Bid Pack 5 Specifications.pdf
PDF 174 KB Posted
- Attached to
- RFP For Roofing and Parking Package
- Solicitation number
- RFP-NEWS-190000000321-3
- Issued by
- Oceana County, Michigan
About this file
This document is a detailed specification for an asphalt shingle roofing project for Newaygo Public Schools, specifically for Newaygo Middle School's reroofing. The project involves installing a new roofing system utilizing laminated-strip asphalt architectural shingles with specific performance requirements, including a 30-year material warranty, 15-year wind-speed warranty up to 110 mph, and a 10-year algae-resistance warranty. The specifications outline precise installation requirements for underlayment, ridge vents, metal flashing, and trim, with detailed instructions for fastening, sealing, and positioning of roofing components.
The roofing materials are required to meet stringent performance standards, including Class A fire resistance, UL 2218 Class 4 impact resistance, and algae-resistant granules. The project specifies the use of hot-dip galvanized steel wire shingle nails, self-adhering sheet underlayment, and rigid ridge vents with specific technical characteristics. The manufacturer must provide extra roofing materials (100 sq. ft. of each type) and ensure proper installation techniques that minimize potential water infiltration, wind damage, and structural issues. The specification also includes provisions for thermal expansion, metal protection, and specific installation techniques for valleys, ridges, and flashing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Newaygo Volume 2_Updated per Addendum 2.pdf | ||
| Middle School Roof.pdf | ||
| Addendum 2 Write Up.pdf | ||
| Addendum 1 Write Up.pdf | ||
| High School Roof.pdf | ||
| HS Parking Lot.pdf | ||
| The Christman Company Front End - Bid Package 5.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO. 17-420.40 ASPHALT SHINGLES
NEWAYGO MIDDLE SCHOOL - REROOFING PROJECT 07 3113 - 1
NEWAYGO PUBLILC SCHOOLS 11/09/2018*
© 2018 Tower Pinkster Titus Associates - All Rights Reserved
SECTION 07 3113 - ASPHALT SHINGLES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Asphalt shingles.
2. Underlayment.
3. Ridge vents.
4. Metal flashing and trim.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Samples for Initial Selection: For each type of asphalt shingle indicated.
1. Include similar Samples of accessories involving color selection.
C. Samples for Verification: For the following products, of sizes indicated:
1. Asphalt Shingles: Full size.
2. Ridge Vent: 12-inch- (300-mm-) long Sample.
1.3 INFORMATIONAL SUBMITTALS
A. Product test reports.
B. Evaluation reports.
C. Sample warranty.
1.4 CLOSEOUT SUBMITTALS
A. Maintenance data.
1.5 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Asphalt Shingles: 100 sq. ft. (9.3 sq. m) of each type, in unbroken bundles.
NEWAYGO MIDDLE SCHOOL - REROOFING PROJECT 07 3113 - 2
1.6 DELIVERY, STORAGE, AND HANDLING
A. Store roofing materials in a dry, well-ventilated location protected from weather, sunlight, and moisture according to manufacturer's written instructions.
B. Store underlayment rolls on end on pallets or other raised surfaces. Do not double stack rolls.
C. Protect unused roofing materials from weather, sunlight, and moisture when left overnight or when roofing work is not in progress.
D. Handle, store, and place roofing materials in a manner to prevent damage to roof deck or structural supporting members.
1.7 WARRANTY
A. Manufacturer's Warranty: Manufacturer agrees to repair or replace asphalt shingles that fail within specified warranty period.
1. Material Warranty Period: 30 years from date of Substantial Completion, prorated, with first five years nonprorated.
2. Wind-Speed Warranty Period: Asphalt shingles will resist blow-off or damage caused by wind speeds of up to 110 mph (49 m/s) for 15 years from date of Substantial Completion.
3. Algae-Resistance Warranty Period: Asphalt shingles will not discolor for 10 years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Exterior Fire-Test Exposure: Provide asphalt shingles and related roofing materials identical to those of assemblies tested for Class A fire resistance according to ASTM E 108 or UL 790 by Underwriters Laboratories, Inc. or another testing and inspecting agency acceptable to authorities having jurisdiction.
Identify products with appropriate markings of applicable testing agency.
2.2 GLASS-FIBER-REINFORCED ASPHALT SHINGLES
A. Laminated-Strip Asphalt Architectural Shingles: ASTM D 3462/D 3462M, laminated, multi-ply overlay construction, glass-fiber reinforced, mineral-granule surfaced, and self-sealing.
1. Butt Edge: Straight cut.
2. Strip Size: Manufacturer's standard.
3. Algae Resistance: Granules resist algae discoloration.
4. Impact Resistance: UL 2218, Class 4.
5. Color and Blends: As selected by Architect from manufacturer's full range
B. Hip and Ridge Shingles: Manufacturer's standard units to match asphalt shingles.
NEWAYGO MIDDLE SCHOOL - REROOFING PROJECT 07 3113 - 3
2.3 UNDERLAYMENT MATERIALS
A. Felt: ASTM D 226/D 226M, heavy duty asphalt-saturated organic felts, nonperforated 30 lb.
1. Type: Type I.
B. Self-Adhering Sheet Underlayment, Polyethylene Faced: ASTM D 1970/D 1970M, minimum of 40-mil- (1.0-mm-) thick, slip-resisting, polyethylene-film-reinforced top surface laminated to SBS-modified asphalt adhesive, with release backing; cold applied. Provide primer for adjoining concrete or masonry surfaces to receive underlayment.
2.4 RIDGE VENTS
A. Rigid Ridge Vent: Manufacturer's standard, rigid section high-density polypropylene or other UV-stabilized plastic ridge vent for use under ridge shingles.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Air Vent, Inc.; a Gibraltar Industries company.
b. Lomanco, Inc.
c. Obdyke, Benjamin Incorporated.
2. Minimum Net Free Area: 18 sq. in./ft.(381 sq. cm./m).
3. Features:
a. Nonwoven geotextile filter strips.
b. External deflector baffles.
