High School Roof.pdf
PDF 498 KB Posted
- Attached to
- RFP For Roofing and Parking Package
- Solicitation number
- RFP-NEWS-190000000321-3
- Issued by
- Oceana County, Michigan
About this file
This is a roofing project specification document for Newaygo High School in Newaygo, Michigan, prepared by Tower Pinkster Titus Associates Inc. The project involves a comprehensive roof replacement for multiple roof areas (A, B, C, D, E, G, H, J, K, L, and M) of the school facility. The specification details a complete roof tear-off down to the existing metal deck for most areas, with a new roofing system consisting of a 60-mil EPDM membrane fully adhered to polyisocyanurate insulation layers. The work includes installing tapered insulation with a minimum 1/8-inch per foot slope, replacing existing wood nailers with pressure-treated wood, and addressing roof penetrations, drains, and edge details.
The roofing system specifications require a 20-year no-dollar-limit full roof system warranty from the membrane manufacturer and a two-year installation workmanship warranty from the contractor. The project includes detailed requirements for insulation layers, membrane installation, flashing, and accessories, with specific attention to maintaining proper drainage and waterproofing. Core samples of existing roof compositions are documented for each roof area, revealing various existing membrane and insulation types. The project appears to be part of a broader school improvement initiative, potentially including secure vestibule additions and mechanical room upgrades, with the roofing work being a critical component of the overall facility renovation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIELD VERIFY
216' - 6"
FI
EL
D
VE
RI
FY
FI
EL
D
VE
RI
FY
FI
EL
D
VE
RI
FY
FIELD VERIFY
47' - 6"
FIELD VERIFY
97' - 8 1/4"
FI
EL
D
VE
RI
FY
FI
EL
D
VE
RI
FY
FI
EL
D
VE
RI
FY
FI
EL
D
VE
RI
FY
FIELD VERIFY
26' - 2"
UNIT "A"
UNIT "B"
UNIT "A"
UNIT "B"
R.D.
R.D.
R.D.
R.D.
R.D.
R.D.
R.D.
R.D.
R.D.
R.D.
R.D.
R.D.
R.D.
R.D.
R.D.
R.D.
R.D.
R.D.
R.D.
R.D.
R.D.
S
LO
P E
SL
O
PE
/8 " P
ER
F T
SLOPE
SL
O
PE
1/ 8"
PE
R
FT
FIELD VERIFY
19' - 0"
SL
O
PE
SLO
PE SL
O
PE
SLO
PE
TA
PE
RE
D
IN
SU
LA
TI
O N
E X
IS
T
IN
G R
O O
F
T O
R E M
A
IN
ROOF AREA - C
ROOF AREA - E
ROOF AREA - K
ROOF
AREA - J
#9
#6
#7
ROOF AREA - A
ROOF AREA - B
ROOF AREA - D
ROOF AREA - D
ROOF
AREA - G
ROOF
AREA - H
#10
#1
#2
#3
#4
#5
#8
ROOF AREA - M
R.D.
R.D.
R.D.
R.D.
R.D.
EX.
SKYLIGHT
EX.
SKYLIGHT
EX.
SKYLIGHT
EX.
SKYLIGHT
EX.
SKYLIGHT
ROOF AREA - F
TA
PE
RE
D
IN
SU
LA
TI
O N
A 321
A 321
_________________ EE.F.
EE.F.
