This is a roofing project specification document for Newaygo Public Schools' Middle School Reroofing Project located in Newaygo, Michigan, prepared by Tower Pinkster Titus Associates Inc. in September 2018. The project involves comprehensive roof replacement for multiple building units (B, C, and D), focusing on removing existing asphalt shingles and underlayment, preparing the roof deck, and installing new architectural-style asphalt shingles with self-adhered sheet underlayment and ice and water shield. Key installation requirements include providing new ridge and hip vents, replacing metal flashings and drip edges, and ensuring proper waterproofing at roof transitions, valleys, and penetrations.

The roofing system specifications include a 25-year no-dollar-limit manufacturer's warranty for materials and installation workmanship, with an additional two-year installer warranty covering installation defects. Contractors are required to inspect existing building conditions, verify dimensions, and accommodate any necessary modifications. The project emphasizes thorough preparation, including examining and potentially replacing wood nailers, blocking, and roof decking as needed to ensure structural integrity. Additional requirements include temporarily removing mechanical equipment, installing crickets to maintain proper slope, and following specific flashing and accessory installation guidelines per NRCA recommended details.

View the file

Other files

File Type Posted
Bid Pack 5 Specifications.pdf PDF
Newaygo Volume 2_Updated per Addendum 2.pdf PDF
Addendum 2 Write Up.pdf PDF
Addendum 1 Write Up.pdf PDF
High School Roof.pdf PDF
HS Parking Lot.pdf PDF
The Christman Company Front End - Bid Package 5.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4/12

/1

EXISTING MEMBRANE

ROOF TO REMAIN

EXISTING MEMBRANE ROOF TO REMAIN

EXISTING MEMBRANE

ROOF TO REMAIN

4/12

/1

/1

4/12

3' - 0"

3' - 0"

6' - 6" 3' - 0"3' - 0"3' - 0"

3' - 0"

3' - 0"

' - 0

' - 0

6' - 6" 3' - 0"

6'

6"

3'

0"

6' - 6"

3' - 0"

' - 0

3' - 0"

3' - 0"

3' - 0"

PROVIDE SELF ADHERED

SHEET UNDERLAYMENT (ICE &

WATER SHIELD) OVER ENTIRE

HIGHER ROOF AND SHALLOW

SLOPED TRANSITION ROOF.

VALLEY

VALLEY

VALLEY

VALLEY

RIDGE

RIDGE

3' - 0"

3' - 0"

VALLEY

PROVIDE SELF ADHERED

SHEET UNDERLAYMENT (ICE &

WATER SHIELD) OVER ENTIRE

HIGHER ROOF.

EXISTING MEMBRANE ROOF TO REMAIN

PROVIDE SELF ADHERED

SHEET UNDERLAYMENT (ICE &

WATER SHIELD) OVER ENTIRE

HIGHER ROOF.

3/12

/1

3/12

/1

3/12 3/12

/1

/1

REPLACE

PREFINISHED

METAL DRIP AS

REQUIRED

4/12

/1

3/12

/1

/1

3/12

EXISTING SADDLE

ALONG HIGH WALL TO

REMAIN

A 321

Sim

A 321

Sim

RI

DG

E

VE

NT

RI

DG

E

VE

NT

RIDGE VENT

RIDGE VENT

R

ID

G E V

E N T

A 321

Sim

RIDGE

VALLEY

' - 0

' - 0

PROVIDE NEW

PEAK VENT AS

REQUIRED

PROVIDE NEW

PEAK VENT AS

REQUIRED

PROVIDE NEW

PEAK VENT AS

REQUIRED

PROVIDE NEW PEAK

VENT AS REQUIRED

4/1

4/

4/12

/1

4/

4/12

PROVIDE SELF ADHERED

SHEET UNDERLAYMENT (ICE &

WATER SHIELD) OVER ENTIRE

HIGHER ROOF.

A 321

Sim

A 321

Sim

A 321

Sim

A 321

Sim

1. CONTRACTORS ARE REQUIRED TO INSPECT/REVIEW THE EXISTING BUILDING(S) INCLUDING THE

ENTIRE ROOF PRIOR TO RELATED DEMOLITION WORK. .

2. CONTRACTOR SHALL VERIFY ALL EXISTING JOB SITE CONDITIONS AND DIMENSIONS AND BE

RESPONSIBLE FOR THE SAME. ADVISE CONSTRUCTION MANAGER OF ANY AND ALL

DISCREPANCIES PRIOR TO STARTING NEW WORK.

3. CONTRACTOR SHALL FIELD VERIFY QUANTITY, SIZE AND LOCATIONS OF ALL ROOF

PENETRATIONS PRIOR BID AND ORDERING MATERIALS.