2.5 ACCESSORIES
A. Asphalt Roofing Cement: ASTM D 4586, Type II, asbestos free.
B. Roofing Nails: ASTM F 1667; hot-dip galvanized-steel wire shingle nails, minimum 0.120-inch- (3-mm-) diameter, sharp-pointed, with a minimum 3/8-inch- (9.5-mm-) diameter flat head and of sufficient length to penetrate 3/4 inch (19 mm) into solid wood decking or extend at least 1/8 inch (3 mm) through OSB or plywood sheathing.
1. Shank: Barbed.
2. Where nails are in contact with metal flashing, use nails made from same metal as flashing.
C. Felt-Underlayment Nails: Hot-dip galvanized-steel wire with low-profile capped heads or disc caps, 1-inch (25-mm) minimum diameter.
2.6 METAL FLASHING AND TRIM
A. General:
1. Sheet Metal: Stainless steel, or Zinc-tin alloy-coated stainless steel, or Zinc-tin alloy-coated steel, or Anodized aluminum.
http://www.specagent.com/Lookup?ulid=4749 http://www.specagent.com/Lookup?uid=123456926719 http://www.specagent.com/Lookup?uid=123456926722 http://www.specagent.com/Lookup?uid=123456926714
NEWAYGO MIDDLE SCHOOL - REROOFING PROJECT 07 3113 - 4
B. Fabricate sheet metal flashing and trim to comply with recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of the item.
1. Apron Flashings: Fabricate with lower flange a minimum of 5 inches (125 mm) over and [4 inches (100 mm) beyond each side of downslope asphalt shingles and 6 inches (150 mm) up the vertical surface.
2. Step Flashings: Fabricate with a headlap of 2 inches (50 mm) and a minimum extension of 5 inches (125 mm) over the underlying asphalt shingle and up the vertical surface.
3. Cricket or Backer Flashings: Fabricate with concealed flange extending a minimum of 24 inches (610 mm)] beneath upslope asphalt shingles and 6 inches (150 mm) beyond each side of penetration and 6 inches (150 mm) above the roof plane.
4. Drip Edges: Fabricate in lengths not exceeding 10 feet with roof-deck flange and 1-1/2-inch (38-
mm) fascia flange with 3/8-inch (9.5-mm) drip at lower edge.
C. Vent Pipe Flashings: ASTM B 749, Type L51121, at least 1/16 inch (1.6 mm) thick. Provide lead sleeve sized to slip over and turn down into pipe, soldered to skirt at slope of roof, and extending at least 4 inches (100 mm) from pipe onto roof.
PART 3 - EXECUTION
3.1 UNDERLAYMENT INSTALLATION
A. General: Comply with underlayment manufacturer's written installation instructions applicable to products and applications indicated unless more stringent requirements apply.
B. Single-Layer Felt Underlayment: Install on roof deck parallel with and starting at the eaves. Lap sides a minimum of 2 inches (50 mm) over underlying course. Lap ends a minimum of 4 inches (100 mm).
Stagger end laps between succeeding courses at least 72 inches (1830 mm). Fasten with felt-underlayment roofing nails.
1. Install felt underlayment on roof deck not covered by self-adhering sheet underlayment. Lap sides of felt over self-adhering sheet underlayment not less than 3 inches (75 mm) in direction that sheds water. Lap ends of felt not less than 6 inches (150 mm) over self-adhering sheet underlayment.
2. Install fasteners at no more than 36 inches (914 mm) o.c.
C. Self-Adhering Sheet Underlayment: Install, wrinkle free, on roof deck. Comply with low-temperature installation restrictions of underlayment manufacturer if applicable. Install lapped in direction that sheds water. Lap sides not less than 3-1/2 inches (89 mm). Lap ends not less than 6 inches (150 mm) staggered 24 inches (600 mm) between courses. Roll laps with roller. Cover underlayment within seven days.
1. Prime concrete and masonry surfaces to receive self-adhering sheet underlayment.
1. Eaves: Extend from edges of eaves 36 inches (914 mm) beyond interior face of exterior wall.
2. Rakes: Extend from edges of rake 36 inches (914 mm) beyond interior face of exterior wall.
3. Valleys: Extend from lowest to highest point 24 inches (610 mm) on each side.
4. Hips: Extend 36 inches (914 mm) on each side.
5. Ridges: Extend 36 inches (914 mm) on each side without obstructing continuous ridge vent slot.
6. Sidewalls: Extend beyond sidewall 24 inches (610 mm),and return vertically against sidewall not less than 6 inches.
NEWAYGO MIDDLE SCHOOL - REROOFING PROJECT 07 3113 - 5
7. Dormers, Chimneys, Skylights, and Other Roof-Penetrating Elements: Extend beyond penetrating element 18 inches,and return vertically against penetrating element not less than 6 inches.
8. Roof Slope Transitions: Extend 24 inches on each roof slope.
3.2 METAL FLASHING INSTALLATION
A. General: Install metal flashings and other sheet metal to comply with requirements in Section 07 6200 "Sheet Metal Flashing and Trim."
1. Install metal flashings according to recommendations in ARMA's "Residential Asphalt Roofing Manual" and NRCA's "NRCA Guidelines for Asphalt Shingle Roof Systems."
3.3 ASPHALT-SHINGLE INSTALLATION
A. General: Install asphalt shingles according to manufacturer's written instructions, recommendations in ARMA's "Residential Asphalt Roofing Manual," and recommendations in NRCA's "NRCA Guidelines for Asphalt Shingle Roof Systems."
B. Install starter strip along lowest roof edge, consisting of an asphalt-shingle strip with tabs removed at least 7 inches (175 mm) wide with self-sealing strip face up at roof edge.
1. Extend asphalt shingles 3/4 inch (19 mm) over fasciae at eaves and rakes.
2. Install starter strip along rake edge.
C. Install first and remaining courses of asphalt shingles stair-stepping diagonally across roof deck with manufacturer's recommended offset pattern at succeeding courses, maintaining uniform exposure.
D. Install first and remaining courses of asphalt shingles stair-stepping diagonally across roof deck with manufacturer's recommended offset pattern at succeeding courses, maintaining uniform exposure.
E. Install asphalt shingles by single-strip column or racking method, maintaining uniform exposure. Install full-length first course followed by cut second course, repeating alternating pattern in succeeding courses.
F. Fasten asphalt-shingle strips with a minimum of six roofing nails located according to manufacturer's written instructions. Use of staples is prohibited.