EEFTR
TAPERED
INSULATION
SL
O
PE
/8 " P
ER
F T
SL
O
PE
1/ 8"
PE
R
FT
TA
PE
RE
D
IN
SU
LA
TI
O N
TA
PE
RE
D
IN
SU
LA
TI
O N
FI
EL
D
VE
RI
FY
SL
O
PE
/8 " P
ER
F T
TA
PE
RE
D
IN
SU
LA
TI
O N
SL
O
PE
1/ 8"
PE
R
FT
TA
PE
RE
D
IN
SU
LA
TI
O N
HIGH PO
INT
HIGH PO
INT
SLO
PE 1/8" PER FT
SLO
PE
1/8"PER FT
SLO
PE 1/8" PER FT
TAPERED
INSULATIO
N
H
IG
H P
O
IN
T
H
IG
H P
O
IN
T
HIG
H PO
INT
HI
GH
P O
IN
T
HIG
H PO
INT
SL
O
PE
+4.5"
A 321
A 321
A 321
A 321
A 321
A 321
A 321
A 321
A 321
A 321
A 321
A 321
FIELD VERIFY
20' - 3"
FIELD VERIFY
78' - 5"
FIELD VERIFY
37' - 4"
FIELD VERIFY
11' - 0"
A 321
FIELD VERIFY
17' - 6"
FI
EL
D
VE
RI
FY
FIELD VERIFY
39' - 8"
FIELD VERIFY
102' - 5"
R.D.
R.D.
R.D.
A 321
A 321
A 321
A 321
EEFTR
EEFTR
EEFTR
EEFTR
EEFTR
EEFTR
EEFTR
EEFTR
EEFTR
HI
GH
P O
IN
T
EEFTR
SLO
PE 1/8" PER FT
TAPERED
INSULATIO
N
HI
GH
P O
IN
T
SLO
PE 1/8" PER FT
TAPERED
INSULATIO
N
HI
GH
P O
IN
T
SLO
PE 1/8" PER FT
TAPERED
INSULATIO
N
FI
EL
D
VE
RI
FY
ROOF
AREA - L
R.D.
+3
1. PROVIDE AND INSTALL NEW TAPERED POLYISOCYANURATE RIGID INSULATION (20 PSI
COMPRESSIVE STRENGTH MIN.) TO PROVIDE POSITIVE DRAINAGE (1/8" PER FT. MIN.) TO
THE EXISTING ROOF DRAINS, R 30 TOTAL MIN. STAGGER LAYERS OF INSULATION.
2. PROVIDE AND INSTALL NEW 60 MIL EPDM MEMBRANE FULLY ADHERED ROOFING SYSTEM,
INCLUDING ALL FLASHINGS, AND PIPING BOOT ACCESSORIES.
3. PROVIDE AND INSTALL NEW FLASHING, FLASHING BOOTS, METAL TERMINATION BARS,
CLEATS, REGLETS THROUGHOUT TO REPLACE EXISTING. ADD EXTENSIONS TO VTR'S AND
CURBS TO MAINTAIN 12" MINIMUM HEIGHT ABOVE THE ROOF SURFACE.
4. INSTALL SHEET FLASHINGS AND PREFORMED FLASHING ACCESSORIES AND ADHERE TO
SUBSTRATES ACCORDING TO NRCA RECOMMENDED DETAILS.
5. FURNISH THE ROOF MEMBRANE MANUFACTURER'S 20 YEAR NO DOLLAR LIMIT FULL ROOF
SYSTEM MATERIALS AND INSTALLATION WORKMANSHIP WARRANTY, INCLUDING FLASHING,
INSULATION, AND ACCESSORIES NECESSARY FOR A WATERTIGHT ROOF SYSTEM
CONSTRUCTION.
6. THE ROOF SYSTEM INSTALLER MUST WARRANT FOR A PERIOD OF TWO YEARS THAT THE
ROOF SYSTEM, AS INSTALLED, IS FREE FROM DEFECTS IN INSTALLATION WORKMANSHIP,
TO INCLUDE THE ROOF MEMBRANE, FLASHING, INSULATION, ACCESSORIES, ATTACHMENTS,
AND SHEET METAL INSTALLATION INTEGRAL TO A COMPLETE WATERTIGHT ROOF SYSTEM
ASSEMBLY.
