Mechanical Record Set - VA Med Surge 35.pdf
PDF 333 KB Posted
- Attached to
- J041--Chiller & Condenser Maintenance - SF Federal contract opportunity
- Solicitation number
- 36C26324Q0595
About this file
This document appears to be a set of mechanical record drawings for the 4th floor of a VA Medical Center facility. The drawings show the general layout and details of the HVAC system, including the location of air handlers, refrigerant lines, steam vents, and other mechanical components. The drawings include general notes that provide guidance on installation, coordination with other trades, and maintenance requirements.
The related federal contract opportunity is a solicitation for HVAC chiller and condenser maintenance services at the Sioux Falls VA Health Care System. This is a fixed-price contract with a base year and four one-year option periods. The procurement is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). Quotes are due by April 19, 2024 and should be emailed to the Contract Specialist. The contract will cover all labor and resources necessary to maintain the HVAC chillers and condensers at the facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation 36C26324Q0595 Amendment 0001.pdf | ||
| 36C26324Q0595 0001_1.docx | DOCX document | |
| Mechanical Record Set - VA Med Surge 32.pdf | ||
| Mechanical Record Set - VA Med Surge 42.pdf | ||
| Mechanical Record Set - VA Med Surge 18.pdf | ||
| Solicitation 36C26324Q0595.pdf | ||
| 36C26324Q0595_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECORD DRAWING
DATE: BY:
THE ISSUANCE OF THIS RECORD DRAWING IS A
REPRESENTATION BY THE ARCHITECT/ENGINEER THAT
THE CONSTRUCTION OR ALTERATIONS OF THE BUILDING
IS IN GENERAL, AS OPPOSED TO PRECISE, CONFORMITY
WITH THE DESIGN PREPARED AND PROVIDED BY THE
ARCHITECT/ENGINEER.
GRID
1S 2S 3S 4S
2.9
E30
E36E32 E33 E34 E35
E1 E2 E3 E4
5-CU-36C5-CU-36D
5-CU-36B 5-CU-36A
5-EF-39A,
5-EF-39B
5-EF-36
1S
2.9
0S 2S 3S 4S
-1S
(8) PAIRS OF REFRIGERANT
LINES DOWN.
6" STEAM RELIEF
DN. THRU ROOF.
5-AHU-5 IN ATTIC ROOM 526D SHALL BE BALANCED DOWN
TO 2,525 CFM. CHANGE OUT STEAM CONTROL VALVE
FOR NEW VALVE TO SERVE REDUCED AIRFLOW AND CAPACITY.
RESHEAVE 5-AHU-5 AND CORRESPONDING RETURN AIR FAN
FOR REVISED CFM'S. REBALANCE OUTSIDE AIR QUANTITY.
KEYPLAN
N O
R T
H
BUILDING
REMODE
L
BUILDING
ADDITION EXISTING
BUILDING
1. MATERIALS AND EQUIPMENT SHOWN ON PLANS SHALL BE NEW AND SHALL BE
FURNISHED BY THIS CONTRACTOR UNLESS OTHERWISE INDICATED.
2. IN GENERAL, PIPING SHALL BE RUN CONCEALED IN SUSPENDED CEILING
SPACES AND IN SHAFTS PROVIDED UNLESS NOTED OR OTHERWISE
INDICATED. CERTAIN ROOMS HAVE NO SUSPENDED CEILINGS, AND PIPING IN
THESE ROOMS SHALL BE EXPOSED.
3. PIPING IS INTENDED TO BE CONCEALED IN WALLS AND PARTITIONS UNLESS
SPECIFICALLY NOTED OTHERWISE. SOME ITEMS MAY APPEAR NOT TO BE
CONCEALED DUE TO DIGITAL REGISTRATION AND ALIGNMENT ISSUES
ASSOCIATED WITH THE DUPLICATION PROCESS.
4. COOPERATE WITH THE OTHER TRADES TO AVOID ANY CONFLICTS BETWEEN
PIPING, DUCTWORK, ELECTRICAL WORK.
5. DETAILS, SCHEMATICS, DIAGRAMS, DESIGNATE GENERAL ARRANGEMENT
ONLY.
6. FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN ON
FLOOR PLANS, REFER TO ELEVATIONS, DETAILS, RISERS AND SCHEDULES.
7. THIS CONTRACTOR IS RESPONSIBLE FOR ALL SLEEVES AND/OR OPENINGS
WHERE REQUIRED TO RUN PIPES THROUGH FOUNDATIONS, FLOOR SLABS,
WALLS, BRIDGING AND BEAMS EXCEPT WHERE OTHERWISE INDICATED.
8. CONSULT REFLECTED CEILING PLAN FOR EXACT LOCATION OF SPRINKLER
HEADS, GRILLES, REGISTERS, AND DIFFUSERS.
9. CEILING ACCESS IS REQUIRED AT ALL REHEAT COILS, VALVES, FIRE
DAMPERS, MANUAL AND MOTORIZED DAMPERS LOCATED ABOVE CEILING.