1. Where roof slope is less than 4:12, seal asphalt shingles with asphalt roofing cement spots.
2. When ambient temperature during installation is below 50 deg F (10 deg C) seal asphalt shingles with asphalt roofing cement spots.
G. Woven Valleys: Extend succeeding asphalt-shingle courses from both sides of valley 12 inches (300
mm) beyond center of valley, weaving intersecting shingle-strip courses over each other. Use one-piece shingle strips without joints in valley.
1. Do not nail asphalt shingles within 6 inches of valley center.
H. Closed-Cut Valleys: Extend asphalt-shingle strips from one side of valley 12 inches (300 mm) beyond center of valley. Use one-piece shingle strips without joints in valley. Fasten with extra nail in upper end of shingle. Install asphalt-shingle courses from other side of valley and cut back to a straight line 2 inches (50
mm) short of valley centerline. Trim upper concealed corners of cut-back shingle strips.
NEWAYGO MIDDLE SCHOOL - REROOFING PROJECT 07 3113 - 6
1. Do not nail asphalt shingles within 6 inches (150 mm) of valley center.
2. Set trimmed, concealed-corner asphalt shingles in a 3-inch- (75-mm-) wide bed of asphalt roofing cement.
I. Ridge Vents: Install continuous ridge vents over asphalt shingles according to manufacturer's written instructions. Fasten with roofing nails of sufficient length to penetrate sheathing.
J. Hip and Ridge Shingles: Maintain same exposure of cap shingles as roofing shingle exposure. Lap cap shingles at ridges to shed water away from direction of prevailing winds. Fasten with roofing nails of sufficient length to penetrate sheathing.
1. Fasten ridge cap asphalt shingles to cover ridge vent without obstructing airflow.
END OF SECTION 07 3113
PROJECT NO. 17-204.40 ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING
NEWAYGO HIGH SCHOOL 07 5323 - 1
NEWAYGO PUBLIC SCHOOLS 11/08/2018*
SECTION 07 5323 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Adhered ethylene-propylene-diene-terpolymer (EPDM) roofing system.
2. Substrate board.
3. Roof insulation.
4. Cover board.
5. Walkways.
B. Section includes installation of sound-absorbing insulation strips in ribs of roof deck. Sound-absorbing insulation strips are furnished under Section 05 3100 "Steel Decking."
C. Related Requirements:
1. Section 06 1000 "Rough Carpentry" for wood nailers, curbs, and blocking.
2. Section 07 7100 "Roof Specialties" for roof edge flashings.
3. Section 07 9200 "Joint Sealants" for joint sealants, joint fillers, and joint preparation.
1.2 DEFINITIONS
A. Roofing Terminology: Definitions in ASTM D 1079 and glossary of NRCA's "The NRCA Roofing Manual:
Membrane Roof Systems" apply to work of this Section.
1.3 PREINSTALLATION MEETINGS
A. Preliminary Conference: Conduct conference at Project site.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. For insulation and roof system component fasteners, include copy of FM Approvals' RoofNav listing.
B. Shop Drawings: Include roof plans, sections, details, and attachments to other work, including the following:
1. Layout and thickness if insulation.
2. Base flashings and membrane terminations.
3. Flashing details at penetrations.
4. Tapered insulation, thickness, and slopes.
NEWAYGO HIGH SCHOOL 07 5323 - 2
5. Roof plan showing orientation of steel roof deck and orientation of roof membrane and fastening spacings and patterns for mechanically fastened roofing system.
6. Insulation fastening patterns for corner, perimeter, and field-of-roof locations.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer and manufacturer.
B. Manufacturer Certificates:
1. Performance Requirement Certificate: Signed by roof membrane manufacturer, certifying that roofing system complies with requirements specified in "Performance Requirements" Article.
a. Submit evidence of complying with performance requirements.
2. Special Warranty Certificate: Signed by roof membrane manufacturer, certifying that all materials supplied under this Section are acceptable for special warranty.
C. Evaluation Reports: For components of roofing system, from ICC-ES.
D. Field Test Reports:
1. Concrete internal relative humidity test reports.
2. Fastener-pullout test results and manufacturer's revised requirements for fastener patterns.
E. Field quality-control reports.
F. Sample warranties.
1.6 CLOSEOUT SUBMITTALS
A. Maintenance data.
B. Certified statement from existing roof membrane manufacturer stating that existing roof warranty has not been affected by Work performed under this Section.
1.7 QUALITY ASSURANCE
A. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by roofing system manufacturer to install manufacturer's product and that is eligible to receive manufacturer's special warranty.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, approval or listing agency markings, and directions for storing and mixing with other components.
NEWAYGO HIGH SCHOOL 07 5323 - 3
B. Store liquid materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by roofing system manufacturer. Protect stored liquid material from direct sunlight.
1. Discard and legally dispose of liquid material that cannot be applied within its stated shelf life.
C. Protect roof insulation materials from physical damage and from deterioration by sunlight, moisture, soiling, and other sources. Store in a dry location. Comply with insulation manufacturer's written instructions for handling, storing, and protecting during installation.
D. Handle and store roofing materials, and place equipment in a manner to avoid permanent deflection of deck.
1.9 FIELD CONDITIONS
A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed according to manufacturer's written instructions and warranty requirements.
1.10 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace components of roofing system that fail in materials or workmanship within specified warranty period.
1. Special warranty includes roofing membrane, all other items specified in this Section, flashings and counterflashings, coping and gravel stop, and other components of membrane roofing system.
2. Wind Speed: Warranty shall not have limitation for wind damage for wind speed less than 70 mph (113 kph).
3. Warranty Period: 25 years from Date of Substantial Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. General Performance: Installed roofing system and base flashings shall withstand specified uplift pressures, thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction. Roofing and flashings shall remain watertight.
1. Accelerated Weathering: Roof membrane shall withstand 2000 hours of exposure when tested according to ASTM G 152, ASTM G 154, or ASTM G 155.
2. Impact Resistance: Roof membrane shall resist impact damage when tested according to ASTM D 3746, ASTM D 4272, or the Resistance to Foot Traffic Test in FM Approvals 4470.