SUMMARY OF ROOFING WORK
MEMBRANE ROOF SYSTEM
1. CONTRACTORS ARE REQUIRED TO INSPECT/REVIEW THE EXISTING BUILDING INCLUDING THE
ROOF PRIOR TO RELATED DEMOLITION WORK. UNLESS NOTED OTHERWISE, REMOVAL OF
ANY WALL, FLOOR OR CEILING INCLUDES ALL GENERAL MECHANICAL AND ELECTRICAL ITEMS
WHICH ARE A PART OF, OR ATTACHED TO IT.
2. CONTRACTOR SHALL VERIFY ALL EXISTING JOB SITE CONDITIONS AND DIMENSIONS AND BE
RESPONSIBLE FOR THE SAME. ADVISE CONSTRUCTION MANAGER OF ANY AND ALL
DISCREPANCIES PRIOR TO STARTING NEW WORK.
3. CONTRACTOR SHALL FIELD VERIFY QUANTITY, SIZE AND LOCATIONS OF ALL ROOF
PENETRATIONS PRIOR BID AND ORDERING MATERIALS.
4. ACCOMMODATE NEW CONSTRUCTION IF NOT INDICATED.
5. ALL MECHANICAL LINES, PIPING, EQUIPMENT, CONDUIT AND WIRING SHALL BE TEMPORARY
REMOVED AS NECESSARY FOR THE INSTALLATION OF THE NEW ROOFING SYSTEM. IF
EXISTING PIPING IS NOT REMOVED, SHORE UP AS REQUIRED TO REMOVE ENTIRE EXISTING
ROOFING SYSTEM. SALVAGE ALL P.T. PIPING SUPPORT FOR REUSE.
6. CUT BACK MEMBRANE AS REQUIRED TO EXISTING ROOFING TRANSITIONS TO ALLOW FOR
WATERTIGHT SEALING FOR NEW MEMBRANE.
7. THE CONTRACTOR SHALL INCLUDE SUCH TIME AND MATERIALS IN THE BID AS REQUIRED TO
MAKE WATERTIGHT CLOSURES AND TRANSITIONS WHERE DIFFERENT ROOF DETAILS
INTERSECT OR WHERE A ROOF DETAIL TERMINATES. THESE WATERTIGHT CLOSURES SHALL
BE MADE IN COMPLETE COMPLIANCE WITH ARCHITECT APPROVED AND CONTRACTOR
SUBMITTED SHOP DRAWINGS. CLOSURES SHALL BE MADE WITH FLASHING MEMBRANE,
COATED METAL AND OTHER APPROVED ACCESSORIES. SURFACE SEALANTS ARE NOT
ACCEPTABLE AS THE PRIMARY CLOSURE COMPONENTS.
8. EXAMINE EXISTING WOOD NAILERS AND BLOCKING, AND REMOVE AND DISPOSE AS
REQUIRED. REPLACE DISPOSED BLOCKING WITH NEW P.T. WOOD.
9. AFTER THE REMOVAL THE ROOFING ASSEMBLY, THE EXISTING METAL ROOF DECK SHALL BE
EXAMINED FOR STRUCTURAL INTEGRITY AND REPAIRED AS NECESSARY.
ROOFING GENERAL DEMOLITION & NEW CONSTRUCTION NOTES
ROOF PLAN KEY
TAPERED INSULATION - SADDLES
R.D.
AHU OR RTU
ACCU
E.F.
ROOF DRAIN - SEE PLUMBING DRAWINGS
ROOF TOP UNIT - SEE MECHANICAL DAWINGS
CONDENSING UNIT - SEE MECHANICAL DRAWINGS
EXHAUST FAN / HOOD - SEE MECHANICAL DRAWINGS
1. TYPICAL ROOF SLOPE 1/4" / 1'-0" UNLESS NOTED OTHERWISE.
2. PROVIDE ROOFING MANUFACTURERS STANDARD ROOFING TERMINATION
DETAILS AT ALL PARAPETS, GRAVEL STOPS, CURBS, PIPE PENETRATIONS, ETC.
3. PROVIDE CRICKETS AS REQUIRED AT ALL MECHANICAL UNITS, VENTS,
ETC. TO MAINTAIN POSITIVE SLOPE OF 1/4" /1'-0" MINIMUM.
