This document appears to be a mechanical record drawing for a renovation project at the VA Medical Center in Sioux Falls, South Dakota. The drawing provides an overview of the mechanical piping systems, including the locations of air handling units, exhaust fans, chilled water and heating water piping, and other mechanical equipment. Key details include:

The related federal contract opportunity is a solicitation (RFQ) for HVAC Chiller and Condenser Maintenance services at the Sioux Falls VA Health Care System. This is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The period of performance is one base year from 07/01/2024 to 06/30/2025, with four one-year option periods. Quotes are due by 04/19/2024. The NAICS code is 811310 with a $12.5 million size standard. Interested SDVOSBs must be registered in SAM.

View the file

Other files for this federal contract opportunity

Other files attached to J041--Chiller & Condenser Maintenance - SF, newest first.
File Type Posted
Solicitation 36C26324Q0595 Amendment 0001.pdf PDF
36C26324Q0595 0001_1.docx DOCX document
Mechanical Record Set - VA Med Surge 35.pdf PDF
Mechanical Record Set - VA Med Surge 18.pdf PDF
Solicitation 36C26324Q0595.pdf PDF
Mechanical Record Set - VA Med Surge 42.pdf PDF
36C26324Q0595_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

DN

RECORD DRAWING

DATE: BY:

THE ISSUANCE OF THIS RECORD DRAWING IS A

REPRESENTATION BY THE ARCHITECT/ENGINEER THAT

THE CONSTRUCTION OR ALTERATIONS OF THE BUILDING

IS IN GENERAL, AS OPPOSED TO PRECISE, CONFORMITY

WITH THE DESIGN PREPARED AND PROVIDED BY THE

ARCHITECT/ENGINEER.

GRID

1S 2S 3S 4S

2.9

E30

E36E32 E33 E34 E35

E1 E2 E3 E4

5-AHU9

5-EF11

5-ERC5

5-UH3T

C W

R

G H

R

G

H S

/4

M P

S

1" HWR1" HWS

4" CWS

4" CWR

3/4" MPR

1 1/4" MPS

4" GHR

4" GHS

5-ET4

5-AS15-P15

5"MPS, 1 1/2"MPR, 4"CWS,

4"CWR, 4:GHR, 4"GHS DN

THRU FLOOR

1"HWS, 1"HWR DN

THRU FLOOR

5-PH37

5-PH36

C W

S

2" 2"

CWS

CWR

HWSHWR

GHS GHR 2"

2"

3" GHR

3" GHS

5-RF-37

5-CH-1

5-RF-36

5-ERC-36E

5-ERC-37E

5-PHR-37

5-PHR-36

5-AHU-36

5-AHU-37

5-PGH37

5-PGH36

5-PC37

5-PC36

3" GHS UP

3" GHR UP

4" CWS UP

4" CWR UP

4" HWR UP

5-AHU

1C

5-MH505

1F

5-MH505

7F

5-MH505

/2

M P

R

4" 4"

1 1/2" GHR

4"

1 1/2" GHS

6" 6"

C W

R

6" CWS

1S

2.9

0S 2S 3S 4S

-1S

3/4" HWS/HWR UP

BARE FINNED TUBE

@ 12'-0".

T

EXISTING

EXISTING

2 1/2" LPR DOWN

IN CHASE

5-MH401

1F

VALVE AND

CAPPED PIPES FOR

TEMPORARY

HEATING SYSTEM

VALVE AND

CAPPED PIPES FOR

TEMPORARY

COOLING SYSTEM

C1

5-MH506

F1

5-MH506

ALL WORK IN LAB AND DENTAL AREAS

TO BE PERFORMED AFTER HOURS,

BETWEEN 6PM-6AM.

CEMLINE V25CCP-3x2-D-65

STEAM CONDENSATE

RECEIVER TANK, NON-ELECTRIC

CONDENSATE PUMPS

F5

5-MH506

1. MATERIALS AND EQUIPMENT SHOWN ON PLANS SHALL BE NEW AND SHALL BE

FURNISHED BY THIS CONTRACTOR UNLESS OTHERWISE INDICATED.

2. IN GENERAL, PIPING SHALL BE RUN CONCEALED IN SUSPENDED CEILING

SPACES AND IN SHAFTS PROVIDED UNLESS NOTED OR OTHERWISE

INDICATED. CERTAIN ROOMS HAVE NO SUSPENDED CEILINGS, AND PIPING IN

THESE ROOMS SHALL BE EXPOSED.

3. PIPING IS INTENDED TO BE CONCEALED IN WALLS AND PARTITIONS UNLESS

SPECIFICALLY NOTED OTHERWISE. SOME ITEMS MAY APPEAR NOT TO BE

CONCEALED DUE TO DIGITAL REGISTRATION AND ALIGNMENT ISSUES

ASSOCIATED WITH THE DUPLICATION PROCESS.

4. COOPERATE WITH THE OTHER TRADES TO AVOID ANY CONFLICTS BETWEEN

PIPING, DUCTWORK, ELECTRICAL WORK.

5. DETAILS, SCHEMATICS, DIAGRAMS, DESIGNATE GENERAL ARRANGEMENT

ONLY.

6. FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN ON

FLOOR PLANS, REFER TO ELEVATIONS, DETAILS, RISERS AND SCHEDULES.

7. THIS CONTRACTOR IS RESPONSIBLE FOR ALL SLEEVES AND/OR OPENINGS

WHERE REQUIRED TO RUN PIPES THROUGH FOUNDATIONS, FLOOR SLABS,

WALLS, BRIDGING AND BEAMS EXCEPT WHERE OTHERWISE INDICATED.