B. Material Compatibility: Roofing materials shall be compatible with one another and adjacent materials under conditions of service and application required, as demonstrated by roof membrane manufacturer based on testing and field experience.
NEWAYGO HIGH SCHOOL 07 5323 - 4
C. Roofing System Design: Tested by a qualified testing agency to resist the following uplift pressures:
1. Field-of-Roof Uplift Pressure: 28.4 lbf/sq. ft. (1.37 KPa).
2. Perimeter Uplift Pressure: 47.7 lbf/sq. ft. (2.29 KPa).
3. Corner Uplift Pressure: 71.8 lbf/sq. ft. (3.45 KPa).
D. Fire-Resistance Ratings: Comply with fire-resistance-rated assembly designs indicated. Identify products with appropriate markings of applicable testing agency.
2.2 ETHYLENE-PROPYLENE-DIENE-TERPOLYMER (EPDM) ROOFING
A. EPDM Sheet: ASTM D 4637/D 4637M, Type I, nonreinforced, EPDM sheet.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Carlisle SynTec Incorporated.
b. Firestone Building Products.
c. Versico Incorporated.
2. Thickness: 60 mils (1.5 mm), nominal.
3. Exposed Face Color: Black.
4. Source Limitations: Obtain components for roofing system from roof membrane manufacturer or manufacturers approved by roof membrane manufacturer.
2.3 AUXILIARY ROOFING MATERIALS
A. General: Auxiliary materials recommended by roofing system manufacturer for intended use and compatible with other roofing components.
1. Adhesive and Sealants: Comply with VOC limits of authorities having jurisdiction.
B. Sheet Flashing: 60-mil- (1.5-mm-) thick EPDM, partially cured or cured, according to application.
C. Protection Sheet: Epichlorohydrin or neoprene nonreinforced flexible sheet, 55 to 60 mils (1.4 to 1.5 mm) thick, recommended by EPDM manufacturer for resistance to hydrocarbons, non-aromatic solvents, grease, and oil.
D. Prefabricated Pipe Flashings: As recommended by roof membrane manufacturer.
E. Bonding Adhesive: Manufacturer's standard.
F. Seaming Material: Manufacturer's standard, synthetic-rubber polymer primer and 3-inch- (75-mm-) wide minimum, butyl splice tape with release film.
G. Lap Sealant: Manufacturer's standard, single-component sealant, colored to match membrane roofing.
H. Water Cutoff Mastic: Manufacturer's standard butyl mastic sealant.
http://www.specagent.com/Lookup?ulid=12785 http://www.specagent.com/Lookup?uid=123457065961 http://www.specagent.com/Lookup?uid=123457065966 http://www.specagent.com/Lookup?uid=123457065971
NEWAYGO HIGH SCHOOL 07 5323 - 5
I. Metal Termination Bars: Manufacturer's standard, predrilled stainless steel or aluminum bars, approximately 1 by 1/8 inch (25 by 3 mm) thick; with anchors.
J. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions in FM Approvals 4470, designed for fastening components to substrate, and acceptable to roofing system manufacturer.
K. Miscellaneous Accessories: Provide pourable sealers, preformed cone and vent sheet flashings, molded pipe boot flashings, preformed inside and outside corner sheet flashings, reinforced EPDM securement strips, T-joint covers, in-seam sealants, termination reglets, cover strips, and other accessories.
1. Provide white flashing accessories for white EPDM membrane roofing.
2.4 SUBSTRATE BOARDS
A. Substrate Board: ASTM C 1177/C 1177M, glass-mat, water-resistant gypsum board or ASTM C 1278/C 1278M, fiber-reinforced gypsum board.
1. Thickness: Type X, 5/8 inch (16 mm).
2. Surface Finish: Existing metal deck
B. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions in FM Approvals 4470, designed for fastening substrate panel to roof deck.
2.5 VAPOR RETARDER
A. Self-Adhering-Sheet Vapor Retarder: ASTM D 1970/D 1970M, polyethylene film laminated to layer of rubberized asphalt adhesive, minimum 40-mil- (1.0-mm-) total thickness; maximum permeance rating of
0.1 perm (6 ng/Pa x s x sq. m); cold applied, with slip-resisting surface and release paper backing. Provide primer when recommended by vapor retarder manufacturer.
2.6 ROOF INSULATION
A. General: Preformed roof insulation boards manufactured or approved by EPDM roof membrane manufacturer.
B. Polyisocyanurate Board Insulation: ASTM C 1289, Type II, Class 1, Grade 2, felt or glass-fiber mat facer on both major surfaces.
1. Compressive Strength: 20 psi (138 k.
2. Thickness: 2-1/2 inches (64 mm). 2 layers, staggered.
C. Tapered Insulation: Provide factory-tapered insulation boards.
1. Material: Match roof insulation.
2. Minimum Thickness: 1/4 inch (6.35 mm).
3. Slope: As required to provide minimum roof slope of 1/8 inch per 12 inches (1:48) unless otherwise indicated. Provide an alternate bid to provide 1/4 inch per 12 inches.
NEWAYGO HIGH SCHOOL 07 5323 - 6
2.7 INSULATION ACCESSORIES
A. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions in FM Approvals 4470, designed for fastening roof insulation to substrate, and acceptable to roofing system manufacturer.
B. Insulation Adhesive: Insulation manufacturer's recommended adhesive formulated to attach roof insulation to substrate or to another insulation layer as follows:
1. Bead-applied, low-rise, one-component or multicomponent urethane adhesive.
C. Cover Board: ASTM C 1289 Type II, Class 4, Grade 1, 1/2-inch- (13-mm-) thick polyisocyanurate, with a minimum compressive strength of 80 psi (551 kPa).
1. Thermal Resistance: Minimum R 2.5.
2.8 WALKWAYS
A. Flexible Walkways: Factory-formed, nonporous, heavy-duty, slip-resisting, surface-textured walkway pads, approximately 3/16 inch (5 mm) thick and acceptable to roofing system manufacturer.
1. Size: Approximately 36 by 60 inches (914 by 1524 mm).
2. Color: Contrasting with roof membrane.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements and other conditions affecting performance of the Work.
1. Verify that roof openings and penetrations are in place, curbs are set and braced, and roof-drain bodies are securely clamped in place.
