This document is a set of Non-Technical Specifications for a construction project at the Bonifay Armory in Bonifay, Florida. The project will involve renovations to approximately 170,000 square feet or 3.90 acres of the existing Bonifay National Guard Armory facility. The base bid scope of work includes civil site work such as demolition, grading, drainage, utility services, paving, fencing, and other miscellaneous items. The project is being solicited and administered by the State of Florida Department of Military Affairs. Bidders must be prequalified according to specific requirements prior to submitting bids. The project has a substantial completion timeframe of 270 calendar days and a final completion timeframe of 30 calendar days after substantial completion. Liquidated damages may be assessed for delays. The contractor will be required to furnish payment and performance bonds, provide detailed construction schedules, and coordinate closely with inspections by local authorities and the state.
The specifications outline detailed insurance requirements, outline procedures for submitting shop drawings and product submittals, and provide guidance on warranty, close-out, and final payment requirements. The project is funded by the State of Florida, and the award will be made to the lowest responsive, responsible bidder. There are no set-asides or incumbent contractors mentioned in the documentation provided.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 2022 1
LEVELS 4 & 5
THE NON-TECHNICAL SPECIFICATION
SECTIONS OF DIVISION ONE
Construction Contract Project Manual
State of Florida Department of Military Affairs
Construction and Facility Management Office Project Number: 218035
Project Name: Bonifay Armory ESP Renovation Project Location: Bonifay, Florida
Revised, March 2022 (All previous revisions are obsolete)
March 2022 2
ARCHITECT-ENGINEER'S
INSTRUCTIONS FOR
COMPLETING DOCUMENT
INITIALS ITEM .
ARCHITECT-ENGINEER'S TABLE OF CONTENTS FOR TECHNICAL SPECIFICATIONS should follow the Non-Technical Specifications Table of Contents.
SECTION B-21, TIME OF COMPLETION - Fill in substantial and final completion time (in calendar days).
NOTE: Information may be handwritten in blanks and initialed by A/E.
SECTION D, SPECIAL CONDITIONS may be modified to fit job conditions, but all changes must be approved by the Project Manager. This section is established for the inclusion of non-typical, non-technical items which, in the opinion of the Architect-Engineer, will require written clarification or instruction in connection with a specific project. If any items are totally, partially or not at all applicable to a particular project, they may be included, modified or deleted by the Architect-Engineer.
Architect-Engineer must sign and seal PLANS, SPECIFICATIONS and ADDENDUM as shown on Attachment
I.
March 2022 3
ATTACHMENT I
The attached CONTRACT CONDITIONS, dated March 2014 must be used as masters for reproduction and included in your specifications. Changes to these CONTRACT CONDITIONS are not authorized unless approved in writing by the Construction and Facility Management Office Business Manager and signed by the Project Manager.
SIGN AND SEAL PLANS AND SPECIFICATIONS AS FOLLOWS:
PLANS
The cover sheet shall be signed, sealed and dated by the principal-in-charge representing the firm under contract with the Department of Military Affairs. Each plan sheet shall be signed, sealed and dated by each professional who did any work on that sheet.
SPECIFICATIONS
The cover page of the specification shall be signed, sealed and dated by the principle-in-charge representing the firm under contract with the Department of Military Affairs. Each technical Table of Contents page shall be signed, sealed and dated by each professional who has any work referenced thereon.
ADDENDUM
The cover page of each addendum shall be signed, sealed and dated by the principle-in-charge representing the firm under contract with the Department of Military Affairs. Each page of the Addendum shall be signed, sealed and dated by each professional who has any work referenced thereon. All addenda must be approved by the Project Manager before release.
March 2022 4
Project Name & Location: Bonifay Armory ESP Renovation, 308 W. North Avenue Bonifay, FL 32425
Project No.: 218035
To be constructed for and the contract administered by:
State of Florida
Department of Military Affairs
2305 State Road 207
St. Augustine, Florida 32086
Set No.
Date Issued
Architect-Engineer's Name & Address: DAG Architects (Tom Miller), 1213 Miccosukee Road
Tallahassee, FL 32308
Non-Technical Specifications are a part of the contract as if attached
March 2022 5
TABLE OF CONTENTS
BIDDING CONDITIONS
SECTION A REQUESTS FOR PROPOSALS
A-1 INVITATION TO BID
A-2 FUNDING
A-3 REQUIRED FORMS
SECTION B INSTRUCTION TO BIDDERS
B-1 SPECIFICATION TERMINOLOGY
B-2 BIDDER'S QUALIFICATION REQUIREMENTS AND PROCEDURES
B-3 FAMILIARITY WITH LAWS
