Mechanical Record Set - VA Med Surge 35.pdf

PDF 333 KB Posted

Attached to
J041--Chiller & Condenser Maintenance - SF Federal contract opportunity
Solicitation number
36C26324Q0595
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23

About this file

This document appears to be a set of mechanical record drawings for the 4th floor of a VA Medical Center facility. The drawings show the general layout and details of the HVAC system, including the location of air handlers, refrigerant lines, steam vents, and other mechanical components. The drawings include general notes that provide guidance on installation, coordination with other trades, and maintenance requirements.

The related federal contract opportunity is a solicitation for HVAC chiller and condenser maintenance services at the Sioux Falls VA Health Care System. This is a fixed-price contract with a base year and four one-year option periods. The procurement is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). Quotes are due by April 19, 2024 and should be emailed to the Contract Specialist. The contract will cover all labor and resources necessary to maintain the HVAC chillers and condensers at the facility.

View the file

Other files for this federal contract opportunity

Other files attached to J041--Chiller & Condenser Maintenance - SF, newest first.
File Type Posted
Solicitation 36C26324Q0595 Amendment 0001.pdf PDF
36C26324Q0595 0001_1.docx DOCX document
Mechanical Record Set - VA Med Surge 32.pdf PDF
Mechanical Record Set - VA Med Surge 42.pdf PDF
Mechanical Record Set - VA Med Surge 18.pdf PDF
Solicitation 36C26324Q0595.pdf PDF
36C26324Q0595_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RECORD DRAWING

DATE: BY:

THE ISSUANCE OF THIS RECORD DRAWING IS A

REPRESENTATION BY THE ARCHITECT/ENGINEER THAT

THE CONSTRUCTION OR ALTERATIONS OF THE BUILDING

IS IN GENERAL, AS OPPOSED TO PRECISE, CONFORMITY

WITH THE DESIGN PREPARED AND PROVIDED BY THE

ARCHITECT/ENGINEER.

GRID

1S 2S 3S 4S

2.9

E30

E36E32 E33 E34 E35

E1 E2 E3 E4

5-CU-36C5-CU-36D

5-CU-36B 5-CU-36A

5-EF-39A,

5-EF-39B

5-EF-36

1S

2.9

0S 2S 3S 4S

-1S

(8) PAIRS OF REFRIGERANT

LINES DOWN.

6" STEAM RELIEF

DN. THRU ROOF.

5-AHU-5 IN ATTIC ROOM 526D SHALL BE BALANCED DOWN

TO 2,525 CFM. CHANGE OUT STEAM CONTROL VALVE

FOR NEW VALVE TO SERVE REDUCED AIRFLOW AND CAPACITY.

RESHEAVE 5-AHU-5 AND CORRESPONDING RETURN AIR FAN

FOR REVISED CFM'S. REBALANCE OUTSIDE AIR QUANTITY.

KEYPLAN

N O

R T

H

BUILDING

REMODE

L

BUILDING

ADDITION EXISTING

BUILDING

1. MATERIALS AND EQUIPMENT SHOWN ON PLANS SHALL BE NEW AND SHALL BE

FURNISHED BY THIS CONTRACTOR UNLESS OTHERWISE INDICATED.

2. IN GENERAL, PIPING SHALL BE RUN CONCEALED IN SUSPENDED CEILING

SPACES AND IN SHAFTS PROVIDED UNLESS NOTED OR OTHERWISE

INDICATED. CERTAIN ROOMS HAVE NO SUSPENDED CEILINGS, AND PIPING IN

THESE ROOMS SHALL BE EXPOSED.

3. PIPING IS INTENDED TO BE CONCEALED IN WALLS AND PARTITIONS UNLESS

SPECIFICALLY NOTED OTHERWISE. SOME ITEMS MAY APPEAR NOT TO BE

CONCEALED DUE TO DIGITAL REGISTRATION AND ALIGNMENT ISSUES

ASSOCIATED WITH THE DUPLICATION PROCESS.

4. COOPERATE WITH THE OTHER TRADES TO AVOID ANY CONFLICTS BETWEEN

PIPING, DUCTWORK, ELECTRICAL WORK.

5. DETAILS, SCHEMATICS, DIAGRAMS, DESIGNATE GENERAL ARRANGEMENT

ONLY.

6. FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN ON

FLOOR PLANS, REFER TO ELEVATIONS, DETAILS, RISERS AND SCHEDULES.

7. THIS CONTRACTOR IS RESPONSIBLE FOR ALL SLEEVES AND/OR OPENINGS

WHERE REQUIRED TO RUN PIPES THROUGH FOUNDATIONS, FLOOR SLABS,

WALLS, BRIDGING AND BEAMS EXCEPT WHERE OTHERWISE INDICATED.

8. CONSULT REFLECTED CEILING PLAN FOR EXACT LOCATION OF SPRINKLER

HEADS, GRILLES, REGISTERS, AND DIFFUSERS.