2. Verify that wood blocking, curbs, and nailers are securely anchored to roof deck at penetrations and terminations and that nailers match thicknesses of insulation.
3. Verify that surface plane flatness and fastening of steel roof deck complies with requirements of the Roofing Manufacturer.
3.2 PREPARATION
A. Clean substrate of dust, debris, moisture, and other substances detrimental to roofing system installation according to roofing system manufacturer's written instructions. Remove sharp projections.
B. Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction. Remove roof-drain plugs when no work is taking place or when rain is forecast.
C. Perform fastener-pullout tests according to roof system manufacturer's written instructions.
NEWAYGO HIGH SCHOOL 07 5323 - 7
1. Submit test result within 24 hours of performing tests.
a. Include manufacturer's requirements for any revision to previously submitted fastener patterns required to achieve specified wind uplift requirements.
D. Install sound-absorbing insulation strips according to acoustical roof deck manufacturer's written instructions.
3.3 ROOFING INSTALLATION, GENERAL
A. Install roofing system according to roofing system manufacturer's written instructions.
B. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system at end of workday or when rain is forecast. Remove and discard temporary seals before beginning work on adjoining roofing.
C. Install roof membrane and auxiliary materials to tie in to existing roofing to maintain weathertightness of transition and to not void warranty for existing roofing system.
3.4 SUBSTRATE BOARD INSTALLATION
A. Install substrate board with long joints in continuous straight lines, with end joints staggered not less than 24 inches (610 mm)in adjacent rows.
1. At steel roof decks, install substrate board at right angle to flutes of deck.
a. Locate end joints over crests of steel roof deck.
2. Tightly butt substrate boards together.
3. Cut substrate board to fit tight around penetrations and projections, and to fit tight to intersecting sloping roof decks.
4. Fasten substrate board to top flanges of steel deck according to recommendations in FM
Approvals' RoofNav assembly requirements and FM Global Property Loss Prevention Data Sheet 1-29 for specified Windstorm Resistance Classification.
5. Fasten substrate board to top flanges of steel deck to resist uplift pressure at corners, perimeter, and field of roof according to roofing system manufacturers' written instructions.
6. Loosely lay substrate board over roof deck.
3.5 VAPOR RETARDER INSTALLATION
A. Self-Adhering-Sheet Vapor Retarder: Prime substrate if required by manufacturer. Install self-adhering-sheet vapor retarder over area to receive vapor retarder, side and end lapping each sheet a minimum of 3- 1/2 and 6 inches (90 and 150 mm), respectively.
1. Extend vertically up parapet walls and projections to a minimum height equal to height of insulation and cover board.
2. Seal laps by rolling.
NEWAYGO HIGH SCHOOL 07 5323 - 8
B. Completely seal vapor retarder at terminations, obstructions, and penetrations to prevent air movement into roofing system.
3.6 INSULATION INSTALLATION
A. Coordinate installing roofing system components so insulation is not exposed to precipitation or left exposed at end of workday.
B. Comply with roofing system and insulation manufacturer's written instructions for installing roof insulation.
C. Installation Over Metal Decking:
1. Install base layer of insulation with joints staggered not less than 24 inches (610 mm) in adjacent rows and end joints staggered not less than 12 inches (305 mm) in adjacent rows] and with long joints continuous at right angle to flutes of decking.
a. Locate end joints over crests of decking.
b. Where installing composite and noncomposite insulation in two or more layers, install noncomposite board insulation for bottom layer and intermediate layers, if applicable, and install composite board insulation for top layer.
c. Trim insulation neatly to fit around penetrations and projections, and to fit tight to intersecting sloping roof decks.
d. Make joints between adjacent insulation boards not more than 1/4 inch (6 mm) in width.
e. At internal roof drains, slope insulation to create a square drain sump with each side equal to the diameter of the drain bowl plus 24 inches (610 mm).
1) Trim insulation so that water flow is unrestricted.
f. Fill gaps exceeding 1/4 inch (6 mm) with insulation.
g. Cut and fit insulation within 1/4 inch (6 mm) of nailers, projections, and penetrations.
h. .
i. Mechanically attach base layer of insulation and substrate board using mechanical fasteners specifically designed and sized for fastening specified board-type roof insulation to metal decks.
1) Fasten insulation according to requirements in FM Approvals' RoofNav for specified Windstorm Resistance Classification.
2) Fasten insulation to resist specified uplift pressure at corners, perimeter, and field of roof.
2. Install upper layers of insulation and tapered insulation with joints of each layer offset not less than 12 inches (305 mm) from previous layer of insulation.
a. Staggered end joints within each layer not less than 24 inches (610 mm) in adjacent rows.
b. Install with long joints continuous and with end joints staggered not less than 12 inches (305 mm)in adjacent rows.
c. Trim insulation neatly to fit around penetrations and projections, and to fit tight to intersecting sloping roof decks.
d. Make joints between adjacent insulation boards not more than 1/4 inch (6 mm) in width.
NEWAYGO HIGH SCHOOL 07 5323 - 9
e. At internal roof drains, slope insulation to create a square drain sump with each side equal to the diameter of the drain bowl plus 24 inches (610 mm).
f. Trim insulation so that water flow is unrestricted.
g. Fill gaps exceeding 1/4 inch (6 mm) with insulation.
h. Cut and fit insulation within 1/4 inch (6 mm) of nailers, projections, and penetrations.
i. Adhere each layer of insulation to substrate using adhesive according to FM Approvals'
RoofNav assembly requirements and FM Global Property Loss Prevention Data Sheet 1-29 for specified Windstorm Resistance Classification, as follows:
1) Set each layer of insulation in ribbons of bead-applied insulation adhesive, firmly pressing and maintaining insulation in place.
3. Install upper layers of insulation and tapered insulation with joints of each layer offset not less than 12 inches (305 mm) from previous layer of insulation.
a. Staggered end joints within each layer not less than 24 inches (305 mm) in adjacent rows.
b. Install with long joints continuous and with end joints staggered not less than 12 inches (305
mm) in adjacent rows.
c. Trim insulation neatly to fit around penetrations and projections, and to fit tight to intersecting sloping roof decks.
d. Make joints between adjacent insulation boards not more than 1/4 inch (6 mm) in width.
e. At internal roof drains, slope insulation to create a square drain sump with each side equal to the diameter of the drain bowl plus 24 inches (610 mm).