B-4 FLORIDA PRODUCTS AND LABOR
B-5 TAXES
B-6 ALTERNATES
B-7 ADDENDA
B-8 INTERPRETATION OF BIDDING DOCUMENTS
B-9 EXAMINATION OF BIDDING DOCUMENTS AND SITE OF WORK
B-10 BASIS FOR BIDDING - TRADE NAMES
B-11 BID GUARANTEE
B-12 SURETY COMPANIES ACCEPTABLE TO STATE
B-13 PREPARATION AND SUBMISSION OF BIDS
B-14 LISTING OF SUBCONTRACTORS
B-15 WITHDRAWAL OF BIDS
B-16 RECEIPT AND OPENING OF BIDS
B-17 DISQUALIFICATION OF BIDS
B-18 REJECTION OF BIDS
B-19 NOTICE AND PROTESTS PROCEDURES
B-20 DETERMINATION OF SUCCESSFUL BIDDER
B-21 NOTICE TO SECURE PERMITS AND PAY FOR UTILITY CONNECTIONS; SCHEDULE OF
VALUES; NOTICE TO PROCEED TO MOBILIZE ON SITE AND TO PROCEED WITH
CONSTRUCTION; TIME OF COMPLETION AND LIQUIDATED DAMAGES
B-22 APPRENTICES
March 2022 6
TABLE OF CONTENTS (Cont)
CONTRACT CONDITIONS
SECTION C CONDITIONS OF THE CONTRACT
C-1 PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND
C-2 EXECUTION OF AGREEMENT AND BONDS
C-3 CONTRACTOR'S INSURANCE
C-4 PROGRESS SCHEDULE FOR PROJECTS WITH CONSTRUCTION COST BELOW $2,000,000
C-5 CONSTRUCTION SCHEDULE AND REQUIREMENTS FOR OVERTIME WORK
FOR PROJECTS WITH CONSTRUCTION COSTS IN EXCESS OF $2,000,000.00
C-6 VERIFICATION OF OWNER'S SURVEY DATA
C-7 CONSTRUCTION FACILITIES
C-8 PROJECT DRAWINGS - COPIES FURNISHED TO CONTRACTOR
C-9 PROJECT DRAWINGS-CHANGES
C-10 INSPECTIONS - ALL PROJECTS
C-11 SHOP DRAWINGS
C-12 REFERENCE TO A.S.T.M. OR FEDERAL SPECIFICATIONS
C-13 MANUFACTURER'S SPECIFICATIONS
C-14 APPROVAL OF MATERIALS
C-15 SUBSTITUTIONS
C-16 CONSTRUCTION CLIMATE CONTROL
C-17 AS-BUILT DRAWINGS
C-18 GUARANTEES AND OPERATING INSTRUCTIONS
C-19 CLEANING
C-20 FINAL PAYMENT
C-21 PUBLIC NOTICE
C-22 INCLUSION OF AIA DOCUMENT A-201
C-23 SCOPE
C-24 ARTICLE 2, OWNER
C-25 ARTICLE 3, CONTRACTOR
C-26 ARTICLE 4, ARCHITECT; ADMINISTRATION OF THE CONTRACT
C-27 ARTICLE 5, SUBCONTRACTORS
March 2022 7
TABLE OF CONTENTS (Cont)
C-28 ARTICLE 7, CHANGES IN THE WORK
C-29 ARTICLE 8, TIME
C-30 ARTICLE 9, PAYMENTS AND COMPLETION
C-31 ARTICLE 11, INSURANCE AND BONDS
C-32 ARTICLE 13, MISCELLANEOUS PROVISIONS
C-33 CHANGES IN THE WORK, DELAYS & EXTENSIONS OF TIME, CLAIMS
C-34 PROGRESS PAYMENTS
C-35 EXCLUSION OF OWNER FROM LIABILITY
C-36 DUTIES OF ARCHITECT-ENGINEER'S REPRESENTATIVE
C-37 DUTIES OF OWNER'S STATE CONSTRUCTION REPRESENTATIVE
C-38 PROHIBITED MATERIALS - ASBESTOS
C-39 CLAIMS AND DISPUTES
C-40 INTEREST PROVISIONS
C-41 HARMONY
C-42 CONTRACTOR REPRESENTATION
C-43 CONTRACTOR'S WORK FORCE
C-44 CONTRACTOR'S SUPERVISION OF PROJECT
C-45 TERMINATION FOR CAUSE OR MUTUAL AGREEMENT
C-46 TERMINATION FOR CONVENIENCE
C-47 CONTRACTOR'S PAYMENT RIGHTS
C-48 PUBLIC ENTITY CRIME INFORMATION STATEMENT
C-49 DISCRIMINATION, DENIAL OR REVOCATION FOR THE RIGHT TO TRANSACT
BUSINESS WITH PUBLIC ENTITIES
C-50 UNAUTHORIZED ALIENS
C-51 ELECTRONIC MAIL CAPABILITIES
C-52 ASSIGNMENT
C-53 BUILDING PLANS EXEMPTION POLICY
C-54 ENVIRONMENTAL AWARENESS TRAINING
C-55 CONTRACTOR COMPLIANCE WITH SECTION 20.055, FLORIDA STATUTES
March 2022 8
C-56 DEBARMENT AND SUSPENSION
C-57 CONTRACTOR COMPLIANCE WITH FLORIDA STATUTES
March 2022 9
TABLE OF CONTENTS (cont.)
SPECIAL CONDITIONS
SECTION D SPECIAL CONDITIONS
D-1 A/E FIELD OFFICE
D-2 VOICE/DATA/FAX
D-3 WATER
D-4 ELECTRICITY
D-5 PROJECT SIGN
D-6 PRE-CONSTRUCTION CONFERENCE
D-7 SITE SECURITY
D-8 FREEDOM OF INFORMATION ACT
D-9 TEMPORARY FACILITIES (PUT IN IF APPLICABLE)
March 2022 10
TABLE OF CONTENTS (cont.)
EXHIBIT LIST
EXHIBIT 1 INVITATION TO BID
EXHIBIT 2 INSURANCE FORM
EXHIBIT 3 FNG FORM 5085, CONTRACTOR QUALIFICATIONS AND FINANCIAL STATEMENT
EXHIBIT 4 PROPOSAL FORM
EXHIBIT 5 SUBCONTRACTOR LIST
EXHIBIT 6 AGREEMENT BETWEEN OWNER & CONTRACTOR
EXHIBIT 7 PERFORMANCE BOND
EXHIBIT 8 LABOR & MATERIAL PAYMENT BOND
EXHIBIT 9 REMOVED
EXHIBIT 10 PAY REQUEST FORM 4012E
EXHIBIT 11 SCHEDULE OF CONTRACT VALUES
EXHIBIT 12 CONTRACTOR'S AFFIDAVIT OF CONTRACT COMPLETION
EXHIBIT 12a A/E CERTIFICATE OF CONTRACT COMPLETION
EXHIBIT 13 PERCENTAGE FACTOR TO BE USED IN SECTION C-37(6) OF THE CONSTRUCTION
EXHIBIT 14 PROJECT SIGN
EXHIBIT 15 CONTRACTOR’S MINORITY BUSINESS STATUS REPORT OF PARTIAL PAYMENT
EXHIBIT 16 PROPOSED CHANGE ORDER SUMMARY FORM
EXHIBIT 17 CONTRACTOR’S ESTIMATED PAYMENT DRAW SCHEDULE
EXHIBIT 18 CONSENT OF SURETY TO FINAL PAYMENT
EXHIBIT 19 SURETY POWER OF ATTORNEY (TO ACCOMPANY EXHIBIT 18)
EXHIBIT 20 REMOVED
March 2022 11
SECTION A
REQUESTS FOR PROPOSALS
A-1 INVITATION TO BID
The "Invitation To Bid" form enclosed as Exhibit 1 shall be utilized for requesting proposals from all Bidders. The standard template for the Invitation to Bid (ITB) form shall be completed by the Contract Management Branch and distributed through the DMS Vendor Bid System (VBS), Florida Administrative Register (FAR) or local news media (newspaper), depending on the level of the project. The ITB shall contain all information needed for the site visit/pre-bid meeting, RFI’s for addenda, submittal of bids and bid opening. Sources of information other than the DMA should not be relied upon.
