High School Roof.pdf

PDF 498 KB Posted

Attached to
RFP For Roofing and Parking Package
Solicitation number
RFP-NEWS-190000000321-3
Issued by
Oceana County, Michigan

About this file

This is a roofing project specification document for Newaygo High School in Newaygo, Michigan, prepared by Tower Pinkster Titus Associates Inc. The project involves a comprehensive roof replacement for multiple roof areas (A, B, C, D, E, G, H, J, K, L, and M) of the school facility. The specification details a complete roof tear-off down to the existing metal deck for most areas, with a new roofing system consisting of a 60-mil EPDM membrane fully adhered to polyisocyanurate insulation layers. The work includes installing tapered insulation with a minimum 1/8-inch per foot slope, replacing existing wood nailers with pressure-treated wood, and addressing roof penetrations, drains, and edge details.

The roofing system specifications require a 20-year no-dollar-limit full roof system warranty from the membrane manufacturer and a two-year installation workmanship warranty from the contractor. The project includes detailed requirements for insulation layers, membrane installation, flashing, and accessories, with specific attention to maintaining proper drainage and waterproofing. Core samples of existing roof compositions are documented for each roof area, revealing various existing membrane and insulation types. The project appears to be part of a broader school improvement initiative, potentially including secure vestibule additions and mechanical room upgrades, with the roofing work being a critical component of the overall facility renovation.

View the file

Other files

File Type Posted
Bid Pack 5 Specifications.pdf PDF
Newaygo Volume 2_Updated per Addendum 2.pdf PDF
Middle School Roof.pdf PDF
Addendum 2 Write Up.pdf PDF
Addendum 1 Write Up.pdf PDF
HS Parking Lot.pdf PDF
The Christman Company Front End - Bid Package 5.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIELD VERIFY

216' - 6"

FI

EL

D

VE

RI

FY

FI

EL

D

VE

RI

FY

FI

EL

D

VE

RI

FY

FIELD VERIFY

47' - 6"

FIELD VERIFY

97' - 8 1/4"

FI

EL

D

VE

RI

FY

FI

EL

D

VE

RI

FY

FI

EL

D

VE

RI

FY

FI

EL

D

VE

RI

FY

FIELD VERIFY

26' - 2"

UNIT "A"

UNIT "B"

UNIT "A"

UNIT "B"

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

R.D.

S

LO

P E

SL

O

PE

/8 " P

ER

F T

SLOPE

SL

O

PE

1/ 8"

PE

R

FT

FIELD VERIFY

19' - 0"

SL

O

PE

SLO

PE SL

O

PE

SLO

PE

TA

PE

RE

D

IN

SU

LA

TI

O N

E X

IS

T

IN

G R

O O

F

T O

R E M

A

IN

ROOF AREA - C

ROOF AREA - E

ROOF AREA - K

ROOF

AREA - J

#9

#6

#7

ROOF AREA - A

ROOF AREA - B

ROOF AREA - D

ROOF AREA - D

ROOF

AREA - G

ROOF

AREA - H

#10

#1

#2

#3

#4

#5

#8

ROOF AREA - M

R.D.

R.D.

R.D.

R.D.

R.D.

EX.

SKYLIGHT

EX.

SKYLIGHT

EX.

SKYLIGHT

EX.

SKYLIGHT

EX.

SKYLIGHT

ROOF AREA - F

TA

PE

RE

D

IN

SU

LA

TI

O N

A 321

A 321

_________________ EE.F.

EE.F.

EEFTR

TAPERED

INSULATION

SL

O

PE

/8 " P

ER

F T

SL

O

PE

1/ 8"

PE

R

FT

TA

PE

RE

D

IN

SU

LA

TI

O N

TA

PE

RE

D

IN

SU

LA

TI

O N

FI

EL

D

VE

RI

FY

SL

O

PE

/8 " P

ER

F T

TA

PE

RE

D

IN

SU

LA

TI

O N

SL

O

PE

1/ 8"

PE

R

FT

TA

PE

RE

D

IN

SU

LA

TI

O N

HIGH PO

INT

HIGH PO

INT

SLO

PE 1/8" PER FT

SLO

PE

1/8"PER FT

SLO

PE 1/8" PER FT

TAPERED

INSULATIO

N

H

IG

H P

O

IN

T

H

IG

H P

O

IN

T

HIG

H PO

INT

HI

GH

P O

IN

T

HIG

H PO

INT

SL

O

PE

+4.5"

A 321

A 321

A 321

A 321

A 321

A 321

A 321

A 321

A 321

A 321

A 321

A 321

FIELD VERIFY

20' - 3"

FIELD VERIFY

78' - 5"

FIELD VERIFY

37' - 4"

FIELD VERIFY

11' - 0"

A 321

FIELD VERIFY

17' - 6"

FI

EL

D

VE

RI

FY

FIELD VERIFY

39' - 8"

FIELD VERIFY

102' - 5"

R.D.