1) Trim insulation so that water is unrestricted.
f. Fill gaps exceeding 1/4 inch (6 mm) with insulation.
g. Cut and fit insulation within 1/4 inch (6 mm) of nailers, projections, and penetrations.
h. Adhere each layer of insulation to substrate using adhesive according to FM Approvals'
RoofNav assembly requirements and FM Global Property Loss Prevention Data Sheet 1-29 for specified Windstorm Resistance Classification, as follows:
1) Set each layer of insulation in ribbons of bead-applied insulation adhesive, firmly pressing and maintaining insulation in place.
3.7 INSTALLATION OF COVER BOARDS
A. Install cover boards over insulation with long joints in continuous straight lines with end joints staggered between rows. Offset joints of insulation below a minimum of 6 inches (150 mm) in each direction.
1. Trim cover board neatly to fit around penetrations and projections, and to fit tight to intersecting sloping roof decks.
2. At internal roof drains, conform to slope of drain sump.
a. Trim cover board so that water flow is unrestricted.
3. Cut and fit cover board tight to nailers, projections, and penetrations.
4. Adhere cover board to substrate using adhesive according to FM Approvals' RoofNav assembly requirements and FM Global Property Loss Prevention Data Sheet 1-29 for specified Windstorm Resistance Classification, as follows:
NEWAYGO HIGH SCHOOL 07 5323 - 10
a. Set cover board in ribbons of bead-applied insulation adhesive, firmly pressing and maintaining insulation in place.
3.8 ADHERED ROOFING INSTALLATION
A. Adhere roof membrane over area to receive roofing according to roofing system manufacturer's written instructions.
B. Unroll membrane roof membrane and allow to relax before installing.
C. Start installation of roofing in presence of roofing system manufacturer's technical personnel and Owner's testing and inspection agency.
D. Accurately align roof membrane, and maintain uniform side and end laps of minimum dimensions required by manufacturer. Stagger end laps.
E. Bonding Adhesive: Apply to substrate and underside of roof membrane at rate required by manufacturer, and allow to partially dry before installing roof membrane. Do not apply to splice area of roof membrane.
F. In addition to adhering, mechanically fasten roof membrane securely at terminations, penetrations, and perimeters.
G. Apply roof membrane with side laps shingled with slope of roof deck where possible.
H. Tape Seam Installation: Clean and prime both faces of splice areas, apply splice tape.
1. Firmly roll side and end laps of overlapping roof membrane to ensure a watertight seam installation.
2. Apply lap sealant and seal exposed edges of roofing terminations.
I. Spread sealant or mastic bed over deck-drain flange at roof drains, and securely seal roof membrane in place with clamping ring.
J. Adhere protection sheet over roof membrane at locations indicated.
3.9 BASE FLASHING INSTALLATION
A. Install sheet flashings and preformed flashing accessories, and adhere to substrates according to roofing system manufacturer's written instructions and NRCA recommended details.
B. Apply bonding adhesive to substrate and underside of sheet flashing at required rate, and allow to partially dry. Do not apply to seam area of flashing.
C. Flash penetrations and field-formed inside and outside corners with cured or uncured sheet flashing.
D. Clean splice areas, apply splicing cement, and firmly roll side and end laps of overlapping sheets to ensure a watertight seam installation. Apply lap sealant and seal exposed edges of sheet flashing terminations.
E. Terminate and seal top of sheet flashings and mechanically anchor to substrate through termination bars.
NEWAYGO HIGH SCHOOL 07 5323 - 11
3.10 WALKWAY INSTALLATION
A. Flexible Walkways: Install walkway products according to manufacturer's written instructions.
1. Install flexible walkways at the following locations:
a. Perimeter of each rooftop unit.
b. Between each rooftop unit location, creating a continuous path connecting rooftop unit locations.
c. Between each roof hatch and each rooftop unit location or path connecting rooftop unit locations.
d. Top and bottom of each roof access ladder.
e. Between each roof access ladder and each rooftop unit location or path connecting rooftop unit locations.
f. Locations indicated on Drawings.
g. As required by roof membrane manufacturer's warranty requirements.
2. Provide 6-inch (76-mm) clearance between adjoining pads.
3. Adhere walkway products to substrate with compatible adhesive according to roofing system manufacturer's written instructions.
3.11 FIELD QUALITY CONTROL
A. Final Roof Inspection: Arrange for roofing system manufacturer's technical personnel to inspect roofing installation on completion, in presence of Architect, and to prepare inspection report.
B. Repair or remove and replace components of roofing system where inspections indicate that they do not comply with specified requirements.
C. Additional testing and inspecting, at Contractor's expense, will be performed to determine if replaced or additional work complies with specified requirements.
3.12 PROTECTING AND CLEANING
A. Protect roofing system from damage and wear during remainder of construction period. When remaining construction does not affect or endanger roofing system, inspect roofing system for deterioration and damage, describing its nature and extent in a written report, with copies to Architect and Owner.
B. Correct deficiencies in or remove roofing system that does not comply with requirements, repair substrates, and repair or reinstall roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to warranty requirements.
C. Clean overspray and spillage from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.
END OF SECTION 07 5323
PROJECT NO. 14-204.50 ROOF SPECIALTIES
NEWAYGO HIGH SCHOOL 07 7100 - 1
NEWAYGO PUBLIC SCHOOLS 11/09/2018
© 2018 Tower Pinkster Titus Associates - All Rights Reserved
SECTION 07 7100 - ROOF SPECIALTIES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Roof-edge specialties.
2. Reglets and counterflashings.
B. Related Requirements:
1. Section 07 5323 "EPDM Roofing".
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
Shop Drawings: For roof specialties.
1. Include plans, elevations, expansion-joint locations, keyed details, and attachments to other work.
Distinguish between plant- and field-assembled work.
C. Samples for Initial Selection: For each type of roof specialty indicated with factory-applied color finishes.
D. Samples for Verification:
1. Include Samples of each type of roof specialty to verify finish and color selection, in manufacturer's standard sizes.