A-2 FUNDING
The State of Florida's award, performance and obligation to pay under this contract is contingent upon availability of funding and an annual appropriation by the Legislature.
A-3 REQUIRED FORMS
The following are the forms required for use by this office. Project specific forms in Word .doc format are available by contacting the Contract Management Branch at ng.fl.flarng.list.cfmo-contracting@army.mil. Use of other forms may cause rejection of bids or a delay in approval and payment of your invoices. Please do not use the forms attached as Exhibits, as these are samples only.
• Project Advertisement “Invitation To Bid” - Exhibit 1
• Insurance Form – Exhibit 2
• Contractor Qualifications Form FNG Form 5085 - Exhibit 3
• Proposal Form - Exhibit 4
• List of Subcontractors - Exhibit 5
• Agreement Between Owner & Contractor - Exhibit 6
• Performance Bond - Exhibit 7
• Labor and Material Bond - Exhibit 8
• Final Receipt of Payment & Release of All Liens & Claims - Exhibit 9
• Owners Certificate of Partial Pay Form 4012E - Exhibit 10
• Schedule of Contract Values - Exhibit 11
• Contractors Affidavit of Contract Completion - Exhibit 12
• A/E Certificate of Contract Completion - Exhibit 12a
• Percentage Factor/Contract Conditions - Exhibit 13
• Contractor Project Sign - Exhibit 14
• Minority Business Status Report - Exhibit 15
• CFMO Change Order Request Summary - Exhibit 16
• Contractor Estimated Payment Draw Schedule – Exhibit 17
• Consent of Surety to Final Payment – Exhibit 18
• Surety Power of Attorney (to accompany Exhibit 18) – Exhibit 19
• Waiver and Release of Lien Upon Progress Payment – Exhibit 20 mailto:ng.fl.flarng.list.cfmo-contracting@army.mil
March 2022 12
SECTION B
INSTRUCTIONS TO BIDDERS
B-1 SPECIFICATION TERMINOLOGY
DEFINITION OF TERMS:
Whenever in these Instructions the following terms (or pronouns which replace these terms) are used, their intent and meaning shall be interpreted as follows:
OWNER
State of Florida, Department of Military Affairs
2305 State Road 207
St. Augustine, FL 32086
PROJECT MANAGER:
The authorized representative of the Owner charged with the construction management of the project for the Department of
Military Affairs
CONTRACT MANAGER:
The authorized representative of the Owner charged with the contract management and administration of the project for the
Department of Military Affairs.
ARCHITECT-ENGINEER/PROJECT REPRESENTATIVE:
The Design Professional (Architect-Engineer, Architect, Engineer or Other) commissioned by the Owner, acting directly or through a duly authorized representative.
BIDDER:
Any individual, firm, partnership or corporation submitting a proposal for the work contemplated.
SURETY:
The corporate body, which is bound with and for the Contractor, which is primarily liable, and which guarantees the faithful performance of the Agreement.
PROPOSAL:
A bid for the work contemplated, which the Bidder shall submit on approved forms (Exhibit 4).
AGREEMENT:
"Agreement" shall mean the document entitled "Agreement between Owner and Contractor."
CONTRACT LEVELS:
LEVEL 1:
Contracts where Agreement has a Contract Sum which does not exceed $35,000
LEVEL 2:
Contracts where Agreement has a Contract Sum greater than $35,000 but does not exceed $65,000.
LEVEL 3:
Contracts where Agreement has a Contract Sum greater than $65,000 but does not exceed $200,000.
LEVEL 4:
Contracts where Agreement has a Contract Sum greater than $200,000 but does not exceed $500,000.
LEVEL 5:
Contracts where Agreements Contract Sum exceeds $500,000.
March 2022 13
THRESHOLD BUILDING:
Threshold Building means any building which is greater than three stories or 50 feet in height, or which has an assembly occupancy classification that exceeds 5,000 square feet in area and an occupant content of greater than 500 persons.
SUBSTANTIAL COMPLETION:
The term "Substantial Completion" shall mean that the project under this contract is sufficiently completed in accordance with the Contract Documents, so that the Owner can occupy or utilize the work or designated portions thereof for the use for which it is intended, as expressed in the Contract Documents. The term "Substantial Completion" shall not mean the inclusion of such minor alterations and patching as the Final Inspection shall disclose.
B-2 BIDDER'S QUALIFICATION REQUIREMENTS AND PROCEDURES
Each Bidder and each subcontractor whose field or area is governed by Chapter 399, 455, 489 or 633 of the Florida Statutes for licensure must hold a valid current license as required by the Statute. If the Bidder is a corporation, he must also be properly registered with the State of Florida, Department of State, Division of Corporations.
Bidder qualification requirements and procedures are established by Department rule (Rule 60D-5, Florida Administrative Code) and by the bidding conditions and Specifications. Failure of the Bidder to strictly meet and follow all such requirements and procedures may result in bid rejection or disqualification for contract award. For the Bidder's convenience, the provisions of
Rule 60D-5.004 Bidder's Qualification Requirements and Procedures are set forth below.
