________________________________________

1-hour response time capability for representative with appropriate technical expertise to initiate corrective action at the scene on an emergency. Y_________ N__________

Ability to initiate cleanup operations within 2 to 3 hours of verbal notification from the Department.

Y_________ N__________

Demonstrated expertise in all situations involving asbestos. Y_________ N__________

Ability to accurately assess the quantity and types of asbestos wastes/materials. This includes the ability to arrange for the analysis of asbestos wastes/materials. Y_________ N__________

Roster of available qualified response personnel. Y_________ N__________

Standard Operating Procedures for safety protocol. Y_________ N__________

Ability to immediately maintain custody of all asbestos materials and to arrange for the transportation and storage of said material until their final disposition is authorized by the Department. Y_________ N__________

Identification of any required sub-contractor assistance for labor or equipment .

RESPONSES INVOLVING RADIOLOGICAL WASTES/MATERIALS: Make copy and insert as part of technical proposal.

All bid packages submitted for the provision of immediate response and cleanup for emergencies involving radiological materials/wastes are desired to poses capabilities which address the items listed below. Please acknowledge each item by indicating “Y” (yes), no “N” (no). The State reserves the right to reject any proposal that does not address each of these items.

Transporter Permits. Y_________ N__________

Ability to respond on a 24-hour basis. Y_________ N__________

Maintain a 24-hour telephone communications service. Y_________ N__________

Define normal working hours. _____________________________________________

1-hour response time capability for representative with appropriate technical expertise to initiate corrective action at the scene on an emergency. Y_________ N__________

Ability to initiate cleanup operations within 2 to 3 hours of verbal notification from the Department.

Demonstrated expertise in all radiological waste/materials situations. Y_________ N__________

Ability to accurately assess the quantity and types of radiological wastes/materials.

This includes the ability to arrange for the analysis of unknown radiological wastes/materials.

Standard Operating Procedures for safety protocol. Y_________ N__________

Identification of any required sub-contractor assistance for labor or equipment .

RESPONSES INVOLVING BIOLOGICAL AND MEDICAL WASTES: Make copy and insert as part of technical proposal.

All bid packages submitted for the provision of immediate response and cleanup for biological and medical wastes emergencies are desired to poses capabilities which address the items listed below. Please acknowledge each item by indicating “Y” (yes), no “N” (n). The State reserves the right to reject any proposal that does not address each of these items.

Medical Waste Transporter Number. Y_________ N__________

Ability to respond on a 24-hour basis. Y_________ N_________

Maintain a 24-hour telephone communications service. Y_________ N__________

Define normal working hours.___________________________________

1-hour response time capability for representative with appropriate technical expertise to initiate corrective action at the scene on an emergency. Y_________ N__________

Ability to initiate cleanup operations within 2 to 3 hours of verbal notification from the Department. Y_________ N__________

Demonstrated expertise in all situations involving biological and medical wastes.

Y_________ N__________

Ability to accurately assess the quantity and types of biological and medical wastes/materials. This includes the ability to arrange for the analysis of unknown wastes/materials.

Y_________ N__________

Ability to immediately maintain custody of all classes of medical waste and materials and to arrange for the transportation and storage of said material until their final disposition is authorized by the Department. Y_________ N__________

List of available equipment.

Identification of any required sub-contractor assistance for labor or equipment.

2018-1 Page 15 of 16 Revised 08/17/2018

SECTION C: PROPOSAL

1. Technical Proposal Narrative and format: Vendors must submit a technical proposal which addresses each of the following elements and is limited to six (6) pages (this excludes any appendices and as appropriate, resumes of key staff that will provide services covered by this request):

A. Staff Qualifications – Provide staff resumes/CV and describe qualifications and experience of key staff who will be involved in this project, including their experience for hazardous cleanup.

B. Capability, Capacity, and Qualifications of the Vendor - Please provide a detailed description of the Vendor’s experience in hazardous cleanup and emergency situations. List a minimum of three (3) relevant client references, to include client names, addresses, contact names with emails and phone numbers, dates of service and type(s) of service(s) provided.

C. Work Plan - Please outline services they can provide for each associated category work will be performed.

D. Storage Approach – List all available storage facilities and the exact types of materials that they are licensed or permitted to store. Storage of the wastes/materials must be at a licensed facility located within Rhode Island or within one hundred miles of the borders of Rhode Island, permitted by either RI DEM or comparable federal agency.

SECTION D: EVALUATION AND SELECTION - SOLICITATION SPECIFIC

Technical proposals must receive a minimum of 70 out of a maximum of 100 points to advance to the qualified vendor list. Technical proposals scoring less than 70 points shall not receive further consideration.

Proposals shall be reviewed and scored based upon the following criteria:

Criteria

Possible Points

Staff Qualifications 25 Points

Capability, Capacity, and Qualifications of the Vendor 30 Points

Work Plan 25 Points

Storage Approach 20 Points

Total Possible Technical Points 100 Points

2018-1 Page 16 of 16 Revised 08/17/2018

NOTE: See the “Requirements” tab of this solicitation for additional information on the evaluation and selection process in the “OE Standard Specifications- Technical Proposal” section.

SECTION A. BACKGROUND
SECTION B: SCOPE OF WORK AND REQUIREMENTS
DESCRIPTION/SPECIFICATION/WORK-STATEMENT
1. DEFINITIONS
2. USE-OF-SERVICES/EQUIPMENT/VEHICLE/VESSEL/MATERIALS/SUPPLIES
3. CONTRACTOR RESPONSIBILITY FOR SPILL
4. ANALYSIS, DISPOSAL AND/OR TREATMENT OF RECOVERED OIL AND HAZARDOUS SUBSTANCES
5. STATE OWNED PROPERTY
7. CONTRACT ADMINISTRATION DATA
8. SUBMISSION OF INVOICES
b) INVOICING PERIOD
SPECIAL-CONTRACT-REQUIREMENTS
9. SUBCONTRACTS AND/OR NON-MPA ITEMS, SERVICES
10. INCIDENT DAILY RESOURCE REPORTS
11. INSURANCE
12. SUPERINTENDENCE BY CONTRACTOR
14. COMPLIANCE WITH APPLICABLE LAWS AND REGULATIONS
15. PERMITS
16. SITE SAFETY PLAN
17. SITE CONDITION AT COMPLETION OF WORK
18. DEPARTMENT OF TRANSPORTATION REQUIREMENTS
19. SALVAGEABLE PRODUCTS
RESPONSES INVOLVING HAZARDOUS WASTES/MATERIALS: Make copy and insert as part of technical proposal.
RESPONSES INVOLVING OIL AND OTHER PETROLEUM RELATED MATERIALS:Make copy and insert as part of technical proposal.
RESPONSES INVOLVING ASBESTOS MATERIALS: Make copy and insert as part of technical proposal.
RESPONSES INVOLVING RADIOLOGICAL WASTES/MATERIALS: Make copy and insert as part of technical proposal.
RESPONSES INVOLVING BIOLOGICAL AND MEDICAL WASTES: Make copy and insert as part of technical proposal.
SECTION C: PROPOSAL
1. Technical Proposal

SECTION D: EVALUATION AND SELECTION - SOLICITATION SPECIFIC

File details come from the government source that posted it. Updated .