4. ACCOMMODATE NEW CONSTRUCTION IF NOT INDICATED.

5. REFER TO STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL PLANS FOR ADDITIONAL

DEMOLITION NOTES.

6. ALL MECHANICAL LINES, PIPING, EQUIPMENT, CONDUIT AND WIRING SHALL BE TEMPORARILY

REMOVED AS NECESSARY DURING DEMOLITION AND FOR THE INSTALLATION OF THE NEW

ROOFING SYSTEM. IF EXISTING PIPING IS NOT REMOVED, SHORE UP AS REQUIRED TO REMOVE

ENTIRE EXISTING ROOFING SYSTEM. SALVAGE ALL P.T. PIPING SUPPORT FOR REUSE.

7. REMOVE AND DISPOSE OF ALL EXISTING ROOF MATERIAL (AREA SHOWN ON PLAN) INCLUDING

EXISTING ASPHALT SHINGLES & ROOFING FELT. REMOVE AND REPLACE METAL FLASHINGS,

PIPING FLASHINGS. EXISTING SELF-ADHERED FLASHING SHALL REMAIN, UNLESS REMOVAL CAN

BE ACHIEVED WITH DAMAGING THE WOOD DECK.

8. THE CONTRACTOR SHALL INCLUDE SUCH TIME AND MATERIALS IN THE BID AS REQUIRED TO

MAKE WATERTIGHT CLOSURES AND TRANSITIONS WHERE DIFFERENT ROOF DETAILS INTERSECT

OR WHERE A ROOF DETAIL TERMINATES. THESE WATERTIGHT CLOSURES SHALL BE MADE IN

COMPLETE COMPLIANCE WITH ARCHITECT APPROVED AND CONTRACTOR SUBMITTED SHOP

DRAWINGS. CLOSURES SHALL BE MADE WITH FLASHING MEMBRANE, COATED METAL AND

OTHER APPROVED ACCESSORIES. SURFACE SEALANTS ARE NOT ACCEPTABLE AS THE PRIMARY

CLOSURE COMPONENTS.

9. EXAMINE EXISTING WOOD NAILERS AND BLOCKING, AND REMOVE AND DISPOSE AS REQUIRED.

REPLACE DISPOSED BLOCKING WITH NEW P.T. WOOD.

10. AFTER THE REMOVAL THE ROOFING ASSEMBLY, THE EXISTING ROOF DECK SHALL BE EXAMINED

FOR STRUCTURAL INTEGRITY AND REPLACED AS NECESSARY.

11. PROVIDE AND INSTALL NEW ARCHITECTURAL STYLE ASPHALT SHINGLE ROOFING SYSTEM,

INCLUDING ALL SELF ADHERED FLASHING, AND PIPING BOOT ACCESSORIES.

12. PROVIDE AND INSTALL NEW FLASHING, FLASHING BOOTS, METAL TERMINATION BARS, CLEATS, REGLETS THROUGHOUT TO REPLACE EXISTING. ADD EXTENSIONS TO VTR'S AND CURBS TO

MAINTAIN 12" MINIMUM HEIGHT ABOVE THE ROOF SURFACE.

13. INSTALL SHEET FLASHINGS AND PREFORMED FLASHING ACCESSORIES AND ADHERE TO

SUBSTRATES ACCORDING TO NRCA RECOMMENDED DETAILS.

14. FURNISH THE ROOFING SHINGLE MANUFACTURER'S 25 YEAR NO DOLLAR LIMIT ROOF SYSTEM

MATERIALS AND INSTALLATION WORKMANSHIP WARRANTY, INCLUDING FLASHING, AND

ACCESSORIES NECESSARY FOR A WATERTIGHT ROOF SYSTEM CONSTRUCTION.

15. THE ROOFING SYSTEM INSTALLER MUST WARRANT FOR A PERIOD OF TWO YEARS THAT THE

ROOFING SYSTEM, AS INSTALLED, IS FREE FROM DEFECTS IN INSTALLATION WORKMANSHIP, TO

INCLUDE THE ROOFING SHINGLES, FLASHING, ACCESSORIES, AND ATTACHMENTS INTEGRAL TO A

COMPLETE WATERTIGHT ROOF SYSTEM ASSEMBLY.

ROOFING GENERAL DEMOLITION & NEW CONSTRUCTION NOTES

EXISTING MEMBRANE ROOF ON METAL ROOF DECK

ROOF PLAN KEY

TAPERED INSULATION

R.D.

O.D.