1.3 CLOSEOUT SUBMITTALS
A. Maintenance Data: For roofing specialties to include in maintenance manuals.
1.4 QUALITY ASSURANCE
A. Source Limitations: Obtain roof specialties approved by manufacturer providing roofing-system warranty specified in Section 07 5323 "Ethylene-Propylene-Diene-Monomer (EPDM) Roofing."
1.5 FIELD CONDITIONS
A. Field Measurements: Verify profiles and tolerances of roof-specialty substrates by field measurements before fabrication, and indicate measurements on Shop Drawings.
NEWAYGO HIGH SCHOOL 07 7100 - 2
NEWAYGO PUBLIC SCHOOLS 11/09/2018
© 2018 Tower Pinkster Titus Associates - All Rights Reserved
B. Coordination: Coordinate roof specialties with flashing, trim, and construction of parapets, roof deck, roof and wall panels, and other adjoining work to provide a leakproof, secure, and noncorrosive installation.
1.6 WARRANTY
A. Roofing-System Warranty: Roof specialties are included in warranty provisions in Section 07 5323 "Ethylene-Propylene-Diene-Monomer (EPDM) Roofing."
B. Special Warranty on Painted Finishes: Manufacturer agrees to repair finish or replace roof specialties that show evidence of deterioration of factory-applied finishes within specified warranty period.
1. Fluoropolymer Finish: Deterioration includes, but is not limited to, the following:
a. Color fading more than 5 Hunter units when tested according to ASTM D 2244.
b. Chalking in excess of a No. 8 rating when tested according to ASTM D 4214.
c. Cracking, checking, peeling, or failure of paint to adhere to bare metal.
2. Finish Warranty Period: 20 years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
SPRI Wind Design Standard: Manufacture and install copings tested according to SPRI ES-1 and capable of resisting the following design pressures:
1. Horizontal Outward at Perimeter: 58 psf (2.8 KPa).
2. Horizontal Outward at Corner: 73 psf (3.5 KPa).
3. Vertical Upward at Perimeter: 101 psf (4.8 KPa).
4. Vertical Upward at Corner: 152 psf (7.3 KPa).
B. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes to prevent buckling, opening of joints, hole elongation, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Provide clips that resist rotation and avoid shear stress as a result of thermal movements. Base calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.
1. Temperature Change (Range): 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.
2.2 ROOF-EDGE SPECIALTIES
A. Spill-Out Roof-Edge Fascia: Manufactured, two-piece, roof-edge fascia consisting of snap-on metal fascia cover in section lengths not exceeding 12 feet (3.6 m) and a continuous formed galvanized-steel sheet cleat, 0.028 inch (0.71 mm) thick, minimum, with extended vertical leg terminating in a drip-edge cleat.
Provide matching corner units.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
http://www.specagent.com/Lookup?ulid=9173
NEWAYGO HIGH SCHOOL 07 7100 - 3
NEWAYGO PUBLIC SCHOOLS 11/09/2018
© 2018 Tower Pinkster Titus Associates - All Rights Reserved
a. Architectural Products Company.
b. ATAS International, Inc.
Cheney Flashing Company.
Hickman Company, W. P.
e. Merchant & Evans Inc.
f. Metal-Era, Inc.
Metallic-Coated Steel Sheet Fascia Covers: Zinc-coated (galvanized) steel, nominal 0.034-inch (0.86-mm) thickness.
a. Surface: Smooth, flat finish.
b. Finish: Three-coat metallic fluoropolymer.
c. Color: Match PPG; Duranr XL, Dark Bronze, UC51602.
3. Corners: Factory mitered and continuously welded.
4. Splice Plates: Concealed, of same material, finish, and shape as fascia cover.
REGLETS AND COUNTERFLASHINGS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
Cheney Flashing Company.
Fry Reglet Corporation.
Hickman Company, W. P.
Metal-Era, Inc.
B. Reglets: Manufactured units formed to provide secure interlocking of separate reglet and counterflashing pieces, from the following exposed metal:
1. Zinc-Coated Steel: Nominal 0.028-inch (0.71-mm) thickness.
2. Corners: Factory mitered and continuously welded.
3. Surface-Mounted Type: Provide reglets with slotted holes for fastening to substrate, with neoprene or other suitable weatherproofing washers, and with channel for sealant at top edge.
C. Counterflashings: Manufactured units of heights to overlap top edges of base flashings by 4 inches (100
mm) and in lengths not exceeding 12 feet (3.6 m) designed to snap into reglets or through-wall-flashing receiver and compress against base flashings with joints lapped, from the following exposed metal:
1. At Reglets: Zinc-coated steel, nominal 0.028-inch (0.71-mm) thickness.
2. At Through-Wall Flashing: Stainless steel, 0.025 inch (0.64 mm) thick.
D. Accessories:
1. Flexible-Flashing Retainer: Provide resilient plastic or rubber accessory to secure flexible flashing in reglet where clearance does not permit use of standard metal counterflashing or where reglet is provided separate from metal counterflashing.
2. Counterflashing Wind-Restraint Clips: Provide clips to be installed before counterflashing to prevent wind uplift of counterflashing lower edge.
E. Zinc-Coated Steel Finish: Two-coat fluoropolymer.
http://www.specagent.com/Lookup?uid=123457047155 http://www.specagent.com/Lookup?uid=123457047156 http://www.specagent.com/Lookup?uid=123457047158 http://www.specagent.com/Lookup?uid=123457047159 http://www.specagent.com/Lookup?uid=123457047160 http://www.specagent.com/Lookup?uid=123457047161 http://www.specagent.com/Lookup?ulid=9177 http://www.specagent.com/Lookup?uid=123457047177 http://www.specagent.com/Lookup?uid=123457047178 http://www.specagent.com/Lookup?uid=123457047180 http://www.specagent.com/Lookup?uid=123457047182
NEWAYGO HIGH SCHOOL 07 7100 - 4
NEWAYGO PUBLIC SCHOOLS 11/09/2018
© 2018 Tower Pinkster Titus Associates - All Rights Reserved
1. Color: As selected by Architect from manufacturer's full range.
F. Stainless-Steel Finish: No. 2B (bright, cold rolled, unpolished).
2.4 MATERIALS
A. Zinc-Coated (Galvanized) Steel Sheet: ASTM A 653/A 653M, G90 (Z275) coating designation.
B. Aluminum Sheet: ASTM B 209 (ASTM B 209M), alloy as standard with manufacturer for finish required, with temper to suit forming operations and performance required.