60D-5-004 Bidder's Qualification Requirements and Procedures.
There are two steps in qualifying to perform construction of State projects: A.) Prequalification to submit a bid, and B.) Prequalification for award of the contract. However, the submission date of qualifications may change dependent upon the complexity of a project, funding time constraints or availability of personnel to perform qualification review and approval procedures. Contractor should verify at the Pre-Bid meeting the exact prequalification requirements and submission due dates.
Pre-qualifications with one agency will not automatically prequalify the contractor with other agencies. Pre-qualifications, unless otherwise stated in writing, shall be submitted on each project advertised by the Department. Qualification documents are not held on file for other projects.
A. Prequalification to submit a bid.
1. Prequalification requirements apply to all Bidders on Levels Four and Five contracts. Bidders must provide this information during the bidding of a specific project, unless otherwise advertised.
a. Current State Contractor license certification or registration as required under Florida Statutes.
b. Current Corporate Charter registration, if the potential Bidder is a domestic (Florida) corporation, or authority to transact business if the potential Bidder is a foreign (non-Florida) corporation, as may be required by Florida law.
c. For projects that require (based on Agency discretion) a contractor with specific expertise and experience, the
Agency may state additional prequalification requirements.
d. A completed FNG 5085 Contractor Questionnaire. (See Exhibit 3)
e. Proof of registration in www.myfloridamarketplace.com web site.
2. For projects that require a contractor with specific expertise and experience, the Agency may state additional prequalification requirements relating to demonstrated performance of similar work of similar size and complexity and the possession or availability of facilities or equipment needed for performance of the work in addition to prequalification requirements in accordance with conditions that will be established in the bidding documents.
3. In each instance where the bid documents set forth certain additional prequalification requirements each potential Bidder shall submit these prequalification data to the Agency as provided in the bid documents. The conditions may include a deadline date for submittal of additional prequalification data, which date will be earlier than the deadline for submission of bids. Bids are to be accepted only from those potential Bidders who have pre-qualified in accordance with this section and the terms of the bidding documents.
http://www.myfloridamarketplace.com/
March 2022 14
4. Each potential Bidder will be notified by the Agency to which it applied for prequalification of ineligibility to submit bids during the balance of the qualification period for a specific field or area of construction. A firm will be permitted to correct prequalification deficiencies if proof of correction is received 120 hours prior to the bid opening date and time. Any Bidder or potential Bidder that is determined to be ineligible because of failure to provide evidence of the minimum requirements will not be qualified to submit a bid and will be informed in writing of the deficiencies that must be corrected to be considered for future projects.
Each potential Bidder notified of its eligibility may submit a bid at the time and place designated in the bidding documents as long as the Bidder is qualified and eligible to perform the work required by the bidding documents.
B. Pre-qualifications for award of the contract
1. Requirements: Any Bidder that has submitted a bid on Levels Four and Five contracts must satisfy the following requirements as judged by the Agency in order to be eligible for award of the contract for construction.
a. Satisfactory compliance with bid pre-qualification criteria.
b. On projects where the bid total exceeds $100,000, the Bidder must provide with the bid, a good faith deposit in the amount of 5% of the bid by way of a bid bond from a surety insurer authorized to do business in this State as surety or a certified check accompanying the bid, such requirement may be satisfied by the Bidder depositing in lieu of such certified check, a cashier's check, treasurer's check or bank draft of any national or state bank.
c. On projects where the bid exceeds $100,000, unless such requirement has been waived in accordance with Rule 60D-
5.0041, the Bidder must provide with the bid, evidence of ability to provide the necessary performance and payment bonds for the project by providing a letter of intent to provide a 100% performance bond and a 100% labor and material payment bond from a surety company authorized to do business in the State of Florida by the Department of
Insurance, and meeting the financial and performance rating required by the bidding documents. For contract amounts not exceeding $500,000 the provisions of Section 287.0935 F.S. shall govern.
d. Supervisor - On Level 5 projects, the Contractor must agree to provide field (on-site) supervision (through a named superintendent) for each of the general, concrete forming and placement, masonry, mechanical, plumbing, electrical and roofing trades. In addition, the Contractor shall assign and name a qualified employee to provide scheduling direction to the entire project. Supervisory employees (including field superintendents, foremen and schedulers at all levels) must have been employed in a supervisory (leadership) capacity of a substantially equivalent level on a similar project for at least two years within the last five years. The Contractor shall include a resume of experience for each of those employees identified by him to supervise each trade, and for scheduling, with its submittal of the experience questionnaire (item d above).
e. Specific expertise and experience a contractor's staff must have to perform a project requiring unique or specialized capabilities.
2. The Agency will evaluate all data submitted within fourteen days of receipt and determine whether the firm is a qualified
Bidder. Should the Bidder be judged unqualified, its bid will be rejected and the Bidder submitting the next low responsive bid will be given seven (7) working days to submit its qualification data. Additional qualification data may be requested.
B-3 FAMILIARITY WITH LAWS
The Bidder is required to be familiar with all Federal, State and local laws, ordinances, rules and regulations that in any manner affect the work. Ignorance on the part of the Bidder will in no way relieve him from responsibility.
B-4 FLORIDA PRODUCTS AND LABOR
The Contractor's attention is called to Section 255.04, Florida Statutes, which requires that on public building contracts Florida products and labor shall be used wherever price and quality are equal.
B-5 TAXES
Although the Owner is not subject to the Florida Sales and Use Tax, any Contractor who purchases materials and services, which will be used in the construction of State-owned buildings, will not be exempt from the tax on these materials and services as evidenced by the following excerpt from the Florida Statutes:
March 2022 15
"The State, any county, municipality or political subdivision of this State is exempt from the sales tax, except this exemption shall not include sales of tangible personal property made to contractors employed either directly or as agents of any such government or political subdivision thereof when such tangible personal property goes into or becomes a part of public works owned by such government or political subdivision thereof."
