Material Submittals BVGM252001.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Building 1 HVAC Repair
- Solicitation number
- W50S8Q26QA001
- Issued by
-
Department of the Army National Guard
About this file
This is a Material Submittals Schedule (AF Form 66 Modified) for the Building 1 HVAC Repair project at Blue Ash Air National Guard Base under contract BVGM252001. The schedule specifies the documentation and submittals required from the contractor, with most items due within 10 days after the Notice to Proceed (NTP) date. The contractor must submit shop drawings, samples, manufacturer's recommendations, warranties, catalog data, and Material Safety Data (MSD) sheets for various HVAC components and related equipment.
The required submittals include: a Progress Schedule (AF Form 3064), Progress Reports (OANG Form 3065), existing condition photographs prior to work commencement, a crane plan, specifications for the rooftop unit (RTU), DDC headend computer, DDC controllers, digital thermostats, and roof access ladder. The schedule includes columns for tracking receipt dates, civil engineering review dates, suspension dates, follow-up dates, contractor notifications, resubmittals, and final approvals with remarks sections for approved or disapproved status. This document serves as the project engineer's tool for managing contractor submittals and ensuring compliance with project requirements throughout the repair scope.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF 3000
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| ( Form 66 Modified) | SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||||||
| (Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| BVGM252001 | Bldg 1 Repair HVAC | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | MSD SHEET | OPERATING INSTRUCTIONS | Other |
SUBMITTAL
REQUIRED DATES DUE
BY__10__
DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||
| APPROVAL | REMARKS | ||||||
| APPROVED | DISAPPROVED | ||||||
| 1 | Progress Schedule | ||||||
| (AF Form 3064) | 1 | ||||||
| 2 | Progress Reports |
(OANG Form 3065)
| 3 | Existing Condition Photos | |||||||
| (Prior to Beginning Work) | 1 | |||||||
| 5 | Crane Plan | 1 | ||||||
| 6 | Rooftop Unit | 1 | 1 | 1 | 1 | |||
| 7 | DDC Headend Computer | 1 | ||||||
| 9 | DDC Controllers | 1 | ||||||
| 11 | Digital Thermostats | 1 | ||||||
| 12 | Roof Access Ladder | 1 | ||||||
| 13 | ||||||||
| 14 | ||||||||
| 15 | ||||||||
| 16 | ||||||||
| 17 | ||||||||
| 18 |
File details come from the government source that posted it. Updated .