NOTES
EVTR EXISTING VENT TO REMAIN
ERDTR EXISTING ROOF DRAIN TO REMAIN
EEFTR EXISTING EXHAUST FAN / HOOD TO REMAIN.
ROOF AREA: 'A', 'B', 'C', 'D', 'E', 'J', 'K', 'L', 'M' - COMPLETE
ROOF TEAR-OFF TO EXISTING METAL DECK.
NEW ROOFING:
1. 60 MIL EPDM MEMBRANE - FULLY ADHERED
2. 1/2" POLYISO (CLOSED CELL) FIBERGLASS FACED INSULATION COVER BOARD.
3. TAPERED RIGID INSULATION (POLYISO), 1/8" PER FT. MIN 11/2" @ EXISTING ROOF DRAINS.
4. 2 1/2" RIGID INSULATION (POLYISO) - 2 LAYERS, STAGGERED BASE LAYER
5. 5/8" TYPE 'X' FIBERGLASS FACED GYPSUM BOARD.
6. EXISTING STEEL ROOF DECK.
ROOF AREAS: 'G' & 'H' - EXISTING TO REMAIN (BASE BID)
NEW ROOFING (ALTERNATE):
1. 60 MIL EPDM MEMBRANE - FULLY ADHERED
2. 1/2" POLYISO (CLOSED CELL) FIBERGLASS FACED INSULATION COVER BOARD.
3. EXISTING EPDM ROOF, CUT INTO 10' X 10' GRID.
NEW ROOFING LEGEND
ROOF CORE #1 (ROOF AREA 'C'):
EXISTING ROOF COMPOSITION @ CORE SAMPLE:
1. EXISTING PVC MEMBRANE
2. SLIP SHEET
3. EXISTING PVC MEMBRANE
4. 3 1/4" EPS INSULATION
5. 1/2" PERLITE INSULATION
6. EXISTING STEEL DECK
ROOF CORE #2 (ROOF AREA 'B'):
EXISTING ROOF COMPOSITION @ CORE SAMPLE:
1. EXISTING EPDM MEMBRANE
2. 1 1/2" POLYISO INSULATION
3. 4 1/2" EPS INSULATION (TAPERED)
4. 1/2" PERLITE INSULATION
5. EXISTING STEEL DECK
ROOF CORE #3 (ROOF AREA 'D'):
EXISTING ROOF COMPOSITION @ CORE SAMPLE:
1. EXISTING EPDM MEMBRANE
2. 1/2" WD. FIBER BOARD
3. 1" EPS INSULATION
4. EXISTING STEEL DECK
ROOF CORE #4 (ROOF AREA 'D'):
EXISTING ROOF COMPOSITION @ CORE SAMPLE:
1. EXISTING EPDM MEMBRANE
2. 1/2" PERLITE INSULATION BD.
3. BUR ASPHALT GRAVEL
4. 1" WD. FIBER BOARD
5. EXISTING STEEL DECK
ROOF CORE #5 (ROOF AREA 'D'):
EXISTING ROOF COMPOSITION @ CORE SAMPLE:
1. EXISTING EPDM MEMBRANE
2. 1/2" WD. FIBER BOARD
3. BUR ASPHALT GRAVEL
4. 1 1/2" PERLITE INSULATION
5. EXISTING STEEL DECK
ROOF CORE #6 (ROOF AREA 'K'):
EXISTING ROOF COMPOSITION @ CORE SAMPLE:
1. EXISTING EPDM MEMBRANE
2. 1 1/2" POLYISO INSULATION
3. 9" EPS INSULATION
4. 1/2" PERLITE INSULATION
5. EXISTING STEEL DECK
ROOF CORE #7 (ROOF AREA 'K'):
ROOF CORE #8 (ROOF AREA 'G'):
EXISTING ROOF COMPOSITION @ CORE SAMPLE:
1. EXISTING EPDM MEMBRANE
2. 1 1/2" POLYISO INSULATION
3. 3" EPS INSULATION
4. 11/2" POLYISO INSULATION
5. EXISTING STEEL DECK
ROOF CORE #9 (ROOF AREA 'E'):
EXISTING ROOF COMPOSITION @ CORE SAMPLE:
1. EXISTING EPDM MEMBRANE
2. 1/2" GYPSUM BD.