ROOF SLOPE DUE TO TAPERED INSULATION OR

SLOPED STRUCTURE - REFER TO STRUCTURAL DRAWINGS

AHU OR RTU

ACCU

E.F.

ROOF DRAIN - SEE PLUMBING DRAWINGS

OVERFLOW DRAIN - SEE PLUMBINMG DRAWINGS

ROOF TOP UNIT - SEE MECHANICAL DAWINGS

CONDENSING UNIT - SEE MECHANICAL DRAWINGS

EXHAUST FAN / HOOD - SEE MECHANICAL DRAWINGS

1. PROVIDE ROOFING MANUFACTURERS STANDARD ROOFING TERMINATION

DETAILS AT ALL PARAPETS, GRAVEL STOPS, CURBS, PIPE PENETRATIONS, ETC.

2. PROVIDE CRICKETS AS REQUIRED AT ALL MECHANICAL UNITS, VENTS,

ETC. TO MAINTAIN POSITIVE SLOPE OF 1/4" /1'-0" MINIMUM.

NOTES

ACCU

E.F.

CONDENSING UNIT - SEE MECHANICAL DRAWINGS

EXHAUST FAN / HOOD - SEE MECHANICAL DRAWINGS

EVTR EXISTING VENT TO REMAIN

ERDTR EXISTING ROOF DRAIN TO REMAIN

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2017©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

KEY PLAN

KEY PLAN

SCALE: 1"=150'

B

SEPTEMBER, 2018

NEWAYGO

MIDDLE SCHOOL

REROOFING

PROJECT

Newaygo, Michigan

ROOF PLAN -

UNIT B

14-204.40

A 201B

NEWAYGO

PUBLIC

SCHOOLS

3/32" = 1'-0"

A 201 - ROOF PLAN - UNIT B

KEYED NOTES - DEMO & NEW CONSTRUCTION

1 REMOVE EXISTING SHINGLES, AND UNDERLAYMENT DOWN TO ROOF DECK (EXISTING ICE

AND WATER SHIELD TO REMAIN IF INTACT). PREP AND CLEAN EXISTING ROOF DECK AND

PROVIDE NEW ARCHITECTURAL STYLE ASPHALT SHINGLES. PROVIDE HEAVY DUTY ROOFING

FELT (30#) UNDERLAYMENT AND SELF ADHERED SHEET UNDERLAYMENT (ICE & WATER

SHIELD), SEE SPECS FOR EXTENT

2 NEW PREMANUFACTURED RIDGE VENT

3 NEW PREMANUFACTURED HIP VENT

4 PROVIDE SELF ADHERED SHEET UNDERLAYMENT (ICE & WATER SHIELD TYPE) @ ALL VALLEYS, EAVES PER SPECS.

ISSUED FOR DATE

4/12

/1

/1

/1

/1

VALLEY

10' - 6"

10' - 6"

3' - 0"

3' - 0"

3'

0"

3'

0"

88' - 4"

84' - 4"

4/12 4/12

4/12

/1

/1

4/12

3' - 0"

3' - 0"

3'

0" 3'

0"

6' - 6" 3' - 0"

6' - 6"

3' - 0"

6' - 6" 3' - 0"3' - 0"3' - 0"

3' - 0"

3' - 0"

PROVIDE SELF ADHERED

SHEET UNDERLAYMENT (ICE &

WATER SHIELD) OVER ENTIRE

HIGHER ROOF AND SHALLOW

SLOPED TRANSITION ROOF.

VALLEY

VALLEY

VALLEY

/1

A 321

Sim

A 321

Sim

A 321

Sim

A 321

Sim

A 321

Sim

A 321

Sim

A 321

Sim

A 321

Sim

RI

DG

E

VE

NT

RIDGE VENT

RIDGE VENT

R

ID

G E V

E N T

R

ID

G E V

E N T

PROVIDE NEW

PEAK VENT AS

REQUIRED

A 321

Sim

A 321

Sim

1. CONTRACTORS ARE REQUIRED TO INSPECT/REVIEW THE EXISTING BUILDING(S) INCLUDING THE

ENTIRE ROOF PRIOR TO RELATED DEMOLITION WORK. .

2. CONTRACTOR SHALL VERIFY ALL EXISTING JOB SITE CONDITIONS AND DIMENSIONS AND BE

RESPONSIBLE FOR THE SAME. ADVISE CONSTRUCTION MANAGER OF ANY AND ALL

DISCREPANCIES PRIOR TO STARTING NEW WORK.

3. CONTRACTOR SHALL FIELD VERIFY QUANTITY, SIZE AND LOCATIONS OF ALL ROOF

PENETRATIONS PRIOR BID AND ORDERING MATERIALS.