The Owner is not subject to:
A. Federal Excise Taxes on materials or appliances that are incorporated into and become a part of the completed improvement.
B. Federal Tax on Transportation of Property.
In every case of a purchase of materials to be incorporated in the work, which are subject to Federal Excise Tax, the Owner will furnish to the Contractor the necessary Federal Excise Tax Exemption Certificate upon receipt of a copy of the supplier's invoice showing the item or items, the net price, and Federal Excise Tax separately.
The Bidder shall take these factors into consideration in preparing his proposal, including therein the cost of the State Sales Tax and Use Tax on materials, but excluding the cost of those taxes not applicable.
B-6 ALTERNATES
If the Owner wishes to learn the relative or additional construction cost of an alternative method of construction, an alternative use or type of material or an increase or decrease in scope of the project, these items will be defined as alternates and will be specifically described by the contract documents. Alternates will be listed in the Proposal form in a manner that the Bidder shall be able to clearly indicate what sums he will add to (or deduct from) his Base Bid.
B-7 ADDENDA
In case the Architect-Engineer finds it expedient to supplement, modify or interpret any portion of the Bidding Documents during the bidding period, such procedure will be accomplished by the issuance of written Addenda to the Bidding Documents.
Addenda shall be made available to all prospective Bidders. It is the Bidders responsibility to ensure receipt of all issued addenda before bid due date. Failure to acknowledge addenda on the Exhibit 4 proposal form may be cause for rejection.
B-8 INTERPRETATION OF BIDDING DOCUMENTS
No interpretation of the meaning of the Drawings, Specifications or other Bidding Documents and no correction of any apparent ambiguity, inconsistency or error therein will be made to any Bidder orally. Every request for such interpretation or correction shall be in writing, and addressed to the Architect-Engineer (or the contact indicated in the bidding documents). All such interpretations and supplemental instruction will be in the form of written Addenda to the Bidding Documents, sent via E-Mail by the Architect-Engineer or posted on the VBS by a Contract Management Branch Official.
Only the interpretation or correction so given by the Architect-Engineer (or Owner appointed expert) in writing shall be binding, and prospective Bidders are advised that no other source is authorized to give information concerning, or to explain or interpret, the Bidding Documents. The DMA will not be responsible for information obtained through sources other than those used by the DMA for solicitations (Vendor Bid System or Florida Administrative Register) that may cause rejection of bids.
B-9 EXAMINATION OF BIDDING DOCUMENTS AND SITE OF WORK
Bidders are required, before submitting their proposals, to visit the site of the proposed work and completely familiarize themselves with the nature and extent of the work and any local conditions that may in any manner affect the work to be performed and the equipment, materials and labor required. They are also required to examine carefully any Drawings, Specifications and other Bidding Documents to inform themselves thoroughly regarding any and all conditions and requirements that may in any manner affect the work. Only those contractors listed on the pre-bid /site visit meeting sign-in roster will be allowed to bid.
March 2022 16
B-10 BASIS FOR BIDDING - TRADE NAMES
For clarity of description and as a standard of comparison, certain equipment, materials, etc., have been specified by at least two trade names or manufacturers. To ensure a uniform basis for bidding, the Bidder shall base his Proposal on the particular system, equipment or material specified. After the contract is let, other equipment materials, etc., as manufactured by other manufacturers may be accepted only if, in the opinion of the Architect-Engineer, same is equivalent in quality and workmanship and will perform its intended purpose satisfactorily.
B-11 BID GUARANTEE
On projects where the base bid and sum of all additive alternates exceeds $100,000, bids shall be accompanied by a bid guarantee of not less than five (5) percent of the amount of the bid, which may be a certified check, a cashier's check, treasurer's check, bank draft or Bid Bond made payable to the Owner. If a bid bond is submitted, it must be signed by a Florida Licensed
Resident Agent who holds a current Power of Attorney from the Surety Company issuing the Bond and the Power of Attorney must be attached to the Bid Bond. Such check or Bid Bond shall be submitted with the understanding that it shall guarantee that the Bidder will not withdraw his bid for a period of forty (40) days after the scheduled closing time for the receipt of bids; that if his bid is accepted, he will enter into a written contract with the Owner in accordance with the form of agreement included as a part of the Contract Documents, and that the required Performance Bond and Labor and Material Payment Bond will be given;
and that in the event of the withdrawal of said bond within said period, or failure to enter into said Agreement and give said bonds within ten (10) calendar days after he has received notice of acceptance of his bid, the Bidder shall be liable to the Owner for the full amount of the bid guarantee as representing the damage to the Owner on account of the default of the Bidder in any particular hereof. The Bid Bonds or checks shall be returned to all except the apparent lowest two qualified Bidders after the formal opening of bids. The remaining Bid Bonds or checks will be returned to the two lowest Bidders after the Owner and the accepted Bidder have executed the Agreement and the Performance Bond and Labor and Material Payment Bond have been approved by the Owner. If the required Agreement and Bonds have not been executed within forty (40) calendar days after the date of the opening of the bids, then the Bid Bond or check of any Bidder will be returned upon his request, provided he has not been notified of the acceptance of his bid prior to the date of such request.
B-12 SURETY COMPANIES ACCEPTABLE TO STATE
To be acceptable to the State as Surety for Bid Bonds, Performance Bonds and Labor and Material Payment Bonds, a Surety
Company shall comply with the following provisions:
A. The Surety Company shall have a currently valid Certificate of Authority, issued by the State of Florida, Department of
Insurance, authorizing it to write surety bonds in the State of Florida.
B. The Surety Company shall have currently valid Certificate of Authority issued by the United States Department of Treasury under Sections 9304 to 9308 of Title 31 of the United States Code.
C. The Surety Company shall be in full compliance with the provisions of the Florida Insurance Code.
D. The Surety Company shall have at least twice the minimum surplus and capital required by the Florida Insurance Code at the time the invitation to bid is issued.