8. CONSULT REFLECTED CEILING PLAN FOR EXACT LOCATION OF SPRINKLER

HEADS, GRILLES, REGISTERS, AND DIFFUSERS.

9. CEILING ACCESS IS REQUIRED AT ALL REHEAT COILS, VALVES, FIRE

DAMPERS, MANUAL AND MOTORIZED DAMPERS LOCATED ABOVE CEILING.

CEILING ACCESS PANELS WILL BE PROVIDED UNDER THE GENERAL SECTION

OF CONSTRUCTION AND SHALL BE MINIMUM OF 24" X 24" UNLESS OTHERWISE

INDICATED. COORDINATE WITH GENERAL CONTRACTOR.

10. THERMOSTATS LOCATED AT OUTSIDE WALLS SHALL BE MOUNTED ON

INSULATED BACKING TO MINIMIZE WALL EFFECT.

11. THE CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL EXISTING

CONDITIONS AND DIMENSIONS. NOTIFY THE A/E IMMEDIATELY OF ANY

DISCREPANCIES.

12. WHERE NEW SERVICES ARE SHOWN CONNECTING TO EXISTING, VERIFY

EXACT LOCATION AND SIZE OF EXISTING.

13. EXISTING SERVICES SHALL BE MAINTAINED UNLESS OTHERWISE INDICATED.

14. ALL PIPING, FIXTURES, ETC., WHICH ARE DASHED AND/OR INDICATED BY NOTE

ON DEMOLITION PLANS SHALL BE REMOVED.

15. PIPE RUNOUT SIZES TO REHEAT COILS SHALL BE 3/4" UNLESS OTHERWISE

NOTED.

16. RECIRCULATING HOT WATER, OXYGEN, VACUUM, AIR, AND GAS SHALL BE 1/2"

UNLESS OTHERWISE INDICATED.

17. REFER TO THE SPECIFICATIONS FOR SIZING OF CONTROL VALVES.

18. WHERE MATERIAL IS INDICATED TO BE REMOVED, IT SHALL REMAIN THE

PROPERTY OF THE OWNER. THIS CONTRACTOR SHALL DISPOSE OF

MATERIAL AS DIRECTED BY THE OWNER.

19. BALANCING OF HYDRONIC SYSTEMS SHALL BE PERFORMED BY AN NEBB OR

AABC CERTIFIED TEST AND BALANCE AGENCY.

20. PIPE PENETRATIONS OF RATED WALLS AND FLOORS SHALL BE SLEEVED AND

PROPERLY FIRE SEALED.

21. PIPE PENETRATIONS OF SMOKE PARTITION WALLS SHALL BE PROPERLY

SEALED TO RESIST THE PASSAGE OF SMOKE AS REQUIRED BY THE LOCAL

AUTHORITY.

22. THE HEATING AND/OR COOLING HYDRONIC SYSTEM SHALL BE PROVIDED AND

FILLED WITH AN ANTIFREEZE GLYCOL SOLUTION (AS INDICATED ON THE

EQUIPMENT SCHEDULES) BY THE PIPING CONTRACTOR WHO SHALL BE

RESPONSIBLE FOR DETERMINING THE AMOUNT OF GLYCOL REQUIRED.

PIPING PLAN GENERAL NOTES

NOTE: NOT ALL KEYNOTES MAY BE USED ON EACH PLAN

PIPING PLAN KEYNOTES

VALVE AND CAP EXISTING MEDICAL GAS PIPING TO EXISTING HEADWALL

UNITS

2 6" RELIEF VENT UP, COORD. WITH ARCH.

NOT ALL CHANGES DONE IN THIS AREA WERE DOCUMENTED. FIELD VERIFY

CHANGES IN THIS AREA.

4 -

5 -

6 -

7 -

8 -

9 -

10 -

KEYPLAN

N O

R T

H

BUILDING

REMODE

L

BUILDING

ADDITION EXISTING

BUILDING

10/19/2018

Copyright TSP, Inc. 2012

CONSULTANTS:

Drawing Number

Drawing Title

A

TSP, Inc.

1112 N. West Ave, Sioux Falls, SD 57104 phone: (605) 336-1160 fax: (605) 336-7926 www.teamtsp.com Date Checked Drawn

Project Number

Building Number

Project Title

Location

ARCHITECTS/ ENGINEERS:

Approved: Project Director

Office of Construction and Facilities Management

Dwg. of

Department of Veterans Affairs

C

D

E

F

B

A

C

D

E

B

F

2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

VA FORM 08-6231

FULLY

SPRINKLERED

/1

9/

:0 4:

P

M

I:\ _T

S P

R ev it Lo ca l\0

7_

V A

_M ed

S ur g_ M

E P

_q ua m en kj

.r vt

1ST FLOOR MECHANICAL PIPING PLAN

5-MP101

100% CONSTRUCTION DOCUMENTS

VA Medical Center 2501 W. 22nd Street, PO Box 5046 Sioux Falls, SD 57117-5046

Acute Inpatient Med. Unit Add & Renovation

Sioux Falls VA Health Care System

JTC08/06/2012 BSW

04100857

82 123

1/8" = 1'-0"1F

1ST FLOOR MECHANICAL PIPING PLAN

MARK REVISION DESCRIPTION DATE

R Record Drawings 07/27/2018

RDND Record Drawings - No Documentation Changes 07/27/2018