3. BUR ASPHALT GRAVEL
4. 1 1/2 EPS INSULATION
5. 1" WD. FIBER BOARD
6. EXISTING STEEL DECK
EXISTING ROOF COMPOSITION @ CORE SAMPLE:
1. EXISTING EPDM MEMBRANE
2. 1 1/2" POLYISO INSULATION
3. 3 1/2" EPS INSULATION
4. 1/2" PERLITE INSULATION
5. EXISTING STEEL DECK
ROOF CORE #9 (ROOF AREA 'E'):
EXISTING ROOF COMPOSITION @ CORE SAMPLE:
1. EXISTING EPDM MEMBRANE
2. 1/2" WD FIBER BOARD.
3. BUR ASPHALT GRAVEL
4. 3" EPS INSULATION
5. EXISTING STEEL DECK
ROOF CORE LEGEND:
Tower Pinkster Titus Associates Inc.
242 East Kalamazoo Avenue, Suite 200
Kalamazoo, Michigan 49007-5828
269.343.6133 PHONE 269.343.6633 FAX
TOWERPINKSTER.COM
ALL RIGHTS RESERVED2017©
DATE
PROJECT TITLE
SHEET TITLE
SHEET NUMBER
4 East Fulton Street, Suite 200
Grand Rapids, Michigan 49503
616.456.9944 PHONE 616.456.5936 FAX
SECURE
VESTIBULE 1
SECURE
VESTIBULE 2
CAFE.
NEW ROOF
OVER MECH
ROOM & BOILER
REPLACEMENT
IN MECH ROOM
KEY PLAN
AREA OF
REROOFING
OCTOBER 31, 2018
NEWAYGO HIGH
SCHOOL
SECURE
VESTIBULES
Newaygo, Michigan
ROOF PLAN -
UNIT A
14204.50
A 201A
NEWAYGO
PUBLIC
SCHOOLS
3/32" = 1'-0"
ROOF PLAN - UNIT A
ISSUED FOR DATE
KEYED NOTES - NEW CONSTRUCTION
1 REMOVE EXISTING EXTERIOR ALUM. STOREFRONT FRAME, DOORS, THRESHOLD. PREP
OPENING FOR NEW STOREFRONT, DOORS, AND THRESHOLD. NEW ALUM. STOREFRONT
SYSTEM AND DOOR TO MATCH EXISTING.
2 PROVIDE NEW ROOF DRAIN IN THE SAME LOCATION AS EXISTING.
3 NEW ROOF DRAIN. TIE-INTO EXISTING STORM LINE.
4 PROVIDE ROOF SADDLE @ ALL FIXED ELEMENTS/EQUIPMENT OVER 48"
EXTEND MEMBRANE OVER
THE ROOF EDGE TO PT
NAILERS.
PREFINISHED 24 GA. GALV.
STEEL ROOF EDGE DRIP
EDGE FASCIA (2-PIECE)
WITH 22 GA. GALV. STEEL
CONTINUOUS CLEAT. ( 4
FASTENERS MIN).
PT WOOD NAILERS,
ANCHOR TO METAL AND
EDGE ANGLE.
MEMBRANE FLASHING
EXISTING EDGE ANGLE
EXISTING METAL DECK
EXISTING EXTERIOR CMU
REMAIN
PROVIDE NEW ROOFING SYSTEM:
60 MIL FULLY ADHERED EPDM OVER POLYISO.
INSULATION RECOVERY BOARD ON TAPERED
POLYSIO. RIGID INSULATION (1/8 PER SLOPE MIN.)