R.D.

R.D.

A 321

A 321

A 321

A 321

EEFTR

EEFTR

EEFTR

EEFTR

EEFTR

EEFTR

EEFTR

EEFTR

EEFTR

HI

GH

P O

IN

T

EEFTR

SLO

PE 1/8" PER FT

TAPERED

INSULATIO

N

HI

GH

P O

IN

T

SLO

PE 1/8" PER FT

TAPERED

INSULATIO

N

HI

GH

P O

IN

T

SLO

PE 1/8" PER FT

TAPERED

INSULATIO

N

FI

EL

D

VE

RI

FY

ROOF

AREA - L

R.D.

+3

1. PROVIDE AND INSTALL NEW TAPERED POLYISOCYANURATE RIGID INSULATION (20 PSI

COMPRESSIVE STRENGTH MIN.) TO PROVIDE POSITIVE DRAINAGE (1/8" PER FT. MIN.) TO

THE EXISTING ROOF DRAINS, R 30 TOTAL MIN. STAGGER LAYERS OF INSULATION.

2. PROVIDE AND INSTALL NEW 60 MIL EPDM MEMBRANE FULLY ADHERED ROOFING SYSTEM,

INCLUDING ALL FLASHINGS, AND PIPING BOOT ACCESSORIES.

3. PROVIDE AND INSTALL NEW FLASHING, FLASHING BOOTS, METAL TERMINATION BARS,

CLEATS, REGLETS THROUGHOUT TO REPLACE EXISTING. ADD EXTENSIONS TO VTR'S AND

CURBS TO MAINTAIN 12" MINIMUM HEIGHT ABOVE THE ROOF SURFACE.

4. INSTALL SHEET FLASHINGS AND PREFORMED FLASHING ACCESSORIES AND ADHERE TO

SUBSTRATES ACCORDING TO NRCA RECOMMENDED DETAILS.

5. FURNISH THE ROOF MEMBRANE MANUFACTURER'S 20 YEAR NO DOLLAR LIMIT FULL ROOF

SYSTEM MATERIALS AND INSTALLATION WORKMANSHIP WARRANTY, INCLUDING FLASHING,

INSULATION, AND ACCESSORIES NECESSARY FOR A WATERTIGHT ROOF SYSTEM

CONSTRUCTION.

6. THE ROOF SYSTEM INSTALLER MUST WARRANT FOR A PERIOD OF TWO YEARS THAT THE

ROOF SYSTEM, AS INSTALLED, IS FREE FROM DEFECTS IN INSTALLATION WORKMANSHIP,

TO INCLUDE THE ROOF MEMBRANE, FLASHING, INSULATION, ACCESSORIES, ATTACHMENTS,

AND SHEET METAL INSTALLATION INTEGRAL TO A COMPLETE WATERTIGHT ROOF SYSTEM

ASSEMBLY.

SUMMARY OF ROOFING WORK

MEMBRANE ROOF SYSTEM

1. CONTRACTORS ARE REQUIRED TO INSPECT/REVIEW THE EXISTING BUILDING INCLUDING THE

ROOF PRIOR TO RELATED DEMOLITION WORK. UNLESS NOTED OTHERWISE, REMOVAL OF

ANY WALL, FLOOR OR CEILING INCLUDES ALL GENERAL MECHANICAL AND ELECTRICAL ITEMS

WHICH ARE A PART OF, OR ATTACHED TO IT.

2. CONTRACTOR SHALL VERIFY ALL EXISTING JOB SITE CONDITIONS AND DIMENSIONS AND BE

RESPONSIBLE FOR THE SAME. ADVISE CONSTRUCTION MANAGER OF ANY AND ALL

DISCREPANCIES PRIOR TO STARTING NEW WORK.

3. CONTRACTOR SHALL FIELD VERIFY QUANTITY, SIZE AND LOCATIONS OF ALL ROOF

PENETRATIONS PRIOR BID AND ORDERING MATERIALS.