4. ACCOMMODATE NEW CONSTRUCTION IF NOT INDICATED.

5. REFER TO STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL PLANS FOR ADDITIONAL

DEMOLITION NOTES.

6. ALL MECHANICAL LINES, PIPING, EQUIPMENT, CONDUIT AND WIRING SHALL BE TEMPORARILY

REMOVED AS NECESSARY DURING DEMOLITION AND FOR THE INSTALLATION OF THE NEW

ROOFING SYSTEM. IF EXISTING PIPING IS NOT REMOVED, SHORE UP AS REQUIRED TO REMOVE

ENTIRE EXISTING ROOFING SYSTEM. SALVAGE ALL P.T. PIPING SUPPORT FOR REUSE.

7. REMOVE AND DISPOSE OF ALL EXISTING ROOF MATERIAL (AREA SHOWN ON PLAN) INCLUDING

EXISTING ASPHALT SHINGLES & ROOFING FELT. REMOVE AND REPLACE METAL FLASHINGS,

PIPING FLASHINGS. EXISTING SELF-ADHERED FLASHING SHALL REMAIN, UNLESS REMOVAL CAN

BE ACHIEVED WITH DAMAGING THE WOOD DECK.

8. THE CONTRACTOR SHALL INCLUDE SUCH TIME AND MATERIALS IN THE BID AS REQUIRED TO

MAKE WATERTIGHT CLOSURES AND TRANSITIONS WHERE DIFFERENT ROOF DETAILS INTERSECT

OR WHERE A ROOF DETAIL TERMINATES. THESE WATERTIGHT CLOSURES SHALL BE MADE IN

COMPLETE COMPLIANCE WITH ARCHITECT APPROVED AND CONTRACTOR SUBMITTED SHOP

DRAWINGS. CLOSURES SHALL BE MADE WITH FLASHING MEMBRANE, COATED METAL AND

OTHER APPROVED ACCESSORIES. SURFACE SEALANTS ARE NOT ACCEPTABLE AS THE PRIMARY

CLOSURE COMPONENTS.

9. EXAMINE EXISTING WOOD NAILERS AND BLOCKING, AND REMOVE AND DISPOSE AS REQUIRED.

REPLACE DISPOSED BLOCKING WITH NEW P.T. WOOD.

10. AFTER THE REMOVAL THE ROOFING ASSEMBLY, THE EXISTING ROOF DECK SHALL BE EXAMINED

FOR STRUCTURAL INTEGRITY AND REPLACED AS NECESSARY.

11. PROVIDE AND INSTALL NEW ARCHITECTURAL STYLE ASPHALT SHINGLE ROOFING SYSTEM,

INCLUDING ALL SELF ADHERED FLASHING, AND PIPING BOOT ACCESSORIES.

12. PROVIDE AND INSTALL NEW FLASHING, FLASHING BOOTS, METAL TERMINATION BARS, CLEATS, REGLETS THROUGHOUT TO REPLACE EXISTING. ADD EXTENSIONS TO VTR'S AND CURBS TO

MAINTAIN 12" MINIMUM HEIGHT ABOVE THE ROOF SURFACE.

13. INSTALL SHEET FLASHINGS AND PREFORMED FLASHING ACCESSORIES AND ADHERE TO

SUBSTRATES ACCORDING TO NRCA RECOMMENDED DETAILS.

14. FURNISH THE ROOFING SHINGLE MANUFACTURER'S 25 YEAR NO DOLLAR LIMIT ROOF SYSTEM

MATERIALS AND INSTALLATION WORKMANSHIP WARRANTY, INCLUDING FLASHING, AND

ACCESSORIES NECESSARY FOR A WATERTIGHT ROOF SYSTEM CONSTRUCTION.

15. THE ROOFING SYSTEM INSTALLER MUST WARRANT FOR A PERIOD OF TWO YEARS THAT THE

ROOFING SYSTEM, AS INSTALLED, IS FREE FROM DEFECTS IN INSTALLATION WORKMANSHIP, TO

INCLUDE THE ROOFING SHINGLES, FLASHING, ACCESSORIES, AND ATTACHMENTS INTEGRAL TO A

COMPLETE WATERTIGHT ROOF SYSTEM ASSEMBLY.

ROOFING GENERAL DEMOLITION & NEW CONSTRUCTION NOTES

EXISTING MEMBRANE ROOF ON METAL ROOF DECK

ROOF PLAN KEY

TAPERED INSULATION

R.D.

O.D.