C. Stainless-Steel Sheet: ASTM A 240/A 240M or ASTM A 666, Type 304.
2.5 UNDERLAYMENT MATERIALS
A. Self-Adhering, High-Temperature Sheet: Minimum 30 to 40 mils (0.76 to 1.0 mm) thick, consisting of slip-resisting polyethylene-film top surface laminated to layer of butyl or SBS-modified asphalt adhesive, with release-paper backing; cold applied. Provide primer when recommended by underlayment manufacturer.
Thermal Stability: ASTM D 1970/D 1970M; stable after testing at 240 deg F (116 deg C).
2. Low-Temperature Flexibility: ASTM D 1970/D 1970M; passes after testing at minus 20 deg F (29 deg C).
B. Slip Sheet: Rosin-sized building paper, 3-lb/100 sq. ft. (0.16-kg/sq. m) minimum.
2.6 MISCELLANEOUS MATERIALS
A. Fasteners: Manufacturer's recommended fasteners, suitable for application and designed to meet performance requirements. Furnish the following unless otherwise indicated:
1. Exposed Penetrating Fasteners: Gasketed screws with hex washer heads matching color of sheet metal.
2. Fasteners for Aluminum: Aluminum or Series 300 stainless steel.
3. Fasteners for Zinc-Coated (Galvanized) Steel Sheet: Series 300 stainless steel or hot-dip zinc-coated steel according to ASTM A 153/A 153M or ASTM F 2329.
B. Elastomeric Sealant: ASTM C 920, elastomeric silicone polymer sealant of type, grade, class, and use classifications required by roofing-specialty manufacturer for each application.
C. Butyl Sealant: ASTM C 1311, single-component, solvent-release butyl rubber sealant; polyisobutylene plasticized; heavy bodied for hooked-type joints with limited movement.
D. Bituminous Coating: Cold-applied asphalt emulsion complying with ASTM D 1187/D 1187M.
E. Asphalt Roofing Cement: ASTM D 4586, asbestos free, of consistency required for application.
NEWAYGO HIGH SCHOOL 07 7100 - 5
NEWAYGO PUBLIC SCHOOLS 11/09/2018
© 2018 Tower Pinkster Titus Associates - All Rights Reserved
2.7 FINISHES
A. General: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.
1. Protect mechanical and painted finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.
2. Appearance of Finished Work: Noticeable variations in same piece are unacceptable. Variations in appearance of adjoining components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.
B. Coil-Coated Galvanized-Steel Sheet Finishes:
1. High-Performance Organic Finish: Prepare, pretreat, and apply coating to exposed metal surfaces to comply with ASTM A 755/A 755M and coating and resin manufacturers' written instructions.
a. Two-Coat Fluoropolymer: AAMA 621. Fluoropolymer finish containing not less than 70 percent PVDF resin by weight in color coat.
b. Three-Coat Metallic Fluoropolymer: AAMA 621. Fluoropolymer finish with suspended metallic flakes containing not less than 70 percent PVDF resin by weight in both color coat and clear topcoat.
c. Concealed Surface Finish: Apply pretreatment and manufacturer's standard acrylic or polyester backer finish consisting of prime coat and wash coat with a minimum total dry film thickness of 0.5 mil (0.013 mm).
C. Coil-Coated Aluminum Sheet Finishes:
1. Color Anodic Finish: AAMA 611, AA-M12C22A42/A44, Class I, 0.018 mm or thicker.
PART 3 - EXECUTION
3.1 UNDERLAYMENT INSTALLATION
A. Self-Adhering Sheet Underlayment: Apply primer if required by manufacturer. Comply with temperature restrictions of underlayment manufacturer for installation. Apply wrinkle free, in shingle fashion to shed water, and with end laps of not less than 6 inches (152 mm) staggered 24 inches (610 mm) between courses. Overlap side edges not less than 3-1/2 inches (90 mm). Roll laps with roller. Cover underlayment within 14 days.
1. Apply continuously under copings and reglets and counterflashings.
2. Coordinate application of self-adhering sheet underlayment under roof specialties with requirements for continuity with adjacent air barrier materials.
B. Slip Sheet: Install over underlayment with tape or adhesive for temporary anchorage to minimize use of mechanical fasteners under roof specialties. Apply in shingle fashion to shed water, with lapped joints of not less than 2 inches (50 mm).
NEWAYGO HIGH SCHOOL 07 7100 - 6
NEWAYGO PUBLIC SCHOOLS 11/09/2018
© 2018 Tower Pinkster Titus Associates - All Rights Reserved
3.2 INSTALLATION, GENERAL
A. General: Install roof specialties according to manufacturer's written instructions. Anchor roof specialties securely in place, with provisions for thermal and structural movement. Use fasteners, solder, protective coatings, separators, underlayments, sealants, and other miscellaneous items as required to complete roof-specialty systems.
1. Install roof specialties level, plumb, true to line and elevation; with limited oil-canning and without warping, jogs in alignment, buckling, or tool marks.
2. Provide uniform, neat seams with minimum exposure of solder and sealant.
3. Install roof specialties to fit substrates and to result in weathertight performance. Verify shapes and dimensions of surfaces to be covered before manufacture.
4. Torch cutting of roof specialties is not permitted.
5. Do not use graphite pencils to mark metal surfaces.
B. Metal Protection: Protect metals against galvanic action by separating dissimilar metals from contact with each other or with corrosive substrates by painting contact surfaces with bituminous coating or by other permanent separation as recommended by manufacturer.
1. Coat concealed side of uncoated aluminum and stainless-steel roof specialties with bituminous coating where in contact with wood, ferrous metal, or cementitious construction.
2. Bed flanges in thick coat of asphalt roofing cement where required by manufacturers of roof specialties for waterproof performance.
C. Expansion Provisions: Allow for thermal expansion of exposed roof specialties.
1. Space movement joints at a maximum of 12 feet (3.6 m) with no…