4. ACCOMMODATE NEW CONSTRUCTION IF NOT INDICATED.

5. ALL MECHANICAL LINES, PIPING, EQUIPMENT, CONDUIT AND WIRING SHALL BE TEMPORARY

REMOVED AS NECESSARY FOR THE INSTALLATION OF THE NEW ROOFING SYSTEM. IF

EXISTING PIPING IS NOT REMOVED, SHORE UP AS REQUIRED TO REMOVE ENTIRE EXISTING

ROOFING SYSTEM. SALVAGE ALL P.T. PIPING SUPPORT FOR REUSE.

6. CUT BACK MEMBRANE AS REQUIRED TO EXISTING ROOFING TRANSITIONS TO ALLOW FOR

WATERTIGHT SEALING FOR NEW MEMBRANE.

7. THE CONTRACTOR SHALL INCLUDE SUCH TIME AND MATERIALS IN THE BID AS REQUIRED TO

MAKE WATERTIGHT CLOSURES AND TRANSITIONS WHERE DIFFERENT ROOF DETAILS

INTERSECT OR WHERE A ROOF DETAIL TERMINATES. THESE WATERTIGHT CLOSURES SHALL

BE MADE IN COMPLETE COMPLIANCE WITH ARCHITECT APPROVED AND CONTRACTOR

SUBMITTED SHOP DRAWINGS. CLOSURES SHALL BE MADE WITH FLASHING MEMBRANE,

COATED METAL AND OTHER APPROVED ACCESSORIES. SURFACE SEALANTS ARE NOT

ACCEPTABLE AS THE PRIMARY CLOSURE COMPONENTS.

8. EXAMINE EXISTING WOOD NAILERS AND BLOCKING, AND REMOVE AND DISPOSE AS

REQUIRED. REPLACE DISPOSED BLOCKING WITH NEW P.T. WOOD.

9. AFTER THE REMOVAL THE ROOFING ASSEMBLY, THE EXISTING METAL ROOF DECK SHALL BE

EXAMINED FOR STRUCTURAL INTEGRITY AND REPAIRED AS NECESSARY.

ROOFING GENERAL DEMOLITION & NEW CONSTRUCTION NOTES

ROOF PLAN KEY

TAPERED INSULATION - SADDLES

R.D.

AHU OR RTU

ACCU

E.F.

ROOF DRAIN - SEE PLUMBING DRAWINGS

ROOF TOP UNIT - SEE MECHANICAL DAWINGS

CONDENSING UNIT - SEE MECHANICAL DRAWINGS

EXHAUST FAN / HOOD - SEE MECHANICAL DRAWINGS

1. TYPICAL ROOF SLOPE 1/4" / 1'-0" UNLESS NOTED OTHERWISE.

2. PROVIDE ROOFING MANUFACTURERS STANDARD ROOFING TERMINATION

DETAILS AT ALL PARAPETS, GRAVEL STOPS, CURBS, PIPE PENETRATIONS, ETC.

3. PROVIDE CRICKETS AS REQUIRED AT ALL MECHANICAL UNITS, VENTS,

ETC. TO MAINTAIN POSITIVE SLOPE OF 1/4" /1'-0" MINIMUM.

NOTES

EVTR EXISTING VENT TO REMAIN

ERDTR EXISTING ROOF DRAIN TO REMAIN

EEFTR EXISTING EXHAUST FAN / HOOD TO REMAIN.

ROOF AREA: 'A', 'B', 'C', 'D', 'E', 'J', 'K', 'L', 'M' - COMPLETE

ROOF TEAR-OFF TO EXISTING METAL DECK.

NEW ROOFING:

1. 60 MIL EPDM MEMBRANE - FULLY ADHERED

2. 1/2" POLYISO (CLOSED CELL) FIBERGLASS FACED INSULATION COVER BOARD.

3. TAPERED RIGID INSULATION (POLYISO), 1/8" PER FT. MIN 11/2" @ EXISTING ROOF DRAINS.

4. 2 1/2" RIGID INSULATION (POLYISO) - 2 LAYERS, STAGGERED BASE LAYER

5. 5/8" TYPE 'X' FIBERGLASS FACED GYPSUM BOARD.