ROOF SLOPE DUE TO TAPERED INSULATION OR

SLOPED STRUCTURE - REFER TO STRUCTURAL DRAWINGS

AHU OR RTU

ACCU

E.F.

ROOF DRAIN - SEE PLUMBING DRAWINGS

OVERFLOW DRAIN - SEE PLUMBINMG DRAWINGS

ROOF TOP UNIT - SEE MECHANICAL DAWINGS

CONDENSING UNIT - SEE MECHANICAL DRAWINGS

EXHAUST FAN / HOOD - SEE MECHANICAL DRAWINGS

1. PROVIDE ROOFING MANUFACTURERS STANDARD ROOFING TERMINATION

DETAILS AT ALL PARAPETS, GRAVEL STOPS, CURBS, PIPE PENETRATIONS, ETC.

2. PROVIDE CRICKETS AS REQUIRED AT ALL MECHANICAL UNITS, VENTS,

ETC. TO MAINTAIN POSITIVE SLOPE OF 1/4" /1'-0" MINIMUM.

NOTES

ACCU

E.F.

CONDENSING UNIT - SEE MECHANICAL DRAWINGS

EXHAUST FAN / HOOD - SEE MECHANICAL DRAWINGS

EVTR EXISTING VENT TO REMAIN

ERDTR EXISTING ROOF DRAIN TO REMAIN

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2017©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

KEY PLAN

KEY PLAN

SCALE: 1"=150'

C

SEPTEMBER, 2018

NEWAYGO

MIDDLE SCHOOL

REROOFING

PROJECT

Newaygo, Michigan

ROOF PLAN -

UNIT C

14-204.40

A 201C

NEWAYGO

PUBLIC

SCHOOLS

3/32" = 1'-0"

A 201 - ROOF PLAN - UNIT C

ISSUED FOR DATE

KEYED NOTES - DEMO & NEW CONSTRUCTION

1 REMOVE EXISTING SHINGLES, AND UNDERLAYMENT DOWN TO ROOF DECK (EXISTING ICE

AND WATER SHIELD TO REMAIN IF INTACT). PREP AND CLEAN EXISTING ROOF DECK AND

PROVIDE NEW ARCHITECTURAL STYLE ASPHALT SHINGLES. PROVIDE HEAVY DUTY ROOFING

FELT (30#) UNDERLAYMENT AND SELF ADHERED SHEET UNDERLAYMENT (ICE & WATER

SHIELD), SEE SPECS FOR EXTENT

2 NEW PREMANUFACTURED RIDGE VENT

3 NEW PREMANUFACTURED HIP VENT

4 PROVIDE SELF ADHERED SHEET UNDERLAYMENT (ICE & WATER SHIELD TYPE) @ ALL VALLEYS, 4/12 4/12

/1

/1

4/12 4/12

/1

/1

VALLEY

PROVIDE SELF ADHERED

SHEET UNDERLAYMENT (ICE &

WATER SHIELD) OVER ENTIRE

HIGHER ROOF.

VALLEY

" 13' - 4"

88' - 4"

88' - 4"

6' - 6"

10' - 6"

6' - 6"

EXTEND SELF ADHERED

SHEET UNDERLAYMENT (ICE

& WATER SHIELD) UP EAVE

& RAKE EDGES PER SPEC

AND AS DIMENSIONED.

10' - 6"

3' - 0"

3' - 0"

3'

0"

3'

0"

3' - 0" 3' - 0"

A 321

Sim

A 321

Sim

A 321

Sim

RIDGE VENT

R

ID

G E V

E N T

A 321

Sim

1. CONTRACTORS ARE REQUIRED TO INSPECT/REVIEW THE EXISTING BUILDING(S) INCLUDING THE

ENTIRE ROOF PRIOR TO RELATED DEMOLITION WORK. .

2. CONTRACTOR SHALL VERIFY ALL EXISTING JOB SITE CONDITIONS AND DIMENSIONS AND BE

RESPONSIBLE FOR THE SAME. ADVISE CONSTRUCTION MANAGER OF ANY AND ALL

DISCREPANCIES PRIOR TO STARTING NEW WORK.

3. CONTRACTOR SHALL FIELD VERIFY QUANTITY, SIZE AND LOCATIONS OF ALL ROOF

PENETRATIONS PRIOR BID AND ORDERING MATERIALS.

4. ACCOMMODATE NEW CONSTRUCTION IF NOT INDICATED.

5. REFER TO STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL PLANS FOR ADDITIONAL

DEMOLITION NOTES.