CEILING ACCESS PANELS WILL BE PROVIDED UNDER THE GENERAL SECTION
OF CONSTRUCTION AND SHALL BE MINIMUM OF 24" X 24" UNLESS OTHERWISE
INDICATED. COORDINATE WITH GENERAL CONTRACTOR.
10. THERMOSTATS LOCATED AT OUTSIDE WALLS SHALL BE MOUNTED ON
INSULATED BACKING TO MINIMIZE WALL EFFECT.
11. THE CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL EXISTING
CONDITIONS AND DIMENSIONS. NOTIFY THE A/E IMMEDIATELY OF ANY
DISCREPANCIES.
12. WHERE NEW SERVICES ARE SHOWN CONNECTING TO EXISTING, VERIFY
EXACT LOCATION AND SIZE OF EXISTING.
13. EXISTING SERVICES SHALL BE MAINTAINED UNLESS OTHERWISE INDICATED.
14. ALL PIPING, FIXTURES, ETC., WHICH ARE DASHED AND/OR INDICATED BY NOTE
ON DEMOLITION PLANS SHALL BE REMOVED.
15. PIPE RUNOUT SIZES TO REHEAT COILS SHALL BE 3/4" UNLESS OTHERWISE
NOTED.
16. RECIRCULATING HOT WATER, OXYGEN, VACUUM, AIR, AND GAS SHALL BE 1/2"
UNLESS OTHERWISE INDICATED.
17. REFER TO THE SPECIFICATIONS FOR SIZING OF CONTROL VALVES.
18. WHERE MATERIAL IS INDICATED TO BE REMOVED, IT SHALL REMAIN THE
PROPERTY OF THE OWNER. THIS CONTRACTOR SHALL DISPOSE OF
MATERIAL AS DIRECTED BY THE OWNER.
19. BALANCING OF HYDRONIC SYSTEMS SHALL BE PERFORMED BY AN NEBB OR
AABC CERTIFIED TEST AND BALANCE AGENCY.
20. PIPE PENETRATIONS OF RATED WALLS AND FLOORS SHALL BE SLEEVED AND
PROPERLY FIRE SEALED.
21. PIPE PENETRATIONS OF SMOKE PARTITION WALLS SHALL BE PROPERLY
SEALED TO RESIST THE PASSAGE OF SMOKE AS REQUIRED BY THE LOCAL
AUTHORITY.
22. THE HEATING AND/OR COOLING HYDRONIC SYSTEM SHALL BE PROVIDED AND
FILLED WITH AN ANTIFREEZE GLYCOL SOLUTION (AS INDICATED ON THE
EQUIPMENT SCHEDULES) BY THE PIPING CONTRACTOR WHO SHALL BE
RESPONSIBLE FOR DETERMINING THE AMOUNT OF GLYCOL REQUIRED.
PIPING PLAN GENERAL NOTES
NOTE: NOT ALL KEYNOTES MAY BE USED ON EACH PLAN
PIPING PLAN KEYNOTES
VALVE AND CAP EXISTING MEDICAL GAS PIPING TO EXISTING HEADWALL
UNITS
2 6" RELIEF VENT UP, COORD. WITH ARCH.
NOT ALL CHANGES DONE IN THIS AREA WERE DOCUMENTED. FIELD VERIFY
CHANGES IN THIS AREA.
4 -
5 -
6 -
7 -
8 -
9 -
10 -
10/19/2018
Copyright TSP, Inc. 2012
CONSULTANTS:
Drawing Number
Drawing Title
A
TSP, Inc.
1112 N. West Ave, Sioux Falls, SD 57104 phone: (605) 336-1160 fax: (605) 336-7926 www.teamtsp.com Date Checked Drawn
Project Number
Building Number
Project Title
Location
ARCHITECTS/ ENGINEERS:
Approved: Project Director
Office of Construction and Facilities Management
Dwg. of
Department of Veterans Affairs
C
D
E
F
B
A
C
D
E
B
F
2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
VA FORM 08-6231
FULLY
SPRINKLERED
/1
9/
:0 6:
P
M
I:\ _T
S P
R ev it Lo ca l\0
7_
V A
_M ed
S ur g_ M
E P
_q ua m en kj
.r vt
4TH FLOOR MECHANICAL PIPING PLAN
5-MP104
100% CONSTRUCTION DOCUMENTS
VA Medical Center 2501 W. 22nd Street, PO Box 5046 Sioux Falls, SD 57117-5046
Acute Inpatient Med. Unit Add & Renovation
Sioux Falls VA Health Care System
BSW08/06/2012 BSW
04100857
85 123
1/8" = 1'-0"1
4TH FLOOR MECHANICAL PIPING PLAN
MARK REVISION DESCRIPTION DATE
R Record Drawings 07/27/2018
KJQ
File details come from the government source that posted it. Updated .