6. EXISTING STEEL ROOF DECK.

ROOF AREAS: 'G' & 'H' - EXISTING TO REMAIN (BASE BID)

NEW ROOFING (ALTERNATE):

1. 60 MIL EPDM MEMBRANE - FULLY ADHERED

2. 1/2" POLYISO (CLOSED CELL) FIBERGLASS FACED INSULATION COVER BOARD.

3. EXISTING EPDM ROOF, CUT INTO 10' X 10' GRID.

NEW ROOFING LEGEND

ROOF CORE #1 (ROOF AREA 'C'):

EXISTING ROOF COMPOSITION @ CORE SAMPLE:

1. EXISTING PVC MEMBRANE

2. SLIP SHEET

3. EXISTING PVC MEMBRANE

4. 3 1/4" EPS INSULATION

5. 1/2" PERLITE INSULATION

6. EXISTING STEEL DECK

ROOF CORE #2 (ROOF AREA 'B'):

EXISTING ROOF COMPOSITION @ CORE SAMPLE:

1. EXISTING EPDM MEMBRANE

2. 1 1/2" POLYISO INSULATION

3. 4 1/2" EPS INSULATION (TAPERED)

4. 1/2" PERLITE INSULATION

5. EXISTING STEEL DECK

ROOF CORE #3 (ROOF AREA 'D'):

EXISTING ROOF COMPOSITION @ CORE SAMPLE:

1. EXISTING EPDM MEMBRANE

2. 1/2" WD. FIBER BOARD

3. 1" EPS INSULATION

4. EXISTING STEEL DECK

ROOF CORE #4 (ROOF AREA 'D'):

EXISTING ROOF COMPOSITION @ CORE SAMPLE:

1. EXISTING EPDM MEMBRANE

2. 1/2" PERLITE INSULATION BD.

3. BUR ASPHALT GRAVEL

4. 1" WD. FIBER BOARD

5. EXISTING STEEL DECK

ROOF CORE #5 (ROOF AREA 'D'):

EXISTING ROOF COMPOSITION @ CORE SAMPLE:

1. EXISTING EPDM MEMBRANE

2. 1/2" WD. FIBER BOARD

3. BUR ASPHALT GRAVEL

4. 1 1/2" PERLITE INSULATION

5. EXISTING STEEL DECK

ROOF CORE #6 (ROOF AREA 'K'):

EXISTING ROOF COMPOSITION @ CORE SAMPLE:

1. EXISTING EPDM MEMBRANE

2. 1 1/2" POLYISO INSULATION

3. 9" EPS INSULATION

4. 1/2" PERLITE INSULATION

5. EXISTING STEEL DECK

ROOF CORE #7 (ROOF AREA 'K'):

ROOF CORE #8 (ROOF AREA 'G'):

EXISTING ROOF COMPOSITION @ CORE SAMPLE:

1. EXISTING EPDM MEMBRANE

2. 1 1/2" POLYISO INSULATION

3. 3" EPS INSULATION

4. 11/2" POLYISO INSULATION

5. EXISTING STEEL DECK

ROOF CORE #9 (ROOF AREA 'E'):

EXISTING ROOF COMPOSITION @ CORE SAMPLE:

1. EXISTING EPDM MEMBRANE

2. 1/2" GYPSUM BD.

3. BUR ASPHALT GRAVEL

4. 1 1/2 EPS INSULATION

5. 1" WD. FIBER BOARD

6. EXISTING STEEL DECK

EXISTING ROOF COMPOSITION @ CORE SAMPLE:

1. EXISTING EPDM MEMBRANE

2. 1 1/2" POLYISO INSULATION

3. 3 1/2" EPS INSULATION

4. 1/2" PERLITE INSULATION

5. EXISTING STEEL DECK

ROOF CORE #9 (ROOF AREA 'E'):

EXISTING ROOF COMPOSITION @ CORE SAMPLE:

1. EXISTING EPDM MEMBRANE

2. 1/2" WD FIBER BOARD.

3. BUR ASPHALT GRAVEL

4. 3" EPS INSULATION

5. EXISTING STEEL DECK

ROOF CORE LEGEND:

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2017©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

SECURE

VESTIBULE 1

SECURE

VESTIBULE 2

CAFE.