E If the Contract Award Amount exceeds $500,000, the Surety Company shall also comply with the following provisions:
1. The Surety Company shall have at least the following minimum ratings in the latest issue of Best's Key Rating Guide.
Policy Required:
Contract Amount Holder's Rating Financial Rating
$ Up to 1,000,000 A- CLASS I
1,000,000 to 2,000,000 A- CLASS II
2,000,000 to 5,000,000 A- CLASS III
5,000,000 to 10,000,000 A- CLASS IV
10,000,000 to 25,000,000 A- CLASS V
25,000,000 to 50,000,000 A- CLASS VI
March 2022 17
50,000,000 to 100,000,000 A- CLASS VII
2. The Surety Company shall not expose itself to any loss on any one risk in an amount exceeding ten (10) percent of its surplus to policyholders, provided:
a. Any risk or portion of any risk being reinsured shall be deducted in determining the limitation of the risk as prescribed in this section. These minimum requirements shall apply to the reinsuring carrier providing authorization or approval from the State of Florida, Department of Insurance requirements to do business in this state have been met.
b. In the case of the surety insurance company, in addition to the deduction for reinsurance, the amount assumed by any co-surety, the value of any security deposited, pledged or held subject to the consent of the surety and for the protection of the surety shall be deducted.
B-13 PREPARATION AND SUBMISSION OF BIDS
Each Bidder shall copy the proposal form (Exhibit 4) on his own letterhead, indicate his bid prices thereon in proper spaces, for the Base Bid and for alternates on which he bids. Any erasure or other correction in the proposal may be explained or noted over the signature of the Bidder.
Proposals containing any conditions, omissions, unexplained erasures, alterations, items not called for or irregularities of any kind may be rejected by the Owner.
Each bid must give the full business name, federal ID number, address, telephone and fax of the Bidder and state whether it is an individual, corporation or partnership. The bid must be signed before submitting in duplicate in a sealed envelope. The envelope must be clearly marked on its face as follows:
ATTN: SEALED BID - PROJECT NO.: 218035
PROJECT NAME: Bonifay Armory ESP RENOVATION
ATTN: CFMO Contract Management Branch
The bid shall be submitted only prior to the time and the place specified in the Invitation to Bid or in accordance with any
Addendum issued subsequent to the advertisement. Sealed bid envelopes submitted by mail or by delivery service must be delivered within a separate mail or delivery envelope, also marked "SEALED BID". Bids not delivered in sealed envelopes may be returned to the Bidder. All bids submitted by mail or delivery service need to be confirmed by Bidder with the CFMO
Contract Management Branch.
B-14 LISTING OF SUBCONTRACTORS
In order that the Owner may be assured that only qualified and competent subcontractors will be employed on the project, each
Bidder shall submit in duplicate with his proposal a list of the subcontractors who will perform the work for each Division of the
Specifications utilizing the "List of Subcontractors" form enclosed as Exhibit 5. The Bidder shall have determined to his own complete satisfaction that a listed subcontractor has been successfully engaged in this particular type of business for a reasonable length of time, has successfully completed installations comparable to that which is required by this Agreement and is qualified technically and financially to perform the work for which he is listed. Only one subcontractor shall be listed for each phase of work.
Any Bidder who lists a subcontractor not certified and/or registered by the State to perform the work of his trade if, such certification or registration is required for the trade, by Florida Laws, will be rejected as non-responsive.
No change shall be made in the List of Subcontractors, before or after the award of a contract, unless agreed to in writing by the
Owner.
B-15 WITHDRAWAL OF BIDS
Bids may be withdrawn on written, e-mail or facsimile request received from Bidders prior to the time fixed for opening.
Negligence on the part of the Bidder in preparing the bid confers no right for withdrawal of the bid after it has been opened.
March 2022 18
B-16 RECEIPT AND OPENING OF BIDS
Bids will be opened publicly at the time and place stated in the Bidding Documents. An official time clock will be used to monitor the closing of the bids and to time-stamp bids as received. No responsibility will be attached to any officer for the premature opening of a bid not properly addressed and identified. At the time fixed for the opening of bids, the bids will be read aloud.
B-17 DISQUALIFICATION OF BIDS
More than one bid from an individual, firm, partnership, corporation or association under the same or different names will not be considered. Reasonable grounds for believing that a Bidder is interested in more than one proposal for the same work will cause the rejection of all proposals in which such Bidders are believed to be interested.
Any or all proposals will be rejected if there is reason to believe that collusion exists among the Bidders and no participants in such collusion will be considered in future proposals for the same work.
The Owner reserves the right to accept or reject any or all proposals received and reserves the right to make an award with or without further discussion of the proposals submitted or accept minor informalities or irregularities in the best interest of the
State of Florida, which are considered a matter of form and not substance, and the correction or waiver of which is not prejudicial to other proposers. Minor irregularities are defined as those that will not have an adverse effect on the
Department’s interest and will not affect the price of the proposal by giving a proposer an advantage or benefit not enjoyed by all other proposers. It is understood the proposal will become a part of the Department’s official file, without obligation to the Department. Proposals may be rejected if found to be irregular or not in conformance with the requirements and instructions contained herein. A proposal may be found to be irregular or non-responsive by reasons that include, but are not limited to failure to utilize or complete in their entirety prescribed forms, conditional proposals, incomplete proposals, ambiguous proposals, and improper, missing and/or undated signatures. Bids not complete with Bid Bonds, (when applicable), List of Subcontractors, or addenda not acknowledged will not be read aloud. The Official announces the deficiency causing the bid to be non-responsive and its disqualification thereby. The disqualified proposal will be impounded and not returned.
Falsification of any entry made on the contractor's bid proposal will be deemed a material bid deviation and will be grounds for rejection.
Any and all bid proposals may be rejected if determined to be non-responsive (does not conform in all material aspects to the invitation to bid or request for proposals) or non-responsible (firm is not deemed capable in all respects to perform fully the contract requirements and the integrity and reliability to assure good faith performance).
