About this file

This document is an Addendum No. 1 issued by DAG Architects for the Florida Army National Guard Department of Military Affairs' BONIFAY ARMORY ENDURING SUSTAINMENT PROGRAM project located at 308 W. North Avenue, Bonifay, Florida 32425. The addendum includes revisions to the technical specifications, drawings, and civil addendum narrative for the project. Key changes include the addition of an intercom system and "BUZZ-IN" capability between the new rear gate and the FMS Shop Manager's Office, revisions to several site plan and utility drawings, and updates to the electrical drawings. The project involves renovation of approximately 170,000 square feet of the existing Bonifay National Guard Armory, including civil site work, paving, fencing, and other miscellaneous items.

The project is funded by the state of Florida. No pricing terms, set asides, incumbents, or funding details are provided in the addendum. Contractors must acknowledge receipt of this addendum when submitting their bids.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1 Add AAdd- 1

Addendum No. 1 Date: April 27, 2022

Florida Army National Guard Department of Military Affairs

BONIFAY ARMORY ENDURING SUSTAINMENT PROGRAM

308 W. North Avenue Bonifay Florida 32425 State Project No.: DMA-218035

DAG PROJECT NO. 20058

General The changes and/or additions to the plans and specifications described in this addendum are hereby made part of same and are incorporated in full as part of the Contract Documents.

The Bidder shall acknowledge receipt of this addendum on the bid form submitted with their bid.

Failure of the Bidder to acknowledge this addendum may disqualify their bid. This addendum provides a brief description of items that have been added, deleted, or otherwise revised. The description is not all inclusive. It shall be the contractor’s responsibility to identify all items included in the addendum.

This document consists of the following:

Addendum: 2 pages.

Attachments: Specifications – one specification section Section 111200

Drawings – seven drawing sheets Sheet G000 Sheet C1.1 Sheet C2.0 Sheet C-4.0 Sheet A502 Sheet E0.1 Sheet E1.1 Sheet E1.2.1

Narrative – one civil addendum narrative.

TECHNICAL SPECIFICATIONS

Item No. 1

A. SPECIFICATION SECTION 111200

a. DELETE : Specification section 111200 PARKING CONTROL EQUIPMENT, bound in the Project Manual.

b. INSERT: Specification section 111200 PARKING CONTROL EQUIPMENT, dated April 2022, Addendum No. 1.

1. Add intercom system between new rear gate keypad and FMS Shop

Manager’s Office.

2. Add “BUZZ-IN” capability between new rear gate operating controls and FMS Shop Manager’s Office.

ADDENDUM NO. 1 Add AAdd- 2

DRAWINGS

Item No. 2

A. SHEET G000 – Cover Sheet

a. REPLACE: Sheet G000 dated 4-4-2022 with revised sheet G000, attached, with Revision No. 1 dated 4-27-2022.

b. REVISED: Index of Drawings and added General Notes.

Item No. 3

A. SHEET C1.1 – DEMOLITION PLAN

a. REPLACE: Sheet C1.1 dated 4-4-2022 with revised sheet C1.1, attached, Item No. 4

A. SHEET C2.2 – SITE GEOMETRY PLAN

a. REPLACE: Sheet C2.2 dated 4-4-2022 with revised sheet C2.2, attached

Item No. 4

B. SHEET C4.0 – UTILITY PLAN

a. REPLACE: Sheet C4.0 dated 4-4-2022 with revised sheet C4.0, attached with Revision No. 1 dated 4-27-2022.

Item No. 5

C. CIVIL ADDENDUM NARRATIVE

a. INSERT: Civil addendum narrative.

Item No. 6

A. SHEET A502 – ROOM SIGNAGE &GATE DETAILS

a. REPLACE: Sheet A502 dated 4-4-2022 with revised sheet A502, attached with Revision No. 1 dated 4-27-2022,

b. REVISED: Detail No. 4 - ROOF EDGE DETAIL – to add additional wood blocking for entire length of building to support new gutters.

Item No. 7

A. ELECTRICAL DRAWNGS

a. REPLACE: Sheet E0.1, dated 4/4/2022 with revised sheet E0.1 dated 4/27/2022.

b. REPLACE: Sheet E1.1, dated 4/4/2022 with revised sheet E1.1 dated 4/27/2022.

c. REPLACE: Sheet E2.1, dated 4/4/2022 with revised sheet E2.1 dated /27/2022.

d. DELETE: Sheet E 3.1, dated 4/4/ 2022. This work is deleted from the project.

e. DELETE: Sheet E 3.2, dated 4/4/ 2022. This work is deleted from the project.

End of Addendum No. 1.

001_Addendum No. 1
002_111200 - PARKING CONTROL EQUIPMENT
003_G000
004A_C1.1 - Demolition Plan C1.1
005A_C2.0 - Site Geometry Plan C2.0
006A_C4.0 - Utility Plan C4.0
007A_DAG20BON Addendum No. 1 04-27-22
008_A502
009_ Electrical Sheets