NEW ROOF

OVER MECH

ROOM & BOILER

REPLACEMENT

IN MECH ROOM

KEY PLAN

AREA OF

REROOFING

OCTOBER 31, 2018

NEWAYGO HIGH

SCHOOL

SECURE

VESTIBULES

Newaygo, Michigan

ROOF PLAN -

UNIT A

14204.50

A 201A

NEWAYGO

PUBLIC

SCHOOLS

3/32" = 1'-0"

ROOF PLAN - UNIT A

ISSUED FOR DATE

KEYED NOTES - NEW CONSTRUCTION

1 REMOVE EXISTING EXTERIOR ALUM. STOREFRONT FRAME, DOORS, THRESHOLD. PREP

OPENING FOR NEW STOREFRONT, DOORS, AND THRESHOLD. NEW ALUM. STOREFRONT

SYSTEM AND DOOR TO MATCH EXISTING.

2 PROVIDE NEW ROOF DRAIN IN THE SAME LOCATION AS EXISTING.

3 NEW ROOF DRAIN. TIE-INTO EXISTING STORM LINE.

4 PROVIDE ROOF SADDLE @ ALL FIXED ELEMENTS/EQUIPMENT OVER 48"

EXTEND MEMBRANE OVER

THE ROOF EDGE TO PT

NAILERS.

PREFINISHED 24 GA. GALV.

STEEL ROOF EDGE DRIP

EDGE FASCIA (2-PIECE)

WITH 22 GA. GALV. STEEL

CONTINUOUS CLEAT. ( 4

FASTENERS MIN).

PT WOOD NAILERS,

ANCHOR TO METAL AND

EDGE ANGLE.

MEMBRANE FLASHING

EXISTING EDGE ANGLE

EXISTING METAL DECK

EXISTING EXTERIOR CMU

REMAIN

PROVIDE NEW ROOFING SYSTEM:

60 MIL FULLY ADHERED EPDM OVER POLYISO.

INSULATION RECOVERY BOARD ON TAPERED

POLYSIO. RIGID INSULATION (1/8 PER SLOPE MIN.)

OVER 2 1/2" BASE LAYER (2 LAYERS MIN., STAGGER

JOINTS) OVER 5/8" TYPE "X" GYP. SHEATHING ON

EXISTING METAL DECK. 1 1/2" MIN. INSULATION @

ROOF DRAINS. TAPERED INSULATION. REPLACE

EXISTING PERIMETER WOOD NAILERS WITH NEW PT

WOOD NAILERS.

PROVIDE NEW 22 GA.

GALV. STEEL RETURN

W/DRIP AT WOOD FASCIA.

/8

WATER BLOCK

MEMBRANE FLASHING

CONTINUOUS BEAD OF

LAP SEALANT

EXTEND MEMBRANE OVER

THE ROOF EDGE TO PT

NAILERS.

PREFINISHED 24 GA. GALV.

STEEL ROOF EDGE DRIP

EDGE FASCIA (2-PIECE) WITH

22 GA. GALV. STEEL

CONTINUOUS CLEAT. ( 4

FASTENERS MIN).

PT WOOD NAILERS WITH

SUPPORT PT BLOCKING.

PROVIDE RIGID

INSULATION BETW. THE

WOOD BLOCKING

MEMBRANE FLASHING

EXISTING EDGE ANGLE

EXISTING METAL DECK

EXISTING EXTERIOR BRICK

REMAIN

PROVIDE NEW ROOFING SYSTEM:

60 MIL FULLY ADHERED EPDM OVER POLYISO.

INSULATION RECOVERY BOARD ON TAPERED

POLYSIO. RIGID INSULATION (1/8 PER SLOPE MIN.)

OVER 2 1/2" BASE LAYER (2 LAYERS MIN., STAGGER

JOINTS) OVER 5/8" TYPE "X" GYP. SHEATHING ON

EXISTING METAL DECK. 1 1/2" MIN. INSULATION @

ROOF DRAINS. TAPERED INSULATION. REPLACE

EXISTING PERIMETER WOOD NAILERS WITH NEW PT

WOOD NAILERS.

/8

CONTINUOUS BEAD OF

LAP SEALANT

EXISTING METAL DECK

EXISTING EXTERIOR

MASONRY WALL

PT WOOD NAILERS WITH

SUPPORT PT BLOCKING

AS REQUIRED.

MEMBRANE

FLASHING

EXISTING EDGE ANGLES

PROVIDE NEW ROOFING SYSTEM:

60 MIL FULLY ADHERED EPDM OVER POLYISO.

INSULATION RECOVERY BOARD ON TAPERED POLYSIO.