OVER 2 1/2" BASE LAYER (2 LAYERS MIN., STAGGER
JOINTS) OVER 5/8" TYPE "X" GYP. SHEATHING ON
EXISTING METAL DECK. 1 1/2" MIN. INSULATION @
ROOF DRAINS. TAPERED INSULATION. REPLACE
EXISTING PERIMETER WOOD NAILERS WITH NEW PT
WOOD NAILERS.
PROVIDE NEW 22 GA.
GALV. STEEL RETURN
W/DRIP AT WOOD FASCIA.
/8
WATER BLOCK
MEMBRANE FLASHING
CONTINUOUS BEAD OF
LAP SEALANT
EXTEND MEMBRANE OVER
THE ROOF EDGE TO PT
NAILERS.
PREFINISHED 24 GA. GALV.
STEEL ROOF EDGE DRIP
EDGE FASCIA (2-PIECE) WITH
22 GA. GALV. STEEL
CONTINUOUS CLEAT. ( 4
FASTENERS MIN).
PT WOOD NAILERS WITH
SUPPORT PT BLOCKING.
PROVIDE RIGID
INSULATION BETW. THE
WOOD BLOCKING
MEMBRANE FLASHING
EXISTING EDGE ANGLE
EXISTING METAL DECK
EXISTING EXTERIOR BRICK
REMAIN
PROVIDE NEW ROOFING SYSTEM:
60 MIL FULLY ADHERED EPDM OVER POLYISO.
INSULATION RECOVERY BOARD ON TAPERED
POLYSIO. RIGID INSULATION (1/8 PER SLOPE MIN.)
OVER 2 1/2" BASE LAYER (2 LAYERS MIN., STAGGER
JOINTS) OVER 5/8" TYPE "X" GYP. SHEATHING ON
EXISTING METAL DECK. 1 1/2" MIN. INSULATION @
ROOF DRAINS. TAPERED INSULATION. REPLACE
EXISTING PERIMETER WOOD NAILERS WITH NEW PT
WOOD NAILERS.
/8
CONTINUOUS BEAD OF
LAP SEALANT
EXISTING METAL DECK
EXISTING EXTERIOR
MASONRY WALL
PT WOOD NAILERS WITH
SUPPORT PT BLOCKING
AS REQUIRED.
MEMBRANE
FLASHING
EXISTING EDGE ANGLES
PROVIDE NEW ROOFING SYSTEM:
60 MIL FULLY ADHERED EPDM OVER POLYISO.
INSULATION RECOVERY BOARD ON TAPERED POLYSIO.
RIGID INSULATION (1/8 PER SLOPE MIN.) OVER 2 1/2"
BASE LAYER (2 LAYERS MIN., STAGGER JOINTS)
OVER 5/8" TYPE "X" GYP. SHEATHING ON EXISTING
METAL DECK. 1 1/2" MIN. INSULATION @ ROOF
DRAINS. REPLACE EXISTING PERIMETER WOOD
NAILERS WITH NEW PT WOOD NAILERS.
COMPRESSIBLE TUBE
COMPRESSIBLE
INSULATION WITH
RETAINER BETWEEN WD.
SUPPORTS
1/4" CONTINUOUS
STEEL EDGE PLATE
WELDED TO EXISTING
EDGE ANGLE
PREFINISHED 22 GA.
GALV. CAP COVER
OVER CONTINUOUS
METAL CLEAT (20 GA).
ANCHOR INTO
EXISTING WD. FASCIA.
PREFINISHED 22 GA. GALV.
STEEL ROOF EDGE DRIP
EDGE FASCIA WITH 20 GA.
GALV. STEEL CONTINUOUS
CLEAT.
60 MIL EPDM
MEMBRANE OVER
EXISTING WOOD DECK
PROVIDE NEW ROOFING SYSTEM:
60 MIL FULLY ADHERED EPDM OVER POLYISO.
INSULATION RECOVERY BOARD ON TAPERED
POLYSIO. RIGID INSULATION (1/8 PER SLOPE
MIN.) OVER 2 1/2" BASE LAYER (2 LAYERS MIN.,
STAGGER JOINTS) OVER 5/8" TYPE "X" GYP.
