This document is an addendum to the Bonifay Armory Enduring Sustainment Program project for the Department of Military Affairs in Florida. The addendum outlines several revisions to the civil site work, including the removal and reinstallation of existing chain link fencing, revisions to the temporary access gate and construction entrances, replacement of water and sewer service lines, and the addition of new chain link fencing and access gate. The addendum also provides clarifications on the pavement work, water service sub-meters, and sanitary sewer connections.

The overall Bonifay Armory Enduring Sustainment Program project involves the renovation of approximately 170,000 square feet or 3.90 acres of the existing Bonifay National Guard Armory located in Bonifay, Florida. The base bid scope of work includes civil site work, utility services, paving, fencing, and other miscellaneous items. The project is being undertaken by the Department of Military Affairs in the state of Florida, with the jurisdictions of St. Johns County and St. Petersburg City involved.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

April 27, 2022

RE: Addendum No.1

Bonifay Armory Enduring Sustainment Program

Department of Military Affairs Project No. 12218035

1. Remove the existing chain link fence north of Existing Building #6. Sheet

C1.1.

2. Temporarily remove and reinstall the existing chain link fence around the existing mechanical units to remain at the south side of Existing Building #1.

Sheet C1.1.

3. Revise the dimensions of the temporary access gate and both construction entrances. Sheet C1.1.

4. Revise four water service notes and one sewer service note to indicate full replacement of the lines. Sheet C1.1.

5. Construct new chain link fence and access gate north of Existing Building

#6. Sheet C2.0.

6. Reinstall the existing 4-foot-tall chain link fence around the existing mechanical units to remain at the south side of Existing Building #1. Sheet

C2.0.

7. Revise the dimensions of the temporary access gate. Sheet C2.0.

8. Pavement at the south and west corners of Existing Building #7 is to be completed last to ensure access to Existing Building #7 throughout construction. Sheet C2.0.

9. Revise four water service notes and one sewer service note to indicate full replacement of the lines. Sheet C4.0.

10. Add a note on the north and south side of FMS No. 7 Building to install sub-meters on the water lines. Sheet C4.0.

11. Add a general note to install gate valves on water lines at every building.

Sheet C4.0.

12. Add four 2” gate valves and delete one 2” gate valve. Sheet C4.0.

13. Add 118 LF, 60 LF, and 76 LF of water service. Sheet C4.0.

14. Cap water service at northwest corner of Building #1. Sheet C4.0.

15. Clarify that existing kitchen sanitary sewer shall connect to the new 6” sanitary sewer service at the east side of Building #1. Sheet C4.0.

16. Connect the existing 1” water service at the kitchen to the new 2-1/2” water service and install 1” gate valve. Sheet C4.0.

Sincerely, DHM Melvin Engineering

Paul Davidson, MS, PE, CGC, CUC, LEED®-AP BD+C

Civil Engineer

General Contractor

Underground Utility & Excavation Contractor cc: \\Tal-Fs02\P\Aaprojects\DAG20BON\Civil\Drawings\Signed & Sealed 04-27-22\DAG20BON Addendum No. 1 04-27-22.Docx

001_Addendum No. 1
002_111200 - PARKING CONTROL EQUIPMENT
003_G000
004A_C1.1 - Demolition Plan C1.1
005A_C2.0 - Site Geometry Plan C2.0
006A_C4.0 - Utility Plan C4.0
007A_DAG20BON Addendum No. 1 04-27-22
008_A502
009_ Electrical Sheets

File details come from the government source that posted it. Updated .