RIGID INSULATION (1/8 PER SLOPE MIN.) OVER 2 1/2"

BASE LAYER (2 LAYERS MIN., STAGGER JOINTS)

OVER 5/8" TYPE "X" GYP. SHEATHING ON EXISTING

METAL DECK. 1 1/2" MIN. INSULATION @ ROOF

DRAINS. REPLACE EXISTING PERIMETER WOOD

NAILERS WITH NEW PT WOOD NAILERS.

COMPRESSIBLE TUBE

COMPRESSIBLE

INSULATION WITH

RETAINER BETWEEN WD.

SUPPORTS

1/4" CONTINUOUS

STEEL EDGE PLATE

WELDED TO EXISTING

EDGE ANGLE

PREFINISHED 22 GA.

GALV. CAP COVER

OVER CONTINUOUS

METAL CLEAT (20 GA).

ANCHOR INTO

EXISTING WD. FASCIA.

PREFINISHED 22 GA. GALV.

STEEL ROOF EDGE DRIP

EDGE FASCIA WITH 20 GA.

GALV. STEEL CONTINUOUS

CLEAT.

60 MIL EPDM

MEMBRANE OVER

EXISTING WOOD DECK

PROVIDE NEW ROOFING SYSTEM:

60 MIL FULLY ADHERED EPDM OVER POLYISO.

INSULATION RECOVERY BOARD ON TAPERED

POLYSIO. RIGID INSULATION (1/8 PER SLOPE

MIN.) OVER 2 1/2" BASE LAYER (2 LAYERS MIN.,

STAGGER JOINTS) OVER 5/8" TYPE "X" GYP.

SHEATHING ON EXISTING METAL DECK. 1 1/2"

MIN. INSULATION @ ROOF DRAINS. REPLACE

EXISTING PERIMETER WOOD NAILERS WITH NEW

PT WOOD NAILERS.

EXTEND MEMBRANE OVER

THE ROOF EDGE TO PT

NAILERS.

EXISTING METAL DECK

EXISTING EXTERIOR

FASCIA PANEL TO REMAIN

SEALANT

PREFINISHED 24 GA. GALV.

STEEL ROOF EDGE DRIP

EDGE FASCIA (2-PIECE)

WITH 22 GA. GALV. STEEL

CONTINUOUS CLEAT. ( 4

FASTENERS MIN).

PT WOOD NAILERS WITH SUPPORT PT

BLOCKING. PROVIDE RIGID

INSULATION BETW. THE WOOD

BLOCKING

MEMBRANE FLASHING

EXISTING EDGE ANGLE

/8

CONTINUOUS BEAD OF

LAP SEALANT

EXTEND MEMBRANE

OVER THE ROOF EDGE

TO PT WOOD NAILERS.

EXISTING METAL DECK

EXISTING EXTERIOR

MASONRY

COMPOSITE WALL

PT WOOD NAILERS

WITH SUPPORT PT

BLOCKING.

MEMBRANE FLASHING

EXISTING EDGE ANGLE

PROVIDE NEW ROOFING SYSTEM:

60 MIL FULLY ADHERED EPDM OVER POLYISO.

INSULATION RECOVERY BOARD ON TAPERED

POLYSIO. RIGID INSULATION (1/8 PER SLOPE

MIN.) OVER 2 1/2" BASE LAYER (2 LAYERS MIN.,

STAGGER JOINTS) OVER 5/8" TYPE "X" GYP.

SHEATHING ON EXISTING METAL DECK. 1 1/2"

MIN. INSULATION @ ROOF DRAINS. REPLACE

EXISTING PERIMETER WOOD NAILERS WITH NEW

PT WOOD NAILERS.

PREFINISHED 22 GA. GALV.

STEEL ROOF EDGE DRIP

EDGE FASCIA (2-PIECE)

WITH 20 GA. GALV. STEEL

CONTINUOUS CLEAT. ( 4

FASTENERS MIN).

/8

PROVIDE NEW 22 GA.

GALV. STEEL RETURN

CONTINUOUS BEAD OF

LAP SEALANT

CONTINUOUS BEAD OF

SEALANT

EXISTING METAL DECK

EXISTING EXTERIOR

MASONRY WALL

PT WOOD NAILERS WITH SUPPORT

PT BLOCKING AS REQUIRED.

ANCHOR TO DECK

MEMBRANE

FLASHING

EXISTING EDGE ANGLES

PROVIDE NEW ROOFING SYSTEM:

60 MIL FULLY ADHERED EPDM OVER POLYISO.

INSULATION RECOVERY BOARD ON TAPERED POLYSIO.