6. ALL MECHANICAL LINES, PIPING, EQUIPMENT, CONDUIT AND WIRING SHALL BE TEMPORARILY

REMOVED AS NECESSARY DURING DEMOLITION AND FOR THE INSTALLATION OF THE NEW

ROOFING SYSTEM. IF EXISTING PIPING IS NOT REMOVED, SHORE UP AS REQUIRED TO REMOVE

ENTIRE EXISTING ROOFING SYSTEM. SALVAGE ALL P.T. PIPING SUPPORT FOR REUSE.

7. REMOVE AND DISPOSE OF ALL EXISTING ROOF MATERIAL (AREA SHOWN ON PLAN) INCLUDING

EXISTING ASPHALT SHINGLES & ROOFING FELT. REMOVE AND REPLACE METAL FLASHINGS,

PIPING FLASHINGS. EXISTING SELF-ADHERED FLASHING SHALL REMAIN, UNLESS REMOVAL CAN

BE ACHIEVED WITH DAMAGING THE WOOD DECK.

8. THE CONTRACTOR SHALL INCLUDE SUCH TIME AND MATERIALS IN THE BID AS REQUIRED TO

MAKE WATERTIGHT CLOSURES AND TRANSITIONS WHERE DIFFERENT ROOF DETAILS INTERSECT

OR WHERE A ROOF DETAIL TERMINATES. THESE WATERTIGHT CLOSURES SHALL BE MADE IN

COMPLETE COMPLIANCE WITH ARCHITECT APPROVED AND CONTRACTOR SUBMITTED SHOP

DRAWINGS. CLOSURES SHALL BE MADE WITH FLASHING MEMBRANE, COATED METAL AND

OTHER APPROVED ACCESSORIES. SURFACE SEALANTS ARE NOT ACCEPTABLE AS THE PRIMARY

CLOSURE COMPONENTS.

9. EXAMINE EXISTING WOOD NAILERS AND BLOCKING, AND REMOVE AND DISPOSE AS REQUIRED.

REPLACE DISPOSED BLOCKING WITH NEW P.T. WOOD.

10. AFTER THE REMOVAL THE ROOFING ASSEMBLY, THE EXISTING ROOF DECK SHALL BE EXAMINED

FOR STRUCTURAL INTEGRITY AND REPLACED AS NECESSARY.

11. PROVIDE AND INSTALL NEW ARCHITECTURAL STYLE ASPHALT SHINGLE ROOFING SYSTEM,

INCLUDING ALL SELF ADHERED FLASHING, AND PIPING BOOT ACCESSORIES.

12. PROVIDE AND INSTALL NEW FLASHING, FLASHING BOOTS, METAL TERMINATION BARS, CLEATS, REGLETS THROUGHOUT TO REPLACE EXISTING. ADD EXTENSIONS TO VTR'S AND CURBS TO

MAINTAIN 12" MINIMUM HEIGHT ABOVE THE ROOF SURFACE.

13. INSTALL SHEET FLASHINGS AND PREFORMED FLASHING ACCESSORIES AND ADHERE TO

SUBSTRATES ACCORDING TO NRCA RECOMMENDED DETAILS.

14. FURNISH THE ROOFING SHINGLE MANUFACTURER'S 25 YEAR NO DOLLAR LIMIT ROOF SYSTEM

MATERIALS AND INSTALLATION WORKMANSHIP WARRANTY, INCLUDING FLASHING, AND

ACCESSORIES NECESSARY FOR A WATERTIGHT ROOF SYSTEM CONSTRUCTION.

15. THE ROOFING SYSTEM INSTALLER MUST WARRANT FOR A PERIOD OF TWO YEARS THAT THE

ROOFING SYSTEM, AS INSTALLED, IS FREE FROM DEFECTS IN INSTALLATION WORKMANSHIP, TO

INCLUDE THE ROOFING SHINGLES, FLASHING, ACCESSORIES, AND ATTACHMENTS INTEGRAL TO A

COMPLETE WATERTIGHT ROOF SYSTEM ASSEMBLY.

ROOFING GENERAL DEMOLITION & NEW CONSTRUCTION NOTES

EXISTING MEMBRANE ROOF ON METAL ROOF DECK

ROOF PLAN KEY

TAPERED INSULATION

R.D.

O.D.

ROOF SLOPE DUE TO TAPERED INSULATION OR

SLOPED STRUCTURE - REFER TO STRUCTURAL DRAWINGS

AHU OR RTU

ACCU

E.F.

ROOF DRAIN - SEE PLUMBING DRAWINGS

OVERFLOW DRAIN - SEE PLUMBINMG DRAWINGS

ROOF TOP UNIT - SEE MECHANICAL DAWINGS

CONDENSING UNIT - SEE MECHANICAL DRAWINGS

EXHAUST FAN / HOOD - SEE MECHANICAL DRAWINGS

1. PROVIDE ROOFING MANUFACTURERS STANDARD ROOFING TERMINATION

DETAILS AT ALL PARAPETS, GRAVEL STOPS, CURBS, PIPE PENETRATIONS, ETC.