9. CEILING ACCESS IS REQUIRED AT ALL REHEAT COILS, VALVES, FIRE

DAMPERS, MANUAL AND MOTORIZED DAMPERS LOCATED ABOVE CEILING.

CEILING ACCESS PANELS WILL BE PROVIDED UNDER THE GENERAL SECTION

OF CONSTRUCTION AND SHALL BE MINIMUM OF 24" X 24" UNLESS OTHERWISE

INDICATED. COORDINATE WITH GENERAL CONTRACTOR.

10. THERMOSTATS LOCATED AT OUTSIDE WALLS SHALL BE MOUNTED ON

INSULATED BACKING TO MINIMIZE WALL EFFECT.

11. THE CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL EXISTING

CONDITIONS AND DIMENSIONS. NOTIFY THE A/E IMMEDIATELY OF ANY

DISCREPANCIES.

12. WHERE NEW SERVICES ARE SHOWN CONNECTING TO EXISTING, VERIFY

EXACT LOCATION AND SIZE OF EXISTING.

13. EXISTING SERVICES SHALL BE MAINTAINED UNLESS OTHERWISE INDICATED.

14. ALL PIPING, FIXTURES, ETC., WHICH ARE DASHED AND/OR INDICATED BY NOTE

ON DEMOLITION PLANS SHALL BE REMOVED.

15. PIPE RUNOUT SIZES TO REHEAT COILS SHALL BE 3/4" UNLESS OTHERWISE

NOTED.

16. RECIRCULATING HOT WATER, OXYGEN, VACUUM, AIR, AND GAS SHALL BE 1/2"

UNLESS OTHERWISE INDICATED.

17. REFER TO THE SPECIFICATIONS FOR SIZING OF CONTROL VALVES.

18. WHERE MATERIAL IS INDICATED TO BE REMOVED, IT SHALL REMAIN THE

PROPERTY OF THE OWNER. THIS CONTRACTOR SHALL DISPOSE OF

MATERIAL AS DIRECTED BY THE OWNER.

19. BALANCING OF HYDRONIC SYSTEMS SHALL BE PERFORMED BY AN NEBB OR

AABC CERTIFIED TEST AND BALANCE AGENCY.

20. PIPE PENETRATIONS OF RATED WALLS AND FLOORS SHALL BE SLEEVED AND

PROPERLY FIRE SEALED.

21. PIPE PENETRATIONS OF SMOKE PARTITION WALLS SHALL BE PROPERLY

SEALED TO RESIST THE PASSAGE OF SMOKE AS REQUIRED BY THE LOCAL

AUTHORITY.

22. THE HEATING AND/OR COOLING HYDRONIC SYSTEM SHALL BE PROVIDED AND

FILLED WITH AN ANTIFREEZE GLYCOL SOLUTION (AS INDICATED ON THE

EQUIPMENT SCHEDULES) BY THE PIPING CONTRACTOR WHO SHALL BE

RESPONSIBLE FOR DETERMINING THE AMOUNT OF GLYCOL REQUIRED.

PIPING PLAN GENERAL NOTES

NOTE: NOT ALL KEYNOTES MAY BE USED ON EACH PLAN

PIPING PLAN KEYNOTES

VALVE AND CAP EXISTING MEDICAL GAS PIPING TO EXISTING HEADWALL

UNITS

2 6" RELIEF VENT UP, COORD. WITH ARCH.

NOT ALL CHANGES DONE IN THIS AREA WERE DOCUMENTED. FIELD VERIFY

CHANGES IN THIS AREA.

4 -

5 -

6 -

7 -

8 -

9 -

10 -

10/19/2018

Copyright TSP, Inc. 2012

CONSULTANTS:

Drawing Number

Drawing Title

A

TSP, Inc.

1112 N. West Ave, Sioux Falls, SD 57104 phone: (605) 336-1160 fax: (605) 336-7926 www.teamtsp.com Date Checked Drawn

Project Number

Building Number

Project Title

Location

ARCHITECTS/ ENGINEERS:

Approved: Project Director

Office of Construction and Facilities Management

Dwg. of

Department of Veterans Affairs

C

D

E

F

B

A

C

D

E

B

F

2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

VA FORM 08-6231

FULLY

SPRINKLERED

/1

9/

:0 6:

P

M

I:\ _T

S P

R ev it Lo ca l\0

7_

V A

_M ed

S ur g_ M

E P

_q ua m en kj

.r vt

4TH FLOOR MECHANICAL PIPING PLAN

5-MP104

100% CONSTRUCTION DOCUMENTS

VA Medical Center 2501 W. 22nd Street, PO Box 5046 Sioux Falls, SD 57117-5046

Acute Inpatient Med. Unit Add & Renovation

Sioux Falls VA Health Care System

BSW08/06/2012 BSW

04100857

85 123

1/8" = 1'-0"1

4TH FLOOR MECHANICAL PIPING PLAN

MARK REVISION DESCRIPTION DATE

R Record Drawings 07/27/2018

KJQ