SHEATHING ON EXISTING METAL DECK. 1 1/2"
MIN. INSULATION @ ROOF DRAINS. REPLACE
EXISTING PERIMETER WOOD NAILERS WITH NEW
PT WOOD NAILERS.
EXTEND MEMBRANE OVER
THE ROOF EDGE TO PT
NAILERS.
EXISTING METAL DECK
EXISTING EXTERIOR
FASCIA PANEL TO REMAIN
SEALANT
PREFINISHED 24 GA. GALV.
STEEL ROOF EDGE DRIP
EDGE FASCIA (2-PIECE)
WITH 22 GA. GALV. STEEL
CONTINUOUS CLEAT. ( 4
FASTENERS MIN).
PT WOOD NAILERS WITH SUPPORT PT
BLOCKING. PROVIDE RIGID
INSULATION BETW. THE WOOD
BLOCKING
MEMBRANE FLASHING
EXISTING EDGE ANGLE
/8
CONTINUOUS BEAD OF
LAP SEALANT
EXTEND MEMBRANE
OVER THE ROOF EDGE
TO PT WOOD NAILERS.
EXISTING METAL DECK
EXISTING EXTERIOR
MASONRY
COMPOSITE WALL
PT WOOD NAILERS
WITH SUPPORT PT
BLOCKING.
MEMBRANE FLASHING
EXISTING EDGE ANGLE
PROVIDE NEW ROOFING SYSTEM:
60 MIL FULLY ADHERED EPDM OVER POLYISO.
INSULATION RECOVERY BOARD ON TAPERED
POLYSIO. RIGID INSULATION (1/8 PER SLOPE
MIN.) OVER 2 1/2" BASE LAYER (2 LAYERS MIN.,
STAGGER JOINTS) OVER 5/8" TYPE "X" GYP.
SHEATHING ON EXISTING METAL DECK. 1 1/2"
MIN. INSULATION @ ROOF DRAINS. REPLACE
EXISTING PERIMETER WOOD NAILERS WITH NEW
PT WOOD NAILERS.
PREFINISHED 22 GA. GALV.
STEEL ROOF EDGE DRIP
EDGE FASCIA (2-PIECE)
WITH 20 GA. GALV. STEEL
CONTINUOUS CLEAT. ( 4
FASTENERS MIN).
/8
PROVIDE NEW 22 GA.
GALV. STEEL RETURN
CONTINUOUS BEAD OF
LAP SEALANT
CONTINUOUS BEAD OF
SEALANT
EXISTING METAL DECK
EXISTING EXTERIOR
MASONRY WALL
PT WOOD NAILERS WITH SUPPORT
PT BLOCKING AS REQUIRED.
ANCHOR TO DECK
MEMBRANE
FLASHING
EXISTING EDGE ANGLES
PROVIDE NEW ROOFING SYSTEM:
60 MIL FULLY ADHERED EPDM OVER POLYISO.
INSULATION RECOVERY BOARD ON TAPERED POLYSIO.
RIGID INSULATION (1/8 PER SLOPE MIN.) OVER 2 1/2"
BASE LAYER (2 LAYERS MIN., STAGGER JOINTS)
OVER 5/8" TYPE "X" GYP. SHEATHING ON EXISTING
METAL DECK. 1 1/2" MIN. INSULATION @ ROOF
DRAINS. REPLACE EXISTING PERIMETER WOOD
NAILERS WITH NEW PT WOOD NAILERS.
COMPRESSIBLE
TUBE
COMPRESSIBLE
INSULATION WITH
RETAINER BETWEEN WD.