2. PROVIDE CRICKETS AS REQUIRED AT ALL MECHANICAL UNITS, VENTS,

ETC. TO MAINTAIN POSITIVE SLOPE OF 1/4" /1'-0" MINIMUM.

NOTES

ACCU

E.F.

CONDENSING UNIT - SEE MECHANICAL DRAWINGS

EXHAUST FAN / HOOD - SEE MECHANICAL DRAWINGS

EVTR EXISTING VENT TO REMAIN

ERDTR EXISTING ROOF DRAIN TO REMAIN

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2017©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

KEY PLAN

KEY PLAN

SCALE: 1"=150'

D

SEPTEMBER, 2018

NEWAYGO

MIDDLE SCHOOL

REROOFING

PROJECT

Newaygo, Michigan

ROOF PLAN -

UNIT D

14-204.40

A 201D

NEWAYGO

PUBLIC

SCHOOLS

3/32" = 1'-0"

ROOF PLAN - UNIT D

KEYED NOTES - DEMO & NEW CONSTRUCTION

1 REMOVE EXISTING SHINGLES, AND UNDERLAYMENT DOWN TO ROOF DECK (EXISTING ICE

AND WATER SHIELD TO REMAIN IF INTACT). PREP AND CLEAN EXISTING ROOF DECK AND

PROVIDE NEW ARCHITECTURAL STYLE ASPHALT SHINGLES. PROVIDE HEAVY DUTY ROOFING

FELT (30#) UNDERLAYMENT AND SELF ADHERED SHEET UNDERLAYMENT (ICE & WATER

SHIELD), SEE SPECS FOR EXTENT

2 NEW PREMANUFACTURED RIDGE VENT

3 NEW PREMANUFACTURED HIP VENT

4 PROVIDE SELF ADHERED SHEET UNDERLAYMENT (ICE & WATER SHIELD TYPE) @ ALL VALLEYS, REMOVE ENTIRE EXISTING ASPHALT SHINGLED ROOF, INCLUDING FELT UNDERLAYMENT. REMOVE ANY

DAMAGED EXISTING "ICE AND WATER" SHIELD. PREP &

CLEAN OF WOOD DECK AND PROVIDE NEW ASPHALT

SHINGLED ROOF (ARCHITECTURAL STYLE) OVER HEAVY

WEIGHT FELT (30#) UNDERLAYMENT. PROVIDE SELF

ADHERED SHEET UNDERLAYMENT @ EAVES, VALLEYS,

RAKES, ETC. SEE ROOF PLANS AND SPECS FOR

ADDITIONAL INFORMATION.

PROVIDE NEW PRE-

FINISHED METAL DRIP

EDGE AS REQUIRED

A 321

Sim

REPLACE EXISTING

CONTINUOUS PRE-

MANUFACTURED RIDGE

VENT WITH NEW. SEE

SPECS.

REMOVE ENTIRE EXISTING ASPHALT SHINGLED

ROOF, INCLUDING FELT UNDERLAYMENT.

REMOVE ANY DAMAGED EXISTING "ICE AND

WATER" SHIELD. PREP & CLEAN OF WOOD DECK

AND PROVIDE NEW ASPHALT SHINGLED ROOF

(ARCHITECTURAL STYLE) OVER HEAVY WEIGHT

FELT (30#) UNDERLAYMENT. PROVIDE SELF

ADHERED SHEET UNDERLAYMENT @ EAVES,

VALLEYS, RAKES, ETC. SEE ROOF PLANS AND

SPECS FOR ADDITIONAL INFORMATION.

REMOVE ENTIRE EXISTING ASPHALT SHINGLED ROOF, INCLUDING FELT

UNDERLAYMENT. REMOVE ANY DAMAGED EXISTING "ICE AND WATER"

SHIELD. PREP & CLEAN OF WOOD DECK AND PROVIDE NEW ASPHALT

SHINGLED ROOF (ARCHITECTURAL STYLE) OVER HEAVY WEIGHT FELT (30#)

UNDERLAYMENT. PROVIDE SELF ADHERED SHEET UNDERLAYMENT @

EAVES, VALLEYS, RAKES, ETC. SEE ROOF PLANS AND SPECS FOR

ADDITIONAL INFORMATION.