RIGID INSULATION (1/8 PER SLOPE MIN.) OVER 2 1/2"

BASE LAYER (2 LAYERS MIN., STAGGER JOINTS)

OVER 5/8" TYPE "X" GYP. SHEATHING ON EXISTING

METAL DECK. 1 1/2" MIN. INSULATION @ ROOF

DRAINS. REPLACE EXISTING PERIMETER WOOD

NAILERS WITH NEW PT WOOD NAILERS.

COMPRESSIBLE

TUBE

COMPRESSIBLE

INSULATION WITH

RETAINER BETWEEN WD.

SUPPORTS

1/4" CONTINUOUS

STEEL EDGE PLATE

WELDED TO EXISTING

EDGE ANGLE

M

IN

REPLACE EXISTING 2-PIECE

FLASHING/COUNTER FLASHING WITH NEW

METAL 2-PIECE FLASHING/COUNTER

FLASHING. REMOVE SECTIONS OF BRICK

TO ATTACH FLASHING BACK EXISTING

COPPER THROUGH WALL FLASHING.

NEW MEMBRANE

ROOFING & MEMBRANE

FLASHING

NEW CONTINUOUS TERMINATION

BAR WITH CONTINUOUS BEAD

OF SEALANT

EXISTING MASONRY

WALL

CENTER LINE OF VALLEY

OF FINISHED ROOF

ROOF DRAIN

CONTINUE MEMBRANE

INTO ROOF DRAIN

14 ga. COATED STEEL

BEARING PAN FURNISHED

WITH ROOF DRAIN

1/2" CLOSED CELL INSULATION

FULLY ADHERED SINGLE PLY

MEMBRANE ROOFING ON RIGID

INSULATION, TAPER TO DRAIN

10" PRECAST PLANK

CLAMPING RING FURNISHED

WITH ROOF DRAIN

NOTE: FOR OVERFLOW ROOF

DRAIN PROVIDE A 4" HIGH COLLAR

M

IN

M

IN

EXISTING STRUCT.

MEMBRANE ROOF

11/2" RIGID ISULATION

PREFAB ROOF CURB

COUNTER FLASHING WITH

APPROVED SEALING WASHER

AND FASTNER @ 6" O.C.

ROOF MOUNTED EQUIPMENT

TREATED 2x4 NAILER

EXISTING METAL

DECK

NEW STRUCTURAL

STEEL FRAMING

FOR MECH

OPENING. -SEE

STRUCT.

EXISTING

METAL DECK

INSULATION

FLASHING

VENT PIPE

SEALANT

ROOFING

MEMBRANE

M

IN

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2017©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

SECURE

VESTIBULE 1

SECURE

VESTIBULE 2

CAFE.

NEW ROOF

OVER MECH

ROOM & BOILER

REPLACEMENT

IN MECH ROOM

KEY PLAN

AREA OF

REROOFING

OCTOBER 31, 2018

NEWAYGO HIGH

SCHOOL

SECURE

VESTIBULES

Newaygo, Michigan

ROOFING

DETAILS

14204.50

A 321

NEWAYGO

PUBLIC

SCHOOLS

ISSUED FOR DATE

1 1/2" = 1'-0"A 321

3 ROOF EDGE DETAIL

1 1/2" = 1'-0"A 321

2 ROOF EDGE DETAIL

1 1/2" = 1'-0"A 321

6 ROOF TRANSITION DETAIL

1 1/2" = 1'-0"A 321

5 ROOF EDGE @ CLERESTORY

1 1/2" = 1'-0"A 321

1 ROOF EDGE DETAIL

1 1/2" = 1'-0"A 321

4 ROOF EDGE DETAIL

1 1/2" = 1'-0"A 321

7 ROOF TRANSITION DETAIL

1 1/2" = 1'-0"A 321

8 WALL TO ROOF DETAIL_FLASHING

1 1/2" = 1'-0"A 321

9 TYPICAL ROOF DRAIN

1 1/2" = 1'-0"A 321

10 TYPICAL ROOF CURB

1 1/2" = 1'-0"A 321

11 TYPICAL ROOF PENETRATION

Sheets
A 201A - ROOF PLAN - UNIT A
A 321 - ROOFING DETAILS

File details come from the government source that posted it. Updated .