B-18 REJECTION OF BIDS
The Owner reserves the right to reject any and all bids under any of the circumstances prescribed in Rule 60D-5.0071, Florida
Administrative Code, and to negotiate the contract in accordance with Rules 60D-5.00, 60D-5.0082, and 60D-5.0091, Florida
Administrative Code, if the low qualified bid exceeds the project construction budget.
B-19 NOTICE AND PROTEST PROCEDURES
A. Notification:
1. Bid Solicitation: The Owner shall provide notice of its decision or intended decision concerning a bid solicitation as provided in the advertising for bids and distribution of bidding documents.
2. Contract Award: On contracts within Levels 2, 3, 4 & 5, the notice of a decision or intended decision on contract award or bid rejection shall be given by posting electronically on the My Florida Market Place (MFMP) Vendor Bid System (VBS), or by posting in the same manner in which the bid solicitation was announced by the Contract Management Branch of the DMA.
March 2022 19
B. Protest:
1. Any person who is affected adversely by the Owner's decision or intended decision shall file with the Owner a notice of protest in writing within 72 hours, excluding Saturday, Sunday and State legal holidays, after receipt of the bidding documents if the protest is directed toward the bidding documents or after the notice of the Owner's decision or intended decision on contract award or bid rejection if the protest is directed toward contract award or bid rejection.
2. Thereafter a formal written protest by petition in compliance with Section 120.57(3), Florida Statutes, and Rule 28-110, Florida Administrative Code, must be filed with the Owner within ten (10) days after the date the notice of protest was filed.
3. Failure to file a timely notice of protest or failure to file a timely formal written protest petition shall constitute a waiver of protest proceedings. Any protest filed prior to posting of the bid tabulation or receipt of the notice of the agency decision or intended decision will be considered abandoned unless renewed within the time limit provided for protests.
4. The Agency and the Commission on Minority Economic and Business Development is hereby granted standing to protest, pursuant to s. 287.0945, in a timely manner, any contract award in competitive bidding for contractual services and construction contracts that fail to include minority business enterprise participation, if any responding Bidder has demonstrated the ability to achieve any level of participation, or any contract award for commodities where, a reasonable and economical opportunity to reserve a contract statewide or district level, for minority participation was not executed or, and agency failed to adopt applicable preference for minority participation. Any low Bidder with no participation may be presumed not in "good faith." All Bidders will be notified of the minority participation goal by addendum.
C. Owner Action:
1. Upon receipt of a notice of protest that has been timely filed, the Owner shall delay the contract award process until the subject of the protest is resolved by mutual agreement between the parties or by final Owner action, unless the Owner sets forth in writing particular facts and circumstances which require the continuation of the bid solicitation process or the contract award process without delay to avoid an immediate and serious danger to public health, safety, or welfare; provided, however, that if the petition is not filed within the time stated above, the contract award process may continue as if the notice of protest had not been filed.
2. Upon receipt of the formal written protest petition which has been timely filed, the Owner shall attempt to resolve the protest by mutual agreement between the parties within 7 days, excluding Saturday, Sunday and legal State holidays.
3. If the protest is not resolved by mutual agreement within said seven (7) days, and if no disputed issue of material fact is involved, the Owner may designate a Hearing Officer who shall conduct an informal proceeding pursuant to Section
120.57(2), Florida Statutes, and Rule 60Q-2.014, Florida Administrative Code. The qualifications of such designated
Hearing Officer shall be: 1 a member in good standing of The Florida Bar; or 2. a person knowledgeable by virtue of practical experience of the procedures relating to soliciting and evaluating bids for state contracts. Notice of informal proceedings shall be given no less than three days prior to the proceeding. The proceeding may be held before the Owner.
4. If there is a disputed issue of material fact, the protest shall be referred to the Division of Administrative Hearings of
Department of Administration, State of Florida, for proceedings under section 120.57(1).
B-20 DETERMINATION OF SUCCESSFUL BIDDER
A. All projects except where competitive bidding is waived under the provisions of Rule 60D-5.008, Florida Administrative
Code, will be publicly bid in accordance with the provisions herein. Award of contract will be made to the lowest responsive responsible Bidder, determined in accordance with the provisions herein and meeting the requirements of the bidding documents, that submits the lowest valid bid for the work. The lowest bid will be determined as follows:
1. The lowest bid will be the bid from the responsive responsible Bidder that has submitted the lowest price for the base bid or the base bid plus the additive alternates or less the deductive alternates chosen by the Agency to be included in or excluded from the proposed contract, taken in numerical order listed in the bid documents. The order of the alternates may be selected by the Agency in any sequence so long as such acceptance out of order does not alter the designation of the low Bidder.
March 2022 20
2. On projects whose bidding documents provide for evaluation of the bids based on first cost and life cycle cost and performance criteria, the lowest bid will be the bid by the firm whose bid products are determined to yield the lowest total cost in accordance with the criteria set forth in the bidding documents.
B-21 NOTICE TO SECURE PERMITS AND PAY FOR UTILITY CONNECTIONS; SCHEDULE OF VALUES;
NOTICE TO PROCEED TO MOBILIZE ON SITE AND TO PROCEED WITH CONSTRUCTION; TIME OF
COMPLETION AND LIQUIDATED DAMAGES
A. The contract will be issued to the Contractor after all signatures have been acquired. At that time, the Contractor will be given a Notice to Secure Permits for required permits from all agencies with jurisdiction over the area in which the project is located; and to pay, at the Contractor’s cost, the required connection fees from all agencies supplying utilities to the project.
The Contractor is allowed thirty (30) calendar days from the issuance of the Notice to Secure Permits to obtain the required permits and utility connections before construction can begin. Special permits, such as tree removal, Water Management
District, Department of Environmental Regulation, septic tank, etc., may be necessary before construction can begin. If additional time is required, the Contractor will request approval of a time extension for good cause for the purpose of obtaining any permit required prior to commencing construction on the site.