PROVIDE SELF ADHERED SHEET

UNDERLAYMENT OVER ENTIRE ROOF

TRANSITION AREA

REMOVE EXISTING PRE-

MOLDED FLASHING & COLLAR

WITH NEW (MATCH EXISTING),

INCLUDING NEW STAINLESS

STEEL CLAMPING RING

PROVIDE NEW FLASHING AND

CONTINUOUS LAP SEALANT EXISTING ROOF

VENT

REPLACE EXISTING FLASHING

FILTERVENT AS REQUIRED

EXISTING PREFINISHED METAL

FLASHING AND CONTINUOUS

CLIP TO REMAIN

PROVIDE SELF ADHERED SHEET

UNDERLAYMENT (ICE & WATER

SHIELD AT ROOF/WALL

TRANSITION

REMOVE ENTIRE EXISTING ASPHALT SHINGLED ROOF,

INCLUDING FELT UNDERLAYMENT. REMOVE ANY DAMAGED

EXISTING "ICE AND WATER" SHIELD. PREP & CLEAN OF WOOD

DECK AND PROVIDE NEW ASPHALT SHINGLED ROOF

(ARCHITECTURAL STYLE) OVER HEAVY WEIGHT FELT (30#)

UNDERLAYMENT. PROVIDE SELF ADHERED SHEET

UNDERLAYMENT @ EAVES, VALLEYS, RAKES, ETC. SEE ROOF

PLANS AND SPECS FOR ADDITIONAL INFORMATION.

REPLACE CUSTOM BENT

PRE-FINISHED METAL DRIP

EDGE AS REQUIRED

REPLACE EXISTING

CONTINUOUS PRE-

MANUFACTURED RIDGE

VENT WITH NEW. SEE

SPECS.

MAINTAIN EXISTING

OPENING @

SHEATHING.

REMOVE ENTIRE EXISTING ASPHALT SHINGLED ROOF,

INCLUDING FELT UNDERLAYMENT. REMOVE ANY

DAMAGED EXISTING "ICE AND WATER" SHIELD. PREP &

CLEAN OF WOOD DECK AND PROVIDE NEW ASPHALT

SHINGLED ROOF (ARCHITECTURAL STYLE) OVER

HEAVY WEIGHT FELT (30#) UNDERLAYMENT. PROVIDE

SELF ADHERED SHEET UNDERLAYMENT @ EAVES,

VALLEYS, RAKES, ETC. SEE ROOF PLANS AND SPECS

FOR ADDITIONAL INFORMATION.

REMOVE ENTIRE EXISTING ASPHALT SHINGLED ROOF,

INCLUDING FELT UNDERLAYMENT. REMOVE ANY DAMAGED

EXISTING "ICE AND WATER" SHIELD. PREP & CLEAN OF WOOD

DECK AND PROVIDE NEW ASPHALT SHINGLED ROOF

(ARCHITECTURAL STYLE) OVER HEAVY WEIGHT FELT (30#)

UNDERLAYMENT. PROVIDE SELF ADHERED SHEET

UNDERLAYMENT @ EAVES, VALLEYS, RAKES, ETC. SEE ROOF

PLANS AND SPECS FOR ADDITIONAL INFORMATION.

EXISTING PREFINISHED METAL

WRAPPED AROUND EXISTING

PLYWOOD FASCIA TO REMAIN

EXISTING PREFINISHED

METAL DRIP REPLACED IF

NECESSARY

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2017©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

KEY PLAN

KEY PLAN

SCALE: 1"=150'

DC

B

SEPTEMBER, 2018

NEWAYGO

MIDDLE SCHOOL

REROOFING

PROJECT

Newaygo, Michigan

ROOFING

DETAILS

14-204.40

A 321

NEWAYGO

PUBLIC

SCHOOLS

1" = 1'-0"A 321

1 TYPICAL ROOF EDGE DETAIL

1 1/2" = 1'-0"A 321

2 RIDGE VENT DETAIL

1" = 1'-0"A 321

4 ROOF TRANSITION DETAIL

1 1/2" = 1'-0"A 321

6 SHINGLED ROOF VENT DETAIL

1 1/2" = 1'-0"A 321

8 ROOF TO WALL EDGE DETAIL

1 1/2" = 1'-0"A 321

7 ROOF ACCENT DETAIL

1 1/2" = 1'-0"A 321

5 HIP RIDGE VENT DETAIL

1 1/2" = 1'-0"A 321

3 ROOF FASCIA EDGE DETAIL

Sheets
A 201B - ROOF PLAN - UNIT B
A 201C - ROOF PLAN - UNIT C
A 201D - ROOF PLAN - UNIT D
A 321 - ROOFING DETAILS