SUPPORTS
1/4" CONTINUOUS
STEEL EDGE PLATE
WELDED TO EXISTING
EDGE ANGLE
M
IN
REPLACE EXISTING 2-PIECE
FLASHING/COUNTER FLASHING WITH NEW
METAL 2-PIECE FLASHING/COUNTER
FLASHING. REMOVE SECTIONS OF BRICK
TO ATTACH FLASHING BACK EXISTING
COPPER THROUGH WALL FLASHING.
NEW MEMBRANE
ROOFING & MEMBRANE
FLASHING
NEW CONTINUOUS TERMINATION
BAR WITH CONTINUOUS BEAD
OF SEALANT
EXISTING MASONRY
WALL
CENTER LINE OF VALLEY
OF FINISHED ROOF
ROOF DRAIN
CONTINUE MEMBRANE
INTO ROOF DRAIN
14 ga. COATED STEEL
BEARING PAN FURNISHED
WITH ROOF DRAIN
1/2" CLOSED CELL INSULATION
FULLY ADHERED SINGLE PLY
MEMBRANE ROOFING ON RIGID
INSULATION, TAPER TO DRAIN
10" PRECAST PLANK
CLAMPING RING FURNISHED
WITH ROOF DRAIN
NOTE: FOR OVERFLOW ROOF
DRAIN PROVIDE A 4" HIGH COLLAR
M
IN
M
IN
EXISTING STRUCT.
MEMBRANE ROOF
11/2" RIGID ISULATION
PREFAB ROOF CURB
COUNTER FLASHING WITH
APPROVED SEALING WASHER
AND FASTNER @ 6" O.C.
ROOF MOUNTED EQUIPMENT
TREATED 2x4 NAILER
EXISTING METAL
DECK
NEW STRUCTURAL
STEEL FRAMING
FOR MECH
OPENING. -SEE
STRUCT.
EXISTING
METAL DECK
INSULATION
FLASHING
VENT PIPE
SEALANT
ROOFING
MEMBRANE
M
IN
Tower Pinkster Titus Associates Inc.
242 East Kalamazoo Avenue, Suite 200
Kalamazoo, Michigan 49007-5828
269.343.6133 PHONE 269.343.6633 FAX
TOWERPINKSTER.COM
ALL RIGHTS RESERVED2017©
DATE
PROJECT TITLE
SHEET TITLE
SHEET NUMBER
4 East Fulton Street, Suite 200
Grand Rapids, Michigan 49503
616.456.9944 PHONE 616.456.5936 FAX
SECURE
VESTIBULE 1
SECURE
VESTIBULE 2
CAFE.
NEW ROOF
OVER MECH
ROOM & BOILER
REPLACEMENT
IN MECH ROOM
KEY PLAN
AREA OF
REROOFING
OCTOBER 31, 2018
NEWAYGO HIGH
SCHOOL
SECURE
VESTIBULES
Newaygo, Michigan
ROOFING
DETAILS
14204.50
A 321
NEWAYGO
PUBLIC
SCHOOLS
ISSUED FOR DATE
1 1/2" = 1'-0"A 321
3 ROOF EDGE DETAIL
1 1/2" = 1'-0"A 321
2 ROOF EDGE DETAIL
1 1/2" = 1'-0"A 321
6 ROOF TRANSITION DETAIL
1 1/2" = 1'-0"A 321
5 ROOF EDGE @ CLERESTORY
1 1/2" = 1'-0"A 321
1 ROOF EDGE DETAIL
1 1/2" = 1'-0"A 321
4 ROOF EDGE DETAIL
1 1/2" = 1'-0"A 321
7 ROOF TRANSITION DETAIL
1 1/2" = 1'-0"A 321
8 WALL TO ROOF DETAIL_FLASHING
1 1/2" = 1'-0"A 321
9 TYPICAL ROOF DRAIN
1 1/2" = 1'-0"A 321
10 TYPICAL ROOF CURB
1 1/2" = 1'-0"A 321
11 TYPICAL ROOF PENETRATION
| Sheets |
| A 201A - ROOF PLAN - UNIT A |
| A 321 - ROOFING DETAILS |
File details come from the government source that posted it. Updated .