The Contractor is obligated to obtain and pay for a building permit from the local authority for construction of this facility.
In the case of plumbing, electrical, other internal system permits and connection permits, the Contractor is obligated to obtain such permits and pay such fees.
The Contractor shall determine the permits and fees required by any entity having jurisdiction over any part of the project and shall include the cost of all such permits in his bid proposal.
B. The Contractor shall, within ten (10) calendar days from date of Notice to Secure Permits letter, submit to the Architect-
Engineer and Project Manager, for review and approval, three copies of a Schedule of Contract Values which will reflect the estimated cost of each subdivision of work of each specification section, further detailed by subcontractor item, and utilizing the Construction Specification's Institute "Master Format Broad Scope Section Numbers". The value of each item shall include a true proportionate amount of the Contractor's overhead and profit. The sum of all such scheduled values shall equal the Contract Sum as evidenced by the Agreement.
C. Upon paying for all required utility connections (not limited to but including telephone, data, electric, water and sewer) and securing the Building Permit, the Contractor shall provide a copy of any and all Permits required and receipts showing payments to the Architect-Engineer and the Owner. The Notice to Proceed to Mobilize on Site and to Proceed with
Construction will then be issued by the Owner. The work to be performed under this contract shall be commenced within ten (10) calendar days after date of Notice to Proceed to Mobilize on Site and to Proceed with Construction, shall be substantially completed within -270-_ calendar days after the date of this Notice to Proceed, and shall be finally completed within _-30-_ calendar days after the date of substantial completion. It is the Contractor’s responsibility to ensure the
Certificate of Occupancy from the authority having jurisdiction is provided to Owner prior to substantial completion.
D. Inasmuch as failure to complete the project within the time fixed above will result in substantial injury to the Owner, and as damages arising from such failure cannot be calculated with any degree of certainty, it is hereby agreed that if the project is not substantially completed, according to the definition of "Substantial Completion" in Section B-1 hereinabove, or within such further time, if any, as in accordance with the provisions of the Contract Documents shall be allowed for such substantial completion, the Contractor shall pay to Owner as liquidated damages for such delay, and not as a penalty, any and all actual costs and/or losses incurred by the Owner, as the result of the delay, for each and every calendar day elapsing between the date fixed for substantial completion above and the date such substantial completion shall have been fully accomplished. Said liquidated damages shall be payable in addition to any other excess expenses or costs payable by the Contractor to the Owner under the provisions of AIA Article 14 of the General Conditions, and shall not exclude the recovery of damages by the Owner under other provisions of the Contract Documents, except for
Contractor's delay. This provision of liquidated damages for delay shall in no manner affect the Owner's right to terminate the contract as provided in Article14 of the General Conditions or elsewhere in the Contract Documents. The
Owner's exercise of the right to terminate shall not release the Contractor from his obligation to pay said liquidated damages in the amounts as provided for above.
March 2022 21
The Owner is entitled to completion of the project within the time fixed above or within such further time, if any, as may be allowed in accordance with the provisions of the contract. In the event of termination of the contract by the Owner prior to completion as provided in Article 14.2 of the General Conditions or elsewhere in the Contract Documents, the
Contractor shall be liable to the Owner for the expenses for additional managerial and administrative services provided in said Article14 and also for the per diem liquidated damages as agreed to above.
1. For each day he is in arrears in his work at the time of said termination as determined by the Architect-Engineer, and
2. For each day of thirty (30) additional calendar days hereby stipulated and agreed to be the time it will require the
Owner to affect another contract for completion of the project and for resumption of work thereon.
Provided, however, that the sum of 1 and 2 above shall not exceed the number of days beyond the original agreed completion date, or any extension thereof as herein provided, reasonably required for completion of the project.
It is further agreed that the Owner may deduct from the balance retained by the Owner, under the provisions above, the liquidated damages stipulated therein for delay or termination, as the case may be, or such portions thereof as the said retained balance will cover.
B-22 APPRENTICES
If the Contractor employs apprentices on the project, the behavior of the Contractor and the Owner shall be governed by the provisions of Chapter 446, Florida Statutes, and by applicable standards and policies governing apprentice programs and agreements established by the Division of Workforce Development of the Department of Education, State of Florida. The
Contractor will include a provision similar to the foregoing sentence in each subcontract.
The Contractor shall have the option of listing all available job vacancies with the local Job Service Florida office in order to take advantage of local pools of unemployed qualified construction personnel.
March 2022 22
SECTION C
CONDITIONS OF THE CONTRACT
C-1 PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND
On projects where the Contract Sum exceeds $100,000, the Contractor shall furnish the Owner with a 100% Performance Bond and 100% Labor and Material Payment Bond written by a Surety Company acceptable to the Owner and authorized to do business in the State of Florida and signed by a Florida Licensed Resident Agent. Contractor is required to furnish replacement bonds in the event of cancellation of the original Performance Bond and Labor and Material Payment Bond. Form of bond shall be as shown on forms Exhibits 7 and 8.
The cost of all Performance Bonds and Labor and Material Payment Bonds shall be borne by the Contractor. The Bonds shall be accompanied by a duly authenticated or certified document, in duplicate, evidencing that the person executing the Bonds on behalf of the Surety had the authority to do so on that date of the Bond. In the usual case, conferring of that authority has occurred prior to the date of the Bond, and the document showing the date of appointment and enumeration of powers of the person executing the Bond is accompanied by a certification that the appointment and powers have not been revoked and remain in effect. The date of that certification shall be dated the same date as the Bonds and the Bonds shall be dated the same date as the Agreement. The Bonds must also be recorded in the same County of the project location.
C-2 EXECUTION OF AGREEMENT AND BONDS
Agreement between Owner and Contractor
The Contractor shall execute all required forms of the Agreement and return within ten (10) calendar days of their receipt.
Failure to return all forms correctly executed within ten (10) calendar days of…